SlideShare a Scribd company logo
1 of 57
Download to read offline
DESIGN PORTFOLIO
2004 - 2012 selected works
kirk gleeson
‘I’m inspired by the Bauhaus designers of the early 20th century,
where the idea of design was taught as a ‘total’ work, in which
all aspects of design, including architecture were brought
together as a whole’.
EDUCATION
EXPERIENCE
AFFILLIATIONS
SKILLS
University of New South Wales
Bachelor of Industrial Design,
Randwick Campus, 2000 - 2004
St Johns College Dubbo
Completed HSC in 1999
Barnson Pty Ltd
Jul 2007 – Present
InDestudio
Jul 2004 – Jul 2007
Member of Building Designers Australia
2007 – Present
Revit Architecture
AutoCAD
3D Studio Max
Rhino 3D Modelling
Microsoft Office
Adobe Creative Suite
6
The initial brief for the project was an extension to the
existing library to cater for the increase in the number
of students at the school. With extra funding however,
the scope of the project increased to include offices and
workrooms, a seminar room as well as a 120 seat tiered
lecture theatre. The overall look of the project developed
from trying to get a modern building to sit within the
existing landscape of older buildings, this is why although
the building has its own unique identity, it still has a lot of
building materials in common with the existing buildings.
ST JOHNS COLLEGE
senior library extension 2010
St Johns College Senior Library - Visitor Entrance
W
07
W
06
D
02
W
08
'COLORBOND - CUSTOM ORB'
STEEL ROOF SHEETING
'COLORBOND' STEEL
RIDGE CAPPING
ROOF 2
FACE BRICKWORK TO MATCH
EXISTING LIBRARY FACADE
LORBOND' STEEL BOX GUTTERS
RAINHEADS & DOWNPIPES
'COLORBOND - CUSTOM ORB'
STEEL WALL SHEETING
RENDERED
BRICKWORK
HUNTER DOUGLAS 'QUADROCLAD' ARCHITECTURAL
FACADE SYSTEM 2400 x 600mm PANELS
(RECESSED JOINT SYSTEM)
'COLORBOND - CUSTOM ORB'
STEEL WALL SHEETING
IUM BATTENS AT 120mm
PED GALVANISED FRAME
ACTURERS SPECIFICATION
W
24
W
25
W
23
W
2222
ROOF 1
DP
DP
'COLORBOND' STEEL
RIDGE CAPPING
RENDERED
BRICKWORK
EXISTING LIBRARY BUILDING
'COLORBOND - CUSTOM ORB'
STEEL WALL SHEETING
'HOT DIPPED GALVANISED' STEEL
FRAMED AWNING ABOVE 200 x
75mm RHS POSTS & RAFTERS &
100 x 50mm RHS PURLINS
ROOF 1
15° ROOF PITCH
5° ROOF PITCH
15° ROOF PITCH
NEW DISABLED RAMP, LANDING &
HANDRAILS TO COMPLY WITH AS1428.1
ALUMINIUM FRAMED SKYLIGHT WITH
1 FIXED DOUBLE GLAZED VENETIAN
BLIND SECTIONS WITH REMOTE
VENETIAN BLIND OPERATION
150PFC 'HOT DIPPED GALVANISED' EAVES
FASCIA CONNECTION TO ROOF PURLINS TO
ENGINEERS DETAILS
150PFC 'HOT DIPPED GALVANISED' EAVES
FASCIA CONNECT TO ROOF PURLINS
'QS INDUSTRIES - ROCHE 110/20' ALUMINIUM BATTENS AT 120mm
CENTRES ON 75 x 100mm RHS HOT DIPPED GALVANISED FRAME
FIXINGS TO MANUFACTURERS SPECIFICATION
W
26
'COLORBOND' STEEL BARGE CAPPING
'COLORBOND' STEEL BARGE CAPPING
DPDP
DP
DP
ROOF 3
60° ROOF PITCH
ROOF 3
60° ROOF PITCH
W
2121
st johns college
senior library
hns college
senior library
s colle
STAINLESS STEEL OFFSET SIGNAGE
TO CLIENTS SPECIFICATIONS
'HOT DIPPED GALVANISED' STEEL FRAMED
AWNING ABOVE 200 x 75mm RHS POSTS &
RAFTERS & 100 x 50mm RHS PURLINS
8
9
STORE
12075
'HOT DIPPED GALVANISED' STEEL
FRAMED AWNING ABOVE 200 x
75mm RHS POSTS & RAFTERS &
100 x 50mm RHS PURLINS
SELECTED FLOOR
TILES TO FOYER
E
W
19
W
18
NEW CONCRETE PATH
ROOF LINE OVER
RAKED
CEIL
RAKED
RAKED
CEILING
OVER
ED
CEILING
O
G
OVER
LECTURE ROOM
CPT
ENTRY PATIOENEN ATIO
PROJECTION DIRECT
OVERHEAD PROJECTOR
MOUNTED TO CEILING
RELOCATED RETRACTA
PROJECTION SC
FIXED TIMBER BENCHES SEE
'14252-A14 - JOINERY SCHEDULE 2'
FOR MORE INFORMATION
D
0505
FHR
NEW LOW RENDERED BRICK WALL
DPDP
DPDP
DPDPDP
165 STEP
W
20
NEW DISABLED RAMP, LANDING &
HANDRAILS TO COMPLY WITH AS1428.1
H'RAIL
UP
MAX1:14
H'RAIL
11
A08
33
A09
44
A09
TACTILE INDICATORS TO
COMPLY WITH AS1428.4
22
A08
PROPOSED AIR CONDITIONING CONDENSERS
AISLE LIGHTS TO BE INSTALLED TO PROVIDE
ILLUMINIATION FOR THE FULL LENGTH OF THE
AISLE & TREAD OF EACH TIER IN ACCORDANCE
WITH 'SECTION H1.7' & 'SECTION NSW
H101.20.3,4,5' OF THE BCA
2 x 13mm 'GYPROCK SOUNDCHEK' LINING ON2
SOUND RESILIENT MOUNTS & 75mm
'BRADFORD SOUNDSCREEN PLUS' R2.
INSULATION TO WALLS BETWEEN LECTURE
ROOM & FOYER/OFFICE/READING AREAS
'QS INDUSTRIES - ROCHE 110/20' ALUMINIUM
BATTENS AT 120mm CENTRES ON 75 x 100mm RHS
HOT DIPPED GALVANISED FRAME FIXINGS TO
MANUFACTURERS SPECIFICATION
R.L. 298.51
E
EXISTING GROUND
COL
COCOCO
COL
COCOCOL
COL
COCOL
COCOL
COL
COL
CO
'HOT DIPPED GALVANISED' STE
AWNING ABOVE 200 x 75mm RHS
RAFTERS & 100 x 50mm RH
10
SENIOR READING AREA
CPT
OFFICE 4OFF
CPTCPT
FOYER
JUNIOR READING AREA
BOOK
STORE
OFFICE
1
OFFICE
2
OFFICE
3
MALE FEMALE
FOYER
2400mm HIGH GLAZING WITH CONCEALED240
ALUMINIUM FRAME TO FOYERALU
NEW LIBRARY COUNTER SEE
'14252-A13 - JOINERY SCHEDULE 1'
FOR MORE INFORMATION
COMSOMSCOCO
ALUMINIUM FRAMED
WINDOWS THROUGHOUT
E
EE
E
E
EE
E
LANDING
UP
E
EXISTING WALLS TO
REMAIN SHOWN THUS
EXISTING WALLS TO BE REMOVEDLS TO
SHOWN THUS. BEAMS ETCBEAM
REQ'D TO ENGINEERS SPECIFICATIONSINEER
EXISTING WALLS TO
REMAIN SHOWN THUS
W
06
W
22
W
24
D
01
W
01
D
02
D
03
WW
15
REINFORCED CONCRETE SLABINFORINFORNFORCNFORCFORCEFORCFORC
TO TIE INTO EXSITING REFERTIE ITIE INIE INTTIE IN
TO ENGINEERS SPECIFICATIONSENGINNGINENGINEENGINE
NEW DISABLED RAMP, LANDING &NEW D
HANDRAILS TO COMPLY WITH AS1428.1
OVER
W
25
OVER
W
26
OVER
W
23
OVER
OFFICE 1
CPT
OFFICE 2
CPT
WORK ROOM
CPT
OFFICE 3
CPT
NEW WORK COUNTER WITH
SINK & O'HEAD CPD'S
WW
0909
OVER
TACTILE INDICATORS TO COMPLY WITH AS1428.4
CHANGE IN FLOOR FINISH
FIRE EXITRE EXIT
ONLYONL
TION
TABLE
CREEN
SEMINAR ROOM
CPT
H'RAIL
H'RAIL
MIN. 50mm SET DOWN INMIMINMIN.MIN
SLAB FOR TILED AREA TILESLAB FAB FOB FOAB FO
TO FINISH FLUSH WITH FLOORFINISFINISHINISHFINISH
FINISH IMMEDIATELY OUTSIDEINISHISH IMISH IMISH IM
RELOCATE EXISTING HOSE
REEL IN ORDER TO COMPLY
WITH 'AS2441' & 'PART E1.4'
OF THE BCA
RR
EXEX
FHR
FHRFHR
NEW DISABLED WC REFERBLED REFERLED W
TO '14252-A11 - DISABLED-A11 - ABLEA11 -
ACCESS' FOR DETAILSOR DE
R.L. 298.70
LINE OF STEEL WEB TRUSS OVERSS OLINLINLINELIN
COL
LINE OF STEEL WEB TRUSS OVERLILINLINLINLI
DP
DPDP
165 STEP
BEAMOVERBEAMOVER
RAKED
CEILING
OVER
D
04
W
21
W
16
W
17
STEEL COLUMNS & BEAMS TOSTEESTEELTEELTEEL
STRUCTURAL ENGINEERS DETAILSUCTUUCTURCTURACTURCTURAL ENGINEERS DETAILS
