Ch.2 Pharmaceutical Quality Management
Q.1) What is Quality Management System (QMS) ? (2)
• Ans. - A quality management system (QMS) is a collection
of business processes focused on consistently meeting customer
requirements and enhancing their satisfaction. It is aligned with an
organization's purpose and strategic direction (ISO9001:2015). It is
expressed as the organizational goals and aspirations, policies,
processes, documented information and resources needed to
implement and maintain it.
• Quality management ensures that an organization, product or
service is consistent. It has four main components: quality
planning, quality assurance, quality control and quality
improvement.[1]
Quality management is focused not only on
product and service quality, but also on the means to achieve it.
Quality management, therefore, uses quality assurance and
control of processes as well as products to achieve more
consistent quality.
• ‘A quality management system (QMS) is a set of policies, processes and
procedures required for planning and execution
(production/development/service) in the core business area of an
organization. (i.e. areas that can impact the organization's ability to
meet customer requirements.)’
Q.2) What is Total Quality Management ? what are basic
concept of TQM? (2)
• Total – Made up of the whole(or) Complete.
Quality – Degree of Excellence of a product or service provides to the
customer in present and future.
Management – Act , art, or manner of handling , controlling, directing,
etc.
TQM is the art of managing the whole to achieve excellence.
• “TQM is a set of systematic activities carried out by the entire
organization to effectively and efficiently achieve company objectives so
as to provide products and services with a level of quality that satisfies
customers, at the appropriate time and price”.
• The process to produce a perfect product by a series of measures
requiring an organized effort by the entire company to prevent or
eliminate errors at every stage in production is called TQM.
• Concept: A successful TQM programme requires the following six
basic concepts:
• 1. Top management commitment 2. Focus on the customer 3. Effective
involvement and utilization of the entire work 4. Continuous
improvement 5. Treating suppliers as partners 6. Establishing
performance measures for the processes. 7. Team work 8. Productivity
improvement 9. Customer satisfaction 10. Reduced costs.
Q.3) What are the quality management tools ?
• Check List - Check lists are useful in collecting data and information easily
.Check list also helps employees to identify problems which prevent an
organization to deliver quality products which would meet and exceed
customer expectations.
• Pareto Chart - The credit for Pareto Chart goes to Italian Economist -
Wilfredo Pareto. Pareto Chart helps employees to identify the problems,
prioritize them and also determine their frequency in the system.
• The Cause and Effect Diagram - Cause and Effect Diagram records causes
of a particular and specific problem .The cause and effect diagram plays a
crucial role in identifying the root cause of a particular problem and also
potential factors which give rise to a common problem at the workplace.
• Histogram - Histogram, introduced by Karl Pearson is nothing but a graphical
representation showing intensity of a particular problem. Histogram helps
identify the cause of problems in the system by the shape as well as width of
the distribution
• Scatter Diagram - Scatter Diagram is a quality management tool which helps
to analyze relationship between two variables. In a scatter chart, data is
represented as points, where each point denotes a value on the horizontal
axis and vertical axis.
• Graphs - Graphs are the simplest and most commonly used quality
management tools. Graphs help to identify whether processes and systems
are as per the expected level or not and if not also record the level of
deviation from the standard specifications.
Q.4) Define Six Sigma. What is the role of sig sigma in QM? (2)
• Six Sigma is a method that provides organizations tools to
improve the capability of their business processes. This
increase in performance and decrease in process
variation helps lead to defect reduction and improvement
in profits, employee morale, and quality of products or
services.
• Six Sigma (6σ) is a set of techniques and tools for
process improvement.
• A six sigma process is one in which 99.99966% of all
opportunities to produce some feature of a part are
statistically expected to be free of defects.
• The term "six sigma" comes from statistics and is used
in statistical quality control, which evaluates process
capability. Originally, it referred to the ability of
manufacturing processes to produce a very high
proportion of output within specification. Processes that
operate with "six sigma quality" over the short term are
assumed to produce long-term defect levels below
3.4 defects per million opportunities.
