AQUA TOWER,
CHICAGO
NAME : AQUA
ALTERNATIVE NAME : AQUA TOWER, LAKESHORE EAST BUILDING 2-P
EBN, 190323
AQUA
Chicago, Illinois
Usage
• Main usage -
residential; condominium; hotel; rental apartments
• Side usage
parking; commercial office; shop(s)
Built - 2007-2009
Cost - US$300 million
Owner - Aqua Realty Holdings LLC
Floor count -
82
1 below ground
Height – 859 ft (262 m)
Floor area - 1,990,635 sq ft (184,936.0 m2)
Lifts/elevators – 24
Number of apartments - 739
Number of hotel rooms - 215
Number of parking spaces - 1557
Architect
Jeanne Gang of Studio Gang Architects
Developer
Magellan Development Group
Structural Engineer
Magnusson Klemencic Associates
main Contractor
James McHugh Construction Co
Aqua is an 82-story mixed-use residential skyscraper in the Lakeshore East
development in downtown Chicago, Illinois. It is designed by Jeanne Gang ,
principal and founder of Studio Gang Architects, and it is her first skyscraper
project. This is the largest project ever awarded to an American firm headed by a
woman. Loewenberg & Associates are the architects of record, led by James
Loewenberg. Each floor covers approximately 16,000 sq ft (1,500 m2). The Aqua
was named the Emporis Skyscraper Award 2009 skyscraper of the year, and was
shortlisted in 2010 for the biannual International Highrise Award.
• The building contains 55,000 sq ft (5,100 m2) of retail and office space,
in addition to 215 hotel rooms (floors 1-18), 476 rental residential units
(floors 19-52), and 263 condominium units & Penthouses (floors 53-81).
Aqua is the first downtown building to combine condos, apartments and a
hotel.
• To capture views of nearby landmarks for Aqua's residents, Gang
stretched its balconies outward by as much as 12 ft (3.7 m). The result is
a building composed of irregularly shaped concrete floor slabs which
lend the facade an undulating, sculptural quality.
• A daring piece of architecture for The Loop area, Aqua comes off more as
a massive sculpture than as a residential block in the crowded heart of the
city. The name 'Aqua' fits the nautical theme of the Lakeshore East
development, and is derived from the wave-like forms of the balconies.
The name also matches the blue-green tint of the windows.
• Aqua is a daring new addition to the Chicago skyline.
• Concrete is utilized in both the structural support and the tower’s
architectural expression.
• The tower’s façade features vertical glass with undulating balconies of
reinforced concrete that varies slightly from floor to floor, creating a
rippling, wavelike effect. Overall, the exterior mimics the natural striated
limestone outcroppings and formations that are plentiful throughout the
Great Lakes region.
• The sinuously curved concrete decks on each floor assume different
configurations where balconies extend anywhere from 2 to 12 feet.
Although the architects used computer modeling to create the rippling
contours, the fact that each floor slab is unique in shape meant
calculations had to be done separately for each floor.
• At the base of the tower, a three-story podium contains the hotel and
apartment lobbies, the hotel ballroom, and other public rooms. But the
coup de théatre is the 80,000-square-foot podium roof garden, with an
outdoor swimming pool and a running track. In this park-like roof,
meandering paths weave between low evergreen plants and deciduous
plantings that may not be native but generate a “geometric naturalism,”.
• Aqua is an amazing tower demonstrating how concrete can be creatively
applied to achieve both outstanding architecture and a durable structure.
• Residents and visitors of the Aqua Tower are able to occupy the building
while retaining the sense of also being a part of a metropolis at large.
The typical tower floors are 16,000 square feet and offer spectacular
views of Lake Michigan, the Chicago River and some of Chicago’s
architecture gems.
View of Lake Michigan/ Navy Pier
View of neighborhood park
View of Chicago RiverView of Millennium Park
Jeanne Gang, FAIA, of Studio Gang, had not designed a high-rise structure (not to
mention a sustainable one) before Aqua, the 82-story tower in Chicago’s
downtown. Her small 38-person firm, in business in the city since 1997, had,
however, distinguished itself with community centers, schools, and houses. Then
in 2004 she met developer and architect James Loewenberg of the Magellan
Development Group, who is behind the 28-acre Lakeshore East mixed-use
complex, which has been under construction on the old Illinois Central Railroad
yards along Lake Michigan during much of the last decade. Loewenberg asked
Gang to come up with a fresh design for a new 1.9 million-square-foot structure in
Lakeshore East, for which he would be both the client and the executive architect.
Now the $300-million (construction) residential tower, which rises from a podium
on the 179,946-square-foot site near Millennium Park, has just been completed. In
a city known for its rectilinear Miesian skyscrapers, Gang brought back the curve
by wrapping her residential tower with sinuously swerving concrete balconies.
Usage
• Main usage -
residential; condominium; hotel; rental apartments
