Estimating for Fixed Price Projects
Overview
• Problem statement
• Known estimation approaches
• WBS-based (bottom up) estimation
• Three-point estimation
• Assumptions
• Risk management and reserves
• Reserves versus Assumptions
• Reasons for poor estimates
Problem statement
• Project or even domain is
unknown
• Team is not yet defined
• Lack of experts
• Typically lack of time and efforts
for analysis and discovery
• But you need to prepare RFP
Cone of uncertainty
• Analogy-based estimation
• WBS-based (bottom-up)
estimation
• Parametric models
• Size-based estimation models
• Group estimation
• Mechanical combination
• Judgmental combination
• Typical projects
• Discuss it later…
• Typical Android screen = 40hrs
• Story points in Agile
• Planning poker
• AVG(Analogy-based, WBS)
• Expert judgment for above
models
Known estimation approaches – no silver bullet
• Deliverable-oriented
decomposition of the project into
smaller components
• WBS permits summing of
subordinate costs for tasks,
materials, etc…
• Design principles: 100% rule,
mutually exclusive components,
outcomes not actions, level of
detail
WBS-based (bottom up) estimation
Product, data, service
Three-point estimation
Normal distribution plot
2xSD = 95% (typical in software dev)
3xSD = 99.7%
• Optimistic, most-likely,
pessimistic
• Estimate(50%) = (P+4*ML+O)/6
• SD = (O – P) / 6
• Estimate(95%) = E + 2 * SD
Assumptions
• Reading between lines
• Requirements guessing
• Functional and non-functional (technology)
• Out of scope assumptions
• Team / resources assumptions
• Skill level
• Availability
• Realistic
• Review with customer -> change requests
Risk management and reserves
• Identification - Risk registry
• Assessment
• Estimates, Risks – input to Cost mgmt
• Contingency reserves
• Management reserves
Reserves versus Assumptions
• Two extremes for unknown: all assumed and all are risks
• All assumed – Low cost and lots of changes
• All are risk – High cost
• Balance:
• Everything critical for customer – assumptions
• Everything optional - risks
Reasons for Poor estimates
• Undefined objectives
• Incomplete plans
• Unrealistic resource assumptions
• Naïve estimates
• Customer/management arrogance
• Lack of training in developing estimates
• Adverse relationship between estimators and customers
• Absence of accountability
• Lack of candor (transparency)
THANK YOU
Anton Bobykin
Project Manager
abobykin@eastbanctech.com
202-295-3000
eastbanctech.com

More Related Content

What's hot

Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
Approach To It Strategy And Architecture
Approach To It Strategy And ArchitectureApproach To It Strategy And Architecture
Approach To It Strategy And ArchitectureAlan McSweeney
 
EA Intensive Course "Building Enterprise Architecture" by mr.danairat
EA Intensive Course "Building Enterprise Architecture" by mr.danairatEA Intensive Course "Building Enterprise Architecture" by mr.danairat
EA Intensive Course "Building Enterprise Architecture" by mr.danairatSoftware Park Thailand
 
What is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFWhat is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFxavblai
 
Solution Architecture Centre Of Excellence
Solution Architecture Centre Of ExcellenceSolution Architecture Centre Of Excellence
Solution Architecture Centre Of ExcellenceAlan McSweeney
 
Learn Togaf 9.1 in 100 slides!
Learn Togaf 9.1 in 100 slides!Learn Togaf 9.1 in 100 slides!
Learn Togaf 9.1 in 100 slides!Sam Mandebvu
 
Incorporating A DesignOps Approach Into Solution Architecture
Incorporating A DesignOps Approach Into Solution ArchitectureIncorporating A DesignOps Approach Into Solution Architecture
Incorporating A DesignOps Approach Into Solution ArchitectureAlan McSweeney
 
Enterprise architecture-career-path
Enterprise architecture-career-pathEnterprise architecture-career-path
Enterprise architecture-career-pathSim Kwan Choo
 
Agile enterprise architecture
Agile enterprise architectureAgile enterprise architecture
Agile enterprise architectureScott W. Ambler
 
Structured Approach to Solution Architecture
Structured Approach to Solution ArchitectureStructured Approach to Solution Architecture
Structured Approach to Solution ArchitectureAlan McSweeney
 
