3. ‘I’m inspired by the Bauhaus designers of the early 20th century,
where the idea of design was taught as a ‘total’ work, in which
all aspects of design, including architecture were brought
together as a whole’.
4.
5. EDUCATION
EXPERIENCE
AFFILLIATIONS
SKILLS
University of New South Wales
Bachelor of Industrial Design,
Randwick Campus, 2000 - 2004
St Johns College Dubbo
Completed HSC in 1999
Barnson Pty Ltd
Jul 2007 – Present
InDestudio
Jul 2004 – Jul 2007
Member of Building Designers Australia
2007 – Present
Revit Architecture
AutoCAD
3D Studio Max
Rhino 3D Modelling
Microsoft Office
Adobe Creative Suite
6. 6
The initial brief for the project was an extension to the
existing library to cater for the increase in the number
of students at the school. With extra funding however,
the scope of the project increased to include offices and
workrooms, a seminar room as well as a 120 seat tiered
lecture theatre. The overall look of the project developed
from trying to get a modern building to sit within the
existing landscape of older buildings, this is why although
the building has its own unique identity, it still has a lot of
building materials in common with the existing buildings.
ST JOHNS COLLEGE
senior library extension 2010
10. STORE
12075
'HOT DIPPED GALVANISED' STEEL
FRAMED AWNING ABOVE 200 x
75mm RHS POSTS & RAFTERS &
100 x 50mm RHS PURLINS
SELECTED FLOOR
TILES TO FOYER
E
W
19
W
18
NEW CONCRETE PATH
ROOF LINE OVER
RAKED
CEIL
RAKED
RAKED
CEILING
OVER
ED
CEILING
O
G
OVER
LECTURE ROOM
CPT
ENTRY PATIOENEN ATIO
PROJECTION DIRECT
OVERHEAD PROJECTOR
MOUNTED TO CEILING
RELOCATED RETRACTA
PROJECTION SC
FIXED TIMBER BENCHES SEE
'14252-A14 - JOINERY SCHEDULE 2'
FOR MORE INFORMATION
D
0505
FHR
NEW LOW RENDERED BRICK WALL
DPDP
DPDP
DPDPDP
165 STEP
W
20
NEW DISABLED RAMP, LANDING &
HANDRAILS TO COMPLY WITH AS1428.1
H'RAIL
UP
MAX1:14
H'RAIL
11
A08
33
A09
44
A09
TACTILE INDICATORS TO
COMPLY WITH AS1428.4
22
A08
PROPOSED AIR CONDITIONING CONDENSERS
AISLE LIGHTS TO BE INSTALLED TO PROVIDE
ILLUMINIATION FOR THE FULL LENGTH OF THE
AISLE & TREAD OF EACH TIER IN ACCORDANCE
WITH 'SECTION H1.7' & 'SECTION NSW
H101.20.3,4,5' OF THE BCA
2 x 13mm 'GYPROCK SOUNDCHEK' LINING ON2
SOUND RESILIENT MOUNTS & 75mm
'BRADFORD SOUNDSCREEN PLUS' R2.