• Side usage
parking; commercial office; shop(s)
Access
• The building has its main access from North Columbus Drive.
Porch
Sapphire neon illuminates
The entrance of Radisson
Blu Aqua hotel. The azure
lighting drives home the
branding of the hotel. Blu is
the luxury offshoot of
Radisson Hotels, once known
for reliable, staid, moderate
hotels.
Orientation
• The east-west orientation of the building maximizes exposure in winter, facilitating
passive heating.
• The balconies on the south facade are deliberately larger to reduce exposure in
summer.
• In addition to low e-coating on all glass, the design team modeled seasonal sun
patterns to identify areas requiring additional glazing in order to increase the
tower’s energy performance.
• Glass on the east and south façades are reflective in areas without a protective
balcony, while glass facing west has a tinted coating that improves its shading
coefficient.
• The undulating slab edges disrupted or “confused” the flow of wind around the
tower, effectively reducing the wind demands, and this, combined with the
effectiveness of the structural design, eliminated the need for a supplemental
damping system.
• Much of the exposed glass is fritted, not only to help reduce heat and glare, but,
along with dark gray aluminum balustrades, to keep birds from crashing into the
tower. Already this strategy won Aqua a Proggy award (named for “progress”)
from the People for the Ethical Treatment of Animals.
• At the base of the tower, a three-story podium is topped with the 80,000-square-
foot podium roof garden. . The roof’s vegetation is not only aesthetic but also
combats the heat- island effect during the hot summer months by lowering ambient
temperatures around the building.
N
MILLENIUM PARK – A
major tourist spot of the
city.
82 – STOREY
AQUA TOWER
3 – STOREY PODIUM
with 80.000 sq.ft. roof
garden
SWISSOTEL
CHICAGO
THREE ILLINOIS
CENTER
BLUE CROSS BLUE SHIELD
BUILDING
Aqua creates a strong identity through its architecture and has become a
landmark addition to the Chicago skyline.
Traffic considerations:
•Aqua's entrances serve a variety of users and residents.
•Canopied walkways lead visitors to the building's main entrance while two
grand public stairs bring pedestrians from Upper Columbus Drive down to a
park at grade level, providing access to Chicago's downtown area and
lakefront.
•The tower also connects to Chicago's extensive underground pedway
system, linking users and residents to restaurants, retail, cultural activities
and jobs in the Loop and on the Magnificent Mile.
•Additional consideration was made when designing the tower's garage exits
below grade to minimize congestion at pedestrian levels.
•To further reduce traffic and confusion, the garage's three levels have
different access points that correlate to the tower's specific uses and users.
3RD FLOOR WITH ROOF GARDEN
TYPICAL FLOOR PLAN
STRUCTURE SYSTEM
• An 87-story, 868-foot-tall building
designed to look like the wind is
blowing waves across its surface —
each floor sporting graceful, thin
curved balconies that look like fins
between the floors. An architectural
achievement, perhaps, but definitely
an engineering challenge.
• Magnusson Klemencic Associates
was chosen to turn architect Jeanne
Gang’s vision of “a vertically
deployed landscape” into reality.
Ultimately, the challenge required
several major engineering
innovations, starting with a custom
floor plate design to create the
unusual wave-like facade.
• Aqua has 78 individually curving
floor plates with cantilevered
balconies that extend up to 12 feet,
both for looks and to capture the best
views.
• The balconies are cast
monolithically with the floor slabs.
• The 9-inch-thick balcony slabs thin
out as they extend from the cladding
line to the edge of the cantilever.
This profile helps in drainage and
keeps rainwater off the face of the
building.
• Dozens of computer models were
created to analyze the strength and
deflection of these unique floor slabs
and their 8 miles of continuously
varying edges.
• In a wind analysis, Aqua’s balcony
design actually seemed to “confuse”
the wind, reducing forces rather than
creating additional pressures or
suction.
OUTRIGGER WALLS
55-58TH STOREY
OUTRIGGER WALLS
81-82ND STOREY
BELT WALLS
57TH STOREY
MKA also needed to
develop a new structural
system to enable the
construction of the
building.
The new system
combined a concrete
core, stepped concrete
shear walls, outrigger
walls at levels 55 to 58
and 81 to 82, belt walls
at level 57, and
building columns, all
on top of 31 drilled
rock caissons(diameters
ranging from 4 to 10
feet and extending up to
112 feet below grade
and six feet into a layer
of dolomite).
The core and shear
walls incorporate four
different concrete
strengths to optimize
performance and
consolidate strength
while the strategically
located outriggers and
belt walls broaden the
stance of the building
and engage the
building’s exterior
columns to resist sway.
CONCRETE
CORE
BALCONIES
EXTEND
FROM 2 TO 12
FEET
SAME FLOOR PLAN ON EACH STOREY
UNDULATING BALCONIES :
EACH INDIVIDUAL TO THE STOREY
CONSTRUCTION IMAGES

