COMMUNICATIONCOMMUNICATION
helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.uk
COMMUNICATION
There are different communication instruments, such
as:
 e-mail
 document
 telephone
 meeting
 contracts
 specifications
 reports
 manuals
 schedules
 calculations
COMMUNICATION
 drawings
 computer files
 Disks
 print-outs
 photographs
 agenda’s and minutes of meetings
 The management of documentation and
communication used in a project is used by a
number of subcontractors, the storage and
retrieval thereof for further use.
COMMUNICATION
STANDARDISATION OF COMMUNICATION
 The main purpose of standardisation is to
develop a specific level of conformity.
 This process of standardisation has certain
advantages for the management of a project,
such as:
 Less different documents.
 Revised drawings overtake the other
drawings.
 Records are easy to handle.
COMMUNICATION
 Training is simpler and more uniform.
 Communication planning and especially
-control is simpler.
 Better utilisation of documents and the
compiling thereof.
 Easy to use in one project or another,
although these are totally different
projects.
COMMUNICATION
 Standardisation contributes to
increased productivity.
 The documents and communication
from one project to the next are the
same or similar.
 Therefore less confusion is created.
COMMUNICATION
COMMUNICATION PLAN
 Communication planning brings the
project together.
 The project manager and head office
staff are at the heart of the project’s
information and control system.
 It is the project manager’s responsibility
to develop the project organisation
structure.
 To develop the project’s communication
plan and lines of communication.
COMMUNICATION
The communication plan should outline:
 Who is responsible for lines of communication?
 Who is the sender and who is the receiver?
 What are the scope of communication and the format
adopted?
 How the message, drawings etc are send to all parties
interested.
 What method would be the most appropriate? Is it:
 e-mail
 document
 telephone
 meeting
COMMUNICATION
 presentation
 Feedback (confirm message received
and understood – document control)
Filing system:
 retrieval
 storing
 disaster recovery
COMMUNICATION
COMMUNICATION FLOW AND
INSTUMENTS
Formal communication
Communication flows in four directions:
1. downwards
2. upwards
3. Horizontally
4. laterally
These basic communication flows are:
Communication flows
COMMUNICATION
Informal communication
In the construction industry, the
following are informal communication
methods:
 Regular contact-face to face
 E mailing
 Phone call
 Team Meetings
COMMUNICATION
Project communication instruments
Project communication
 Internal
 External
 Between members of an organisation
at all levels in order to achieve a
mutual goal or goals.
COMMUNICATION
 To achieve goals, it is necessary to
communicate or interact at various levels of
the organisation.
 This is known as internal communication.
 Members also have to communicate with
individuals or groups who are not members
of the project.
 This is referred to as external
communication.
COMMUNICATION
Subcontractor BSubcontractor A
Web Browser
General
Contractor
Web Browser
Web Browser
XML XML
XML
Message
Agent
Message
Agent
Message
Agent
Platform: IBM PC
OS: Window 2000 Professional
FTP server: IIS 5.0
Platform: IBM PC
OS: Linux
FTP server: WuFTP
Platform: IBM PC
OS: Window 2000 Professional
FTP server: IIS 5.0
Data
Synchronization
Subcontractor BSubcontractor A
Web Browser
General
Contractor
Web Browser
Web Browser
XML XML
XML
Message
Agent
Message
Agent
Message