2400mm HIGH GLAZED INTERNAL
PARTIONING WITH A CONCEALED
ALUMINIUM FRAME TO ALL OFFICES
& WORKROOMS. OPAQUE GRAPHIC TINT
APPLIED TO 1000mm HEIGHT
BEAMOVER
COMPACTUSCTUS
MAX1:14
EXISTING AIR
CONDITIONING
CONDENSERS
REMOVE EXISTING COLUMNING CING COLUMN
EXISTING BEAMS OVER SHOWN THUS:-BEA
EXISTING COMS TO BE PROTECTEDS TO
DURING CONSTRUCTIONRUCT
DP
W
07
W
08
DP
W
02
W
04
W
03
W
05
ON
mm
.0
RE
AS
EXISTING PROJECTION
SCREEN TO BE RELOCATED
TO LECTURE ROOM
STEEL WEB TRUSSES TO ENG. DETAILSEEL WEL WEL WEEL WEB TRUS
BATTEN & CLAD WITH TASMANIAN OAKTTENTEN &EN &TEN & AD WITH
GLUE LAMINATED TIMBER VENEER SEEE LAE LAMLAME LAME LAMINATED TIMBER VENEER SEELAMINATED TIMBER VENEER SEETIMBER
TAILTAIL'14252-A08 - SECTIONS' FOR MORE DETAIL252-A08 - SECTIONS' FOR MORE DETAILNS' FOR
ON SHAPE REQUIRED
FIXED TIMBER BENCH SEE
'14252-A14 - JOINERY
SCHEDULE 2' FOR MORE
INFORMATION
SELECTED FLOOR TILES
EXISTING WALLS THROUGHOUTNG W
TO BE REPAINTED TO MATCHE REP
NEW EXTENSION
2400mm HIGH GLAZED INTERNAL PARTIONING WITHGLAZE
A CONCEALED ALUMINIUM FRAME TO ALL OFFICESALUM
& WORKROOMS. OPAQUE GRAPHIC TINT APPLIED. OPA
TO 1000mm HEIGHTIGHT
11
A08
33
A09
44
A09
22
A08
W
10
OVER
W
11
OVER
W
12
OVER
W
13
OVER
W
14
OVER
TO MATCH EXISTING
R.L. 298.70
EXISTING
R.L. 298.51
PROPOSED
EXISTING GROUND
18801880 3900
1500
1500
66
A10
66
A10
55
A10
55
A10
E
COL
COL
COL
COL
CO
COL
CO
COL
COCOL
COL
COCO
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COCO
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COCOCO
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COCOL
COCO
COL
CO
COL
CO
COL
CO
COL
COCO
EEL FRAMED
HS POSTS &
HS PURLINS
FIXED TIMBER BENCH SEE
'14252-A14 - JOINERY SCHEDULE
2' FOR MORE INFORMATION
11
12
location
Dubbo, NSW
floor area
23.14Ha site
533sqm floor
project cost
$1,425,000
time schedule
design, documentation
9 months
construction
6 months
13
14
The project comprised the building of a highly flexible
cluster of villas to house five people with severe and
profound disability. Each villa is self contained including
private access, bedroom, bathroom, kitchen and living
space,withinternalspacesdesignedtoadapteasilyaround
residents’ changing needs and provides the flexibility
required for delivery of individual support services.
The villa’s are oriented in a cluster allowing for separation
and independence but also shared use of innovative
interactive outdoor areas and covered spaces designed for
culturally sensitive social interaction.
SAIF HOUSING PROJECT
accessible unit development 2014
SAIF Housing Project - Visitor Entrance
16
17
18
19
location
Dubbo, NSW
floor area
3283sqm site
653qm floor
project cost
$1,200,000
time schedule
design, documentation
12 months
construction
6 months
21
22
The project developed through the need to upgrade an old
and dated club to meet the future needs of the club and
comply with current regulations. Through reconfiguring
the entrance to the club, creating all new gaming and
function areas and upgrading the existing joinery and
toilets throughout, the club has been able to create a
comfortable atmosphere for its current members and also
attract new clientele.
SPORTIES
bowling club renovation 2013
Sporties - Visitor Entrance
24
location
Dubbo, NSW
floor area
8993sqm site
1446sqm floor
project cost
$1,300,000
time schedule
design, documentation
12 months
construction
5 months
25
26
27
3
28
The project was developed in response to the need
for adequate medical services to be provided to the
population of Walgett. The building has been developed
as a multipurpose use health facility that is mindful of the
community the facility was built for, providing modern
clinical space for visiting doctors, health service workers &
the local clientele.
WALGETT ABORIGINAL MEDICAL SERVICE
chronic disease unit 2013
Walgett Aboriginal Medical Service - Front Facade
CONSULT
ROOM 3
CONSULTING
ROOM 4CONSULTING
ROOM 5
MEETING
ROOM
FCPHC
H4L
ALLIED
H4L
PERMAN
DENOTES
NEW 'AWS
SHOPF
RAMP UP
1:70
COFFEE
FHR
9
06
9
06
W
19
W
20
W
1616
W
1717
W
1818
W
21
D
05
D
06
D
08
D
07
D
15
D
14
D
13
D
09
D
11
D
10
D
12
D
21
D
24
AMBULANT
FEMALE
W/C
STAFF
W/C 1
STAFF
W/C 2
AMBULANT
MALE
W/C
M
V
DISAB
W/C
FE
VA
MIN. 50mm SET DOWN IN SLAB FOR TILED
AREA TILES TO FINISH FLUSH WITH FLOOR
FINISH IMMEDIATELY OUTSIDE
NEW 36m HOSE REEL I
IN ACCORDANCE WITH
& 'PART E1.4' OF THE
W
22
W
23
W
25
W
26
W
24
CPT TILESCPT TILESCPT TILESCPT TILES
CPT TILES
CPT TILES
CPT TILES
CPT TILES CPT TILES
NEW STEEL BEAM & LINTEL
OVER SUPPORTING TRUSSES &
BRICKWORK ABOVE
RAMPUP
1:70
NEW 90mm STEEL WALL FRAMING
THROUGHOUT IN ACCORDANCE
WITH MANUFACTURERS
SPECIFICATIONS
TOILET FACILITIES TO COMPLY WITH
AS1428.1-2009 SEE 16217-A08 FOR
MORE INFORMATION
DP
DP
DP
MEETING ROOM JOINERY
SEE 16217-A12 FOR MORE
INFORMATION
POSSIBLE MECHANICAL PLANT LOCATION
REFER TO MECHANICAL SPECIFICATIONS BY
OTHERS FOR MORE INFORMATION
MSB
NEW DIS
SURFAC
ACCORD
'FLETCHER - PINK PARTITION 32'
R2.7 WALL BATTS & 'INSULMIST
800 THERMAL BREAK INSULATION'
TO ALL NEW EXTERNAL WALLS
'FLETCHER - PINK PARTITION
32' R2.7 WALL BATTS TO ALL
NEW INTERNAL WALLS
MECHANICAL SUB BOARD
LOCATED WITHIN 'EATON -
ETA WALL ENCLOSURE' IP65
MILD STEEL WALL MOUNTED
SWITCHBOARD ENCLOSURE
OR SIMILAR IN ACCORDANCE
WITH PART D2.7 OF THE
BCA VOL. 1, 2012
NEW 50mm DIA. TUBULAR HOT DIPPED
GALVANISED STEEL HANDRAIL BOLTED
TO BRICKWORK WITH COVERPLATE @
900mm HIGH IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATION
30
ING
3
ENT
MANAGERS
OFFICE
STAFF
ROOM UTILITY
ROOM
EQUIPMENT
CONSULTING
ROOM
EXERCISE
ROOM
STORE
CONSULTING
ROOM 1
STORE
CONSULTING
ROOM 2
WAITING
AREA
RECEPTION
FILE ROOM
STAFF
OUTDOOR
PORTICO
132.84
NEW 'AWS' ALUMINIUM FRAMED
FIXED WINDOWS THROUGHOUT
ROOF OVER
CLLLLLEAAAAAAAANEEEEERSSSSSSSSSSSSSSSS
CCCCCCCLLLLOOOOSSSSSEEEEEEETTTTTTT
SERIES 400' ALUMINIUM
RONT GLAZING SYSTEM
RAMP UP
1:35
RAMP UP
1:35
NEW ACCESSIBLE TOILET &
SHOWER TO COMPLY WITH
AS1428.1-2009 SEE 16217-A10
FOR MORE INFORMATION
FEFEFE
FEFE
MSB
FHR
FHR
10
06
10
06
11
07
11
07
W
01
W
02
W
03
W
04
W
05
W
07
W
06
W
08
W
09
W
10
W
11
W
1212
W
1313
W
14
W
15
D
40 D
39
D
38
D
28
D
19
D
18
D
42
D
16
D
17
D
25
D
26
D
29
D
32
D
33
D
27
D
30
D
34
D
35
D