More Related Content

What's hot

Presentation on Works of Architect Raj Rewal
Presentation on Works of Architect Raj RewalPresentation on Works of Architect Raj Rewal
Presentation on Works of Architect Raj RewalArchistudent Portal
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case studyRadhikaJadhav8
 
Case study milwaukee art museum.
Case study  milwaukee art museum.Case study  milwaukee art museum.
Case study milwaukee art museum.rajitk97
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study Nitesh Parmar
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Prateek Srivastava
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research DocumentNicholas Socrates
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...UdayGotetiStudios
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadOnal Kothari
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyARYAN GUPTA
 
Raj rewal Asian games Village
Raj rewal Asian games VillageRaj rewal Asian games Village
Raj rewal Asian games VillageWaseem Noor
 
High rise building case study
High rise building case study High rise building case study
High rise building case study VISHAKA BOTHRA
 
A case study of Bihar Museum, Patna
A case study of Bihar Museum, PatnaA case study of Bihar Museum, Patna
A case study of Bihar Museum, PatnaAnkitVishwa
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Towermisschand
 

What's hot (20)

Presentation on Works of Architect Raj Rewal
Presentation on Works of Architect Raj RewalPresentation on Works of Architect Raj Rewal
Presentation on Works of Architect Raj Rewal
 
JOHN HANCOCK CENTER
JOHN HANCOCK CENTERJOHN HANCOCK CENTER
JOHN HANCOCK CENTER
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case study
 
Case study milwaukee art museum.
Case study  milwaukee art museum.Case study  milwaukee art museum.
Case study milwaukee art museum.
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
 
CHARLES MOORE
CHARLES MOORECHARLES MOORE
CHARLES MOORE
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
Raj rewal Asian games Village
Raj rewal Asian games VillageRaj rewal Asian games Village
Raj rewal Asian games Village
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Al bahar
Al baharAl bahar
Al bahar
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
A case study of Bihar Museum, Patna
A case study of Bihar Museum, PatnaA case study of Bihar Museum, Patna
A case study of Bihar Museum, Patna
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Vertical Circulation and Services of Highrise
Vertical Circulation and Services of HighriseVertical Circulation and Services of Highrise
Vertical Circulation and Services of Highrise
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 

Similar to Aqua towers

Architecture eNews #1 - #5
Architecture eNews #1 - #5Architecture eNews #1 - #5
Architecture eNews #1 - #5unionsquare
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Mayur Waghulde
 
Ryan Davis - Selected Work
Ryan Davis - Selected WorkRyan Davis - Selected Work
Ryan Davis - Selected Workrpdarch
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Prasad Thanthratey
 