Lecture 2: The Concept of Enterprise Architecture
Lecture 2: The Concept of Enterprise ArchitectureLecture 2: The Concept of Enterprise Architecture
Lecture 2: The Concept of Enterprise ArchitectureSvyatoslav Kotusev
 
Togaf 9 an introduction
Togaf 9   an introductionTogaf 9   an introduction
Togaf 9 an introductionDaan Bakboord
 

What's hot (20)

Project management office value
Project management office valueProject management office value
Project management office value
 
Approach To It Strategy And Architecture
Approach To It Strategy And ArchitectureApproach To It Strategy And Architecture
Approach To It Strategy And Architecture
 
AgileBA® - Agile Business Analysis - Foundation
AgileBA® - Agile Business Analysis - FoundationAgileBA® - Agile Business Analysis - Foundation
AgileBA® - Agile Business Analysis - Foundation
 
EA Intensive Course "Building Enterprise Architecture" by mr.danairat
EA Intensive Course "Building Enterprise Architecture" by mr.danairatEA Intensive Course "Building Enterprise Architecture" by mr.danairat
EA Intensive Course "Building Enterprise Architecture" by mr.danairat
 
Azure ML Training - Deep Dive
Azure ML Training - Deep DiveAzure ML Training - Deep Dive
Azure ML Training - Deep Dive
 
What is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFWhat is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAF
 
Solution Architecture Centre Of Excellence
Solution Architecture Centre Of ExcellenceSolution Architecture Centre Of Excellence
Solution Architecture Centre Of Excellence
 
Learn Togaf 9.1 in 100 slides!
Learn Togaf 9.1 in 100 slides!Learn Togaf 9.1 in 100 slides!
Learn Togaf 9.1 in 100 slides!
 
AWS IoT Lab Introduction
AWS IoT Lab IntroductionAWS IoT Lab Introduction
AWS IoT Lab Introduction
 
Incorporating A DesignOps Approach Into Solution Architecture
Incorporating A DesignOps Approach Into Solution ArchitectureIncorporating A DesignOps Approach Into Solution Architecture
Incorporating A DesignOps Approach Into Solution Architecture
 
Enterprise architecture-career-path
Enterprise architecture-career-pathEnterprise architecture-career-path
Enterprise architecture-career-path
 
Entendendo o Ciclo de Desenvolvimento Seguro
Entendendo o Ciclo de Desenvolvimento SeguroEntendendo o Ciclo de Desenvolvimento Seguro
Entendendo o Ciclo de Desenvolvimento Seguro
 
Agile enterprise architecture
Agile enterprise architectureAgile enterprise architecture
Agile enterprise architecture
 
Structured Approach to Solution Architecture
Structured Approach to Solution ArchitectureStructured Approach to Solution Architecture
Structured Approach to Solution Architecture
 
Lecture 2: The Concept of Enterprise Architecture
Lecture 2: The Concept of Enterprise ArchitectureLecture 2: The Concept of Enterprise Architecture
Lecture 2: The Concept of Enterprise Architecture
 
CTO presentation
CTO presentation  CTO presentation
CTO presentation
 
Togaf 9 an introduction
Togaf 9   an introductionTogaf 9   an introduction
Togaf 9 an introduction
 
Togaf 9 template Preliminary Phase architecture principles
Togaf 9 template  Preliminary Phase architecture principlesTogaf 9 template  Preliminary Phase architecture principles
Togaf 9 template Preliminary Phase architecture principles
 
DevOps and Tools
DevOps and ToolsDevOps and Tools
DevOps and Tools
 
TOGAF ADM Steps reference
TOGAF ADM Steps referenceTOGAF ADM Steps reference
TOGAF ADM Steps reference
 

Similar to Estimating for Fixed Price Projects

Software development project estimation
Software development project estimationSoftware development project estimation
Software development project estimationOleksandr Katrusha
 
Project Estimating Process
Project Estimating Process Project Estimating Process
Project Estimating Process Crystal Guliford
 
АРТУР ШЕВЧЕНКО «Як спланувати проєкт та все встигнути»
АРТУР ШЕВЧЕНКО «Як спланувати проєкт та все встигнути»АРТУР ШЕВЧЕНКО «Як спланувати проєкт та все встигнути»
АРТУР ШЕВЧЕНКО «Як спланувати проєкт та все встигнути»GoQA
 