36
D
41
D
37
D
23
D
22
D
04
D
03
D
02
D
01
D
20
DDDDDIISSSSSSSSSSSAAAAAAAABBBBBBLLLLEEEEDDDDDDDDD
WWWWWWW/C 2222222
SSSSSSSSSSHHHHHOOOOWWWWWWWWWWWEEEERRRRRRRRRR
D
31
MALE
ANITY
LED
1
EMALE
ANITY
REINFORCED
CONCRETE SLAB
TO ENGINEERS
SPECIFICATIONS
NEW 50mm DIA. TUBULAR HOT DIPPED GALVANISED
STEEL HANDRAIL BOLTED TO BRICKWORK WITH
COVERPLATE @ 900mm HIGH IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATION
DUCTED REVERSE CYCLE
AIR-CONDITIONING IS TO
BE PROVIDED
THROUGHOUT
NEW 'BIRRUS - ULTRAMAT' WITHE
'ONTERA ENVISION - IRONSTONE 848'OO
CARPET INSERT RA ECESSED INTO NEW
SLAB INSTALLED IN ACCORDANCE WITHL
AS1428.4.1-2009 & MANUFACTURERSSRS
SPECIFICATIONSP
INSTALLED
H 'AS2441'2
E BCA 2012
'QS INDUSTRIES - ROCHE
110/20' ALUMINIUM
BATTENS AT 100mm
CENTRES ON 50x50mm RHS
HOT DIPPED GALVANISED
FRAME SET 15 DEGREES TO
WALL & BOLTED TO
BRICKWORK FIXINGS TO
MANUFACTURERS
SPECIFICATION
W
27
CPT TILES
VNYL PL
CPT TILESCPT TILESSS
NEW HOT DIPPED GALVANISED
STRUCTURAL STEEL BEAM & COLUMNS
SUPPORTING VERANDAH PURLINS OVER
NEW HOT DIPPED GALVANISED
STRUCTURAL STEEL BEAM &
COLUMNS SUPPORTING PORTICO
PURLINS OVER
NEW 50mm DIA. TUBULAR HOT DIPPED
GALVANISED STEEL HANDRAIL @ 900mm
HIGH BOLTED TO CONCRETE SLAB WITH
COVERPLATE IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATIONS
FBFB
DP
DPD
DP
DP
DP
DP
DDDDPP
VNYL PL
VINYL PLANK FLOORING
TO HALLWAYS
RECEPTION COUNTER
SEE 16217-A11 FOR MORE
INFORMATION
LINE OF NEW
BULKHEAD OVER
CONSULTING ROOM 1
JOINERY
SEE 16217-A12 FOR MORE
INFORMATION
CONSULTING ROOM 2 JOINERYC
SEE 16217-A12 FOR MORESS
INFORMATIONN
STAFF ROOM JOINERY
SEE 16217-A12 FOR MORE
INFORMATION
INTERNAL 'GYPROCK -
SUPERCHEK' PLASTERBOARD
WALL LINING THROUGHOUT
'GYPROCK - AQUACHEK'
PLASTERBOARD TO WET AREAS
NEW HOT DIPPED GALVANISED
STRUCTURAL STEEL BEAM SUPPORTING
VERANDAH PURLINS OVER
VNYL PLVNYL PL
VNYL PLVNYL PL
VNYL PLVNYL PL
VNYL PLVNYL PL
VNYL PL
VNYL PLVNYL PL
VYNL PL
REINFORCED CONCRETE
PATHWAY SLAB TO
ENGINEERS
SPECIFICATIONS
MIN. 50mm SET DOWN IN SLAB FOR TILED
AREA TILES TO FINISH FLUSH WITH FLOOR
FINISH IMMEDIATELY OUTSIDE
CPT TILES
FEFE
FILE ROOM JOINERY
SEE 16217-A12 FOR MORE
INFORMATION
CRETE S/S TACTILE GROUND
CE INDICATORS INSTALLED IN
DANCE WITH AS1428.4.1-2009
RAMPUP
1:44
31
location
Walgett, NSW
floor area
5480sqm site
570sqm floor
project cost
$2,400,000
time schedule
design, documentation
10 months
construction
7 months
33
34
The project developed through the intention of creating
a world-class restaurant and bar that would happily
satisfy international guests and locals alike. The Kirketon
Dining Room & Bar is reminiscent of the timeless modern
restaurants and bars found in Paris & New York. Leather
upholstery, dark timber panelling, brass feature walls &
screens finished with a bronze patina, polished stucco
plaster & aged French wall mirrors are all key elements
that brought about a theatrical and ambient atmosphere.
KIRKETON DINING ROOM & BAR
restaurant fitout 2006
Kirketon Dining Room & Bar - Restaurant
36
37
location
Darlinghurst, NSW
floor area
504sqm floor
project cost
$2,000,000
time schedule
design, documentation
14 months
construction
9 months
39
3
40
The project developed through the need to upgrade a
20 year old, worn and dated fitout that was hampering
sales, as well as cater for an increase in staff and clientele.
The project involved the refurbishment of the existing
consultation rooms, and a reconfiguring of the reception,
waiting and display areas, with all new joinery, flooring
and paint colours.
MORRISON’S FAMILY EYECARE
shop fitout 2012
Morrison’s Family Eyecare - Entrance
location
Dubbo, NSW
floor area
202sqm floor
project cost
$90,000
time schedule
design, documentation
3 months
construction
6 weeks
43
44
The aim of the project was to create a facility that caters
for provincial and national standard athletics events,
providing undercover spectator seating and all-weather
synthetic track and field surfaces that meet International
Association of Athletics Federation standards.
WorkingwithAruptodevelopthemasterplanforthewhole
facility, the design included a 600 seat grandstand with
a multi-purpose space for training and administration,
as well as bunk style accommodation, canteen & bbq
facilities, plus change rooms, amenities and a secure
storage area.
BARDEN PARK ATHLETICS CENTRE
600 seat grandstand 2014
Barden Park Athletics Centre - Grandstand Seating
46
location
Dubbo, NSW
floor area
40,679sqm site
1760sqm floor
project cost
$5,300,000
time schedule
design, documentation
12 months
construction
9 months
47
48
The brief involved the design of a family home, that
provided spaces for gathering, as well as private zones
for the parents and kids. The central wing houses the
communal areas, incorporating the kitchen, living and
dining areas, with the western wing branching off one
side to provide a parents reteat and den. The eastern wing
houses the guest bedroom, laundry and garage, whilst
tucked away within the roof line are the kids bedroom and
rumpus.
The aesthetic style were dictated by the client’s love of
American Hamptons style architecture, incorporating a
weatherboard facade and shingled roof.
MORRIS RESIDENCE
four bedroom house design 2014
Morris Residence - Front Facade
50
location
Mudgee, NSW
floor area
21.04Ha site
655sqm floor
project cost
$700,000
time schedule
design, documentation
6 months
construction
in construction
51
52
Situated on a large acre property, the clients brief for the
project involved designing a luxurious homestead that felt
like it had stood for a hundred years, but still maintained a
modern and comfortable way of living for himself and his
guests. With the intention of working from home the house
also contained offices and meeting areas, and a large
gallery, library and wine cellar to house his collections.
MOOLUNGUNDI
homestead design 2009
Moolungundi - Front & Rear Facades
54
location
Coonabarabran, NSW
floor area
240Ha site
1337sqm floor
project cost
$2,400,000
time schedule
design, documentation
3 months
construction
yet to start
55
Online portfolio
www.barnson.com.au
Contact
phone: 1300 138 657
email: kgleeson@barnson.com.au
KIRK GLEESON
building designer