Agent
Message
Agent
Message
Agent
Message
Agent
Platform: IBM PC
OS: Window 2000 Professional
FTP server: IIS 5.0
Platform: IBM PC
OS: Linux
FTP server: WuFTP
Platform: IBM PC
OS: Window 2000 Professional
FTP server: IIS 5.0
Data
Synchronization
COMMUNICATION
Time-Based
Schedule
WWP
Resource
Vendor
Item-Based
Schedule
Task-Based
Schedule
Work package
Breakdown
WWP
Planning
Resource
Limitation
Other External
Information
Other
participants
No
Yes
General
Contractor
Data Collection
Data Conversion
Communication
Time-Based
Schedule
WWP
Resource
Vendor
Item-Based
Schedule
Task-Based
Schedule
Work package
Breakdown
WWP
Planning
Resource
Limitation
Other External
Information
Other
participants
No
Yes
General
Contractor
Data Collection
Data Conversion
Communication
Weekly work plan (WWP)
COMMUNICATION-CITED-SMITH AND CRONJI
(2001)
Project communication instruments
COMMUNICATION AND
PRODUCTIVITY
RESEARCH MODEL
(Process model productivity on site)
• Organisational Factors
• Contract management
• Finance
• Etc
PROJECT WORK ENVIRONMENT
Pre-construction
Activities (1)
D1. Client brief
D2. Project objectives
D3. Specification
D4. Design/build-ability
D5. Contractual
arrangement
D6. Planning
D7. Scheduling
D8. Estimating
Site/Project
Manager (2)
Characteristics
D9. Experience/capability
D10. Leadership style
D11. Authority/influence
D12. Goal commitment
D13. Involvement
Labour (6)
Characteristics
D39. Subcontracting
Labour
D40. Direct labour
Management (3)
Factors
D14. Clarity of tasks
D15. Team work
D16. The style of
management
D17. Safety management
Management (4)
System
D18. Planning
D19. Communication
D20. Controlling
D21. Co-ordinating
Resource (5)
Management
D22. Labour selection
D23. Labour control
D24. Material selection
D25. Material handling
D26. Plant
D27. D31. Waste on site
D32. D38. Delay and
Disruption on site
Motivating
Factors (7)
D41-D46
Hygiene
Factors
D47-D55
P
R
O
D
U
C
T
I
V
I
T
Y
Project
Performance
• Time
• Cost
• Quality
• Safety
Job
SatisfactionEffort Rewards
Ability and Skill of worker
COMMUNICATION RANKING-
RESULT OF A SURVEY
Bivariate/ inferential analysis
 Bivariate/ inferential analysis
 examines the relationship between the research
variables and case studies
 by applying correlation coefficient and chi-
square test
 development of a hypothesis and sub-
hypothesis
COMMUNICATION RANKING-
RESULT OF A SURVEY
 16 case studies with a high level of
productivity.
 16 case studies with a low level of productivity
were investigated in the London area.
 All of the construction firms who participated
in the case studies are involved in providing
homes for Housing Associations.
COMMUNICATION
 In order to test the hypothesis and sub-
hypothesis the following technique was used:
 Data from the 32 case studies is fed onto a
spreadsheet containing all the information
that is related to site productivity.
 Communication was also amongst collected
data.
 The rating for communication was set from 1
to 5.
 Scale 1 is least and scale 5 is rated as best.
COMMUNICATION RANKING-
RESULT OF A SURVEY
 The relationship between influencing
factors and the productivity level is tested.
 The correlation co-efficient and the chi-
square test was used.
 Output from the analysis is tabulated and
highly significant factors affecting
productivity was ranked (see table below).
DEVELOPMENT OF A MODEL
 CONSIDER VARIABLES WITHIN THE
PROCESS MODEL
 CONSIDER ALL SFACTORS-
INETERNAL AND EXTERNAL
 DEVELOP A RELATIONSHIP BETWEEN
PRODUCTIVITY AND EFFECTIVE
COMMUNICATION
 DEVELOP A PROCESS MODEL
 READ ABOUT PRINCE 2-NOT
RECOMMENDED.

