INVESTMENT COOPERATION
Proposal
MANAGEMENT OF
THE OIL WELL IN THE EAST JAVA
Wonocolo BOJONEGORO
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
Old oil wells in Block Cepu located in the district of
Bojonegoro in East Java and KabubatenBlora was
originally a Dutch legacy oil wells that are no longer
maintained. The old oil wells and then by local
communities (miners) do the cleaning wells (work-
over) by way of traditional means. Wells that have net
later in the bucket and the results are then deposited
into the Pertamina at a predetermined price.
Until the present time sustainable management of the
Dutch legacy wells by local people is still underway
even as the cost of cleaning the wells is expensive
and sometimes less than the maximum then have
done the side of the well drilling in hopes of getting
more oil production.
Nowadays many investors, both individuals and
companies who came to the region to participate
invest their funds in the management of the old oil
wells. Investors are not only coming from Jakarta,
Central Java or East Java, Java and even from
outside of Singapore and the Philippines were also
interested and involved in investing for the
management of the Dutch former wells.
INTRODUCTION
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
OVERVIEW INVESTMENT MANAGEMENTN OLD OIL WELLS
This investment should be for investors with medium capacities up with funds deposited
around Rp.30.000.000.000, - (thirty billion rupiahs) may be the capital of individuals and
groups or companies.
The funding will be used for the management of about 10 old oil wells run community is to re-
program me-reactivation of the wells (well service / workover) and the drilling side so that the
oil production from these wells will increase.
Technology and management system applied to the management of the people's wells tend
to choose the technology / management simple (cheap) so that the investment made
profitableand capital may quickly return.
The rate of return on investments is expressed in the following estimates:
- Break Even Point (BEP) ranging between 5-20 months
- Return on Investment ranged between 50% - 1000% per year
All values of the above parameters is dependent on the luck factor to production results
obtained. Because again that this technology is a simple technology that we are not able to
analyze in detail and accurately compared with the oil companies who are able to do so at a
cost that is very expensive.
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
INVESTMENT COOPERATION
WHY HAVE 10 WELL?
In principle, the investment management of the wells can be
done for one (1) wells. When more and more wells
run the chance of getting the advantage of being bigger.
Management of 10 wells are our estimates to produce the lowest
cost / efficient in business management. If less than this amount,
the management fee will be higher.
CAN DO MORE THAN 10 WELL?
This investment certainly allows for the management of more
than 10 wells and more than 100 wells. Artisanal miners of yore
manage wells at a depth of 100-200 meters because the fewer
the results then this year some investors entered at a depth of
400 meters. And less likely to go on into the 600 meters could be
done in the future with drilling costs are much higher for sure.
HOW TO SMALL INVESTORS
For investors who have limited funds are not even able to fund in
full for the first well even then we have the option to combine
several small investors will still be able to have the opportunity to
invest in the old wells.
We opened the opportunity for small investors who have funds of
at least 20% of the cost of the investment, or about our
Rp.600.000.000 to combine with other small investors are under
our management.
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
TECHNOLOGY we use is a simple technology that is cheap.
Although this technology remains essentially refers to the
systems and procedures performed in petroleum operations as
appropriate. As an example of that drilling is done with water drill
machine / drill mine are modified in order to penetrate at a depth
of 400 meters. When we perform drilling with drilling machines /
rigs used conventional oil drilling For it is certain that this
investment would not be profitable because very expensive.
Oil production technology of drawing also done well or with a
simple pump that stays with low production costs.
MANAGEMENT Management of good operational at the time of
reactivation / drilling and for the production is done in a simple
way but still refers to the achievement of business objectives.
Operational offices placed near production wells with local
people renting houses at low cost.
Labor will also be adapted to its purpose with qualifications that
do not require high skills to avoid high costs.
TECHNOLOGY AND MANAGEMENT
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
This business is legal because it is done with good legal
basis Act, Candy, regulation and the Operational
Agreement are bound by the parties and instasi
authorities in the management of natural mineral
resources and oilnatural gas in this country.
Stakeholders, the Ministry of Energy and Mineral
Resources, Pertamina, enterprises, cooperatives and
Miners People of them are as follows:
1. The Minister of Energy and Mineral Resources
Regulation No.01 Year 2008
Exploitation of Oil Mining at Old Wells
2. Principle Approval to produce a
Petroleum in Old Wells by KUD / enterprises
3. Agreement producing Petroleum On
Old wells between Pertamina EP with KUD /
enterprises
4. Recommendations of Regency / City and approval
from the Provincial Government
LEGALITY
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
