SlideShare a Scribd company logo
1 of 6
CURRICULUM VITAE
Name: ERNESTO N. VALERIO
Address:BLK. 20 LOT 18 C-63 PHASE 1, VILLA DE CALAMBA,
LAMESA,CALAMBACITY4027,LAGUNA, PHILIPPINES
E-mail address: envalerio@yahoo.com
Philippinespassportno.: EB 1844901
Date of issue: FEBRUARY2, 2011
Valid until: FEBRUARY1, 2016
Telephoneno.: 0063-49-5453754
Cellphone no.:0063-9155007999
Date of birth: DECEMBER28,1956
Nationality:FILIPINO
Marital status: MARRIED
Educational attainment:BACHELOROF SCIENCE IN MECHANICAL
ENGINEERING
Position applyingfor: PRODUCTIONOPERATOR
Work experiences:
1.Wood Group Equatorial Guinea Limited - Offshore Operator
ALBA FIELD PLATFORM -from OCT.2005 to MAR. 2012
Responsiblefor start up / shut down of Production Separator,Test
Separator, Coalescer, HP Degasser,LP Degasser, Flare Scrubber,Fuel
Gas Scrubber, Gas Compressor, Gas Injection, Glycol Dehydration Unit,
Glycol Contactor, Air Compressor,and R.O. Unit. Check valve setting
prior start up of Process Unit. Monitor Process Unit Parametersuch as
Flow, Level,Pressure, Temperature,and makes necessaryadjustment/
setting as required.Perform line pigging, and well test. Check chemical
injection rate to ensure correct chemical dosage.Toppingup chemical
on it’s specified storage tank such as Anti Foulant,Corrosion Inhibitor,
Demulsifier,Hydrate Inhibitor,Methanol,and Water Clarifier. Conduct
laboratoryanalysis such as BS&W, Oil Content,and Free Chlorine
Content. Perform Draining,De-Pressurizing,Purging,and Ventingon
Process Unit prior maintenance job.Perform minor maintenance such
as bolt tightening, pump strainer cleaning,and toppingup oil on
rotating equipment.
2. MODEC International LLC- Process Technician
FPSO FLUMINENSE,BRAZIL - from JAN. 2003 to JUN. 2005
Responsiblefor start up / shut down of Production Separator,Test
Separator,IP Separator, Treater,Heater, Heat Exchanger,Waste Heat
RecoveryUnit, Flash Gas Compressor,BoosterGas Compressor,Gas
Lift, Gas Inlet Separator,VaporRecovery Unit, Fuel Gas Scrubber,
Glycol Reboiler,Glycol Contactor,LP Flare Scrubber,HP Flare
Scrubber, WaterInjection Pump,De-Oxidizer,R.O. Unit, Air
Compressor,and Nitrogen Generator.Checkvalve setting prior start up
of Process Unit. MonitorProcess Unit Parametersuch as Flow, Level,
Pressure, Temperature,and makes necessaryadjustment/ setting as
required.Perform line pigging, and well test. Check chemical injection
rate to ensure correct chemical dosage.Toppingup chemical on it’s
specified storage tank such as Corrosion Inhibitor, Defoamer,
Demulsifier,Methanol,Scale Inhibitor,Biocide,and Oxygen Scavenger.
Conductlaboratoryanalysis such as BS&W, RVP,Oxygen Content,and
Conductivity.Perform Draining,De-Pressurizing,Purging,and Venting
on Process Unit prior maintenance job.Perform minor maintenance
such as bolt tightening, pump strainer cleaning,and toppingup oil on
rotating equipment.
3. IPEDEXProduction LLC - Production Operator
EAST SHABWA BLOCK,YEMEN- from OCT. 2000 to NOV. 2001
Responsiblefor start up / shut down of Early Production Facility
such as Surge Separator,Test Separator,Hydrogen Sulphide Stripper,
Flare Scrubber, Crude Oil Storage Tank,and Centrilift Pump. Check
valve setting prior start up of Process Unit. MonitorProcess Unit
Parametersuch as Flow, Level, Pressure, Temperature,and makes
necessaryadjustment/ setting as required.Perform well test. Check
chemical injection rate to ensure correct chemical dosage.Toppingup
chemical on it’s specified storage tank such as Corrosion Inhibitor,and
Demulsifier. Conductlaboratoryanalysis such as BS&W. Perform
Draining,De-Pressurizing,Purging, and Venting on Process Unit prior
maintenance job. Perform minor maintenance such as bolt tightening,
pump strainercleaning,and topping up oil on rotating equipment.
4. SBM Offshore Contractor Inc. - Production Operator
FPSO KUITO, ANGOLA - from JAN. 2000 to JUL. 2000
Responsiblefor start up / shut down of Production Separator,Test
Separator,Treater, Degasser,Heat Exchanger, BoosterGas
Compressor,Main Gas Compressor,Gas Lift, Gas Filter Separator,
Glycol Reboiler,Glycol Contactor,Fuel Gas Scrubber, LP Flare Knock
Out Drum, HP Flare Knock Out Drum, Water Injection Pump,and R.O.
Unit. Check valve setting prior start up of Process Unit. Monitor
Process Unit Parametersuch as Flow, Level, Pressure, Temperature,
and makes necessaryadjustment/ setting as required.Perform line
pigging, and well test. Check chemical injection rate to ensure correct
chemical dosage. Toppingup chemical on it’s specified storage tank
such as Corrosion Inhibitor,Defoamer,Demulsifier,Methanol,Scale
Inhibitor,Biocide,and Oxygen Scavenger. Conductlaboratoryanalysis
such as BS&W, RVP, Oxygen Content,and Conductivity. Perform
Draining,De-Pressurizing,Purging, and Venting on Process Unit prior
maintenance job.Perform minor maintenance such as bolt tightening,
pump strainercleaning,and topping up oil on rotating equipment.
5. Alliance Marine Services - Lead Production Operator
MOPU TCHATAMBAA, GABON - from JAN. 1998 to NOV. 1999
Responsiblefor start up / shut down of Production Separator,Test
Separator,Treater, Water Skimmer, FloatationCell,Heat Exchanger,
Flare KnockOut Drum, Surge Tank, R.O. Unit, and Air Compressor.
Check valve setting prior start up of Process Unit. MonitorProcess Unit