More Related Content

Viewers also liked

Avances espaciales en la vida cotidiana
Avances espaciales en la vida cotidianaAvances espaciales en la vida cotidiana
Avances espaciales en la vida cotidianaPedro gm
 
Interpretacion previa de la escena del suceso
Interpretacion previa de la escena del sucesoInterpretacion previa de la escena del suceso
Interpretacion previa de la escena del sucesoyetsycardenas
 
Catalogo fpgc
Catalogo fpgcCatalogo fpgc
Catalogo fpgclelinares
 
IMPLICACIONES ETICAS EN TORNO AL ACCESO Y USO DE LA INFORMACION Y LAS TEGNOLO...
IMPLICACIONES ETICAS EN TORNO AL ACCESO Y USO DE LA INFORMACION Y LAS TEGNOLO...IMPLICACIONES ETICAS EN TORNO AL ACCESO Y USO DE LA INFORMACION Y LAS TEGNOLO...
IMPLICACIONES ETICAS EN TORNO AL ACCESO Y USO DE LA INFORMACION Y LAS TEGNOLO...Sugey Rabadán
 
1 ra tarea power point 001
1 ra tarea power point 0011 ra tarea power point 001
1 ra tarea power point 001Sonia_Gaona
 
10 estudio de impacto ambiental
10  estudio de impacto ambiental10  estudio de impacto ambiental
10 estudio de impacto ambientalCesar Julio
 
022 B Construction Croductivity-WRITE SYSTEM
022 B Construction Croductivity-WRITE SYSTEM 022 B Construction Croductivity-WRITE SYSTEM
022 B Construction Croductivity-WRITE SYSTEM Dr Fereidoun Dejahang
 
Ilovepdf merged.ef bus eng1 fl
Ilovepdf merged.ef bus eng1 flIlovepdf merged.ef bus eng1 fl
Ilovepdf merged.ef bus eng1 flEugenioFouz
 
Correccion%20 ppt%20daniel[1]
Correccion%20 ppt%20daniel[1]Correccion%20 ppt%20daniel[1]
Correccion%20 ppt%20daniel[1]parzajuk
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 
045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM 045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM Dr Fereidoun Dejahang
 
087 Pricing my product-strategical tkinking
087 Pricing my product-strategical tkinking087 Pricing my product-strategical tkinking
087 Pricing my product-strategical tkinkingDr Fereidoun Dejahang
 
Aprendizaje colaborativo
Aprendizaje colaborativoAprendizaje colaborativo
Aprendizaje colaborativoSonia_Gaona
 
077 Motivation and Financial Incentives
077 Motivation and Financial Incentives077 Motivation and Financial Incentives
077 Motivation and Financial IncentivesDr Fereidoun Dejahang
 

Viewers also liked (20)

Avances espaciales en la vida cotidiana
Avances espaciales en la vida cotidianaAvances espaciales en la vida cotidiana
Avances espaciales en la vida cotidiana
 
Interpretacion previa de la escena del suceso
Interpretacion previa de la escena del sucesoInterpretacion previa de la escena del suceso
Interpretacion previa de la escena del suceso
 
043 Integrating Risk Management
043 Integrating Risk Management043 Integrating Risk Management
043 Integrating Risk Management
 
035 INNOVATION PART 2
035 INNOVATION PART 2035 INNOVATION PART 2
035 INNOVATION PART 2
 
Catalogo fpgc
Catalogo fpgcCatalogo fpgc
Catalogo fpgc
 
Lyst til at lære
Lyst til at læreLyst til at lære
Lyst til at lære
 
031 Front Line Leadership
031 Front Line Leadership031 Front Line Leadership
031 Front Line Leadership
 
IMPLICACIONES ETICAS EN TORNO AL ACCESO Y USO DE LA INFORMACION Y LAS TEGNOLO...
IMPLICACIONES ETICAS EN TORNO AL ACCESO Y USO DE LA INFORMACION Y LAS TEGNOLO...IMPLICACIONES ETICAS EN TORNO AL ACCESO Y USO DE LA INFORMACION Y LAS TEGNOLO...
IMPLICACIONES ETICAS EN TORNO AL ACCESO Y USO DE LA INFORMACION Y LAS TEGNOLO...
 
