PROJECT CURING
2
Project Charter
Communication
Objective:
To improve the Curing performance and features to make process more reliable with conformance and
durability through better service, aesthetics and to ensure its sustainability.
D M A I C
Performance:
The performance of Curing can be improved by adopting the following steps:
1- Production Target on daily basis.
2- Cost reduction can be achieved by enhancing output, on-time preventive maintenance, control
fabric mixing and wastage control.
3- The best quality can be achieved when we have no stoppages, follow 5S theory and motivation of
workers .
4-Follow the sequence of program of ready to cure fabric according to FIFO method.
5- Should maintain record keeping.
DEFINE PHASE
1-Travel cards are not properly attached with batchers and trolleys.
Challenges faced in curing are listed below:
2- Mix fabric
3-Provide unidentified fabric to Finishing & washing.
4-Mis-management in handling of batchers and trolleys.
5-House keeping issue.
6-Registers are not properly maintained.
7-Overlapping of curing fabric on RFP fabric.
8- Different Width
MEASURE
- Do not have receiving procedure of fabric from Previous department
-Do not have production target on daily basis.
-Workers are not properly trained.
-Same number on two different batchers.
ANALYZE
TRACIBILITY OF ACTIVITIES THROUGH PRIMAVERA P6
IMPROVE
RECEIVED BATCHERS WITH TRAVEL CARDS
NO MIX FABRIC
RECEIVED & SEND STITCHED FABRIC
MANAGEMENT OF BATCHERS & TROLLEYS
HOUSE KEEPING
PROPER RECORD KEEPING
SAME WIDTH
PRODUCTION TARGET OF CURING
RECEIVE PRODUCTION TARGET ON DAILY BASIS
FABRIC RECEIVING FORM FROM PRINTING DEPARTMENT
TRAINING OF STAFF
Shift: A, B, C
• We provided training about the nature of working and how to improve
their skills.
• Trained them how to work in a team and organized way.
• Provided them the knowledge of housekeeping and motivated them to
work in a neat and clean environment.
• Arranged lectures on safety and made them understand how much safety
is important.
30th May, 2015
1st June, 2015
18th June, 2015
15th June, 2015 ASSESSMENT THROUGH
EVALUATION FORM
 Provided trainings to curing department of different shifts and assessed
them through evaluation form.
5th June, 2015 MAINTENANCE OF TROLLEYS
 Most of the trolleys were without wheels and some were in a very bad
condition. List of the repaired trolleys are given below.
8th June, 2015 ARRANGEMENT OF WIRES
 It was observed that Electrical wires on Arioli were exposed to
environment. Then they were covered properly by taking help from
maintenance department.
Before After
19th June,2015 PROBLEM IN GUIDER OF
ARIOLI
• Maintenance of guider.
BEFORE AFTER
5S IMPLEMENTATION
• Implementation of 5S is our next target:
SORT (July 11 – Aug 11):
Remove unnecessary items and dispose them properly
Make work easier by eliminating obstacles
Reduce chance of being disturbed with unnecessary items
Segregate unwanted material from the workplace
Define a red-tagged area to keep those unnecessary items
SET (Aug 12 – Sep 12)
 Arrange all necessary items so they can be easily selected for
use
 Make it easy to find and pick up necessary items
 All above work should be done on regular basis
SHINE (Sep 14- Sep 30)
 Clean workplace completely
 Prevent machinery and equipment deterioration
 Keep workplace safe and easy to work
 Need fully skilled supervisor for checking on regular basis
STANDARDIZE (Oct 01 – Oct 15)
 Maintain standards of housekeeping and workplace
organization at all times.
 Maintain orderliness. Maintain everything in order and
according to its standard. Everything in its right place.
 Every process has a standard.
SUSTAIN (Oct 16- cont.)
 Perform regular audits
 Training and Discipline
 Training is goal oriented process.
 Maintenance
 Feedback & Evaluation form.
CONTROL
RECEIVING PROCEDURE &
1st June, 2015 PRODUCTION TARGET
 Implemented procedure of fabric receiving report from Printing Department.
 Implemented production target report on daily basis in Curing department to
monitor the progress of Curing Department.
6th June, 2015 FEEDBACK FORM
 Developed feedback form and provided it to Finishing ,Kuster washing and
Curing department.
EVALUATION FORM
• Assessed the performance of workers through evaluation form.
25th June,2015 PROVIDE STOPPAGE FORM
• To obtain the zero downtime of breakdowns and other stoppages, developed
stoppage form .
Phase Complete Date
Define 18/05/2015
Measure 19/05/2015
Analyze 20/05/2015
Improve 01/06/2015
Control 06/06/2015
Approved
Status:
On track At Risk Delayed
 Restriction of fabric receiving without
Travel cards
 Control of Mixed Fabric from printing and
curing .
.Optimize Sample testing procedure.
 Implementation of proper receiving
procedure of printed fabric
Controlling of unidentified fabric from
Printing and Curing.
Prepare KPI
House Keeping
Proper handling of Batchers and trolleys
Training of workers on daily basis
Stoppage Reduction
Maintenance related downtime
5S Implementation
Safety shoes and Uniform
Project Plan Projected Benefits
Better performance
More efficient working
Wastage control
Cost Reduction
Quality improvement
Project Status
ACHIEVEMENTS
 Highest production.
 Zero downtime of Trolley waiting
 Zero downtime of Batchers waiting.
 Reduction of Selvedge cut fault by avoiding fabric mixing.
 Trolleys repaired
 Identified and Stitched fabric
 Better House keeping through 5S.
 Stoppage Reduction
 Feed back & Improvement
 Training and Evaluation
DMAIC- Communication - Curing new