Parametersuch as Flow, Level, Pressure, Temperature,and makes
necessaryadjustment/ setting as required. Perform line pigging, and
well test. Checkchemical injection rate to ensure correct chemical
dosage.Toppingup chemical on it’s specified storage tank such as
Corrosion Inhibitor,Defoamer,Demulsifier,and Scale Inhibitor.
Conductlaboratoryanalysis such as BS&W, RVP,and Conductivity.
Perform Draining,De-Pressurizing,Purging, and Ventingon Process
Unit prior maintenance job.Perform minor maintenance suchas bolt
tightening,pump strainer cleaning,and topping up oil on rotating
equipment.
6. Saudi Arabian Oil Company - Utilities Operator
RABIGH,K.S.A. - from OCT. 1989 to DEC. 1996
Responsiblefor start up / shut down of Waste Water Treatment
Plant such as BallastSeparator,Process Separator,Ballast Polishing
Pond,Process PolishingPond,Aerator, Clarifier, Filtration Unit, and
Sludge Basin. Checkvalve setting prior start up of Process Unit. Check
chemical injection rate to ensure correct chemical dosage.Toppingup
chemical on it’s specified storage tank such as Aluminum Sulphate,
Caustic Soda, Demulsifier,Ferrous Sulphate, PhosphoricAcid,
SulphuricAcid, and Urea. Conductlaboratoryanalysis such as
Biological Oxygen Demand,Chemical Oxygen Demand,Conductivity,
and Sludge Volume Index.Skimmed oil on BallastSeparator,and
Process Separator,and then pumped out to crude oil storage tank.
Responsiblefor start up / shut down of DesalinationPlantsuch as Meco
Distillation Unit, ElectrolizerUnit, Chlorine Unit, and Potable Water
Production Unit. Check valve setting prior start up of Process Unit.
Check chemical injection rate to ensure correct chemical dosage.
Toppingup chemical on it’s specified storage tank such as Calcium
Chloride,Sodium Chloride,CausticSoda, and SulphuricAcid. Conduct
laboratoryanalysis such as Chlorine,Conductivity,and PH. Perform
minor maintenance such as bolttightening,pump strainercleaning,
and toppingup oil on rotating equipment.
7. Star EnergyResources Ltd. - Terminal Supervisor
DUBAI,UNITED ARAB EMIRATES - from SEP. 1987 to SEP. 1989
Supervise loading/ unloadingof petroleum product on oil tanker,
line blending, and line pigging, Check valve setting prior loading/
unloadingof petroleum product on oil tanker. Check shore tank ullage
prior receivingof petroleum product to preventshore tank overflow.
Calculate shore tank received / discharged quantity,and oil tanker
received / discharged quantity.Check possible cause of abnormal gain /
loss on petroleum productshipment.Check job site for safety prior
issuance of permit to work. Appraise operatorperformance.
8. Mobil Oil Philipines - Process Operator/ Oil MovementOperator
MANILA,PHILIPPINES -from JUL. 1979 to JUL. 1987
Monitorcondition of equipmenton Crude Distillation Unit to ensure
safe, efficient, and continuousoperation.Carry out Control Room
Operatorinstruction during upsetor emergency,start up / shut down,
and on operational change of Crude Distillation Unit. Take sample, and
perform analysis to be made on Crude Distillation Unit such as API
gravity. Drain accumulated wateron vessel.Adjust heateroperation
such as changingburner, correcting draft, improve flame by
manipulatingair register, and atomizingsteam. Adjustammonia
injection rate to obtain desired PH of 6.5 on Naptha accumulatordrain,
and to neutralize acid formed on atmospheric column overhead vapor
line, and Kerosene stripper vaporreturn line. Set Caustic injection rate
at 7.5 gallons per thousand barrels crude oil feed on furnace crude inlet
lines in order to neutralize mostof the HCL formed by the
decomposition of salt. Adjust Organic InhibitorNALCO 165 AC, and
Kerosenemixture injection rate on atmosphericcolumn overhead vapor
line in order to protect Naptha condenser,and downstream equipment
from H2S attack. Set Phosphateinjection rate on steam drum to react
with ions to minimize scale formation.Operate side stream to produce
Keroseneor Jet A distillate specification.Correct a low 10% point on
distillation by increasingvapor line temperature. Correct a high 10%
point on distillation by reducing vaporline temperature.Correct a low
90% pointon distillation by increasingKerosene rate to storage. Correct
a high 90% on distillation by reducing Kerosenerate to storage.
Increase stripping steam rate to increase flash point. Decrease stripping
steam rate to decrease flash point. Operate side stream to produce
Diesel distillate specification.Correct a low 90% pointon distillation by
increasingDiesel rate to storage.Correct a high 90% point on
distillation by reducing Diesel rate to storage. Perform Draining,De-
Pressurizing,Purging, and Ventingon Process Unit prior maintenance
job. Perform minor maintenance such as bolt tightening,pump strainer
cleaning,and toppingup oil on rotating equipment. Take openinggauge
/ closing gauge, and sample of petroleum producton shore tank prior
receiving / discharging,and after receiving/ discharging of petroleum
product. Inspect / take gauging,and sample of petroleum product on
Cargo Oil Compartmenton oil tanker prior loading/ unloading,and
after loading / unloading of petroleum product. Valve, and line setting
on shore tank prior receiving / dischargingof petroleum product. Take
midnightinventory of petroleum product on shore tank.