INSULATION TO WALLS BETWEEN LECTURE
ROOM & FOYER/OFFICE/READING AREAS
'QS INDUSTRIES - ROCHE 110/20' ALUMINIUM
BATTENS AT 120mm CENTRES ON 75 x 100mm RHS
HOT DIPPED GALVANISED FRAME FIXINGS TO
MANUFACTURERS SPECIFICATION
R.L. 298.51
E
EXISTING GROUND
COL
COCOCO
COL
COCOCOL
COL
COCOL
COCOL
COL
COL
CO
'HOT DIPPED GALVANISED' STE
AWNING ABOVE 200 x 75mm RHS
RAFTERS & 100 x 50mm RH
10
11. SENIOR READING AREA
CPT
OFFICE 4OFF
CPTCPT
FOYER
JUNIOR READING AREA
BOOK
STORE
OFFICE
1
OFFICE
2
OFFICE
3
MALE FEMALE
FOYER
2400mm HIGH GLAZING WITH CONCEALED240
ALUMINIUM FRAME TO FOYERALU
NEW LIBRARY COUNTER SEE
'14252-A13 - JOINERY SCHEDULE 1'
FOR MORE INFORMATION
COMSOMSCOCO
ALUMINIUM FRAMED
WINDOWS THROUGHOUT
E
EE
E
E
EE
E
LANDING
UP
E
EXISTING WALLS TO
REMAIN SHOWN THUS
EXISTING WALLS TO BE REMOVEDLS TO
SHOWN THUS. BEAMS ETCBEAM
REQ'D TO ENGINEERS SPECIFICATIONSINEER
EXISTING WALLS TO
REMAIN SHOWN THUS
W
06
W
22
W
24
D
01
W
01
D
02
D
03
WW
15
REINFORCED CONCRETE SLABINFORINFORNFORCNFORCFORCEFORCFORC
TO TIE INTO EXSITING REFERTIE ITIE INIE INTTIE IN
TO ENGINEERS SPECIFICATIONSENGINNGINENGINEENGINE
NEW DISABLED RAMP, LANDING &NEW D
HANDRAILS TO COMPLY WITH AS1428.1
OVER
W
25
OVER
W
26
OVER
W
23
OVER
OFFICE 1
CPT
OFFICE 2
CPT
WORK ROOM
CPT
OFFICE 3
CPT
NEW WORK COUNTER WITH
SINK & O'HEAD CPD'S
WW
0909
OVER
TACTILE INDICATORS TO COMPLY WITH AS1428.4
CHANGE IN FLOOR FINISH
FIRE EXITRE EXIT
ONLYONL
TION
TABLE
CREEN
SEMINAR ROOM
CPT
H'RAIL
H'RAIL
MIN. 50mm SET DOWN INMIMINMIN.MIN
SLAB FOR TILED AREA TILESLAB FAB FOB FOAB FO
TO FINISH FLUSH WITH FLOORFINISFINISHINISHFINISH
FINISH IMMEDIATELY OUTSIDEINISHISH IMISH IMISH IM
RELOCATE EXISTING HOSE
REEL IN ORDER TO COMPLY
WITH 'AS2441' & 'PART E1.4'
OF THE BCA
RR
EXEX
FHR
FHRFHR
NEW DISABLED WC REFERBLED REFERLED W
TO '14252-A11 - DISABLED-A11 - ABLEA11 -
ACCESS' FOR DETAILSOR DE
R.L. 298.70
LINE OF STEEL WEB TRUSS OVERSS OLINLINLINELIN
COL
LINE OF STEEL WEB TRUSS OVERLILINLINLINLI
DP
DPDP
165 STEP
BEAMOVERBEAMOVER
RAKED
CEILING
OVER
D
04
W
21
W
16
W
17
STEEL COLUMNS & BEAMS TOSTEESTEELTEELTEEL
STRUCTURAL ENGINEERS DETAILSUCTUUCTURCTURACTURCTURAL ENGINEERS DETAILS
2400mm HIGH GLAZED INTERNAL
PARTIONING WITH A CONCEALED
ALUMINIUM FRAME TO ALL OFFICES
& WORKROOMS. OPAQUE GRAPHIC TINT
APPLIED TO 1000mm HEIGHT
BEAMOVER
COMPACTUSCTUS
MAX1:14
EXISTING AIR
CONDITIONING
CONDENSERS
REMOVE EXISTING COLUMNING CING COLUMN
EXISTING BEAMS OVER SHOWN THUS:-BEA
EXISTING COMS TO BE PROTECTEDS TO
DURING CONSTRUCTIONRUCT
DP
W
07
W
08
DP
W
02
W
04
W
03
W
05
ON
mm
.0
RE
AS
EXISTING PROJECTION
SCREEN TO BE RELOCATED
TO LECTURE ROOM
STEEL WEB TRUSSES TO ENG. DETAILSEEL WEL WEL WEEL WEB TRUS
BATTEN & CLAD WITH TASMANIAN OAKTTENTEN &EN &TEN & AD WITH
GLUE LAMINATED TIMBER VENEER SEEE LAE LAMLAME LAME LAMINATED TIMBER VENEER SEELAMINATED TIMBER VENEER SEETIMBER
TAILTAIL'14252-A08 - SECTIONS' FOR MORE DETAIL252-A08 - SECTIONS' FOR MORE DETAILNS' FOR
ON SHAPE REQUIRED
FIXED TIMBER BENCH SEE
'14252-A14 - JOINERY
SCHEDULE 2' FOR MORE
INFORMATION
SELECTED FLOOR TILES
EXISTING WALLS THROUGHOUTNG W
TO BE REPAINTED TO MATCHE REP
NEW EXTENSION
2400mm HIGH GLAZED INTERNAL PARTIONING WITHGLAZE