More Related Content

What's hot

Resume -Ganesh
Resume -GaneshResume -Ganesh
Resume -GaneshGanesh .E
 
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRAT
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRATBRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRAT
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRATPriyanka kushawaha
 
Supervises and trains 30 hourly employees and 1 salaried supervisor in a 250
Supervises and trains 30 hourly employees and 1 salaried supervisor in a 250Supervises and trains 30 hourly employees and 1 salaried supervisor in a 250
Supervises and trains 30 hourly employees and 1 salaried supervisor in a 250Chris Pearson
 
CURRICULUM VITAE - Thoala
CURRICULUM VITAE - ThoalaCURRICULUM VITAE - Thoala
CURRICULUM VITAE - ThoalaThabo Thoala
 
Imran Ali Resume
Imran Ali ResumeImran Ali Resume
Imran Ali Resumeaiali
 
thilanka ranatunga cv (new) (1)
thilanka ranatunga cv (new) (1)thilanka ranatunga cv (new) (1)
thilanka ranatunga cv (new) (1)Thilanka Ranatunga
 
Brittany Jenkins Manufacturing_resume
Brittany Jenkins Manufacturing_resumeBrittany Jenkins Manufacturing_resume
Brittany Jenkins Manufacturing_resumeBrittany Jenkins
 
Hesham salah hasan el zayat
Hesham salah hasan el zayatHesham salah hasan el zayat
Hesham salah hasan el zayatHesham Salah
 
Resume Patrick New Rev
Resume Patrick New RevResume Patrick New Rev
Resume Patrick New RevPatrick Geiger
 
Professional mori 20160415 package
Professional mori 20160415 packageProfessional mori 20160415 package
Professional mori 20160415 packageHiroyuki Mori
 
Professional mori 20160531 project&operation
Professional mori 20160531 project&operationProfessional mori 20160531 project&operation
Professional mori 20160531 project&operationHiroyuki Mori
 

What's hot (20)

Resume -Ganesh
Resume -GaneshResume -Ganesh
Resume -Ganesh
 
Softwood New Profile
Softwood New ProfileSoftwood New Profile
Softwood New Profile
 
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRAT
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRATBRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRAT
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRAT
 
Supervises and trains 30 hourly employees and 1 salaried supervisor in a 250
Supervises and trains 30 hourly employees and 1 salaried supervisor in a 250Supervises and trains 30 hourly employees and 1 salaried supervisor in a 250
Supervises and trains 30 hourly employees and 1 salaried supervisor in a 250
 
Brittney-Morgan-3
Brittney-Morgan-3Brittney-Morgan-3
Brittney-Morgan-3
 
CV of DP Saayman
CV of DP SaaymanCV of DP Saayman
CV of DP Saayman
 
CURRICULUM VITAE - Thoala
CURRICULUM VITAE - ThoalaCURRICULUM VITAE - Thoala
CURRICULUM VITAE - Thoala
 
mohamed elsayed
mohamed elsayedmohamed elsayed
mohamed elsayed
 
Imran Ali Resume
Imran Ali ResumeImran Ali Resume
Imran Ali Resume
 
WAEL ENGLISH
WAEL ENGLISHWAEL ENGLISH
WAEL ENGLISH
 
thilanka ranatunga cv (new) (1)
thilanka ranatunga cv (new) (1)thilanka ranatunga cv (new) (1)
thilanka ranatunga cv (new) (1)
 