More Related Content

What's hot

Selection of Reboilers for Distillation Columns
Selection of Reboilers for Distillation ColumnsSelection of Reboilers for Distillation Columns
Selection of Reboilers for Distillation ColumnsGerard B. Hawkins
 
Chemical Treatment For Cooling Water
Chemical Treatment For Cooling WaterChemical Treatment For Cooling Water
Chemical Treatment For Cooling WaterGerard B. Hawkins
 
Hydrogenolysis Operations Manual
Hydrogenolysis Operations ManualHydrogenolysis Operations Manual
Hydrogenolysis Operations ManualGerard B. Hawkins
 
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND PRELIMINARY ENGINEER...
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND  PRELIMINARY ENGINEER...PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND  PRELIMINARY ENGINEER...
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND PRELIMINARY ENGINEER...Gerard B. Hawkins
 
Principles & Practices to Manage Cl lon Stabilizer
Principles & Practices to Manage Cl lon StabilizerPrinciples & Practices to Manage Cl lon Stabilizer
Principles & Practices to Manage Cl lon StabilizerGerard B. Hawkins
 
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesCritical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesGerard B. Hawkins
 
Refluxing Condensation Systems (Dephlegmators)
Refluxing Condensation Systems (Dephlegmators)Refluxing Condensation Systems (Dephlegmators)
Refluxing Condensation Systems (Dephlegmators)Gerard B. Hawkins
 
production operator
production operatorproduction operator
production operatorGURU JOY
 
Guidelines for Charging Primary Reforming Catalyst via Wet Method
Guidelines for Charging Primary Reforming Catalyst via Wet MethodGuidelines for Charging Primary Reforming Catalyst via Wet Method
Guidelines for Charging Primary Reforming Catalyst via Wet MethodGerard B. Hawkins
 
Selection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsSelection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsGerard B. Hawkins
 
Introduction To Pressure Surge In Liquid Systems
Introduction To Pressure Surge In Liquid SystemsIntroduction To Pressure Surge In Liquid Systems
Introduction To Pressure Surge In Liquid SystemsGerard B. Hawkins
 
