1. RESUME
Name: - DILLIP KUMAR SENAPATI Contact No: 09439646892
Address: - QR No-23/66, Chahata Nagar, E-mail: - dillip196@gmail.com
Bidanasi , Cuttack-753014,
Orissa
OBJECTIVE:
Looking for a career, which offers avenues for career growth, self development and
expansion of the organization that offer me opportunities to work as well as to
enhance my knowledge in my respective field.
CURRENT EMPLOYER:
Company : EMPOWERTRANS PVT LTD (Bhubaneswar)
Designation: Project Manager
Duration: From Feb 2011 till Date (5 Year 9 Month)
RESPONSIBILITIES:
Experience in project Execution of 33kv,132kv ,220kv substation &132KV
,220KV, & 400KV Transmission line projects.
Preparation of Project schedule & Material Documentation List.
Preparation of Bill of Quantities & Budgetary Costings.
Skilled in business development, project costing, proposal preparation, contract
negotiation and preparation of claims
Ability to develop and implement practices & procedures for costing, execution
and control of projects
Preparation of Tender Documents & submitting the proposals, techno-
commercial clarification submittals, attending meetings for techno-commercial
negotiations and clarifications in the post order stage.
Cross checking the Interconnecting Drawings, Electrical & Instrumentation BOM,
Fabrication & Structural drawings.
Preparation of technical specifications (Datasheets, etc.,) in accordance with
the tender specifications/Client’s requirement for all Major Equipments of
CT,CVT,CB,MVA Transformers, Control & Relay Panel, Isolator(33 KV to 400
KV),Battery & Battery Charger, WT, Solid Core Post Insulators ,Normal &
Antifog Disc Insulators, ACDB, DCDB, JB, High Mast, Indoor & Outdoor
Lighting’s of Switchyard, EarthMat (as per IEEE 80-2000) AC Refrigerator/split ,
Electrical Rubber Mat & obtaining approval from Client/Consultant.
Vendor Development, Evaluation of Vendor Particulars,( as per IS & IEC )
Drawings & Offers; Preparing Comparative statements, Negotiation &
finalization of Orders.
Dispatching materials to site after Inspection clearance; Obtaining Delivery
Copies acknowledged; submitting bills for payment & follow-up of the same;
releasing of funds for vendor’s.
Co-ordinating with project manager of Erection & Commissioning activities at
site &client communication at all levels.
2. Conducting Inter-Department Project review on weekly/monthly basis &
submitting reports to Management.
Having good knowledge in material management.
Assigned the tasks of planning layout of electric sub-stations , switching
stations, transmission and distribution lines
Handling the tasks of reviewing technical drawings, topographical maps and
specifications of electrical systems.
Responsible for coordinating with external and internal stakeholders.
Required and ordered the materials for the projects with various Vendors ( Like
ABB, Siemens,CGL, Alstom, ABI, Schneider, BHEL….) and manufactures
for Various Electrical substation and Transmission line projects Upto 400kv.
Projected the billing forecast and worked with the controller to make sure all
billing invoices were correct.
Managed, turnkey commercial and industrial projects from start to completion.
Created client relationships which have lead to repeat business
opportunity.
Created schedules for projects, budget updates for ongoing projects.
Managed the project team including any subcontractors.
Liasoning of Various Approval Like System Study, Drawings, PTCC,
Forest, Aviation, Railway, CEI, for Various Electrical substation and
Transmission line projects Upto 400kv.
PROJECT HANDELD:
a) Aditya Aluminum Ltd ( 220/33KV Switching Switchyard with 220KV
Transmission LILO Line at Rayagada In Odisha ) Worked As Project
Engineer.
b) Vedanta Aluminum Ltd( 132/33KV switchyard at Lanjigarh in Odisha)
Worked As Project Engineer.
c) B.C.Mohnanty Ltd (132KV Switching station at Jajpur in Odisha) Worked As
Project Engineer.
d) Monnet Power Company Ltd (400KV Transmission Line) Worked As Sr.
Project Engineer.
e) GMR Kamalanga Energy Ltd. (400KV Transmission Line) Worked As Sr.
Project Engineer.
f) India Power Corporation Limited (220KV Transmission Line with Monopole)
Worked As Worked As Project Manager (Procurement).
3. g) Power Grid Corporation India Limited (400KV BAY Extension Project) Worked
As Project Manager (Procurement).
h) TANTRANSCO (220/110KV Transmission Line) Worked As Project Manager
(Procurement).
i) NALCO (220KV Transmission Line) Worked As Project Manager
(Procurement).
PERFORMANCE REVIEWS:
Now looking forward to a making a significant contribution with an ambitious company
that offers opportunities for progression.
ESSENTIAL SKILLS:
Effective interpersonal and communication skills
Excellent organizational skills to reach the required deadlines
Able to manage all activities
Result oriented
Able to work under pressure and independently
Leading engaging and building confidence in Project Staff.
Proven ability to stay within approved budgets, schedules &achieve objectives.
Possess excellent written and verbal communication skills
Ability to think analytically and strategically
Result oriented and ability to handle multiple tasks
Ability to perform task under pressure and within deadlines
Proven track of Providing Technical guidelines
SOFTWARE SKILLS:
.
Basic knowledge of AutoCAD.
Good knowledge of computer (MS-OFFICE, WINDOWS).
ACADAMIC CREDENTIALS:
Bachelors’ in Electrical Engineering from Bijupattnaik University in 2009.
Intermediate from Board of Intermediate Education in 2004.
Board of Secondary Education in 2002.
PERSONAL DETAILS:
Date of Birth : 7T H
June 1986
Nationality : Indian
Religion : Hindu
Languages known : English, Hindi, & ORIYA.
Marital Status : Unmarried.
4. DECLARATION:
I consider myself familiar with professional aspects. I am also confident of my
ability to work in a team. I hereby declare that the information furnished
above is true to the best of my knowledge.
DATE: 29.11.16
PLACE: Cuttack DillipKumar Senapati