WILFREDO GONZALES CV
WILFREDO GONZALES CVWILFREDO GONZALES CV
WILFREDO GONZALES CV
 
Brittany Jenkins Manufacturing_resume
Brittany Jenkins Manufacturing_resumeBrittany Jenkins Manufacturing_resume
Brittany Jenkins Manufacturing_resume
 
Hesham salah hasan el zayat
Hesham salah hasan el zayatHesham salah hasan el zayat
Hesham salah hasan el zayat
 
Resume Patrick New Rev
Resume Patrick New RevResume Patrick New Rev
Resume Patrick New Rev
 
Professional mori 20160415 package
Professional mori 20160415 packageProfessional mori 20160415 package
Professional mori 20160415 package
 
Professional mori 20160531 project&operation
Professional mori 20160531 project&operationProfessional mori 20160531 project&operation
Professional mori 20160531 project&operation
 
joe c.v
joe c.vjoe c.v
joe c.v
 
Richard's Resume
Richard's ResumeRichard's Resume
Richard's Resume
 
New Resume_Babu
New Resume_BabuNew Resume_Babu
New Resume_Babu
 

Viewers also liked

Interferogram Filtering Using Gaussians Scale Mixtures in Steerable Wavelet D...
Interferogram Filtering Using Gaussians Scale Mixtures in Steerable Wavelet D...Interferogram Filtering Using Gaussians Scale Mixtures in Steerable Wavelet D...
Interferogram Filtering Using Gaussians Scale Mixtures in Steerable Wavelet D...CSCJournals
 
The HIP Investor: Making a better profit by building a better world
The HIP Investor: Making a better profit by building a better worldThe HIP Investor: Making a better profit by building a better world
The HIP Investor: Making a better profit by building a better worldSasin SEC
 
Pitch Workshop / Silicon Valley War Stories @ CEMS / WU Wien 5/3/13
Pitch Workshop / Silicon Valley War Stories @ CEMS / WU Wien 5/3/13Pitch Workshop / Silicon Valley War Stories @ CEMS / WU Wien 5/3/13
Pitch Workshop / Silicon Valley War Stories @ CEMS / WU Wien 5/3/13Hansjoerg Posch
 
CSR in the Hospitality Industry: Chiva-Som International Health Resort Co., Ltd.
CSR in the Hospitality Industry: Chiva-Som International Health Resort Co., Ltd.CSR in the Hospitality Industry: Chiva-Som International Health Resort Co., Ltd.
CSR in the Hospitality Industry: Chiva-Som International Health Resort Co., Ltd.Sasin SEC
 
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay""Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"Remedy Geotechnics Ltd
 
Usage of-ict-in-every-day-life2852
Usage of-ict-in-every-day-life2852Usage of-ict-in-every-day-life2852
Usage of-ict-in-every-day-life2852Lukhele Yolanda
 
Introduction to Node.JS Express
Introduction to Node.JS ExpressIntroduction to Node.JS Express
Introduction to Node.JS ExpressEueung Mulyana
 
Managing Patient SatLEADfor4-25-13
Managing Patient SatLEADfor4-25-13Managing Patient SatLEADfor4-25-13
Managing Patient SatLEADfor4-25-13alfred lopez
 
RevoluçãO Industrial, Agricultura,Demografia E IndúStria
RevoluçãO Industrial, Agricultura,Demografia E IndúStriaRevoluçãO Industrial, Agricultura,Demografia E IndúStria
RevoluçãO Industrial, Agricultura,Demografia E IndúStriaSílvia Mendonça
 
Maintenance, Re-engineering &Reverse Engineering in Software Engineering
Maintenance,Re-engineering &Reverse Engineering in Software EngineeringMaintenance,Re-engineering &Reverse Engineering in Software Engineering
Maintenance, Re-engineering &Reverse Engineering in Software EngineeringManish Kumar
 
Daughters of erin piano+violin
Daughters of erin piano+violinDaughters of erin piano+violin
Daughters of erin piano+violinSuni Aguado
 
Column detailing, Session 14-15 (DUET)
Column detailing, Session 14-15 (DUET)Column detailing, Session 14-15 (DUET)
Column detailing, Session 14-15 (DUET)swatapriya
 
In situ conservation
In situ conservationIn situ conservation
In situ conservationSukriti Singh
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing SystemSalil Vaidya
 
Statistical Methods for Quality
Statistical Methods for QualityStatistical Methods for Quality
Statistical Methods for QualityEmilio L. Cano
 

Viewers also liked (18)

Interferogram Filtering Using Gaussians Scale Mixtures in Steerable Wavelet D...
Interferogram Filtering Using Gaussians Scale Mixtures in Steerable Wavelet D...Interferogram Filtering Using Gaussians Scale Mixtures in Steerable Wavelet D...
Interferogram Filtering Using Gaussians Scale Mixtures in Steerable Wavelet D...
 