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-builtStephen Matkovits
 
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing DesignDon Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing DesignDon Talend
 
Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor CenterRay Rankin
 
Leeser Architecture 2016
Leeser Architecture 2016Leeser Architecture 2016
Leeser Architecture 2016Nena Miller
 
Leeser Architecture 2016
Leeser Architecture 2016Leeser Architecture 2016
Leeser Architecture 2016Nena Miller
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters DubaiNeha Rampuria
 

Similar to Aqua towers (20)

Presentation1
Presentation1Presentation1
Presentation1
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 
Architecture eNews #1 - #5
Architecture eNews #1 - #5Architecture eNews #1 - #5
Architecture eNews #1 - #5
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
Ryan Davis - Selected Work
Ryan Davis - Selected WorkRyan Davis - Selected Work
Ryan Davis - Selected Work
 
Aldar Headqaurter
Aldar Headqaurter  Aldar Headqaurter
Aldar Headqaurter
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
 
Cayan tower
Cayan towerCayan tower
Cayan tower
 
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing DesignDon Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
 
Woodlawn project in Ascent magazine
Woodlawn project in Ascent magazineWoodlawn project in Ascent magazine
Woodlawn project in Ascent magazine
 
ULX Sept 09
ULX Sept 09ULX Sept 09
ULX Sept 09
 
solus4_Arch_Portfolio01
solus4_Arch_Portfolio01solus4_Arch_Portfolio01
solus4_Arch_Portfolio01
 
Cs louvers 2017 jon salis cell 940 445 1845
Cs louvers 2017   jon salis cell 940 445 1845Cs louvers 2017   jon salis cell 940 445 1845
Cs louvers 2017 jon salis cell 940 445 1845
 
Norman foster
Norman fosterNorman foster
Norman foster
 
Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor Center
 
Current Works
Current WorksCurrent Works
Current Works
 
Leeser Architecture 2016
Leeser Architecture 2016Leeser Architecture 2016
Leeser Architecture 2016
 
Leeser Architecture 2016
Leeser Architecture 2016Leeser Architecture 2016
Leeser Architecture 2016
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 

More from Rajat Nainwal

Wildlife presentation
Wildlife presentationWildlife presentation
Wildlife presentationRajat Nainwal
 
Vernacular Architecture
Vernacular Architecture Vernacular Architecture
Vernacular Architecture Rajat Nainwal
 
Timber, its use and conections
Timber, its use and conectionsTimber, its use and conections
Timber, its use and conectionsRajat Nainwal
 
Sustainable water supply
Sustainable water supplySustainable water supply
Sustainable water supplyRajat Nainwal
 
The international centre goa
The international centre goaThe international centre goa
The international centre goaRajat Nainwal
 
Sustainable transport
Sustainable transportSustainable transport
Sustainable transportRajat Nainwal
 
Sustainable energy and power
Sustainable energy and powerSustainable energy and power
Sustainable energy and powerRajat Nainwal
 
Storm water management and its techniques
Storm water management and its techniquesStorm water management and its techniques
Storm water management and its techniquesRajat Nainwal
 
St. peter's basillica
St. peter's basillicaSt. peter's basillica
St. peter's basillicaRajat Nainwal
 
Solid wast managment
Solid wast managmentSolid wast managment
Solid wast managmentRajat Nainwal
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajat Nainwal
 
Presentation on developmental plan
Presentation on developmental  planPresentation on developmental  plan
Presentation on developmental planRajat Nainwal
 

More from Rajat Nainwal (20)

Wildlife presentation
Wildlife presentationWildlife presentation
Wildlife presentation
 
Vernacular Architecture
Vernacular Architecture Vernacular Architecture
Vernacular Architecture
 
Types of windows
Types of windowsTypes of windows
Types of windows
 
Types of steel
Types of steelTypes of steel
Types of steel
 
Timber, its use and conections
Timber, its use and conectionsTimber, its use and conections
Timber, its use and conections
 
Sustainable water supply
Sustainable water supplySustainable water supply
Sustainable water supply
 
The international centre goa
The international centre goaThe international centre goa
The international centre goa
 