OURS INVESTMENT COOPERATION is a team of personal
Legality
This business is legal because it is done with good legal bas is
Law Act, Candy, Regulation
and the Operational Agreement with the definite parties and
authorities in management of natural mineral resources and oil
natural gas in the country. Stake holders, the Ministry of Energy
and Mineral Resources, Pertamina, enterprises, cooperatives
and miners.
Folkthem areas follows:
1. The Minister of Energy and Mineral Resources Regulation
No.01 Year 2008
Exploitation of Oil Miningin Old Wellsin Old Wells
2.Principle Approvalto produce a Petroleumin Old Wells by
KUD/enterprises
3.Agreement producing Petroleum On Old wells between
Pertamina EP with KUD/enterprises
4.Recommendations of the District /Town and approval from the
Provincial Government
Wonocolo BOJONEGORO EAST JAVA
Technical competen ceeither, norin Relationship Management to
all relevant agenci esprimarily to artisanal miners and the local
environment.
WHY SHOULD WE
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
Technical competen ceeither, norin Relationship Management to
all relevant agencies primarily to artisanal miners and the local
environment.
Technical ability is needed in the management of oil wells as well
for large-scale CHEVRON, CNOOC, Pertamina and small scale
like this business plan.
For such a small scale that we offer Technical capabilities
required include the capabilities in the field of geology and
engineering rebervoir to provide the best analysis in the selection
of potential wells to be drilled / managed.
Technically drilling is also needed in order to produce a
directional wellbore and clean in order to increase oil production
potential for the stew.
Then Technical production to get the appropriate production
system selection and appropriate at the same time the ability to
care well for future production.
Management capability is desirable for the management of all
lines of the organization so that it remains focused on the
purpose of the organization managing the budget and maintain
the level of operating profit as planned.
Relationships with relevant agencies is needed to support the
legality of the process of rapid and targeted. Relationships with
artisanal miners and the local environment is also important in
order to avoid racketeering and expenses that are not planned by
other parties who are not responsible
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
Old wells not only in the field Dandangilo / Wonocolo only. Field
Dandangilo / Wonocolois onlyOne of the many oil fields that fall
into the category of old oil wells which can be managed
according EMR decree No.01 of 2008.
In Indonesia, according to data from the Directorate General of
Oil and Gas expected to more than13,000 old wells that can be
managed using the legal basis of the ministerial decree.
Management of old wells in each field will be very berbeda2 in
terms of investment cost that is issued because it depends on
several things including the cost of red tape in obtaining permits
in each region of the province, extensive grounds and spread
well managed, the distance between the location of wells with
yag collecting station in designated as the recipient of oil
production. Besides, that local security factors also have a role
that is not small in terms of total investment cost overruns.
13000 OLD WELL IN INDONESIA
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
Terms and Conditions in the management of old oil wells:
The status of oil wells is owned by PT. Pertamina EP managed
by KUD (group of miners)
The results of crude oil delivered and measured at stations
owned by PT. Gatherer Pertamina EP in Menggung, Cepu.
Payment of the sale of crude oil from PT.Pertamina EP to KUD.
Long-time cash payment of PT.Pertamina EP is 30 working days.
KUD parties provide a tank truck to transport crude oil from oil
wells to Cepu.
The target daily production is 3,000 liters of crude oil per day
per well
(Target moderate)
Crude oil prices received by investors is Rp 3.000, - per liter.
(Starting price
USD 4160.40 / liter reduced management fee and the cost of
trucking KUD)
Note : Sling replacement every 3 months are borne by the
investor at : Rp. 20.000.000, -
Damage to production machines (machines truck) / overhoul fully
borne byinvestor.The entire cost of production, maintenance and
operation is the responsibilityBusiness + miners.
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
TERMS AND CONDOTION
List of Oil Well Old Location
Dandangilo Wonocolo - Bojonegoro
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
Simulation Results For Miners, business and investors
FLOW CHART OF PRODUCING OIL WELLS OLD
Status old oil wells is owned by PT. Pertamina EP managed by
KUD (group of miners) Results crude oil delivered and measured
in the Gatherer station owned by PT. Pertamina EP in
Menggung - Cepu.
Payment from the sale of crude oil from PT. Pertamina EP to
KUD.
Term of payment in cash of PT. Pertamina EP is: 30 (thirty) days.
TIME SCHEDULE
Reactivation WORK OLD OIL WELL
Contact Us :
Ramlah Nurhamidin (08122821118)
Mulki Wibowo (08122833747)
Iwan Kurniawan (082125136222)
WONCOLO
BANJARNEGORO EAST JAVA
PARTNERSHIP INVESTMENT
MANAGEMENT OF OIL WELLS FOLK
BUDGET PLAN
Budget plans are required to work twenWs well drilling wells
within about 2.5 months is as follows: Rp.3,000,000,000, -
(Three Billion Rupiah) / $ 240,000 consisting of:
1. Exemption Location / Land Clearing : Rp. 250,000,000.00
2. Geo Survey : Rp. 50,000,000.00
3. Construction : Rp. 131,000,000.00
4. Material : Rp.1.330.000.000,00
5. Drilling Operations : Rp.1.102.000.000,00
6. Equipment Production : Rp. 137,000,000.00