The HIP Investor: Making a better profit by building a better world
The HIP Investor: Making a better profit by building a better worldThe HIP Investor: Making a better profit by building a better world
The HIP Investor: Making a better profit by building a better world
 
Pitch Workshop / Silicon Valley War Stories @ CEMS / WU Wien 5/3/13
Pitch Workshop / Silicon Valley War Stories @ CEMS / WU Wien 5/3/13Pitch Workshop / Silicon Valley War Stories @ CEMS / WU Wien 5/3/13
Pitch Workshop / Silicon Valley War Stories @ CEMS / WU Wien 5/3/13
 
CSR in the Hospitality Industry: Chiva-Som International Health Resort Co., Ltd.
CSR in the Hospitality Industry: Chiva-Som International Health Resort Co., Ltd.CSR in the Hospitality Industry: Chiva-Som International Health Resort Co., Ltd.
CSR in the Hospitality Industry: Chiva-Som International Health Resort Co., Ltd.
 
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay""Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
"Observed Installation Effects of Vibro Replacement Stone Columns in Soft Clay"
 
Usage of-ict-in-every-day-life2852
Usage of-ict-in-every-day-life2852Usage of-ict-in-every-day-life2852
Usage of-ict-in-every-day-life2852
 
Francis turbine
Francis turbineFrancis turbine
Francis turbine
 
Das basics
Das basicsDas basics
Das basics
 
Introduction to Node.JS Express
Introduction to Node.JS ExpressIntroduction to Node.JS Express
Introduction to Node.JS Express
 
Managing Patient SatLEADfor4-25-13
Managing Patient SatLEADfor4-25-13Managing Patient SatLEADfor4-25-13
Managing Patient SatLEADfor4-25-13
 
RevoluçãO Industrial, Agricultura,Demografia E IndúStria
RevoluçãO Industrial, Agricultura,Demografia E IndúStriaRevoluçãO Industrial, Agricultura,Demografia E IndúStria
RevoluçãO Industrial, Agricultura,Demografia E IndúStria
 
Maintenance, Re-engineering &Reverse Engineering in Software Engineering
Maintenance,Re-engineering &Reverse Engineering in Software EngineeringMaintenance,Re-engineering &Reverse Engineering in Software Engineering
Maintenance, Re-engineering &Reverse Engineering in Software Engineering
 
Daughters of erin piano+violin
Daughters of erin piano+violinDaughters of erin piano+violin
Daughters of erin piano+violin
 
Column detailing, Session 14-15 (DUET)
Column detailing, Session 14-15 (DUET)Column detailing, Session 14-15 (DUET)
Column detailing, Session 14-15 (DUET)
 
In situ conservation
In situ conservationIn situ conservation
In situ conservation
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
Statistical Methods for Quality
Statistical Methods for QualityStatistical Methods for Quality
Statistical Methods for Quality
 
Blood pressure
Blood pressure Blood pressure
Blood pressure
 

Similar to DMAIC- Communication - Curing new

autonomous-maintenance-training-pack.pptx
autonomous-maintenance-training-pack.pptxautonomous-maintenance-training-pack.pptx
autonomous-maintenance-training-pack.pptxssuser6dba3d
 
Total quality management
Total quality managementTotal quality management
Total quality managementAanand Gajjar
 
Technical compliance requirement PPT.
Technical compliance requirement PPT.Technical compliance requirement PPT.
Technical compliance requirement PPT.md.najmul huda hemel
 
5_6055567037369942224.pdf
5_6055567037369942224.pdf5_6055567037369942224.pdf
5_6055567037369942224.pdfJismithRaj
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity MaintenanceGohelYash1
 
BUI VAN THIEU - November-2015
BUI VAN THIEU - November-2015BUI VAN THIEU - November-2015
BUI VAN THIEU - November-2015Thieu Bui Van
 