Gas-Solid-Liquid Mixing Systems
Gas-Solid-Liquid Mixing SystemsGas-Solid-Liquid Mixing Systems
Gas-Solid-Liquid Mixing SystemsGerard B. Hawkins
 
Shell and Tube Heat Exchangers Using Cooling Water
Shell and Tube Heat Exchangers Using Cooling WaterShell and Tube Heat Exchangers Using Cooling Water
Shell and Tube Heat Exchangers Using Cooling WaterGerard B. Hawkins
 
Suspensions Processing Guide - Basic Principles & Test Methods
Suspensions Processing Guide - Basic Principles & Test MethodsSuspensions Processing Guide - Basic Principles & Test Methods
Suspensions Processing Guide - Basic Principles & Test MethodsGerard B. Hawkins
 
Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance Gerard B. Hawkins
 
Estimation of Pressure Drop in Pipe Systems
Estimation of Pressure Drop in Pipe SystemsEstimation of Pressure Drop in Pipe Systems
Estimation of Pressure Drop in Pipe SystemsGerard B. Hawkins
 

What's hot (20)

Selection of Reboilers for Distillation Columns
Selection of Reboilers for Distillation ColumnsSelection of Reboilers for Distillation Columns
Selection of Reboilers for Distillation Columns
 
Chemical Treatment For Cooling Water
Chemical Treatment For Cooling WaterChemical Treatment For Cooling Water
Chemical Treatment For Cooling Water
 
Hydrogenolysis Operations Manual
Hydrogenolysis Operations ManualHydrogenolysis Operations Manual
Hydrogenolysis Operations Manual
 
Laboratory Distillation
Laboratory DistillationLaboratory Distillation
Laboratory Distillation
 
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND PRELIMINARY ENGINEER...
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND  PRELIMINARY ENGINEER...PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND  PRELIMINARY ENGINEER...
PRACTICAL GUIDE TO DEVELOPING PROCESS FLOW DIAGRAMS AND PRELIMINARY ENGINEER...
 
Principles & Practices to Manage Cl lon Stabilizer
Principles & Practices to Manage Cl lon StabilizerPrinciples & Practices to Manage Cl lon Stabilizer
Principles & Practices to Manage Cl lon Stabilizer
 
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesCritical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
 
Refluxing Condensation Systems (Dephlegmators)
Refluxing Condensation Systems (Dephlegmators)Refluxing Condensation Systems (Dephlegmators)
Refluxing Condensation Systems (Dephlegmators)
 
production operator
production operatorproduction operator
production operator
 
Guidelines for Charging Primary Reforming Catalyst via Wet Method
Guidelines for Charging Primary Reforming Catalyst via Wet MethodGuidelines for Charging Primary Reforming Catalyst via Wet Method
Guidelines for Charging Primary Reforming Catalyst via Wet Method
 
Mechanical Seals
Mechanical SealsMechanical Seals
Mechanical Seals
 
Selection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsSelection of Internals for Distillation Columns
Selection of Internals for Distillation Columns
 
Introduction To Pressure Surge In Liquid Systems
Introduction To Pressure Surge In Liquid SystemsIntroduction To Pressure Surge In Liquid Systems
Introduction To Pressure Surge In Liquid Systems
 
Boiler Feedwater Pumps
Boiler Feedwater PumpsBoiler Feedwater Pumps
Boiler Feedwater Pumps
 
Gas-Solid-Liquid Mixing Systems
Gas-Solid-Liquid Mixing SystemsGas-Solid-Liquid Mixing Systems
Gas-Solid-Liquid Mixing Systems
 
Shell and Tube Heat Exchangers Using Cooling Water
Shell and Tube Heat Exchangers Using Cooling WaterShell and Tube Heat Exchangers Using Cooling Water
Shell and Tube Heat Exchangers Using Cooling Water
 
Suspensions Processing Guide - Basic Principles & Test Methods
Suspensions Processing Guide - Basic Principles & Test MethodsSuspensions Processing Guide - Basic Principles & Test Methods
Suspensions Processing Guide - Basic Principles & Test Methods
 
Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance
 
Estimation of Pressure Drop in Pipe Systems
Estimation of Pressure Drop in Pipe SystemsEstimation of Pressure Drop in Pipe Systems
Estimation of Pressure Drop in Pipe Systems
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 

Viewers also liked

Viewers also liked (13)

C.V
C.VC.V
C.V
 
Vitae-2016-PPE
Vitae-2016-PPEVitae-2016-PPE
Vitae-2016-PPE
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
CURRICULUM VITAE Ayman1
CURRICULUM VITAE Ayman1CURRICULUM VITAE Ayman1
CURRICULUM VITAE Ayman1
 