More Related Content

What's hot

Eric Buck resume 2017
Eric Buck resume 2017Eric Buck resume 2017
Eric Buck resume 2017Eric Buck
 
Selected Restaurant Projects
Selected Restaurant ProjectsSelected Restaurant Projects
Selected Restaurant ProjectsPerry Becker
 
Village Centre Guidelines
Village Centre GuidelinesVillage Centre Guidelines
Village Centre GuidelinesEllenbrook
 
Selected Office Projects
Selected Office ProjectsSelected Office Projects
Selected Office ProjectsPerry Becker
 
20110402 nadzab modular housing
20110402 nadzab modular housing20110402 nadzab modular housing
20110402 nadzab modular housingetonmodular
 
Avon valley design guidelines
Avon valley design guidelinesAvon valley design guidelines
Avon valley design guidelinesEllenbrook
 
Acm project presentation
Acm  project presentationAcm  project presentation
Acm project presentationJr Rob
 
Aia Design Awards 2012 Reduce
Aia Design Awards 2012 ReduceAia Design Awards 2012 Reduce
Aia Design Awards 2012 Reducejgwinkler1
 
Restoring a Sag Harbor Eyesore-behance
Restoring a Sag Harbor Eyesore-behanceRestoring a Sag Harbor Eyesore-behance
Restoring a Sag Harbor Eyesore-behancekimmendeni
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian Akl
 
General zone design guidelines
General zone design guidelinesGeneral zone design guidelines
General zone design guidelinesEllenbrook
 
Projects handled at Mistry Architects - - Industrial - 01.
Projects handled at Mistry Architects  -  - Industrial - 01.Projects handled at Mistry Architects  -  - Industrial - 01.
Projects handled at Mistry Architects - - Industrial - 01.Sathyanarayan C V
 
Projects handled at Mistry Architects - Residence - Retreat for H.B. Jairaj -03
Projects handled at Mistry Architects  - Residence - Retreat for H.B. Jairaj -03Projects handled at Mistry Architects  - Residence - Retreat for H.B. Jairaj -03
Projects handled at Mistry Architects - Residence - Retreat for H.B. Jairaj -03Sathyanarayan C V
 
Architecture eNews #1 - #5
Architecture eNews #1 - #5Architecture eNews #1 - #5
Architecture eNews #1 - #5unionsquare
 
Town planning report northroad 20121210 a
Town planning report northroad 20121210 aTown planning report northroad 20121210 a
Town planning report northroad 20121210 aAnne Kim
 

What's hot (18)

Eric Buck resume 2017
Eric Buck resume 2017Eric Buck resume 2017
Eric Buck resume 2017
 
Selected Restaurant Projects
Selected Restaurant ProjectsSelected Restaurant Projects
Selected Restaurant Projects
 
Village Centre Guidelines
Village Centre GuidelinesVillage Centre Guidelines
Village Centre Guidelines
 
Selected Office Projects
Selected Office ProjectsSelected Office Projects
Selected Office Projects
 
20110402 nadzab modular housing
20110402 nadzab modular housing20110402 nadzab modular housing
20110402 nadzab modular housing
 
Avon valley design guidelines
Avon valley design guidelinesAvon valley design guidelines
Avon valley design guidelines
 
DRT Portfolio Works
DRT Portfolio WorksDRT Portfolio Works
DRT Portfolio Works
 
Acm project presentation
Acm  project presentationAcm  project presentation
Acm project presentation
 
Aia Design Awards 2012 Reduce
Aia Design Awards 2012 ReduceAia Design Awards 2012 Reduce
Aia Design Awards 2012 Reduce
 
Restoring a Sag Harbor Eyesore-behance
Restoring a Sag Harbor Eyesore-behanceRestoring a Sag Harbor Eyesore-behance
Restoring a Sag Harbor Eyesore-behance
 
Kc x bldg_features
Kc x bldg_featuresKc x bldg_features
Kc x bldg_features
 
TOP 29 - Tribeca 12:30
TOP 29 - Tribeca 12:30TOP 29 - Tribeca 12:30
TOP 29 - Tribeca 12:30
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
General zone design guidelines
General zone design guidelinesGeneral zone design guidelines
General zone design guidelines
 
Projects handled at Mistry Architects - - Industrial - 01.
Projects handled at Mistry Architects  -  - Industrial - 01.Projects handled at Mistry Architects  -  - Industrial - 01.
Projects handled at Mistry Architects - - Industrial - 01.
 
Projects handled at Mistry Architects - Residence - Retreat for H.B. Jairaj -03
Projects handled at Mistry Architects  - Residence - Retreat for H.B. Jairaj -03Projects handled at Mistry Architects  - Residence - Retreat for H.B. Jairaj -03
Projects handled at Mistry Architects - Residence - Retreat for H.B. Jairaj -03
 
Architecture eNews #1 - #5
Architecture eNews #1 - #5Architecture eNews #1 - #5
Architecture eNews #1 - #5
 
Town planning report northroad 20121210 a
Town planning report northroad 20121210 aTown planning report northroad 20121210 a
Town planning report northroad 20121210 a
 

Viewers also liked

Final ppp slideshow
Final ppp slideshowFinal ppp slideshow
Final ppp slideshowlaladner06
 
Rekwizyt jako narzedzie komunikowania politycznego
Rekwizyt jako narzedzie komunikowania politycznegoRekwizyt jako narzedzie komunikowania politycznego
Rekwizyt jako narzedzie komunikowania politycznegoJakub Jakubowski
 
creative writing 354; story 2
creative writing 354; story 2creative writing 354; story 2
creative writing 354; story 2Thalia Pe
 
MPFM for Storage Gas Applications
MPFM for Storage Gas ApplicationsMPFM for Storage Gas Applications
MPFM for Storage Gas ApplicationsNunzio Bonavita
 
Practica de power point N° 2
Practica de power point N° 2Practica de power point N° 2
Practica de power point N° 2Efrain Arias Meza
 
IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...
IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...
IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...rajguptanitw
 
Kunal Mehta_CV New
Kunal Mehta_CV NewKunal Mehta_CV New
Kunal Mehta_CV NewKunal Mehta
 
SpiritIT_mCT_Petrolchimico_Final_rev1
SpiritIT_mCT_Petrolchimico_Final_rev1SpiritIT_mCT_Petrolchimico_Final_rev1
SpiritIT_mCT_Petrolchimico_Final_rev1Nunzio Bonavita
 