Bui van thieu november-2015
Bui van thieu   november-2015Bui van thieu   november-2015
Bui van thieu november-2015Thieu Bui Van
 
2018-11-141Project ManagementClass – 10Project Q
2018-11-141Project ManagementClass – 10Project Q2018-11-141Project ManagementClass – 10Project Q
2018-11-141Project ManagementClass – 10Project Qcargillfilberto
 
Lean Production POM.pptx
Lean Production POM.pptxLean Production POM.pptx
Lean Production POM.pptxSaranshGera2
 
Quality Assurance Services, Inc.
Quality Assurance Services, Inc.Quality Assurance Services, Inc.
Quality Assurance Services, Inc.William Lenn Coffey
 
Thennarasu n.resume.12 l_19.02.16
Thennarasu n.resume.12 l_19.02.16Thennarasu n.resume.12 l_19.02.16
Thennarasu n.resume.12 l_19.02.16Thennarasu G
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceAakashGT
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)Shreya Chaudhary
 

Similar to DMAIC- Communication - Curing new (20)

tpm presentation
tpm presentationtpm presentation
tpm presentation
 
5 s awareness icst
5 s awareness  icst5 s awareness  icst
5 s awareness icst
 
kka 110316
kka 110316kka 110316
kka 110316
 
sudath
sudath sudath
sudath
 
CV - FRANCISCO DOMINGUEZ - JULY 2018
CV - FRANCISCO DOMINGUEZ - JULY 2018CV - FRANCISCO DOMINGUEZ - JULY 2018
CV - FRANCISCO DOMINGUEZ - JULY 2018
 
autonomous-maintenance-training-pack.pptx
autonomous-maintenance-training-pack.pptxautonomous-maintenance-training-pack.pptx
autonomous-maintenance-training-pack.pptx
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Technical compliance requirement PPT.
Technical compliance requirement PPT.Technical compliance requirement PPT.
Technical compliance requirement PPT.
 
5_6055567037369942224.pdf
5_6055567037369942224.pdf5_6055567037369942224.pdf
5_6055567037369942224.pdf
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
BUI VAN THIEU - November-2015
BUI VAN THIEU - November-2015BUI VAN THIEU - November-2015
BUI VAN THIEU - November-2015
 
Bui van thieu november-2015
Bui van thieu   november-2015Bui van thieu   november-2015
Bui van thieu november-2015
 
2018-11-141Project ManagementClass – 10Project Q
2018-11-141Project ManagementClass – 10Project Q2018-11-141Project ManagementClass – 10Project Q
2018-11-141Project ManagementClass – 10Project Q
 
Lean Production POM.pptx
Lean Production POM.pptxLean Production POM.pptx
Lean Production POM.pptx
 
Quality Assurance Services, Inc.
Quality Assurance Services, Inc.Quality Assurance Services, Inc.
Quality Assurance Services, Inc.
 
Thennarasu n.resume.12 l_19.02.16
Thennarasu n.resume.12 l_19.02.16Thennarasu n.resume.12 l_19.02.16
Thennarasu n.resume.12 l_19.02.16
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Apparel Merchandising
Apparel MerchandisingApparel Merchandising
Apparel Merchandising
 
Applying 5S Principles - October 2015
Applying 5S Principles - October 2015Applying 5S Principles - October 2015
Applying 5S Principles - October 2015
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 