CURRICULUM VITAE OF ISABELLA VASSILOPOULOU
CURRICULUM VITAE OF ISABELLA VASSILOPOULOUCURRICULUM VITAE OF ISABELLA VASSILOPOULOU
CURRICULUM VITAE OF ISABELLA VASSILOPOULOU
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
CURRICULUM VITAE OF B EVERT 2016
CURRICULUM VITAE OF B EVERT 2016CURRICULUM VITAE OF B EVERT 2016
CURRICULUM VITAE OF B EVERT 2016
 
Tariq CURRICULUM VITAE
Tariq CURRICULUM VITAETariq CURRICULUM VITAE
Tariq CURRICULUM VITAE
 
CV Kitjuk Harijanto
CV Kitjuk HarijantoCV Kitjuk Harijanto
CV Kitjuk Harijanto
 
CV-Phung The Vinh-2016_new
CV-Phung The Vinh-2016_newCV-Phung The Vinh-2016_new
CV-Phung The Vinh-2016_new
 

Similar to CURRICULUM VITAE OF ERNESTO N. VALERIO 1

bismilla operation & comissioning
bismilla operation & comissioningbismilla operation & comissioning
bismilla operation & comissioningBismilla Syed
 
Chlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsChlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsSURESHKUMAR MUTHURAMALINGAM
 
EDWARD JOSE VERA DOUGLAS CV 2016 R
EDWARD JOSE VERA DOUGLAS CV 2016 REDWARD JOSE VERA DOUGLAS CV 2016 R
EDWARD JOSE VERA DOUGLAS CV 2016 REdward Vera
 
High Temperature Shift Catalyst Reduction Procedure
High Temperature Shift Catalyst Reduction ProcedureHigh Temperature Shift Catalyst Reduction Procedure
High Temperature Shift Catalyst Reduction ProcedureGerard B. Hawkins
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentationisamhasbi
 
Discharge and Reduction Procedures for Methanation Catalyst
Discharge and Reduction Procedures for Methanation CatalystDischarge and Reduction Procedures for Methanation Catalyst
Discharge and Reduction Procedures for Methanation CatalystGerard B. Hawkins
 
ACTIVATED CARBON- AIR-STEAM REGENERATION PROCEDURE
ACTIVATED CARBON-  AIR-STEAM REGENERATION PROCEDUREACTIVATED CARBON-  AIR-STEAM REGENERATION PROCEDURE
ACTIVATED CARBON- AIR-STEAM REGENERATION PROCEDUREGerard B. Hawkins
 
Catalyst Breakage in Reformer Tubes
Catalyst Breakage in Reformer TubesCatalyst Breakage in Reformer Tubes
Catalyst Breakage in Reformer TubesGerard B. Hawkins
 
Determination of Inert Gas in Anhydrous Ammonia
Determination of Inert Gas in  Anhydrous AmmoniaDetermination of Inert Gas in  Anhydrous Ammonia
Determination of Inert Gas in Anhydrous AmmoniaGerard B. Hawkins
 
Methanator Water Wash Procedures
Methanator Water Wash ProceduresMethanator Water Wash Procedures
Methanator Water Wash ProceduresGerard B. Hawkins
 
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSSTEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSGerard B. Hawkins
 
VULCAN VGP Series Purification Catalyst / Absorbents Operating Manual
VULCAN VGP Series Purification Catalyst / Absorbents Operating ManualVULCAN VGP Series Purification Catalyst / Absorbents Operating Manual
VULCAN VGP Series Purification Catalyst / Absorbents Operating ManualGerard B. Hawkins
 
Naseem hayat RO PLANT OPERATOR CV (1).docx
Naseem hayat RO PLANT OPERATOR CV (1).docxNaseem hayat RO PLANT OPERATOR CV (1).docx
Naseem hayat RO PLANT OPERATOR CV (1).docxnaseemhayat2
 

Similar to CURRICULUM VITAE OF ERNESTO N. VALERIO 1 (20)

bismilla operation & comissioning
bismilla operation & comissioningbismilla operation & comissioning
bismilla operation & comissioning
 
Antro
AntroAntro
Antro
 
JPE.doc
JPE.docJPE.doc
JPE.doc
 
Chlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsChlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant Operations
 
Chlor alkali 2016
Chlor alkali 2016Chlor alkali 2016
Chlor alkali 2016
 
EDWARD JOSE VERA DOUGLAS CV 2016 R
EDWARD JOSE VERA DOUGLAS CV 2016 REDWARD JOSE VERA DOUGLAS CV 2016 R
EDWARD JOSE VERA DOUGLAS CV 2016 R
 