More Related Content

What's hot

431189975-03Diseno-y-ejecucion-Proyectos-Explotacion-VCD-2011-pptx.pptx
431189975-03Diseno-y-ejecucion-Proyectos-Explotacion-VCD-2011-pptx.pptx431189975-03Diseno-y-ejecucion-Proyectos-Explotacion-VCD-2011-pptx.pptx
431189975-03Diseno-y-ejecucion-Proyectos-Explotacion-VCD-2011-pptx.pptx
Jorge Varela
 
02 wireline
02 wireline02 wireline
02 wireline
Johan RC
 
Nodal Analysis introduction to inflow and outflow performance - next
Nodal Analysis   introduction to inflow and outflow performance - nextNodal Analysis   introduction to inflow and outflow performance - next
Nodal Analysis introduction to inflow and outflow performance - next
gusgon
 
Estimulacion no reactiva
Estimulacion no reactivaEstimulacion no reactiva
Estimulacion no reactiva
None
 

What's hot (20)

Secondary cementing
Secondary cementingSecondary cementing
Secondary cementing
 
Drilling Fluids Mud
Drilling Fluids MudDrilling Fluids Mud
Drilling Fluids Mud
 
431189975-03Diseno-y-ejecucion-Proyectos-Explotacion-VCD-2011-pptx.pptx
431189975-03Diseno-y-ejecucion-Proyectos-Explotacion-VCD-2011-pptx.pptx431189975-03Diseno-y-ejecucion-Proyectos-Explotacion-VCD-2011-pptx.pptx
431189975-03Diseno-y-ejecucion-Proyectos-Explotacion-VCD-2011-pptx.pptx
 
Cementation
CementationCementation
Cementation
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
02 wireline
02 wireline02 wireline
02 wireline
 
Well Workover
Well Workover Well Workover
Well Workover
 
Drilling problems and optimization
Drilling problems and optimizationDrilling problems and optimization
Drilling problems and optimization
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
Production logging tools
Production logging tools Production logging tools
Production logging tools
 
Nodal Analysis introduction to inflow and outflow performance - next
Nodal Analysis   introduction to inflow and outflow performance - nextNodal Analysis   introduction to inflow and outflow performance - next
Nodal Analysis introduction to inflow and outflow performance - next
 
Skin Factor and Formation Damage
Skin Factor and Formation DamageSkin Factor and Formation Damage
Skin Factor and Formation Damage
 
Estimulacion no reactiva
Estimulacion no reactivaEstimulacion no reactiva
Estimulacion no reactiva
 
Oil and gas separators
Oil and gas separatorsOil and gas separators
Oil and gas separators
 
Basic Workover dan Wellservices.pptx
Basic Workover dan Wellservices.pptxBasic Workover dan Wellservices.pptx
Basic Workover dan Wellservices.pptx
 
Liquid permeability
Liquid permeabilityLiquid permeability
Liquid permeability
 
Wellhead hanger xmastree
Wellhead hanger xmastreeWellhead hanger xmastree
Wellhead hanger xmastree
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
CEMENT SLURRY DESIGN
CEMENT SLURRY DESIGNCEMENT SLURRY DESIGN
CEMENT SLURRY DESIGN
 

Similar to Project proposal oil wells

surasit CV 2016 186kb
surasit CV 2016 186kbsurasit CV 2016 186kb
surasit CV 2016 186kb
Eei Surasit
 
International Market Entry
International Market EntryInternational Market Entry
International Market Entry
Zainab Abid
 