1 ra tarea power point 001
1 ra tarea power point 0011 ra tarea power point 001
1 ra tarea power point 001
 
10 estudio de impacto ambiental
10  estudio de impacto ambiental10  estudio de impacto ambiental
10 estudio de impacto ambiental
 
022 B Construction Croductivity-WRITE SYSTEM
022 B Construction Croductivity-WRITE SYSTEM 022 B Construction Croductivity-WRITE SYSTEM
022 B Construction Croductivity-WRITE SYSTEM
 
Ilovepdf merged.ef bus eng1 fl
Ilovepdf merged.ef bus eng1 flIlovepdf merged.ef bus eng1 fl
Ilovepdf merged.ef bus eng1 fl
 
Correccion%20 ppt%20daniel[1]
Correccion%20 ppt%20daniel[1]Correccion%20 ppt%20daniel[1]
Correccion%20 ppt%20daniel[1]
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM 045 INTERGRATING SCN WITH JIT AND TQM
045 INTERGRATING SCN WITH JIT AND TQM
 
087 Pricing my product-strategical tkinking
087 Pricing my product-strategical tkinking087 Pricing my product-strategical tkinking
087 Pricing my product-strategical tkinking
 
Mapa de la piel
Mapa de la pielMapa de la piel
Mapa de la piel
 
Aprendizaje colaborativo
Aprendizaje colaborativoAprendizaje colaborativo
Aprendizaje colaborativo
 
077 Motivation and Financial Incentives
077 Motivation and Financial Incentives077 Motivation and Financial Incentives
077 Motivation and Financial Incentives
 
Web 1 2 3..0
Web 1 2 3..0Web 1 2 3..0
Web 1 2 3..0
 

Similar to 017 communication

Project Communications Management - Information Technology
Project Communications Management - Information TechnologyProject Communications Management - Information Technology
Project Communications Management - Information TechnologyIshan Parekh
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxclarebernice
 
Project communications management
Project communications managementProject communications management
Project communications managementSanket Gandhi
 
Communication management
Communication management Communication management
Communication management ammara2010
 
049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity 049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity Dr Fereidoun Dejahang
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructabilitydrdej19
 
Communication Management
Communication ManagementCommunication Management
Communication ManagementSanjay Rajpoot
 
10. Project Communications Management.pptx
10. Project Communications Management.pptx10. Project Communications Management.pptx
10. Project Communications Management.pptxKamranKhan353531
 
Improving IT Project Communication
Improving IT Project CommunicationImproving IT Project Communication
Improving IT Project Communicationarshriz
 
Communication a success to project management
Communication a success to project managementCommunication a success to project management
Communication a success to project managementShankar Mandapaka
 
14.15 andrew killander, aconex for distribution
14.15 andrew killander, aconex   for distribution14.15 andrew killander, aconex   for distribution
14.15 andrew killander, aconex for distributionIbrahim Al-Hudhaif
 
Communications Management Presentation
Communications Management PresentationCommunications Management Presentation
Communications Management Presentationbrianbish10795
 
Project communication management
Project communication managementProject communication management
Project communication managementAzeem Anwar
 
Project communication management
Project communication managementProject communication management
Project communication managementSaad Al Jabri
 
TaskNetworking Systems Administration StudentsTaskBased on y.docx
TaskNetworking  Systems Administration StudentsTaskBased on y.docxTaskNetworking  Systems Administration StudentsTaskBased on y.docx
TaskNetworking Systems Administration StudentsTaskBased on y.docxjohniemcm5zt
 
Project communication management
Project communication managementProject communication management
Project communication managementDikshant Ghimire
 

Similar to 017 communication (20)

017 communication
017 communication017 communication
017 communication
 
Pmp communication chapter 10
Pmp communication chapter 10Pmp communication chapter 10
Pmp communication chapter 10
 
Project Communications Management - Information Technology
Project Communications Management - Information TechnologyProject Communications Management - Information Technology
Project Communications Management - Information Technology
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docx
 
Project communications management
Project communications managementProject communications management
Project communications management
 
Communication management
Communication management Communication management
Communication management
 