A CONCEALED ALUMINIUM FRAME TO ALL OFFICESALUM
& WORKROOMS. OPAQUE GRAPHIC TINT APPLIED. OPA
TO 1000mm HEIGHTIGHT
11
A08
33
A09
44
A09
22
A08
W
10
OVER
W
11
OVER
W
12
OVER
W
13
OVER
W
14
OVER
TO MATCH EXISTING
R.L. 298.70
EXISTING
R.L. 298.51
PROPOSED
EXISTING GROUND
18801880 3900
1500
1500
66
A10
66
A10
55
A10
55
A10
E
COL
COL
COL
COL
CO
COL
CO
COL
COCOL
COL
COCO
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COCO
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COCOCO
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COCOL
COCO
COL
CO
COL
CO
COL
CO
COL
COCO
EEL FRAMED
HS POSTS &
HS PURLINS
FIXED TIMBER BENCH SEE
'14252-A14 - JOINERY SCHEDULE
2' FOR MORE INFORMATION
11
14. 14
The project comprised the building of a highly flexible
cluster of villas to house five people with severe and
profound disability. Each villa is self contained including
private access, bedroom, bathroom, kitchen and living
space,withinternalspacesdesignedtoadapteasilyaround
residents’ changing needs and provides the flexibility
required for delivery of individual support services.
The villa’s are oriented in a cluster allowing for separation
and independence but also shared use of innovative
interactive outdoor areas and covered spaces designed for
culturally sensitive social interaction.
SAIF HOUSING PROJECT
accessible unit development 2014
22. 22
The project developed through the need to upgrade an old
and dated club to meet the future needs of the club and
comply with current regulations. Through reconfiguring
the entrance to the club, creating all new gaming and
function areas and upgrading the existing joinery and
toilets throughout, the club has been able to create a
comfortable atmosphere for its current members and also
attract new clientele.
SPORTIES
bowling club renovation 2013
28. 28
The project was developed in response to the need
for adequate medical services to be provided to the
population of Walgett. The building has been developed
as a multipurpose use health facility that is mindful of the
community the facility was built for, providing modern
clinical space for visiting doctors, health service workers &
the local clientele.
WALGETT ABORIGINAL MEDICAL SERVICE
chronic disease unit 2013
30. CONSULT
ROOM 3
CONSULTING
ROOM 4CONSULTING
ROOM 5
MEETING
ROOM
FCPHC
H4L
ALLIED
H4L
PERMAN
DENOTES
NEW 'AWS
SHOPF
RAMP UP
1:70
COFFEE
FHR
9
06
9
06
W
19
W
20
W
1616
W
1717
W
1818
W
21
D
05
D
06
D
08
D
07
D
15
D
14
D
13
D
09
D
11
D
10
D
12
D
21
D
24
AMBULANT
FEMALE
W/C
STAFF
W/C 1
STAFF
W/C 2
AMBULANT
MALE
W/C
M
V
DISAB
W/C
FE
VA
MIN. 50mm SET DOWN IN SLAB FOR TILED
AREA TILES TO FINISH FLUSH WITH FLOOR
FINISH IMMEDIATELY OUTSIDE
NEW 36m HOSE REEL I
IN ACCORDANCE WITH
& 'PART E1.4' OF THE
W
22
W
23
W
25
W
26
W
24
CPT TILESCPT TILESCPT TILESCPT TILES
CPT TILES
CPT TILES
CPT TILES
CPT TILES CPT TILES
NEW STEEL BEAM & LINTEL
OVER SUPPORTING TRUSSES &
BRICKWORK ABOVE
RAMPUP
1:70
NEW 90mm STEEL WALL FRAMING
THROUGHOUT IN ACCORDANCE
WITH MANUFACTURERS
SPECIFICATIONS
TOILET FACILITIES TO COMPLY WITH
AS1428.1-2009 SEE 16217-A08 FOR
MORE INFORMATION
DP
DP
DP
MEETING ROOM JOINERY
SEE 16217-A12 FOR MORE
INFORMATION