Lathe-Types, Parts, Feed Mechanisms, Specifications,Lathe Accessories and Att...
Lathe-Types, Parts, Feed Mechanisms, Specifications,Lathe Accessories and Att...Lathe-Types, Parts, Feed Mechanisms, Specifications,Lathe Accessories and Att...
Lathe-Types, Parts, Feed Mechanisms, Specifications,Lathe Accessories and Att...rajguptanitw
 
Construcción de un octógono
Construcción de un octógonoConstrucción de un octógono
Construcción de un octógononoeypau
 
Trabajo comun - Iphone 4
Trabajo comun - Iphone 4Trabajo comun - Iphone 4
Trabajo comun - Iphone 4valeriare27
 
Teories de l'evolució
Teories de l'evolucióTeories de l'evolució
Teories de l'evoluciómllargue
 
Samsung climatización 2010 (1)
Samsung climatización 2010 (1)Samsung climatización 2010 (1)
Samsung climatización 2010 (1)Rooibos13
 

Viewers also liked (20)

Final ppp slideshow
Final ppp slideshowFinal ppp slideshow
Final ppp slideshow
 
Rekwizyt jako narzedzie komunikowania politycznego
Rekwizyt jako narzedzie komunikowania politycznegoRekwizyt jako narzedzie komunikowania politycznego
Rekwizyt jako narzedzie komunikowania politycznego
 
creative writing 354; story 2
creative writing 354; story 2creative writing 354; story 2
creative writing 354; story 2
 
practica de power point
practica de power pointpractica de power point
practica de power point
 
MPFM for Storage Gas Applications
MPFM for Storage Gas ApplicationsMPFM for Storage Gas Applications
MPFM for Storage Gas Applications
 
Practica de power point N° 2
Practica de power point N° 2Practica de power point N° 2
Practica de power point N° 2
 
IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...
IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...
IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...
 
ABB Laser Analyzers-r1
ABB Laser Analyzers-r1ABB Laser Analyzers-r1
ABB Laser Analyzers-r1
 
Kunal Mehta_CV New
Kunal Mehta_CV NewKunal Mehta_CV New
Kunal Mehta_CV New
 
SpiritIT_mCT_Petrolchimico_Final_rev1
SpiritIT_mCT_Petrolchimico_Final_rev1SpiritIT_mCT_Petrolchimico_Final_rev1
SpiritIT_mCT_Petrolchimico_Final_rev1
 
Lathe-Types, Parts, Feed Mechanisms, Specifications,Lathe Accessories and Att...
Lathe-Types, Parts, Feed Mechanisms, Specifications,Lathe Accessories and Att...Lathe-Types, Parts, Feed Mechanisms, Specifications,Lathe Accessories and Att...
Lathe-Types, Parts, Feed Mechanisms, Specifications,Lathe Accessories and Att...
 
Construcción de un octógono
Construcción de un octógonoConstrucción de un octógono
Construcción de un octógono
 
Trabajo comun - Iphone 4
Trabajo comun - Iphone 4Trabajo comun - Iphone 4
Trabajo comun - Iphone 4
 
Teories de l'evolució
Teories de l'evolucióTeories de l'evolució
Teories de l'evolució
 
L Catalog V20090618
L Catalog V20090618L Catalog V20090618
L Catalog V20090618
 
Samsung climatización 2010 (1)
Samsung climatización 2010 (1)Samsung climatización 2010 (1)
Samsung climatización 2010 (1)
 
Hardware
HardwareHardware
Hardware
 
Socialz dbr
Socialz dbrSocialz dbr
Socialz dbr
 
Acontece agora ed385
Acontece agora ed385Acontece agora ed385
Acontece agora ed385
 
T/4
T/4T/4
T/4
 

Similar to Kirk Gleeson - Portfolio Low Res

Architecture Construction Portfolio 17 x 11
Architecture Construction Portfolio 17 x 11Architecture Construction Portfolio 17 x 11
Architecture Construction Portfolio 17 x 11Al Bacon
 
Full-Bore Siphonic Roof Drains Overview by Jay R. Smith Mfg. Co.
Full-Bore Siphonic Roof Drains Overview by Jay R. Smith Mfg. Co.Full-Bore Siphonic Roof Drains Overview by Jay R. Smith Mfg. Co.
Full-Bore Siphonic Roof Drains Overview by Jay R. Smith Mfg. Co.Morris Group International
 
CMS DIP Presentation 18
CMS DIP Presentation 18CMS DIP Presentation 18
CMS DIP Presentation 18presentimage
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate buildingNayan Rao
 
Amadu Residential Extension
Amadu Residential ExtensionAmadu Residential Extension
Amadu Residential ExtensionGrant Hepburn
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.WorldHaus
 
Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project MatthewSelleck1
 
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektPOSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektMorten Lund
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building ConstructionAsz My
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson
 
Intelligent refractory technology for the primary aluminium industry
Intelligent refractory technology for the primary aluminium industryIntelligent refractory technology for the primary aluminium industry
Intelligent refractory technology for the primary aluminium industryRefratechnik Group
 

Similar to Kirk Gleeson - Portfolio Low Res (20)

Cs louvers 2017 jon salis cell 940 445 1845
Cs louvers 2017   jon salis cell 940 445 1845Cs louvers 2017   jon salis cell 940 445 1845
Cs louvers 2017 jon salis cell 940 445 1845
 
EBSE + ES3 Commercial Presentation
EBSE + ES3 Commercial PresentationEBSE + ES3 Commercial Presentation
EBSE + ES3 Commercial Presentation
 
GITAU JOHN PORTFOLIO
GITAU JOHN PORTFOLIOGITAU JOHN PORTFOLIO
GITAU JOHN PORTFOLIO
 
044_PHPD_NOV16[1]
044_PHPD_NOV16[1]044_PHPD_NOV16[1]
044_PHPD_NOV16[1]
 
Wilshire Grand Redevelopment Project
Wilshire Grand Redevelopment ProjectWilshire Grand Redevelopment Project
Wilshire Grand Redevelopment Project
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Architecture Construction Portfolio 17 x 11
Architecture Construction Portfolio 17 x 11Architecture Construction Portfolio 17 x 11
Architecture Construction Portfolio 17 x 11
 
Full-Bore Siphonic Roof Drains Overview by Jay R. Smith Mfg. Co.
Full-Bore Siphonic Roof Drains Overview by Jay R. Smith Mfg. Co.Full-Bore Siphonic Roof Drains Overview by Jay R. Smith Mfg. Co.
Full-Bore Siphonic Roof Drains Overview by Jay R. Smith Mfg. Co.
 
CMS DIP Presentation 18
CMS DIP Presentation 18CMS DIP Presentation 18
CMS DIP Presentation 18
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
Amadu Residential Extension
Amadu Residential ExtensionAmadu Residential Extension
Amadu Residential Extension
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.
 
Cooling tower
Cooling towerCooling tower
Cooling tower
 
Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project
 
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektPOSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
 
Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson Portfolio
 
Company brochure
Company brochureCompany brochure
Company brochure
 
Intelligent refractory technology for the primary aluminium industry
Intelligent refractory technology for the primary aluminium industryIntelligent refractory technology for the primary aluminium industry
Intelligent refractory technology for the primary aluminium industry
 