High Temperature Shift Catalyst Reduction Procedure
High Temperature Shift Catalyst Reduction ProcedureHigh Temperature Shift Catalyst Reduction Procedure
High Temperature Shift Catalyst Reduction Procedure
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
Discharge and Reduction Procedures for Methanation Catalyst
Discharge and Reduction Procedures for Methanation CatalystDischarge and Reduction Procedures for Methanation Catalyst
Discharge and Reduction Procedures for Methanation Catalyst
 
BALA cv 1
BALA cv 1BALA cv 1
BALA cv 1
 
ACTIVATED CARBON- AIR-STEAM REGENERATION PROCEDURE
ACTIVATED CARBON-  AIR-STEAM REGENERATION PROCEDUREACTIVATED CARBON-  AIR-STEAM REGENERATION PROCEDURE
ACTIVATED CARBON- AIR-STEAM REGENERATION PROCEDURE
 
Pickling & Passivation
Pickling & PassivationPickling & Passivation
Pickling & Passivation
 
Fugitive Emissions
Fugitive EmissionsFugitive Emissions
Fugitive Emissions
 
Catalyst Breakage in Reformer Tubes
Catalyst Breakage in Reformer TubesCatalyst Breakage in Reformer Tubes
Catalyst Breakage in Reformer Tubes
 
Determination of Inert Gas in Anhydrous Ammonia
Determination of Inert Gas in  Anhydrous AmmoniaDetermination of Inert Gas in  Anhydrous Ammonia
Determination of Inert Gas in Anhydrous Ammonia
 
VETRI CV
VETRI CVVETRI CV
VETRI CV
 
Methanator Water Wash Procedures
Methanator Water Wash ProceduresMethanator Water Wash Procedures
Methanator Water Wash Procedures
 
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSSTEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
 
VULCAN VGP Series Purification Catalyst / Absorbents Operating Manual
VULCAN VGP Series Purification Catalyst / Absorbents Operating ManualVULCAN VGP Series Purification Catalyst / Absorbents Operating Manual
VULCAN VGP Series Purification Catalyst / Absorbents Operating Manual
 
Naseem hayat RO PLANT OPERATOR CV (1).docx
Naseem hayat RO PLANT OPERATOR CV (1).docxNaseem hayat RO PLANT OPERATOR CV (1).docx
Naseem hayat RO PLANT OPERATOR CV (1).docx
 