049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity 049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
 
Communication Management
Communication ManagementCommunication Management
Communication Management
 
10. Project Communications Management.pptx
10. Project Communications Management.pptx10. Project Communications Management.pptx
10. Project Communications Management.pptx
 
Improving IT Project Communication
Improving IT Project CommunicationImproving IT Project Communication
Improving IT Project Communication
 
Communication a success to project management
Communication a success to project managementCommunication a success to project management
Communication a success to project management
 
14.15 andrew killander, aconex for distribution
14.15 andrew killander, aconex   for distribution14.15 andrew killander, aconex   for distribution
14.15 andrew killander, aconex for distribution
 
Communications Management Presentation
Communications Management PresentationCommunications Management Presentation
Communications Management Presentation
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project communication management
Project communication managementProject communication management
Project communication management
 
TaskNetworking Systems Administration StudentsTaskBased on y.docx
TaskNetworking  Systems Administration StudentsTaskBased on y.docxTaskNetworking  Systems Administration StudentsTaskBased on y.docx
TaskNetworking Systems Administration StudentsTaskBased on y.docx
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project Communications Management
Project Communications ManagementProject Communications Management
Project Communications Management
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 

Recently uploaded

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 

017 communication

  • 2. COMMUNICATION There are different communication instruments, such as:  e-mail  document  telephone  meeting  contracts  specifications  reports  manuals  schedules  calculations
  • 3. COMMUNICATION  drawings  computer files  Disks  print-outs  photographs  agenda’s and minutes of meetings  The management of documentation and communication used in a project is used by a number of subcontractors, the storage and retrieval thereof for further use.
  • 4. COMMUNICATION STANDARDISATION OF COMMUNICATION  The main purpose of standardisation is to develop a specific level of conformity.  This process of standardisation has certain advantages for the management of a project, such as:  Less different documents.  Revised drawings overtake the other drawings.  Records are easy to handle.
  • 5. COMMUNICATION  Training is simpler and more uniform.  Communication planning and especially -control is simpler.  Better utilisation of documents and the compiling thereof.  Easy to use in one project or another, although these are totally different projects.
  • 6. COMMUNICATION  Standardisation contributes to increased productivity.  The documents and communication from one project to the next are the same or similar.  Therefore less confusion is created.
  • 7. COMMUNICATION COMMUNICATION PLAN  Communication planning brings the project together.  The project manager and head office staff are at the heart of the project’s information and control system.  It is the project manager’s responsibility to develop the project organisation structure.  To develop the project’s communication plan and lines of communication.
  • 8. COMMUNICATION The communication plan should outline:  Who is responsible for lines of communication?  Who is the sender and who is the receiver?  What are the scope of communication and the format adopted?  How the message, drawings etc are send to all parties interested.  What method would be the most appropriate? Is it:  e-mail  document  telephone  meeting
  • 9. COMMUNICATION  presentation  Feedback (confirm message received and understood – document control) Filing system:  retrieval  storing  disaster recovery
  • 10. COMMUNICATION COMMUNICATION FLOW AND INSTUMENTS Formal communication Communication flows in four directions: 1. downwards 2. upwards 3. Horizontally 4. laterally
  • 11. These basic communication flows are: Communication flows
  • 12. COMMUNICATION Informal communication In the construction industry, the following are informal communication methods:  Regular contact-face to face  E mailing  Phone call  Team Meetings
