1. Energy efficiency in urban areas
The project Aspern Smart City Research
Smart City Expo World Congress
Barcelona, 14. November 2017
Oliver Juli (ASCR GmbH & Co KG, Project Management)
2. One of Europe’s largest
city development projects
• Overall area 2,4 mio. m²
• > 20.000 people
• Up to 20.000 work places
• 5,000 mio € invest
3. ASCR – Shareholder structure
44,1 % 20,0 %29,95 % 4,66 % 1,29 %
Overall budget w/o funding: 38,5 mio. €
Infrastructure planning and construction ~ 10 mio. €
Operation and maintenance ~ 6,5 mio. €
Research and development ~ 14 mio. €
ASCR staff ~ 5,5 mio. €
Operating costs (marketing, office,…) 2,5 mio. €
4. ASCR - Testbed Smart Building
D12 – EBG – 213 flats
• 7 heat pump systems (800 kWth)
• Solarthermal (90kWth) + Hybrid (60 kWpth)
• PV (20 kWp) + Hybrid (16 kWpel)
• Hot water storage (6 x 2000 l)
• Soil storage (40 MWhth)
• El. storage (2 kWh)
• Smart building management
• Smart home automation (111 households)
D18 – BIG – School campus
• 2 heat pump systems (510 kWth)
• Solarthermal (90 kWth)
• Hot water storage with heating elements
(2 x 35 kW)
• PV: 29,9 kWp (∑ 58 kWp)
• Smart building management
D5b – GPA – Students home of residence
• PV (221 kWp)
• El. storage (120 kWh)
• Hot water storage with heating elements (2x8 kW)
• Smart building management
5. ASCR - Testbeds Smart Grid & Smart ICT
Smart Grid Testbed
• 12 prototypes of smart network stations
• 24 transformers of differenet types
• > 100 grid monitoring devices
• > 500 smart meter
• 5 el. storage systems (> 120 kWh)
Smart ICT Testbed
• Central data warehouse: Teradata DM670C
• Hyper-V environment with 25 virtual systems
6. ASCR R&D-program → Use Cases
Large scale implementation for urban energy research
Building
flexibilities
Smart Grid Services Smart Building Services
Smart ICT
Infrastructure &
Data Warehouse
Benchmarks
Strategic grid
planning
Grid load forecast
Operational grid
planning
LV grid
management
Grid alarm
handling
Smart Meter for
grid monitoring
Self consumption
optimization
Smart User
interaction
Predictive
maintenance
UC07
UC11UC06
UC04UC03
UC05
UC02UC01
UC10UC09UC08