Kirk Gleeson - Portfolio Low Res

  • 1. DESIGN PORTFOLIO 2004 - 2012 selected works kirk gleeson
  • 2.
  • 3. ‘I’m inspired by the Bauhaus designers of the early 20th century, where the idea of design was taught as a ‘total’ work, in which all aspects of design, including architecture were brought together as a whole’.
  • 4.
  • 5. EDUCATION EXPERIENCE AFFILLIATIONS SKILLS University of New South Wales Bachelor of Industrial Design, Randwick Campus, 2000 - 2004 St Johns College Dubbo Completed HSC in 1999 Barnson Pty Ltd Jul 2007 – Present InDestudio Jul 2004 – Jul 2007 Member of Building Designers Australia 2007 – Present Revit Architecture AutoCAD 3D Studio Max Rhino 3D Modelling Microsoft Office Adobe Creative Suite
  • 6. 6 The initial brief for the project was an extension to the existing library to cater for the increase in the number of students at the school. With extra funding however, the scope of the project increased to include offices and workrooms, a seminar room as well as a 120 seat tiered lecture theatre. The overall look of the project developed from trying to get a modern building to sit within the existing landscape of older buildings, this is why although the building has its own unique identity, it still has a lot of building materials in common with the existing buildings. ST JOHNS COLLEGE senior library extension 2010
  • 7. St Johns College Senior Library - Visitor Entrance
  • 8. W 07 W 06 D 02 W 08 'COLORBOND - CUSTOM ORB' STEEL ROOF SHEETING 'COLORBOND' STEEL RIDGE CAPPING ROOF 2 FACE BRICKWORK TO MATCH EXISTING LIBRARY FACADE LORBOND' STEEL BOX GUTTERS RAINHEADS & DOWNPIPES 'COLORBOND - CUSTOM ORB' STEEL WALL SHEETING RENDERED BRICKWORK HUNTER DOUGLAS 'QUADROCLAD' ARCHITECTURAL FACADE SYSTEM 2400 x 600mm PANELS (RECESSED JOINT SYSTEM) 'COLORBOND - CUSTOM ORB' STEEL WALL SHEETING IUM BATTENS AT 120mm PED GALVANISED FRAME ACTURERS SPECIFICATION W 24 W 25 W 23 W 2222 ROOF 1 DP DP 'COLORBOND' STEEL RIDGE CAPPING RENDERED BRICKWORK EXISTING LIBRARY BUILDING 'COLORBOND - CUSTOM ORB' STEEL WALL SHEETING 'HOT DIPPED GALVANISED' STEEL FRAMED AWNING ABOVE 200 x 75mm RHS POSTS & RAFTERS & 100 x 50mm RHS PURLINS ROOF 1 15° ROOF PITCH 5° ROOF PITCH 15° ROOF PITCH NEW DISABLED RAMP, LANDING & HANDRAILS TO COMPLY WITH AS1428.1 ALUMINIUM FRAMED SKYLIGHT WITH 1 FIXED DOUBLE GLAZED VENETIAN BLIND SECTIONS WITH REMOTE VENETIAN BLIND OPERATION 150PFC 'HOT DIPPED GALVANISED' EAVES FASCIA CONNECTION TO ROOF PURLINS TO ENGINEERS DETAILS 150PFC 'HOT DIPPED GALVANISED' EAVES FASCIA CONNECT TO ROOF PURLINS 'QS INDUSTRIES - ROCHE 110/20' ALUMINIUM BATTENS AT 120mm CENTRES ON 75 x 100mm RHS HOT DIPPED GALVANISED FRAME FIXINGS TO MANUFACTURERS SPECIFICATION W 26 'COLORBOND' STEEL BARGE CAPPING 'COLORBOND' STEEL BARGE CAPPING DPDP DP DP ROOF 3 60° ROOF PITCH ROOF 3 60° ROOF PITCH W 2121 st johns college senior library hns college senior library s colle STAINLESS STEEL OFFSET SIGNAGE TO CLIENTS SPECIFICATIONS 'HOT DIPPED GALVANISED' STEEL FRAMED AWNING ABOVE 200 x 75mm RHS POSTS & RAFTERS & 100 x 50mm RHS PURLINS 8
  • 9. 9
  • 10. STORE 12075 'HOT DIPPED GALVANISED' STEEL FRAMED AWNING ABOVE 200 x 75mm RHS POSTS & RAFTERS & 100 x 50mm RHS PURLINS SELECTED FLOOR TILES TO FOYER E W 19 W 18 NEW CONCRETE PATH ROOF LINE OVER RAKED CEIL RAKED RAKED CEILING OVER ED CEILING O G OVER LECTURE ROOM CPT ENTRY PATIOENEN ATIO PROJECTION DIRECT OVERHEAD PROJECTOR MOUNTED TO CEILING RELOCATED RETRACTA PROJECTION SC FIXED TIMBER BENCHES SEE '14252-A14 - JOINERY SCHEDULE 2' FOR MORE INFORMATION D 0505 FHR NEW LOW RENDERED BRICK WALL DPDP DPDP DPDPDP 165 STEP W 20 NEW DISABLED RAMP, LANDING & HANDRAILS TO COMPLY WITH AS1428.1 H'RAIL UP MAX1:14 H'RAIL 11 A08 33 A09 44 A09 TACTILE INDICATORS TO COMPLY WITH AS1428.4 22 A08 PROPOSED AIR CONDITIONING CONDENSERS AISLE LIGHTS TO BE INSTALLED TO PROVIDE ILLUMINIATION FOR THE FULL LENGTH OF THE AISLE & TREAD OF EACH TIER IN ACCORDANCE WITH 'SECTION H1.7' & 'SECTION NSW H101.20.3,4,5' OF THE BCA 2 x 13mm 'GYPROCK SOUNDCHEK' LINING ON2 SOUND RESILIENT MOUNTS & 75mm 'BRADFORD SOUNDSCREEN PLUS' R2. INSULATION TO WALLS BETWEEN LECTURE ROOM & FOYER/OFFICE/READING AREAS 'QS INDUSTRIES - ROCHE 110/20' ALUMINIUM BATTENS AT 120mm CENTRES ON 75 x 100mm RHS HOT DIPPED GALVANISED FRAME FIXINGS TO MANUFACTURERS SPECIFICATION R.L. 298.51 E EXISTING GROUND COL COCOCO COL COCOCOL COL COCOL COCOL COL COL CO 'HOT DIPPED GALVANISED' STE AWNING ABOVE 200 x 75mm RHS RAFTERS & 100 x 50mm RH 10
  • 11. SENIOR READING AREA CPT OFFICE 4OFF CPTCPT FOYER JUNIOR READING AREA BOOK STORE OFFICE 1 OFFICE 2 OFFICE 3 MALE FEMALE FOYER 2400mm HIGH GLAZING WITH CONCEALED240 ALUMINIUM FRAME TO FOYERALU NEW LIBRARY COUNTER SEE '14252-A13 - JOINERY SCHEDULE 1' FOR MORE INFORMATION COMSOMSCOCO ALUMINIUM FRAMED WINDOWS THROUGHOUT E EE E E EE E LANDING UP E EXISTING WALLS TO REMAIN SHOWN THUS EXISTING WALLS TO BE REMOVEDLS TO SHOWN THUS. BEAMS ETCBEAM REQ'D TO ENGINEERS SPECIFICATIONSINEER EXISTING WALLS TO REMAIN SHOWN THUS W 06 W 22 W 24 D 01 W 01 D 02 D 03 WW 15 REINFORCED CONCRETE SLABINFORINFORNFORCNFORCFORCEFORCFORC TO TIE INTO EXSITING REFERTIE ITIE INIE INTTIE IN TO ENGINEERS SPECIFICATIONSENGINNGINENGINEENGINE NEW DISABLED RAMP, LANDING &NEW D HANDRAILS TO COMPLY WITH AS1428.1 OVER W 25 OVER W 26 OVER W 23 OVER OFFICE 1 CPT OFFICE 2 CPT WORK ROOM CPT OFFICE 3 CPT NEW WORK COUNTER WITH SINK & O'HEAD CPD'S WW 0909 OVER TACTILE INDICATORS TO COMPLY WITH AS1428.4 CHANGE IN FLOOR FINISH FIRE EXITRE EXIT ONLYONL TION TABLE CREEN SEMINAR ROOM CPT H'RAIL H'RAIL MIN. 50mm SET DOWN INMIMINMIN.MIN SLAB FOR TILED AREA TILESLAB FAB FOB FOAB FO TO FINISH FLUSH WITH FLOORFINISFINISHINISHFINISH FINISH IMMEDIATELY OUTSIDEINISHISH IMISH IMISH IM RELOCATE EXISTING HOSE REEL IN ORDER TO COMPLY WITH 'AS2441' & 'PART E1.4' OF THE BCA RR EXEX FHR FHRFHR NEW DISABLED WC REFERBLED REFERLED W TO '14252-A11 - DISABLED-A11 - ABLEA11 - ACCESS' FOR DETAILSOR DE R.L. 298.70 LINE OF STEEL WEB TRUSS OVERSS OLINLINLINELIN COL LINE OF STEEL WEB TRUSS OVERLILINLINLINLI DP DPDP 165 STEP BEAMOVERBEAMOVER RAKED CEILING OVER D 04 W 21 W 16 W 17 STEEL COLUMNS & BEAMS TOSTEESTEELTEELTEEL STRUCTURAL ENGINEERS DETAILSUCTUUCTURCTURACTURCTURAL ENGINEERS DETAILS 2400mm HIGH GLAZED INTERNAL PARTIONING