CURRICULUM VITAE OF ERNESTO N. VALERIO 1

  • 1. CURRICULUM VITAE Name: ERNESTO N. VALERIO Address:BLK. 20 LOT 18 C-63 PHASE 1, VILLA DE CALAMBA, LAMESA,CALAMBACITY4027,LAGUNA, PHILIPPINES E-mail address: envalerio@yahoo.com Philippinespassportno.: EB 1844901 Date of issue: FEBRUARY2, 2011 Valid until: FEBRUARY1, 2016 Telephoneno.: 0063-49-5453754 Cellphone no.:0063-9155007999 Date of birth: DECEMBER28,1956 Nationality:FILIPINO Marital status: MARRIED Educational attainment:BACHELOROF SCIENCE IN MECHANICAL ENGINEERING Position applyingfor: PRODUCTIONOPERATOR Work experiences: 1.Wood Group Equatorial Guinea Limited - Offshore Operator ALBA FIELD PLATFORM -from OCT.2005 to MAR. 2012
  • 2. Responsiblefor start up / shut down of Production Separator,Test Separator, Coalescer, HP Degasser,LP Degasser, Flare Scrubber,Fuel Gas Scrubber, Gas Compressor, Gas Injection, Glycol Dehydration Unit, Glycol Contactor, Air Compressor,and R.O. Unit. Check valve setting prior start up of Process Unit. Monitor Process Unit Parametersuch as Flow, Level,Pressure, Temperature,and makes necessaryadjustment/ setting as required.Perform line pigging, and well test. Check chemical injection rate to ensure correct chemical dosage.Toppingup chemical on it’s specified storage tank such as Anti Foulant,Corrosion Inhibitor, Demulsifier,Hydrate Inhibitor,Methanol,and Water Clarifier. Conduct laboratoryanalysis such as BS&W, Oil Content,and Free Chlorine Content. Perform Draining,De-Pressurizing,Purging,and Ventingon Process Unit prior maintenance job.Perform minor maintenance such as bolt tightening, pump strainer cleaning,and toppingup oil on rotating equipment. 2. MODEC International LLC- Process Technician FPSO FLUMINENSE,BRAZIL - from JAN. 2003 to JUN. 2005 Responsiblefor start up / shut down of Production Separator,Test Separator,IP Separator, Treater,Heater, Heat Exchanger,Waste Heat RecoveryUnit, Flash Gas Compressor,BoosterGas Compressor,Gas Lift, Gas Inlet Separator,VaporRecovery Unit, Fuel Gas Scrubber, Glycol Reboiler,Glycol Contactor,LP Flare Scrubber,HP Flare Scrubber, WaterInjection Pump,De-Oxidizer,R.O. Unit, Air Compressor,and Nitrogen Generator.Checkvalve setting prior start up of Process Unit. MonitorProcess Unit Parametersuch as Flow, Level, Pressure, Temperature,and makes necessaryadjustment/ setting as required.Perform line pigging, and well test. Check chemical injection rate to ensure correct chemical dosage.Toppingup chemical on it’s specified storage tank such as Corrosion Inhibitor, Defoamer, Demulsifier,Methanol,Scale Inhibitor,Biocide,and Oxygen Scavenger. Conductlaboratoryanalysis such as BS&W, RVP,Oxygen Content,and Conductivity.Perform Draining,De-Pressurizing,Purging,and Venting
  • 3. on Process Unit prior maintenance job.Perform minor maintenance such as bolt tightening, pump strainer cleaning,and toppingup oil on rotating equipment. 3. IPEDEXProduction LLC - Production Operator EAST SHABWA BLOCK,YEMEN- from OCT. 2000 to NOV. 2001 Responsiblefor start up / shut down of Early Production Facility such as Surge Separator,Test Separator,Hydrogen Sulphide Stripper, Flare Scrubber, Crude Oil Storage Tank,and Centrilift Pump. Check valve setting prior start up of Process Unit. MonitorProcess Unit Parametersuch as Flow, Level, Pressure, Temperature,and makes necessaryadjustment/ setting as required.Perform well test. Check chemical injection rate to ensure correct chemical dosage.Toppingup chemical on it’s specified storage tank such as Corrosion Inhibitor,and Demulsifier. Conductlaboratoryanalysis such as BS&W. Perform Draining,De-Pressurizing,Purging, and Venting on Process Unit prior maintenance job. Perform minor maintenance such as bolt tightening, pump strainercleaning,and topping up oil on rotating equipment. 4. SBM Offshore Contractor Inc. - Production Operator FPSO KUITO, ANGOLA - from JAN. 2000 to JUL. 2000 Responsiblefor start up / shut down of Production Separator,Test Separator,Treater, Degasser,Heat Exchanger, BoosterGas Compressor,Main Gas Compressor,Gas Lift, Gas Filter Separator, Glycol Reboiler,Glycol Contactor,Fuel Gas Scrubber, LP Flare Knock Out Drum, HP Flare Knock Out Drum, Water Injection Pump,and R.O. Unit. Check valve setting prior start up of Process Unit. Monitor Process Unit Parametersuch as Flow, Level, Pressure, Temperature, and makes necessaryadjustment/ setting as required.Perform line pigging, and well test. Check chemical injection rate to ensure correct chemical dosage. Toppingup chemical on it’s specified storage tank such as Corrosion Inhibitor,Defoamer,Demulsifier,Methanol,Scale