  • 13. COMMUNICATION Project communication instruments Project communication  Internal  External  Between members of an organisation at all levels in order to achieve a mutual goal or goals.
  • 14. COMMUNICATION  To achieve goals, it is necessary to communicate or interact at various levels of the organisation.  This is known as internal communication.  Members also have to communicate with individuals or groups who are not members of the project.  This is referred to as external communication.
  • 15. COMMUNICATION Subcontractor BSubcontractor A Web Browser General Contractor Web Browser Web Browser XML XML XML Message Agent Message Agent Message Agent Platform: IBM PC OS: Window 2000 Professional FTP server: IIS 5.0 Platform: IBM PC OS: Linux FTP server: WuFTP Platform: IBM PC OS: Window 2000 Professional FTP server: IIS 5.0 Data Synchronization Subcontractor BSubcontractor A Web Browser General Contractor Web Browser Web Browser XML XML XML Message Agent Message Agent Message Agent Message Agent Message Agent Message Agent Platform: IBM PC OS: Window 2000 Professional FTP server: IIS 5.0 Platform: IBM PC OS: Linux FTP server: WuFTP Platform: IBM PC OS: Window 2000 Professional FTP server: IIS 5.0 Data Synchronization
  • 16. COMMUNICATION Time-Based Schedule WWP Resource Vendor Item-Based Schedule Task-Based Schedule Work package Breakdown WWP Planning Resource Limitation Other External Information Other participants No Yes General Contractor Data Collection Data Conversion Communication Time-Based Schedule WWP Resource Vendor Item-Based Schedule Task-Based Schedule Work package Breakdown WWP Planning Resource Limitation Other External Information Other participants No Yes General Contractor Data Collection Data Conversion Communication Weekly work plan (WWP)
  • 20. RESEARCH MODEL (Process model productivity on site) • Organisational Factors • Contract management • Finance • Etc PROJECT WORK ENVIRONMENT Pre-construction Activities (1) D1. Client brief D2. Project objectives D3. Specification D4. Design/build-ability D5. Contractual arrangement D6. Planning D7. Scheduling D8. Estimating Site/Project Manager (2) Characteristics D9. Experience/capability D10. Leadership style D11. Authority/influence D12. Goal commitment D13. Involvement Labour (6) Characteristics D39. Subcontracting Labour D40. Direct labour Management (3) Factors D14. Clarity of tasks D15. Team work D16. The style of management D17. Safety management Management (4) System D18. Planning D19. Communication D20. Controlling D21. Co-ordinating Resource (5) Management D22. Labour selection D23. Labour control D24. Material selection D25. Material handling D26. Plant D27. D31. Waste on site D32. D38. Delay and Disruption on site Motivating Factors (7) D41-D46 Hygiene Factors D47-D55 P R O D U C T I V I T Y Project Performance • Time • Cost • Quality • Safety Job SatisfactionEffort Rewards Ability and Skill of worker
  • 21. COMMUNICATION RANKING- RESULT OF A SURVEY Bivariate/ inferential analysis  Bivariate/ inferential analysis  examines the relationship between the research variables and case studies  by applying correlation coefficient and chi- square test  development of a hypothesis and sub- hypothesis
  • 22. COMMUNICATION RANKING- RESULT OF A SURVEY  16 case studies with a high level of productivity.  16 case studies with a low level of productivity were investigated in the London area.  All of the construction firms who participated in the case studies are involved in providing homes for Housing Associations.
  • 23. COMMUNICATION  In order to test the hypothesis and sub- hypothesis the following technique was used:  Data from the 32 case studies is fed onto a spreadsheet containing all the information that is related to site productivity.  Communication was also amongst collected data.  The rating for communication was set from 1 to 5.  Scale 1 is least and scale 5 is rated as best.
  • 24. COMMUNICATION RANKING- RESULT OF A SURVEY  The relationship between influencing factors and the productivity level is tested.  The correlation co-efficient and the chi- square test was used.  Output from the analysis is tabulated and highly significant factors affecting productivity was ranked (see table below).
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. DEVELOPMENT OF A MODEL  CONSIDER VARIABLES WITHIN THE PROCESS MODEL  CONSIDER ALL SFACTORS- INETERNAL AND EXTERNAL  DEVELOP A RELATIONSHIP BETWEEN PRODUCTIVITY AND EFFECTIVE COMMUNICATION  DEVELOP A PROCESS MODEL  READ ABOUT PRINCE 2-NOT RECOMMENDED.