Lviv PMDay 2016 S Олег Мізьов: Smart Proposal for your Fixed Price Deal
Lviv PMDay 2016 S Олег Мізьов: Smart Proposal for your Fixed Price DealLviv PMDay 2016 S Олег Мізьов: Smart Proposal for your Fixed Price Deal
Lviv PMDay 2016 S Олег Мізьов: Smart Proposal for your Fixed Price DealLviv Startup Club
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Agus Suhanto
 
Estimates or #NoEstimates by Enes Pelko
Estimates or #NoEstimates by Enes PelkoEstimates or #NoEstimates by Enes Pelko
Estimates or #NoEstimates by Enes PelkoBosnia Agile
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and schedulingSulman Ahmed
 
project on software industry
project on software industryproject on software industry
project on software industryAamir chouhan
 
Estimation
EstimationEstimation
EstimationDev9Com
 
LARION Engagement Model
LARION Engagement Model LARION Engagement Model
LARION Engagement Model Eric Lai
 
10 Ways to Increase Your Project's Success
10 Ways to Increase Your Project's Success10 Ways to Increase Your Project's Success
10 Ways to Increase Your Project's SuccessBrandon Olson
 
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...p6academy
 
Estimation - web software development estimation DrupalCon and DrupalCamp pre...
Estimation - web software development estimation DrupalCon and DrupalCamp pre...Estimation - web software development estimation DrupalCon and DrupalCamp pre...
Estimation - web software development estimation DrupalCon and DrupalCamp pre...Andy Kucharski
 
Flevy.com - Pricing a Consulting Project
Flevy.com - Pricing a Consulting ProjectFlevy.com - Pricing a Consulting Project
Flevy.com - Pricing a Consulting ProjectDavid Tracy
 

Similar to Estimating for Fixed Price Projects (20)

Software development project estimation
Software development project estimationSoftware development project estimation
Software development project estimation
 
Project Estimating Process
Project Estimating Process Project Estimating Process
Project Estimating Process
 
АРТУР ШЕВЧЕНКО «Як спланувати проєкт та все встигнути»
АРТУР ШЕВЧЕНКО «Як спланувати проєкт та все встигнути»АРТУР ШЕВЧЕНКО «Як спланувати проєкт та все встигнути»
АРТУР ШЕВЧЕНКО «Як спланувати проєкт та все встигнути»
 
PMP.pptx
PMP.pptxPMP.pptx
PMP.pptx
 
Lviv PMDay 2016 S Олег Мізьов: Smart Proposal for your Fixed Price Deal
Lviv PMDay 2016 S Олег Мізьов: Smart Proposal for your Fixed Price DealLviv PMDay 2016 S Олег Мізьов: Smart Proposal for your Fixed Price Deal
Lviv PMDay 2016 S Олег Мізьов: Smart Proposal for your Fixed Price Deal
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6
 
Estimates or #NoEstimates by Enes Pelko
Estimates or #NoEstimates by Enes PelkoEstimates or #NoEstimates by Enes Pelko
Estimates or #NoEstimates by Enes Pelko
 
Wbs
WbsWbs
Wbs
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and scheduling
 
Lean Six Sigma Black Belt Training
Lean Six Sigma Black Belt TrainingLean Six Sigma Black Belt Training
Lean Six Sigma Black Belt Training
 
project on software industry
project on software industryproject on software industry
project on software industry
 
Estimation
EstimationEstimation
Estimation
 
LARION Engagement Model
LARION Engagement Model LARION Engagement Model
LARION Engagement Model
 
Project Cost Management for IEM talk on 13 January 2018.
Project Cost Management  for IEM talk on 13 January 2018.Project Cost Management  for IEM talk on 13 January 2018.
Project Cost Management for IEM talk on 13 January 2018.
 
10 Ways to Increase Your Project's Success
10 Ways to Increase Your Project's Success10 Ways to Increase Your Project's Success
10 Ways to Increase Your Project's Success
 
Spm lecture-5
Spm lecture-5Spm lecture-5
Spm lecture-5
 
test
testtest
test
 
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
 
Estimation - web software development estimation DrupalCon and DrupalCamp pre...
Estimation - web software development estimation DrupalCon and DrupalCamp pre...Estimation - web software development estimation DrupalCon and DrupalCamp pre...
Estimation - web software development estimation DrupalCon and DrupalCamp pre...
 