  • 4. Inhibitor,Biocide,and Oxygen Scavenger. Conductlaboratoryanalysis such as BS&W, RVP, Oxygen Content,and Conductivity. Perform Draining,De-Pressurizing,Purging, and Venting on Process Unit prior maintenance job.Perform minor maintenance such as bolt tightening, pump strainercleaning,and topping up oil on rotating equipment. 5. Alliance Marine Services - Lead Production Operator MOPU TCHATAMBAA, GABON - from JAN. 1998 to NOV. 1999 Responsiblefor start up / shut down of Production Separator,Test Separator,Treater, Water Skimmer, FloatationCell,Heat Exchanger, Flare KnockOut Drum, Surge Tank, R.O. Unit, and Air Compressor. Check valve setting prior start up of Process Unit. MonitorProcess Unit Parametersuch as Flow, Level, Pressure, Temperature,and makes necessaryadjustment/ setting as required. Perform line pigging, and well test. Checkchemical injection rate to ensure correct chemical dosage.Toppingup chemical on it’s specified storage tank such as Corrosion Inhibitor,Defoamer,Demulsifier,and Scale Inhibitor. Conductlaboratoryanalysis such as BS&W, RVP,and Conductivity. Perform Draining,De-Pressurizing,Purging, and Ventingon Process Unit prior maintenance job.Perform minor maintenance suchas bolt tightening,pump strainer cleaning,and topping up oil on rotating equipment. 6. Saudi Arabian Oil Company - Utilities Operator RABIGH,K.S.A. - from OCT. 1989 to DEC. 1996 Responsiblefor start up / shut down of Waste Water Treatment Plant such as BallastSeparator,Process Separator,Ballast Polishing Pond,Process PolishingPond,Aerator, Clarifier, Filtration Unit, and Sludge Basin. Checkvalve setting prior start up of Process Unit. Check chemical injection rate to ensure correct chemical dosage.Toppingup chemical on it’s specified storage tank such as Aluminum Sulphate, Caustic Soda, Demulsifier,Ferrous Sulphate, PhosphoricAcid,
  • 5. SulphuricAcid, and Urea. Conductlaboratoryanalysis such as Biological Oxygen Demand,Chemical Oxygen Demand,Conductivity, and Sludge Volume Index.Skimmed oil on BallastSeparator,and Process Separator,and then pumped out to crude oil storage tank. Responsiblefor start up / shut down of DesalinationPlantsuch as Meco Distillation Unit, ElectrolizerUnit, Chlorine Unit, and Potable Water Production Unit. Check valve setting prior start up of Process Unit. Check chemical injection rate to ensure correct chemical dosage. Toppingup chemical on it’s specified storage tank such as Calcium Chloride,Sodium Chloride,CausticSoda, and SulphuricAcid. Conduct laboratoryanalysis such as Chlorine,Conductivity,and PH. Perform minor maintenance such as bolttightening,pump strainercleaning, and toppingup oil on rotating equipment. 7. Star EnergyResources Ltd. - Terminal Supervisor DUBAI,UNITED ARAB EMIRATES - from SEP. 1987 to SEP. 1989 Supervise loading/ unloadingof petroleum product on oil tanker, line blending, and line pigging, Check valve setting prior loading/ unloadingof petroleum product on oil tanker. Check shore tank ullage prior receivingof petroleum product to preventshore tank overflow. Calculate shore tank received / discharged quantity,and oil tanker received / discharged quantity.Check possible cause of abnormal gain / loss on petroleum productshipment.Check job site for safety prior issuance of permit to work. Appraise operatorperformance. 8. Mobil Oil Philipines - Process Operator/ Oil MovementOperator MANILA,PHILIPPINES -from JUL. 1979 to JUL. 1987 Monitorcondition of equipmenton Crude Distillation Unit to ensure safe, efficient, and continuousoperation.Carry out Control Room Operatorinstruction during upsetor emergency,start up / shut down, and on operational change of Crude Distillation Unit. Take sample, and perform analysis to be made on Crude Distillation Unit such as API
  • 6. gravity. Drain accumulated wateron vessel.Adjust heateroperation such as changingburner, correcting draft, improve flame by manipulatingair register, and atomizingsteam. Adjustammonia injection rate to obtain desired PH of 6.5 on Naptha accumulatordrain, and to neutralize acid formed on atmospheric column overhead vapor line, and Kerosene stripper vaporreturn line. Set Caustic injection rate at 7.5 gallons per thousand barrels crude oil feed on furnace crude inlet lines in order to neutralize mostof the HCL formed by the decomposition of salt. Adjust Organic InhibitorNALCO 165 AC, and Kerosenemixture injection rate on atmosphericcolumn overhead vapor line in order to protect Naptha condenser,and downstream equipment from H2S attack. Set Phosphateinjection rate on steam drum to react with ions to minimize scale formation.Operate side stream to produce Keroseneor Jet A distillate specification.Correct a low 10% point on distillation by increasingvapor line temperature. Correct a high 10% point on distillation by reducing vaporline temperature.Correct a low 90% pointon distillation by increasingKerosene rate to storage. Correct a high 90% on distillation by reducing Kerosenerate to storage. Increase stripping steam rate to increase flash point. Decrease stripping steam rate to decrease flash point. Operate side stream to produce Diesel distillate specification.Correct a low 90% pointon distillation by increasingDiesel rate to storage.Correct a high 90% point on distillation by reducing Diesel rate to storage. Perform Draining,De- Pressurizing,Purging, and Ventingon Process Unit prior maintenance job. Perform minor maintenance such as bolt tightening,pump strainer cleaning,and toppingup oil on rotating equipment. Take openinggauge / closing gauge, and sample of petroleum producton shore tank prior receiving / discharging,and after receiving/ discharging of petroleum product. Inspect / take gauging,and sample of petroleum product on Cargo Oil Compartmenton oil tanker prior loading/ unloading,and after loading / unloading of petroleum product. Valve, and line setting on shore tank prior receiving / dischargingof petroleum product. Take midnightinventory of petroleum product on shore tank.