DMAIC- Communication - Curing new

  • 2. 2 Project Charter Communication Objective: To improve the Curing performance and features to make process more reliable with conformance and durability through better service, aesthetics and to ensure its sustainability. D M A I C Performance: The performance of Curing can be improved by adopting the following steps: 1- Production Target on daily basis. 2- Cost reduction can be achieved by enhancing output, on-time preventive maintenance, control fabric mixing and wastage control. 3- The best quality can be achieved when we have no stoppages, follow 5S theory and motivation of workers . 4-Follow the sequence of program of ready to cure fabric according to FIFO method. 5- Should maintain record keeping.
  • 4. 1-Travel cards are not properly attached with batchers and trolleys. Challenges faced in curing are listed below: 2- Mix fabric 3-Provide unidentified fabric to Finishing & washing. 4-Mis-management in handling of batchers and trolleys. 5-House keeping issue. 6-Registers are not properly maintained. 7-Overlapping of curing fabric on RFP fabric. 8- Different Width
  • 6. - Do not have receiving procedure of fabric from Previous department -Do not have production target on daily basis. -Workers are not properly trained. -Same number on two different batchers.
  • 8.
  • 9.
  • 10. TRACIBILITY OF ACTIVITIES THROUGH PRIMAVERA P6
  • 12. RECEIVED BATCHERS WITH TRAVEL CARDS NO MIX FABRIC RECEIVED & SEND STITCHED FABRIC MANAGEMENT OF BATCHERS & TROLLEYS HOUSE KEEPING PROPER RECORD KEEPING SAME WIDTH PRODUCTION TARGET OF CURING RECEIVE PRODUCTION TARGET ON DAILY BASIS FABRIC RECEIVING FORM FROM PRINTING DEPARTMENT
  • 13. TRAINING OF STAFF Shift: A, B, C • We provided training about the nature of working and how to improve their skills. • Trained them how to work in a team and organized way. • Provided them the knowledge of housekeeping and motivated them to work in a neat and clean environment. • Arranged lectures on safety and made them understand how much safety is important. 30th May, 2015 1st June, 2015 18th June, 2015
  • 14. 15th June, 2015 ASSESSMENT THROUGH EVALUATION FORM  Provided trainings to curing department of different shifts and assessed them through evaluation form.
  • 15. 5th June, 2015 MAINTENANCE OF TROLLEYS  Most of the trolleys were without wheels and some were in a very bad condition. List of the repaired trolleys are given below.
  • 16. 8th June, 2015 ARRANGEMENT OF WIRES  It was observed that Electrical wires on Arioli were exposed to environment. Then they were covered properly by taking help from maintenance department. Before After
  • 17. 19th June,2015 PROBLEM IN GUIDER OF ARIOLI • Maintenance of guider. BEFORE AFTER
  • 18. 5S IMPLEMENTATION • Implementation of 5S is our next target: SORT (July 11 – Aug 11): Remove unnecessary items and dispose them properly Make work easier by eliminating obstacles Reduce chance of being disturbed with unnecessary items Segregate unwanted material from the workplace Define a red-tagged area to keep those unnecessary items
  • 19. SET (Aug 12 – Sep 12)  Arrange all necessary items so they can be easily selected for use  Make it easy to find and pick up necessary items  All above work should be done on regular basis
  • 20. SHINE (Sep 14- Sep 30)  Clean workplace completely  Prevent machinery and equipment deterioration  Keep workplace safe and easy to work  Need fully skilled supervisor for checking on regular basis
  • 21. STANDARDIZE (Oct 01 – Oct 15)  Maintain standards of housekeeping and workplace organization at all times.  Maintain orderliness. Maintain everything in order and according to its standard. Everything in its right place.  Every process has a standard.
  • 22. SUSTAIN (Oct 16- cont.)  Perform regular audits  Training and Discipline  Training is goal oriented process.  Maintenance  Feedback & Evaluation form.
  • 24. RECEIVING PROCEDURE & 1st June, 2015 PRODUCTION TARGET  Implemented procedure of fabric receiving report from Printing Department.  Implemented production target report on daily basis in Curing department to monitor the progress of Curing Department.
  • 25. 6th June, 2015 FEEDBACK FORM  Developed feedback form and provided it to Finishing ,Kuster washing and Curing department.
  • 26. EVALUATION FORM • Assessed the performance of workers through evaluation form.
  • 27. 25th June,2015 PROVIDE STOPPAGE FORM • To obtain the zero downtime of breakdowns and other stoppages, developed stoppage form .
  • 28. Phase Complete Date Define 18/05/2015 Measure 19/05/2015 Analyze 20/05/2015 Improve 01/06/2015 Control 06/06/2015 Approved Status: On track At Risk Delayed  Restriction of fabric receiving without Travel cards  Control of Mixed Fabric from printing and curing . .Optimize Sample testing procedure.  Implementation of proper receiving procedure of printed fabric Controlling of unidentified fabric from Printing and Curing. Prepare KPI House Keeping Proper handling of Batchers and trolleys Training of workers on daily basis Stoppage Reduction Maintenance related downtime 5S Implementation Safety shoes and Uniform Project Plan Projected Benefits Better performance More efficient working Wastage control Cost Reduction Quality improvement Project Status
  • 30.  Highest production.  Zero downtime of Trolley waiting  Zero downtime of Batchers waiting.  Reduction of Selvedge cut fault by avoiding fabric mixing.  Trolleys repaired  Identified and Stitched fabric  Better House keeping through 5S.  Stoppage Reduction  Feed back & Improvement  Training and Evaluation