Flevy.com - Pricing a Consulting Project
Flevy.com - Pricing a Consulting ProjectFlevy.com - Pricing a Consulting Project
Flevy.com - Pricing a Consulting Project
 

More from EastBanc Tachnologies

Unpacking .NET Core | EastBanc Technologies
Unpacking .NET Core | EastBanc TechnologiesUnpacking .NET Core | EastBanc Technologies
Unpacking .NET Core | EastBanc TechnologiesEastBanc Tachnologies
 
Azure and/or AWS: How to Choose the best cloud platform for your project
Azure and/or AWS: How to Choose the best cloud platform for your projectAzure and/or AWS: How to Choose the best cloud platform for your project
Azure and/or AWS: How to Choose the best cloud platform for your projectEastBanc Tachnologies
 
Getting started with azure event hubs and stream analytics services
Getting started with azure event hubs and stream analytics servicesGetting started with azure event hubs and stream analytics services
Getting started with azure event hubs and stream analytics servicesEastBanc Tachnologies
 
Developing Cross-Platform Web Apps with ASP.NET Core1.0
Developing Cross-Platform Web Apps with ASP.NET Core1.0Developing Cross-Platform Web Apps with ASP.NET Core1.0
Developing Cross-Platform Web Apps with ASP.NET Core1.0EastBanc Tachnologies
 
Highlights from MS build\\2016 Conference
Highlights from MS build\\2016 ConferenceHighlights from MS build\\2016 Conference
Highlights from MS build\\2016 ConferenceEastBanc Tachnologies
 
Introduction to Kotlin Language and its application to Android platform
Introduction to Kotlin Language and its application to Android platformIntroduction to Kotlin Language and its application to Android platform
Introduction to Kotlin Language and its application to Android platformEastBanc Tachnologies
 
Async Programming with C#5: Basics and Pitfalls
Async Programming with C#5: Basics and PitfallsAsync Programming with C#5: Basics and Pitfalls
Async Programming with C#5: Basics and PitfallsEastBanc Tachnologies
 
EastBanc Technologies US-Russian Collaboration and Innovation
EastBanc Technologies US-Russian Collaboration and InnovationEastBanc Technologies US-Russian Collaboration and Innovation
EastBanc Technologies US-Russian Collaboration and InnovationEastBanc Tachnologies
 
EastBanc Technologies SharePoint Portfolio
EastBanc Technologies SharePoint PortfolioEastBanc Technologies SharePoint Portfolio
EastBanc Technologies SharePoint PortfolioEastBanc Tachnologies
 
EastBanc Technologies Data Visualization/BI Portfolio
EastBanc Technologies Data Visualization/BI PortfolioEastBanc Technologies Data Visualization/BI Portfolio
EastBanc Technologies Data Visualization/BI PortfolioEastBanc Tachnologies
 
EastBanc Technologies Portals and CMS Portfolio
EastBanc Technologies Portals and CMS PortfolioEastBanc Technologies Portals and CMS Portfolio
EastBanc Technologies Portals and CMS PortfolioEastBanc Tachnologies
 
Cross Platform Mobile Application Development Using Xamarin and C#
Cross Platform Mobile Application Development Using Xamarin and C#Cross Platform Mobile Application Development Using Xamarin and C#
Cross Platform Mobile Application Development Using Xamarin and C#EastBanc Tachnologies
 

More from EastBanc Tachnologies (14)

Unpacking .NET Core | EastBanc Technologies
Unpacking .NET Core | EastBanc TechnologiesUnpacking .NET Core | EastBanc Technologies
Unpacking .NET Core | EastBanc Technologies
 
Azure and/or AWS: How to Choose the best cloud platform for your project
Azure and/or AWS: How to Choose the best cloud platform for your projectAzure and/or AWS: How to Choose the best cloud platform for your project
Azure and/or AWS: How to Choose the best cloud platform for your project
 
Functional Programming with C#
Functional Programming with C#Functional Programming with C#
Functional Programming with C#
 
Getting started with azure event hubs and stream analytics services
Getting started with azure event hubs and stream analytics servicesGetting started with azure event hubs and stream analytics services
Getting started with azure event hubs and stream analytics services
 
DevOps with Kubernetes
DevOps with KubernetesDevOps with Kubernetes
DevOps with Kubernetes
 
Developing Cross-Platform Web Apps with ASP.NET Core1.0
Developing Cross-Platform Web Apps with ASP.NET Core1.0Developing Cross-Platform Web Apps with ASP.NET Core1.0
Developing Cross-Platform Web Apps with ASP.NET Core1.0
 