POSSIBLE MECHANICAL PLANT LOCATION
REFER TO MECHANICAL SPECIFICATIONS BY
OTHERS FOR MORE INFORMATION
MSB
NEW DIS
SURFAC
ACCORD
'FLETCHER - PINK PARTITION 32'
R2.7 WALL BATTS & 'INSULMIST
800 THERMAL BREAK INSULATION'
TO ALL NEW EXTERNAL WALLS
'FLETCHER - PINK PARTITION
32' R2.7 WALL BATTS TO ALL
NEW INTERNAL WALLS
MECHANICAL SUB BOARD
LOCATED WITHIN 'EATON -
ETA WALL ENCLOSURE' IP65
MILD STEEL WALL MOUNTED
SWITCHBOARD ENCLOSURE
OR SIMILAR IN ACCORDANCE
WITH PART D2.7 OF THE
BCA VOL. 1, 2012
NEW 50mm DIA. TUBULAR HOT DIPPED
GALVANISED STEEL HANDRAIL BOLTED
TO BRICKWORK WITH COVERPLATE @
900mm HIGH IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATION
30
31. ING
3
ENT
MANAGERS
OFFICE
STAFF
ROOM UTILITY
ROOM
EQUIPMENT
CONSULTING
ROOM
EXERCISE
ROOM
STORE
CONSULTING
ROOM 1
STORE
CONSULTING
ROOM 2
WAITING
AREA
RECEPTION
FILE ROOM
STAFF
OUTDOOR
PORTICO
132.84
NEW 'AWS' ALUMINIUM FRAMED
FIXED WINDOWS THROUGHOUT
ROOF OVER
CLLLLLEAAAAAAAANEEEEERSSSSSSSSSSSSSSSS
CCCCCCCLLLLOOOOSSSSSEEEEEEETTTTTTT
SERIES 400' ALUMINIUM
RONT GLAZING SYSTEM
RAMP UP
1:35
RAMP UP
1:35
NEW ACCESSIBLE TOILET &
SHOWER TO COMPLY WITH
AS1428.1-2009 SEE 16217-A10
FOR MORE INFORMATION
FEFEFE
FEFE
MSB
FHR
FHR
10
06
10
06
11
07
11
07
W
01
W
02
W
03
W
04
W
05
W
07
W
06
W
08
W
09
W
10
W
11
W
1212
W
1313
W
14
W
15
D
40 D
39
D
38
D
28
D
19
D
18
D
42
D
16
D
17
D
25
D
26
D
29
D
32
D
33
D
27
D
30
D
34
D
35
D
36
D
41
D
37
D
23
D
22
D
04
D
03
D
02
D
01
D
20
DDDDDIISSSSSSSSSSSAAAAAAAABBBBBBLLLLEEEEDDDDDDDDD
WWWWWWW/C 2222222
SSSSSSSSSSHHHHHOOOOWWWWWWWWWWWEEEERRRRRRRRRR
D
31
MALE
ANITY
LED
1
EMALE
ANITY
REINFORCED
CONCRETE SLAB
TO ENGINEERS
SPECIFICATIONS
NEW 50mm DIA. TUBULAR HOT DIPPED GALVANISED
STEEL HANDRAIL BOLTED TO BRICKWORK WITH
COVERPLATE @ 900mm HIGH IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATION
DUCTED REVERSE CYCLE
AIR-CONDITIONING IS TO
BE PROVIDED
THROUGHOUT
NEW 'BIRRUS - ULTRAMAT' WITHE
'ONTERA ENVISION - IRONSTONE 848'OO
CARPET INSERT RA ECESSED INTO NEW
SLAB INSTALLED IN ACCORDANCE WITHL
AS1428.4.1-2009 & MANUFACTURERSSRS
SPECIFICATIONSP
INSTALLED
H 'AS2441'2
E BCA 2012
'QS INDUSTRIES - ROCHE
110/20' ALUMINIUM
BATTENS AT 100mm
CENTRES ON 50x50mm RHS
HOT DIPPED GALVANISED
FRAME SET 15 DEGREES TO
WALL & BOLTED TO
BRICKWORK FIXINGS TO
MANUFACTURERS
SPECIFICATION
W
27
CPT TILES
VNYL PL
CPT TILESCPT TILESSS
NEW HOT DIPPED GALVANISED
STRUCTURAL STEEL BEAM & COLUMNS
SUPPORTING VERANDAH PURLINS OVER
NEW HOT DIPPED GALVANISED
STRUCTURAL STEEL BEAM &
COLUMNS SUPPORTING PORTICO
PURLINS OVER
NEW 50mm DIA. TUBULAR HOT DIPPED
GALVANISED STEEL HANDRAIL @ 900mm
HIGH BOLTED TO CONCRETE SLAB WITH
COVERPLATE IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATIONS
FBFB
DP
DPD
DP
DP
DP
DP
DDDDPP
VNYL PL
VINYL PLANK FLOORING
TO HALLWAYS
RECEPTION COUNTER
SEE 16217-A11 FOR MORE
INFORMATION
LINE OF NEW
BULKHEAD OVER
CONSULTING ROOM 1
JOINERY
SEE 16217-A12 FOR MORE
INFORMATION
CONSULTING ROOM 2 JOINERYC
SEE 16217-A12 FOR MORESS
INFORMATIONN
STAFF ROOM JOINERY
SEE 16217-A12 FOR MORE
INFORMATION
INTERNAL 'GYPROCK -
SUPERCHEK' PLASTERBOARD
WALL LINING THROUGHOUT
'GYPROCK - AQUACHEK'
PLASTERBOARD TO WET AREAS
NEW HOT DIPPED GALVANISED