WITH A CONCEALED ALUMINIUM FRAME TO ALL OFFICES & WORKROOMS. OPAQUE GRAPHIC TINT APPLIED TO 1000mm HEIGHT BEAMOVER COMPACTUSCTUS MAX1:14 EXISTING AIR CONDITIONING CONDENSERS REMOVE EXISTING COLUMNING CING COLUMN EXISTING BEAMS OVER SHOWN THUS:-BEA EXISTING COMS TO BE PROTECTEDS TO DURING CONSTRUCTIONRUCT DP W 07 W 08 DP W 02 W 04 W 03 W 05 ON mm .0 RE AS EXISTING PROJECTION SCREEN TO BE RELOCATED TO LECTURE ROOM STEEL WEB TRUSSES TO ENG. DETAILSEEL WEL WEL WEEL WEB TRUS BATTEN & CLAD WITH TASMANIAN OAKTTENTEN &EN &TEN & AD WITH GLUE LAMINATED TIMBER VENEER SEEE LAE LAMLAME LAME LAMINATED TIMBER VENEER SEELAMINATED TIMBER VENEER SEETIMBER TAILTAIL'14252-A08 - SECTIONS' FOR MORE DETAIL252-A08 - SECTIONS' FOR MORE DETAILNS' FOR ON SHAPE REQUIRED FIXED TIMBER BENCH SEE '14252-A14 - JOINERY SCHEDULE 2' FOR MORE INFORMATION SELECTED FLOOR TILES EXISTING WALLS THROUGHOUTNG W TO BE REPAINTED TO MATCHE REP NEW EXTENSION 2400mm HIGH GLAZED INTERNAL PARTIONING WITHGLAZE A CONCEALED ALUMINIUM FRAME TO ALL OFFICESALUM & WORKROOMS. OPAQUE GRAPHIC TINT APPLIED. OPA TO 1000mm HEIGHTIGHT 11 A08 33 A09 44 A09 22 A08 W 10 OVER W 11 OVER W 12 OVER W 13 OVER W 14 OVER TO MATCH EXISTING R.L. 298.70 EXISTING R.L. 298.51 PROPOSED EXISTING GROUND 18801880 3900 1500 1500 66 A10 66 A10 55 A10 55 A10 E COL COL COL COL CO COL CO COL COCOL COL COCO COL COL COL COL COL COL COL COL COL COL COCO COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COCOCO COL COL COL COL COL COL COL COL COL COL COCOL COCO COL CO COL CO COL CO COL COCO EEL FRAMED HS POSTS & HS PURLINS FIXED TIMBER BENCH SEE '14252-A14 - JOINERY SCHEDULE 2' FOR MORE INFORMATION 11
  • 12. 12 location Dubbo, NSW floor area 23.14Ha site 533sqm floor project cost $1,425,000 time schedule design, documentation 9 months construction 6 months
  • 13. 13
  • 14. 14 The project comprised the building of a highly flexible cluster of villas to house five people with severe and profound disability. Each villa is self contained including private access, bedroom, bathroom, kitchen and living space,withinternalspacesdesignedtoadapteasilyaround residents’ changing needs and provides the flexibility required for delivery of individual support services. The villa’s are oriented in a cluster allowing for separation and independence but also shared use of innovative interactive outdoor areas and covered spaces designed for culturally sensitive social interaction. SAIF HOUSING PROJECT accessible unit development 2014
  • 15. SAIF Housing Project - Visitor Entrance
  • 16. 16
  • 17. 17
  • 18. 18
  • 19. 19
  • 20. location Dubbo, NSW floor area 3283sqm site 653qm floor project cost $1,200,000 time schedule design, documentation 12 months construction 6 months
  • 21. 21
  • 22. 22 The project developed through the need to upgrade an old and dated club to meet the future needs of the club and comply with current regulations. Through reconfiguring the entrance to the club, creating all new gaming and function areas and upgrading the existing joinery and toilets throughout, the club has been able to create a comfortable atmosphere for its current members and also attract new clientele. SPORTIES bowling club renovation 2013
  • 23. Sporties - Visitor Entrance
  • 24. 24 location Dubbo, NSW floor area 8993sqm site 1446sqm floor project cost $1,300,000 time schedule design, documentation 12 months construction 5 months
  • 25. 25
  • 26. 26
  • 27. 27 3
  • 28. 28 The project was developed in response to the need for adequate medical services to be provided to the population of Walgett. The building has been developed as a multipurpose use health facility that is mindful of the community the facility was built for, providing modern clinical space for visiting doctors, health service workers & the local clientele. WALGETT ABORIGINAL MEDICAL SERVICE chronic disease unit 2013
  • 29. Walgett Aboriginal Medical Service - Front Facade
  • 30. CONSULT ROOM 3 CONSULTING ROOM 4CONSULTING ROOM 5 MEETING ROOM FCPHC H4L ALLIED H4L PERMAN DENOTES NEW 'AWS SHOPF RAMP UP 1:70 COFFEE FHR 9 06 9 06 W 19 W 20 W 1616 W 1717 W 1818 W 21 D 05 D 06 D 08 D 07 D 15 D 14 D 13 D 09 D 11 D 10 D 12 D 21 D 24 AMBULANT FEMALE W/C STAFF W/C 1 STAFF W/C 2 AMBULANT MALE W/C M V DISAB W/C FE VA MIN. 50mm SET DOWN IN SLAB FOR TILED AREA TILES TO FINISH FLUSH WITH FLOOR FINISH IMMEDIATELY OUTSIDE NEW 36m HOSE REEL I IN ACCORDANCE WITH & 'PART E1.4' OF THE W 22 W 23 W 25 W 26 W 24 CPT TILESCPT TILESCPT TILESCPT TILES CPT TILES CPT TILES CPT TILES CPT TILES CPT TILES NEW STEEL BEAM & LINTEL OVER SUPPORTING TRUSSES & BRICKWORK ABOVE RAMPUP 1:70 NEW 90mm STEEL WALL FRAMING THROUGHOUT IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS TOILET FACILITIES TO COMPLY WITH AS1428.1-2009 SEE 16217-A08 FOR MORE INFORMATION DP DP DP MEETING ROOM JOINERY SEE 16217-A12 FOR MORE INFORMATION POSSIBLE MECHANICAL PLANT LOCATION REFER TO MECHANICAL SPECIFICATIONS BY OTHERS FOR MORE INFORMATION MSB NEW DIS SURFAC ACCORD 'FLETCHER - PINK PARTITION 32' R2.7 WALL BATTS & 'INSULMIST 800 THERMAL BREAK INSULATION' TO ALL NEW EXTERNAL WALLS 'FLETCHER - PINK PARTITION 32' R2.7 WALL BATTS TO ALL NEW INTERNAL WALLS MECHANICAL SUB BOARD LOCATED WITHIN 'EATON - ETA WALL ENCLOSURE' IP65 MILD STEEL WALL MOUNTED SWITCHBOARD ENCLOSURE OR SIMILAR IN ACCORDANCE WITH PART D2.7 OF THE BCA VOL. 1, 2012 NEW 50mm DIA. TUBULAR HOT DIPPED GALVANISED STEEL HANDRAIL BOLTED TO BRICKWORK WITH COVERPLATE @ 900mm HIGH IN ACCORDANCE WITH MANUFACTURERS SPECIFICATION 30