Technosphere
TechnosphereTechnosphere
Technosphere
 
Sustainable transport
Sustainable transportSustainable transport
Sustainable transport
 
Sustainable housing
Sustainable housingSustainable housing
Sustainable housing
 
Sustainable energy and power
Sustainable energy and powerSustainable energy and power
Sustainable energy and power
 
Supernova noida
Supernova   noidaSupernova   noida
Supernova noida
 
Storm water management and its techniques
Storm water management and its techniquesStorm water management and its techniques
Storm water management and its techniques
 
St. peter's basillica
St. peter's basillicaSt. peter's basillica
St. peter's basillica
 
Steel manufacturing
Steel manufacturingSteel manufacturing
Steel manufacturing
 
Steel and its types
Steel and its typesSteel and its types
Steel and its types
 
Solid wast managment
Solid wast managmentSolid wast managment
Solid wast managment
 
Shear walls
Shear wallsShear walls
Shear walls
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Presentation on developmental plan
Presentation on developmental  planPresentation on developmental  plan
Presentation on developmental plan
 

Recently uploaded

dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningMarc Dusseiller Dusjagr
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....Ritu480198
 
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptxMichaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptxRugvedSathawane
 
Rich Dad Poor Dad ( PDFDrive.com )--.pdf
Rich Dad Poor Dad ( PDFDrive.com )--.pdfRich Dad Poor Dad ( PDFDrive.com )--.pdf
Rich Dad Poor Dad ( PDFDrive.com )--.pdfJerry Chew
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonhttgc7rh9c
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project researchCaitlinCummins3
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024Borja Sotomayor
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital ManagementMBA Assignment Experts
 
Ernest Hemingway's For Whom the Bell Tolls
Ernest Hemingway's For Whom the Bell TollsErnest Hemingway's For Whom the Bell Tolls
Ernest Hemingway's For Whom the Bell TollsPallavi Parmar
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxCeline George
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of PlayPooky Knightsmith
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Pharmaceutical Biotechnology VI semester.pdf
Pharmaceutical Biotechnology VI semester.pdfPharmaceutical Biotechnology VI semester.pdf
Pharmaceutical Biotechnology VI semester.pdfBALASUNDARESAN M
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnershipsexpandedwebsite
 

Recently uploaded (20)

dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptxMichaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
 
Rich Dad Poor Dad ( PDFDrive.com )--.pdf
Rich Dad Poor Dad ( PDFDrive.com )--.pdfRich Dad Poor Dad ( PDFDrive.com )--.pdf
Rich Dad Poor Dad ( PDFDrive.com )--.pdf
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management
 
Ernest Hemingway's For Whom the Bell Tolls
Ernest Hemingway's For Whom the Bell TollsErnest Hemingway's For Whom the Bell Tolls
Ernest Hemingway's For Whom the Bell Tolls
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptx
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of Play
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Pharmaceutical Biotechnology VI semester.pdf
Pharmaceutical Biotechnology VI semester.pdfPharmaceutical Biotechnology VI semester.pdf
Pharmaceutical Biotechnology VI semester.pdf
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 