NIGERIA15_EC_INT_MAKON_JACKSON_EDIT
NIGERIA15_EC_INT_MAKON_JACKSON_EDITNIGERIA15_EC_INT_MAKON_JACKSON_EDIT
NIGERIA15_EC_INT_MAKON_JACKSON_EDIT
Stephen Jackson
 
Northern Corridor Economic Region
Northern Corridor Economic RegionNorthern Corridor Economic Region
Northern Corridor Economic Region
mandalina landy
 

Similar to Project proposal oil wells (20)

Project Proposal of Oil Wells
Project Proposal of Oil WellsProject Proposal of Oil Wells
Project Proposal of Oil Wells
 
New project proposal oil wells
New project proposal oil wellsNew project proposal oil wells
New project proposal oil wells
 
surasit CV 2016 186kb
surasit CV 2016 186kbsurasit CV 2016 186kb
surasit CV 2016 186kb
 
Polgov ugm joko
Polgov ugm jokoPolgov ugm joko
Polgov ugm joko
 
Indonesia
IndonesiaIndonesia
Indonesia
 
Indonesia 2013
Indonesia 2013Indonesia 2013
Indonesia 2013
 
Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and MacroeconomicsOil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
 
International Market Entry
International Market EntryInternational Market Entry
International Market Entry
 
NIGERIA15_EC_INT_MAKON_JACKSON_EDIT
NIGERIA15_EC_INT_MAKON_JACKSON_EDITNIGERIA15_EC_INT_MAKON_JACKSON_EDIT
NIGERIA15_EC_INT_MAKON_JACKSON_EDIT
 
2018 - 2021 Eni Strategic Plan
2018 - 2021 Eni Strategic Plan2018 - 2021 Eni Strategic Plan
2018 - 2021 Eni Strategic Plan
 
VIETNAM - AGRICULTURE 4.0 - ECONOMIC TIMES INTERVIEWING DR. OLIVER MASSMANN
VIETNAM - AGRICULTURE 4.0 - ECONOMIC TIMES INTERVIEWING DR. OLIVER MASSMANNVIETNAM - AGRICULTURE 4.0 - ECONOMIC TIMES INTERVIEWING DR. OLIVER MASSMANN
VIETNAM - AGRICULTURE 4.0 - ECONOMIC TIMES INTERVIEWING DR. OLIVER MASSMANN
 
Northern Corridor Economic Region
Northern Corridor Economic RegionNorthern Corridor Economic Region
Northern Corridor Economic Region
 
Oando Annual Report 2012
Oando Annual Report 2012Oando Annual Report 2012
Oando Annual Report 2012
 
Small-scale Community Oil Palm Mill Project in Telupid, Sabah, Malaysia
Small-scale Community Oil Palm Mill Project in Telupid, Sabah, MalaysiaSmall-scale Community Oil Palm Mill Project in Telupid, Sabah, Malaysia
Small-scale Community Oil Palm Mill Project in Telupid, Sabah, Malaysia
 
Oil And Gas Sector Industry
Oil And  Gas  Sector IndustryOil And  Gas  Sector Industry
Oil And Gas Sector Industry
 
2014 10-30-oil-and-gas-swia-offshore-local-content
2014 10-30-oil-and-gas-swia-offshore-local-content2014 10-30-oil-and-gas-swia-offshore-local-content
2014 10-30-oil-and-gas-swia-offshore-local-content
 
Petronog
PetronogPetronog
Petronog
 
New base 1042 special 13 june 2017 energy news
New base 1042 special 13 june 2017 energy newsNew base 1042 special 13 june 2017 energy news
New base 1042 special 13 june 2017 energy news
 
Finance
FinanceFinance
Finance
 
Presentation Webinar Oct21.pptx
Presentation Webinar Oct21.pptxPresentation Webinar Oct21.pptx
Presentation Webinar Oct21.pptx
 

Recently uploaded

VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
hanshkumar9870
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
anilsa9823
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
only4webmaster01
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
MollyBrown86
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 

Recently uploaded (20)

Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
 
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
 
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptx
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 