  • 31. ING 3 ENT MANAGERS OFFICE STAFF ROOM UTILITY ROOM EQUIPMENT CONSULTING ROOM EXERCISE ROOM STORE CONSULTING ROOM 1 STORE CONSULTING ROOM 2 WAITING AREA RECEPTION FILE ROOM STAFF OUTDOOR PORTICO 132.84 NEW 'AWS' ALUMINIUM FRAMED FIXED WINDOWS THROUGHOUT ROOF OVER CLLLLLEAAAAAAAANEEEEERSSSSSSSSSSSSSSSS CCCCCCCLLLLOOOOSSSSSEEEEEEETTTTTTT SERIES 400' ALUMINIUM RONT GLAZING SYSTEM RAMP UP 1:35 RAMP UP 1:35 NEW ACCESSIBLE TOILET & SHOWER TO COMPLY WITH AS1428.1-2009 SEE 16217-A10 FOR MORE INFORMATION FEFEFE FEFE MSB FHR FHR 10 06 10 06 11 07 11 07 W 01 W 02 W 03 W 04 W 05 W 07 W 06 W 08 W 09 W 10 W 11 W 1212 W 1313 W 14 W 15 D 40 D 39 D 38 D 28 D 19 D 18 D 42 D 16 D 17 D 25 D 26 D 29 D 32 D 33 D 27 D 30 D 34 D 35 D 36 D 41 D 37 D 23 D 22 D 04 D 03 D 02 D 01 D 20 DDDDDIISSSSSSSSSSSAAAAAAAABBBBBBLLLLEEEEDDDDDDDDD WWWWWWW/C 2222222 SSSSSSSSSSHHHHHOOOOWWWWWWWWWWWEEEERRRRRRRRRR D 31 MALE ANITY LED 1 EMALE ANITY REINFORCED CONCRETE SLAB TO ENGINEERS SPECIFICATIONS NEW 50mm DIA. TUBULAR HOT DIPPED GALVANISED STEEL HANDRAIL BOLTED TO BRICKWORK WITH COVERPLATE @ 900mm HIGH IN ACCORDANCE WITH MANUFACTURERS SPECIFICATION DUCTED REVERSE CYCLE AIR-CONDITIONING IS TO BE PROVIDED THROUGHOUT NEW 'BIRRUS - ULTRAMAT' WITHE 'ONTERA ENVISION - IRONSTONE 848'OO CARPET INSERT RA ECESSED INTO NEW SLAB INSTALLED IN ACCORDANCE WITHL AS1428.4.1-2009 & MANUFACTURERSSRS SPECIFICATIONSP INSTALLED H 'AS2441'2 E BCA 2012 'QS INDUSTRIES - ROCHE 110/20' ALUMINIUM BATTENS AT 100mm CENTRES ON 50x50mm RHS HOT DIPPED GALVANISED FRAME SET 15 DEGREES TO WALL & BOLTED TO BRICKWORK FIXINGS TO MANUFACTURERS SPECIFICATION W 27 CPT TILES VNYL PL CPT TILESCPT TILESSS NEW HOT DIPPED GALVANISED STRUCTURAL STEEL BEAM & COLUMNS SUPPORTING VERANDAH PURLINS OVER NEW HOT DIPPED GALVANISED STRUCTURAL STEEL BEAM & COLUMNS SUPPORTING PORTICO PURLINS OVER NEW 50mm DIA. TUBULAR HOT DIPPED GALVANISED STEEL HANDRAIL @ 900mm HIGH BOLTED TO CONCRETE SLAB WITH COVERPLATE IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS FBFB DP DPD DP DP DP DP DDDDPP VNYL PL VINYL PLANK FLOORING TO HALLWAYS RECEPTION COUNTER SEE 16217-A11 FOR MORE INFORMATION LINE OF NEW BULKHEAD OVER CONSULTING ROOM 1 JOINERY SEE 16217-A12 FOR MORE INFORMATION CONSULTING ROOM 2 JOINERYC SEE 16217-A12 FOR MORESS INFORMATIONN STAFF ROOM JOINERY SEE 16217-A12 FOR MORE INFORMATION INTERNAL 'GYPROCK - SUPERCHEK' PLASTERBOARD WALL LINING THROUGHOUT 'GYPROCK - AQUACHEK' PLASTERBOARD TO WET AREAS NEW HOT DIPPED GALVANISED STRUCTURAL STEEL BEAM SUPPORTING VERANDAH PURLINS OVER VNYL PLVNYL PL VNYL PLVNYL PL VNYL PLVNYL PL VNYL PLVNYL PL VNYL PL VNYL PLVNYL PL VYNL PL REINFORCED CONCRETE PATHWAY SLAB TO ENGINEERS SPECIFICATIONS MIN. 50mm SET DOWN IN SLAB FOR TILED AREA TILES TO FINISH FLUSH WITH FLOOR FINISH IMMEDIATELY OUTSIDE CPT TILES FEFE FILE ROOM JOINERY SEE 16217-A12 FOR MORE INFORMATION CRETE S/S TACTILE GROUND CE INDICATORS INSTALLED IN DANCE WITH AS1428.4.1-2009 RAMPUP 1:44 31
  • 32. location Walgett, NSW floor area 5480sqm site 570sqm floor project cost $2,400,000 time schedule design, documentation 10 months construction 7 months
  • 33. 33
  • 34. 34 The project developed through the intention of creating a world-class restaurant and bar that would happily satisfy international guests and locals alike. The Kirketon Dining Room & Bar is reminiscent of the timeless modern restaurants and bars found in Paris & New York. Leather upholstery, dark timber panelling, brass feature walls & screens finished with a bronze patina, polished stucco plaster & aged French wall mirrors are all key elements that brought about a theatrical and ambient atmosphere. KIRKETON DINING ROOM & BAR restaurant fitout 2006
  • 35. Kirketon Dining Room & Bar - Restaurant
  • 36. 36
  • 37. 37
  • 38. location Darlinghurst, NSW floor area 504sqm floor project cost $2,000,000 time schedule design, documentation 14 months construction 9 months
  • 39. 39 3
  • 40. 40 The project developed through the need to upgrade a 20 year old, worn and dated fitout that was hampering sales, as well as cater for an increase in staff and clientele. The project involved the refurbishment of the existing consultation rooms, and a reconfiguring of the reception, waiting and display areas, with all new joinery, flooring and paint colours. MORRISON’S FAMILY EYECARE shop fitout 2012
  • 42. location Dubbo, NSW floor area 202sqm floor project cost $90,000 time schedule design, documentation 3 months construction 6 weeks
  • 43. 43
  • 44. 44 The aim of the project was to create a facility that caters for provincial and national standard athletics events, providing undercover spectator seating and all-weather synthetic track and field surfaces that meet International Association of Athletics Federation standards. WorkingwithAruptodevelopthemasterplanforthewhole facility, the design included a 600 seat grandstand with a multi-purpose space for training and administration, as well as bunk style accommodation, canteen & bbq facilities, plus change rooms, amenities and a secure storage area. BARDEN PARK ATHLETICS CENTRE 600 seat grandstand 2014
  • 45. Barden Park Athletics Centre - Grandstand Seating
  • 46. 46 location Dubbo, NSW floor area 40,679sqm site 1760sqm floor project cost $5,300,000 time schedule design, documentation 12 months construction 9 months
  • 47. 47
  • 48. 48 The brief involved the design of a family home, that provided spaces for gathering, as well as private zones for the parents and kids. The central wing houses the communal areas, incorporating the kitchen, living and dining areas, with the western wing branching off one side to provide a parents reteat and den. The eastern wing houses the guest bedroom, laundry and garage, whilst tucked away within the roof line are the kids bedroom and rumpus. The aesthetic style were dictated by the client’s love of American Hamptons style architecture, incorporating a weatherboard facade and shingled roof. MORRIS RESIDENCE four bedroom house design 2014
  • 49. Morris Residence - Front Facade
  • 50. 50 location Mudgee, NSW floor area 21.04Ha site 655sqm floor project cost $700,000 time schedule design, documentation 6 months construction in construction
  • 51. 51
  • 52. 52 Situated on a large acre property, the clients brief for the project involved designing a luxurious homestead that felt like it had stood for a hundred years, but still maintained a modern and comfortable way of living for himself and his guests. With the intention of working from home the house also contained offices and meeting areas, and a large gallery, library and wine cellar to house his collections. MOOLUNGUNDI homestead design 2009
  • 53. Moolungundi - Front & Rear Facades
  • 54. 54 location Coonabarabran, NSW floor area 240Ha site 1337sqm floor project cost $2,400,000 time schedule design, documentation 3 months construction yet to start
  • 55. 55
  • 56.
  • 57. Online portfolio www.barnson.com.au Contact phone: 1300 138 657 email: kgleeson@barnson.com.au KIRK GLEESON building designer