Highlights from MS build\\2016 Conference
Highlights from MS build\\2016 ConferenceHighlights from MS build\\2016 Conference
Highlights from MS build\\2016 Conference
 
Introduction to Kotlin Language and its application to Android platform
Introduction to Kotlin Language and its application to Android platformIntroduction to Kotlin Language and its application to Android platform
Introduction to Kotlin Language and its application to Android platform
 
Async Programming with C#5: Basics and Pitfalls
Async Programming with C#5: Basics and PitfallsAsync Programming with C#5: Basics and Pitfalls
Async Programming with C#5: Basics and Pitfalls
 
EastBanc Technologies US-Russian Collaboration and Innovation
EastBanc Technologies US-Russian Collaboration and InnovationEastBanc Technologies US-Russian Collaboration and Innovation
EastBanc Technologies US-Russian Collaboration and Innovation
 
EastBanc Technologies SharePoint Portfolio
EastBanc Technologies SharePoint PortfolioEastBanc Technologies SharePoint Portfolio
EastBanc Technologies SharePoint Portfolio
 
EastBanc Technologies Data Visualization/BI Portfolio
EastBanc Technologies Data Visualization/BI PortfolioEastBanc Technologies Data Visualization/BI Portfolio
EastBanc Technologies Data Visualization/BI Portfolio
 
EastBanc Technologies Portals and CMS Portfolio
EastBanc Technologies Portals and CMS PortfolioEastBanc Technologies Portals and CMS Portfolio
EastBanc Technologies Portals and CMS Portfolio
 
Cross Platform Mobile Application Development Using Xamarin and C#
Cross Platform Mobile Application Development Using Xamarin and C#Cross Platform Mobile Application Development Using Xamarin and C#
Cross Platform Mobile Application Development Using Xamarin and C#
 

Recently uploaded

"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 

Recently uploaded (20)

"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 

Estimating for Fixed Price Projects

  • 1. Estimating for Fixed Price Projects
  • 2. Overview • Problem statement • Known estimation approaches • WBS-based (bottom up) estimation • Three-point estimation • Assumptions • Risk management and reserves • Reserves versus Assumptions • Reasons for poor estimates
  • 3. Problem statement • Project or even domain is unknown • Team is not yet defined • Lack of experts • Typically lack of time and efforts for analysis and discovery • But you need to prepare RFP Cone of uncertainty
  • 4. • Analogy-based estimation • WBS-based (bottom-up) estimation • Parametric models • Size-based estimation models • Group estimation • Mechanical combination • Judgmental combination • Typical projects • Discuss it later… • Typical Android screen = 40hrs • Story points in Agile • Planning poker • AVG(Analogy-based, WBS) • Expert judgment for above models Known estimation approaches – no silver bullet
  • 5. • Deliverable-oriented decomposition of the project into smaller components • WBS permits summing of subordinate costs for tasks, materials, etc… • Design principles: 100% rule, mutually exclusive components, outcomes not actions, level of detail WBS-based (bottom up) estimation Product, data, service
  • 6. Three-point estimation Normal distribution plot 2xSD = 95% (typical in software dev) 3xSD = 99.7% • Optimistic, most-likely, pessimistic • Estimate(50%) = (P+4*ML+O)/6 • SD = (O – P) / 6 • Estimate(95%) = E + 2 * SD
  • 7. Assumptions • Reading between lines • Requirements guessing • Functional and non-functional (technology) • Out of scope assumptions • Team / resources assumptions • Skill level • Availability • Realistic • Review with customer -> change requests
  • 8. Risk management and reserves • Identification - Risk registry • Assessment • Estimates, Risks – input to Cost mgmt • Contingency reserves • Management reserves
  • 9. Reserves versus Assumptions • Two extremes for unknown: all assumed and all are risks • All assumed – Low cost and lots of changes • All are risk – High cost • Balance: • Everything critical for customer – assumptions • Everything optional - risks
  • 10. Reasons for Poor estimates • Undefined objectives • Incomplete plans • Unrealistic resource assumptions • Naïve estimates • Customer/management arrogance • Lack of training in developing estimates • Adverse relationship between estimators and customers • Absence of accountability • Lack of candor (transparency)
  • 11. THANK YOU Anton Bobykin Project Manager abobykin@eastbanctech.com 202-295-3000 eastbanctech.com