Project proposal oil wells

  • 1. INVESTMENT COOPERATION Proposal MANAGEMENT OF THE OIL WELL IN THE EAST JAVA Wonocolo BOJONEGORO
  • 2. PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK Old oil wells in Block Cepu located in the district of Bojonegoro in East Java and KabubatenBlora was originally a Dutch legacy oil wells that are no longer maintained. The old oil wells and then by local communities (miners) do the cleaning wells (work- over) by way of traditional means. Wells that have net later in the bucket and the results are then deposited into the Pertamina at a predetermined price. Until the present time sustainable management of the Dutch legacy wells by local people is still underway even as the cost of cleaning the wells is expensive and sometimes less than the maximum then have done the side of the well drilling in hopes of getting more oil production. Nowadays many investors, both individuals and companies who came to the region to participate invest their funds in the management of the old oil wells. Investors are not only coming from Jakarta, Central Java or East Java, Java and even from outside of Singapore and the Philippines were also interested and involved in investing for the management of the Dutch former wells. INTRODUCTION Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA
  • 3. Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK
  • 4. OVERVIEW INVESTMENT MANAGEMENTN OLD OIL WELLS This investment should be for investors with medium capacities up with funds deposited around Rp.30.000.000.000, - (thirty billion rupiahs) may be the capital of individuals and groups or companies. The funding will be used for the management of about 10 old oil wells run community is to re- program me-reactivation of the wells (well service / workover) and the drilling side so that the oil production from these wells will increase. Technology and management system applied to the management of the people's wells tend to choose the technology / management simple (cheap) so that the investment made profitableand capital may quickly return. The rate of return on investments is expressed in the following estimates: - Break Even Point (BEP) ranging between 5-20 months - Return on Investment ranged between 50% - 1000% per year All values of the above parameters is dependent on the luck factor to production results obtained. Because again that this technology is a simple technology that we are not able to analyze in detail and accurately compared with the oil companies who are able to do so at a cost that is very expensive. Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK INVESTMENT COOPERATION
  • 5. WHY HAVE 10 WELL? In principle, the investment management of the wells can be done for one (1) wells. When more and more wells run the chance of getting the advantage of being bigger. Management of 10 wells are our estimates to produce the lowest cost / efficient in business management. If less than this amount, the management fee will be higher. CAN DO MORE THAN 10 WELL? This investment certainly allows for the management of more than 10 wells and more than 100 wells. Artisanal miners of yore manage wells at a depth of 100-200 meters because the fewer the results then this year some investors entered at a depth of 400 meters. And less likely to go on into the 600 meters could be done in the future with drilling costs are much higher for sure. HOW TO SMALL INVESTORS For investors who have limited funds are not even able to fund in full for the first well even then we have the option to combine several small investors will still be able to have the opportunity to invest in the old wells. We opened the opportunity for small investors who have funds of at least 20% of the cost of the investment, or about our Rp.600.000.000 to combine with other small investors are under our management. Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK
  • 6. TECHNOLOGY we use is a simple technology that is cheap. Although this technology remains essentially refers to the systems and procedures performed in petroleum operations as appropriate. As an example of that drilling is done with water drill machine / drill mine are modified in order to penetrate at a depth of 400 meters. When we perform drilling with drilling machines / rigs used conventional oil drilling For it is certain that this investment would not be profitable because very expensive. Oil production technology of drawing also done well or with a simple pump that stays with low production costs. MANAGEMENT Management of good operational at the time of reactivation / drilling and for the production is done in a simple way but still refers to the achievement of business objectives. Operational offices placed near production wells with local people renting houses at low cost. Labor will also be adapted to its purpose with qualifications that do not require high skills to avoid high costs. TECHNOLOGY AND MANAGEMENT Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK
  • 7. This business is legal because it is done with good legal basis Act, Candy, regulation and the Operational Agreement are bound by the parties and instasi authorities in the management of natural mineral resources and oilnatural gas in this country. Stakeholders, the Ministry of Energy and Mineral Resources, Pertamina, enterprises, cooperatives and Miners People of them are as follows: 1. The Minister of Energy and Mineral Resources Regulation No.01 Year 2008 Exploitation of Oil Mining at Old Wells 2. Principle Approval to produce a Petroleum in Old Wells by KUD / enterprises 3. Agreement producing Petroleum On Old wells between Pertamina EP with KUD / enterprises 4. Recommendations of Regency / City and approval from the Provincial Government LEGALITY Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK
  • 8. OURS INVESTMENT COOPERATION is a team of personal Legality This business is legal because it is done with good legal bas is Law Act, Candy, Regulation and the Operational Agreement with the definite parties and authorities in management of natural mineral resources and oil natural gas in the country. Stake holders, the Ministry of Energy and Mineral Resources, Pertamina, enterprises, cooperatives and miners. Folkthem areas follows: 1. The Minister of Energy and Mineral Resources Regulation No.01 Year 2008 Exploitation of Oil Miningin Old Wellsin Old Wells 2.Principle Approvalto produce a Petroleumin Old Wells by KUD/enterprises 3.Agreement producing Petroleum On Old wells between Pertamina EP with KUD/enterprises 4.Recommendations of the District /Town and approval from the Provincial Government Wonocolo BOJONEGORO EAST JAVA Technical competen ceeither, norin Relationship Management to all relevant agenci esprimarily to artisanal miners and the local environment. WHY SHOULD WE Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK
  • 9. Technical competen ceeither, norin Relationship Management to all relevant agencies primarily to artisanal miners and the local environment. Technical ability is needed in the management of oil wells as well for large-scale CHEVRON, CNOOC, Pertamina and small scale like this business plan. For such a small scale that we offer Technical capabilities required include the capabilities in the field of geology and engineering rebervoir to provide the best analysis in the selection of potential wells to be drilled / managed. Technically drilling is also needed in order to produce a directional wellbore and clean in order to increase oil production potential for the stew. Then Technical production to get the appropriate production system selection and appropriate at the same time the ability to care well for future production. Management capability is desirable for the management of all lines of the organization so that it remains focused on the purpose of the organization managing the budget and maintain the level of operating profit as planned. Relationships with relevant agencies is needed to support the legality of the process of rapid and targeted. Relationships with artisanal miners and the local environment is also important in order to avoid racketeering and expenses that are not planned by other parties who are not responsible Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK
  • 10. Old wells not only in the field Dandangilo / Wonocolo only. Field Dandangilo / Wonocolois onlyOne of the many oil fields that fall into the category of old oil wells which can be managed according EMR decree No.01 of 2008. In Indonesia, according to data from the Directorate General of Oil and Gas expected to more than13,000 old wells that can be managed using the legal basis of the ministerial decree. Management of old wells in each field will be very berbeda2 in terms of investment cost that is issued because it depends on several things including the cost of red tape in obtaining permits in each region of the province, extensive grounds and spread well managed, the distance between the location of wells with yag collecting station in designated as the recipient of oil production. Besides, that local security factors also have a role that is not small in terms of total investment cost overruns. 13000 OLD WELL IN INDONESIA Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK
  • 11. Terms and Conditions in the management of old oil wells: The status of oil wells is owned by PT. Pertamina EP managed by KUD (group of miners) The results of crude oil delivered and measured at stations owned by PT. Gatherer Pertamina EP in Menggung, Cepu. Payment of the sale of crude oil from PT.Pertamina EP to KUD. Long-time cash payment of PT.Pertamina EP is 30 working days. KUD parties provide a tank truck to transport crude oil from oil wells to Cepu. The target daily production is 3,000 liters of crude oil per day per well (Target moderate) Crude oil prices received by investors is Rp 3.000, - per liter. (Starting price USD 4160.40 / liter reduced management fee and the cost of trucking KUD) Note : Sling replacement every 3 months are borne by the investor at : Rp. 20.000.000, - Damage to production machines (machines truck) / overhoul fully borne byinvestor.The entire cost of production, maintenance and operation is the responsibilityBusiness + miners. Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK TERMS AND CONDOTION
  • 12. List of Oil Well Old Location Dandangilo Wonocolo - Bojonegoro Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK Simulation Results For Miners, business and investors FLOW CHART OF PRODUCING OIL WELLS OLD Status old oil wells is owned by PT. Pertamina EP managed by KUD (group of miners) Results crude oil delivered and measured in the Gatherer station owned by PT. Pertamina EP in Menggung - Cepu. Payment from the sale of crude oil from PT. Pertamina EP to KUD. Term of payment in cash of PT. Pertamina EP is: 30 (thirty) days. TIME SCHEDULE Reactivation WORK OLD OIL WELL
  • 13. Contact Us : Ramlah Nurhamidin (08122821118) Mulki Wibowo (08122833747) Iwan Kurniawan (082125136222) WONCOLO BANJARNEGORO EAST JAVA PARTNERSHIP INVESTMENT MANAGEMENT OF OIL WELLS FOLK BUDGET PLAN Budget plans are required to work twenWs well drilling wells within about 2.5 months is as follows: Rp.3,000,000,000, - (Three Billion Rupiah) / $ 240,000 consisting of: 1. Exemption Location / Land Clearing : Rp. 250,000,000.00 2. Geo Survey : Rp. 50,000,000.00 3. Construction : Rp. 131,000,000.00 4. Material : Rp.1.330.000.000,00 5. Drilling Operations : Rp.1.102.000.000,00 6. Equipment Production : Rp. 137,000,000.00