Aqua towers

  • 2. NAME : AQUA ALTERNATIVE NAME : AQUA TOWER, LAKESHORE EAST BUILDING 2-P EBN, 190323
  • 3. AQUA Chicago, Illinois Usage • Main usage - residential; condominium; hotel; rental apartments • Side usage parking; commercial office; shop(s) Built - 2007-2009 Cost - US$300 million Owner - Aqua Realty Holdings LLC Floor count - 82 1 below ground Height – 859 ft (262 m) Floor area - 1,990,635 sq ft (184,936.0 m2) Lifts/elevators – 24 Number of apartments - 739 Number of hotel rooms - 215 Number of parking spaces - 1557 Architect Jeanne Gang of Studio Gang Architects Developer Magellan Development Group Structural Engineer Magnusson Klemencic Associates main Contractor James McHugh Construction Co Aqua is an 82-story mixed-use residential skyscraper in the Lakeshore East development in downtown Chicago, Illinois. It is designed by Jeanne Gang , principal and founder of Studio Gang Architects, and it is her first skyscraper project. This is the largest project ever awarded to an American firm headed by a woman. Loewenberg & Associates are the architects of record, led by James Loewenberg. Each floor covers approximately 16,000 sq ft (1,500 m2). The Aqua was named the Emporis Skyscraper Award 2009 skyscraper of the year, and was shortlisted in 2010 for the biannual International Highrise Award.
  • 4. • The building contains 55,000 sq ft (5,100 m2) of retail and office space, in addition to 215 hotel rooms (floors 1-18), 476 rental residential units (floors 19-52), and 263 condominium units & Penthouses (floors 53-81). Aqua is the first downtown building to combine condos, apartments and a hotel. • To capture views of nearby landmarks for Aqua's residents, Gang stretched its balconies outward by as much as 12 ft (3.7 m). The result is a building composed of irregularly shaped concrete floor slabs which lend the facade an undulating, sculptural quality. • A daring piece of architecture for The Loop area, Aqua comes off more as a massive sculpture than as a residential block in the crowded heart of the city. The name 'Aqua' fits the nautical theme of the Lakeshore East development, and is derived from the wave-like forms of the balconies. The name also matches the blue-green tint of the windows. • Aqua is a daring new addition to the Chicago skyline.
  • 5. • Concrete is utilized in both the structural support and the tower’s architectural expression. • The tower’s façade features vertical glass with undulating balconies of reinforced concrete that varies slightly from floor to floor, creating a rippling, wavelike effect. Overall, the exterior mimics the natural striated limestone outcroppings and formations that are plentiful throughout the Great Lakes region. • The sinuously curved concrete decks on each floor assume different configurations where balconies extend anywhere from 2 to 12 feet. Although the architects used computer modeling to create the rippling contours, the fact that each floor slab is unique in shape meant calculations had to be done separately for each floor. • At the base of the tower, a three-story podium contains the hotel and apartment lobbies, the hotel ballroom, and other public rooms. But the coup de théatre is the 80,000-square-foot podium roof garden, with an outdoor swimming pool and a running track. In this park-like roof, meandering paths weave between low evergreen plants and deciduous plantings that may not be native but generate a “geometric naturalism,”. • Aqua is an amazing tower demonstrating how concrete can be creatively applied to achieve both outstanding architecture and a durable structure. • Residents and visitors of the Aqua Tower are able to occupy the building while retaining the sense of also being a part of a metropolis at large.
  • 6.
  • 7.
  • 8. The typical tower floors are 16,000 square feet and offer spectacular views of Lake Michigan, the Chicago River and some of Chicago’s architecture gems. View of Lake Michigan/ Navy Pier View of neighborhood park View of Chicago RiverView of Millennium Park
  • 9. Jeanne Gang, FAIA, of Studio Gang, had not designed a high-rise structure (not to mention a sustainable one) before Aqua, the 82-story tower in Chicago’s downtown. Her small 38-person firm, in business in the city since 1997, had, however, distinguished itself with community centers, schools, and houses. Then in 2004 she met developer and architect James Loewenberg of the Magellan Development Group, who is behind the 28-acre Lakeshore East mixed-use complex, which has been under construction on the old Illinois Central Railroad yards along Lake Michigan during much of the last decade. Loewenberg asked Gang to come up with a fresh design for a new 1.9 million-square-foot structure in Lakeshore East, for which he would be both the client and the executive architect. Now the $300-million (construction) residential tower, which rises from a podium on the 179,946-square-foot site near Millennium Park, has just been completed. In a city known for its rectilinear Miesian skyscrapers, Gang brought back the curve by wrapping her residential tower with sinuously swerving concrete balconies.