STRUCTURAL STEEL BEAM SUPPORTING
VERANDAH PURLINS OVER
VNYL PLVNYL PL
VNYL PLVNYL PL
VNYL PLVNYL PL
VNYL PLVNYL PL
VNYL PL
VNYL PLVNYL PL
VYNL PL
REINFORCED CONCRETE
PATHWAY SLAB TO
ENGINEERS
SPECIFICATIONS
MIN. 50mm SET DOWN IN SLAB FOR TILED
AREA TILES TO FINISH FLUSH WITH FLOOR
FINISH IMMEDIATELY OUTSIDE
CPT TILES
FEFE
FILE ROOM JOINERY
SEE 16217-A12 FOR MORE
INFORMATION
CRETE S/S TACTILE GROUND
CE INDICATORS INSTALLED IN
DANCE WITH AS1428.4.1-2009
RAMPUP
1:44
31
34. 34
The project developed through the intention of creating
a world-class restaurant and bar that would happily
satisfy international guests and locals alike. The Kirketon
Dining Room & Bar is reminiscent of the timeless modern
restaurants and bars found in Paris & New York. Leather
upholstery, dark timber panelling, brass feature walls &
screens finished with a bronze patina, polished stucco
plaster & aged French wall mirrors are all key elements
that brought about a theatrical and ambient atmosphere.
KIRKETON DINING ROOM & BAR
restaurant fitout 2006
40. 40
The project developed through the need to upgrade a
20 year old, worn and dated fitout that was hampering
sales, as well as cater for an increase in staff and clientele.
The project involved the refurbishment of the existing
consultation rooms, and a reconfiguring of the reception,
waiting and display areas, with all new joinery, flooring
and paint colours.
MORRISON’S FAMILY EYECARE
shop fitout 2012
44. 44
The aim of the project was to create a facility that caters
for provincial and national standard athletics events,
providing undercover spectator seating and all-weather
synthetic track and field surfaces that meet International
Association of Athletics Federation standards.
WorkingwithAruptodevelopthemasterplanforthewhole
facility, the design included a 600 seat grandstand with
a multi-purpose space for training and administration,
as well as bunk style accommodation, canteen & bbq
facilities, plus change rooms, amenities and a secure
storage area.
BARDEN PARK ATHLETICS CENTRE
600 seat grandstand 2014
48. 48
The brief involved the design of a family home, that
provided spaces for gathering, as well as private zones
for the parents and kids. The central wing houses the
communal areas, incorporating the kitchen, living and
dining areas, with the western wing branching off one
side to provide a parents reteat and den. The eastern wing
houses the guest bedroom, laundry and garage, whilst
tucked away within the roof line are the kids bedroom and
rumpus.
The aesthetic style were dictated by the client’s love of
American Hamptons style architecture, incorporating a
weatherboard facade and shingled roof.
MORRIS RESIDENCE
four bedroom house design 2014
52. 52
Situated on a large acre property, the clients brief for the
project involved designing a luxurious homestead that felt
like it had stood for a hundred years, but still maintained a
modern and comfortable way of living for himself and his
guests. With the intention of working from home the house
also contained offices and meeting areas, and a large
gallery, library and wine cellar to house his collections.
MOOLUNGUNDI
homestead design 2009