  • 10. Usage • Main usage - residential; condominium; hotel; rental apartments • Side usage parking; commercial office; shop(s) Access • The building has its main access from North Columbus Drive. Porch Sapphire neon illuminates The entrance of Radisson Blu Aqua hotel. The azure lighting drives home the branding of the hotel. Blu is the luxury offshoot of Radisson Hotels, once known for reliable, staid, moderate hotels.
  • 11. Orientation • The east-west orientation of the building maximizes exposure in winter, facilitating passive heating. • The balconies on the south facade are deliberately larger to reduce exposure in summer. • In addition to low e-coating on all glass, the design team modeled seasonal sun patterns to identify areas requiring additional glazing in order to increase the tower’s energy performance. • Glass on the east and south façades are reflective in areas without a protective balcony, while glass facing west has a tinted coating that improves its shading coefficient. • The undulating slab edges disrupted or “confused” the flow of wind around the tower, effectively reducing the wind demands, and this, combined with the effectiveness of the structural design, eliminated the need for a supplemental damping system. • Much of the exposed glass is fritted, not only to help reduce heat and glare, but, along with dark gray aluminum balustrades, to keep birds from crashing into the tower. Already this strategy won Aqua a Proggy award (named for “progress”) from the People for the Ethical Treatment of Animals. • At the base of the tower, a three-story podium is topped with the 80,000-square- foot podium roof garden. . The roof’s vegetation is not only aesthetic but also combats the heat- island effect during the hot summer months by lowering ambient temperatures around the building. N
  • 12. MILLENIUM PARK – A major tourist spot of the city. 82 – STOREY AQUA TOWER 3 – STOREY PODIUM with 80.000 sq.ft. roof garden SWISSOTEL CHICAGO THREE ILLINOIS CENTER BLUE CROSS BLUE SHIELD BUILDING Aqua creates a strong identity through its architecture and has become a landmark addition to the Chicago skyline.
  • 13. Traffic considerations: •Aqua's entrances serve a variety of users and residents. •Canopied walkways lead visitors to the building's main entrance while two grand public stairs bring pedestrians from Upper Columbus Drive down to a park at grade level, providing access to Chicago's downtown area and lakefront. •The tower also connects to Chicago's extensive underground pedway system, linking users and residents to restaurants, retail, cultural activities and jobs in the Loop and on the Magnificent Mile. •Additional consideration was made when designing the tower's garage exits below grade to minimize congestion at pedestrian levels. •To further reduce traffic and confusion, the garage's three levels have different access points that correlate to the tower's specific uses and users.
  • 14. 3RD FLOOR WITH ROOF GARDEN
  • 16. STRUCTURE SYSTEM • An 87-story, 868-foot-tall building designed to look like the wind is blowing waves across its surface — each floor sporting graceful, thin curved balconies that look like fins between the floors. An architectural achievement, perhaps, but definitely an engineering challenge. • Magnusson Klemencic Associates was chosen to turn architect Jeanne Gang’s vision of “a vertically deployed landscape” into reality. Ultimately, the challenge required several major engineering innovations, starting with a custom floor plate design to create the unusual wave-like facade. • Aqua has 78 individually curving floor plates with cantilevered balconies that extend up to 12 feet, both for looks and to capture the best views. • The balconies are cast monolithically with the floor slabs. • The 9-inch-thick balcony slabs thin out as they extend from the cladding line to the edge of the cantilever. This profile helps in drainage and keeps rainwater off the face of the building. • Dozens of computer models were created to analyze the strength and deflection of these unique floor slabs and their 8 miles of continuously varying edges. • In a wind analysis, Aqua’s balcony design actually seemed to “confuse” the wind, reducing forces rather than creating additional pressures or suction.
  • 17. OUTRIGGER WALLS 55-58TH STOREY OUTRIGGER WALLS 81-82ND STOREY BELT WALLS 57TH STOREY MKA also needed to develop a new structural system to enable the construction of the building. The new system combined a concrete core, stepped concrete shear walls, outrigger walls at levels 55 to 58 and 81 to 82, belt walls at level 57, and building columns, all on top of 31 drilled rock caissons(diameters ranging from 4 to 10 feet and extending up to 112 feet below grade and six feet into a layer of dolomite). The core and shear walls incorporate four different concrete strengths to optimize performance and consolidate strength while the strategically located outriggers and belt walls broaden the stance of the building and engage the building’s exterior columns to resist sway.
  • 18. CONCRETE CORE BALCONIES EXTEND FROM 2 TO 12 FEET SAME FLOOR PLAN ON EACH STOREY UNDULATING BALCONIES : EACH INDIVIDUAL TO THE STOREY