• Role:
• 1. It eliminate waste and inefficiency, thus
increases customer satisfaction by delivering what
the customer is expecting.
2. Six Sigma is strictly structured methodology,
which is very specific for the particular
participants.
3. Six Sigma is statistical data driven methodology
which requires accurate or error-less data to
perfectly analyse the process.
4. Six Sigma put results on financial statements.
5. Six Sigma is a business-driven, multi-
dimensional structured approach for:
• Upgrading Processes
• Decreasing Defects
• Diminishing process variability
• Diminishing costs
• Extending customer satisfaction
• Widening profits
Q.5) Describe principle components of TQM. (2.5)
• Leadership commitment
• Customer focus
• Training
• Empowerment and involvement
• Measurement
• Empowerment and involvement
• Recognition and awards
• Communication
1. Leadership : Leaders establish unity of purpose and direction of
the organization. The should create and maintain the internal
environment in which people can become fully involved in
achieving the organization’s objectives.
2. Customer Focus : The main objective for a product or service
design is to meet or exceed the customers’ expectation and
thus to satisfy the customer while making a reasonable profit.
Customers are the driving force for product and service design.
A customer oriented or customer focused organization
maintains its competitive advantage.
3. Training: The organization must access the current skill level &
awareness of the total quality principles of all employees.
Employee training is an important factor of quality
management. Training is an efficient way to increase
employees’ ability to perform better.
4. Empowerment & involvement: After training period the
organization must provide opportunities for employees to
apply what they have learnt. They check their skills. People at
all levels are the essence of an organization, and their full
involvement enables their abilities to be used for the
organization’s benefit.
5. Measurement: The 1st step is to define the organization’s
critical performance indicator(CPI). CPI defined as those
measure that contribute to customer’s satisfaction.
6. Recognition and Awards: The form of recognition should fit the
accomplishment in other words, the value of the recognition
should be common ensurate with the value of the
accomplishment.
7. Communication: The organization must communicate with
work force, their supplier and their customers all are interface.
With in the organization, employees at all level need
information on continuous improvement project so they can
become aware of progress their contribution and the effect.
Business goals should be communicated to suppliers.
Q.6) Discuss the concept & give advantages of quality
management system with example. Explain the principle of six
sigma. (10)
• “TQM is a set of systematic activities carried out by the
entire organization to effectively and efficiently achieve
company objectives so as to provide products and
services with a level of quality that satisfies customers, at
the appropriate time and price.
• Total Quality Management is commonly expressed in
conjunction with business excellence. It is a scientific
management methodology that values the quality of
companies and organizations—quality not only in
products, but also in their processes and in their
organization for quality management.
• TQM is a management method in which quality is
required in all manners, to satisfy customer requirements.
It involves every employee’s daily commitment in the
office, which differentiates TQM from other management
systems.
• TQM is not a program. It is “a strategy, a way of doing
businesses, a way of managing, a way of looking at the
organization and its activities” (Anschutz 1995, 13).
Therefore, the success of TQM is measured not only by its
tangible outcome but also by both the way in which the
organizational structure is established and the processes
by which corporate objectives are achieved.
• One of the significant impacts of Japanese TQM is often
explained by describing the development of car industry
during the oil crises in the 1970s. During this period, TQM
was extended to activities for energy conservation and
measures for resource maintenance. It greatly impacted
various industries and became more securely established
as a valuable quality framework for Japanese industrial
development.
• Total quality management ensures that every single
employee is working towards the improvement of work
culture, processes, services, systems and so on to ensure
long term success.
• Total Quality management can be divided into four
categories:
• Plan
• Do
• Check
• Act
• Also referred to as PDCA cycle.
• Planning Phase
Planning is the most crucial phase of total quality
management. In this phase employees have to come up
with their problems and queries which need to be
addressed. They need to come up with the various
challenges they face in their day to day operations and
also analyze the problem’s root cause. Employees are
required to do necessary research and collect relevant
data which would help them find solutions to all the
problems.
• Doing Phase
In the doing phase, employees develop a solution for the
problems defined in planning phase. Strategies are
devised and implemented to overcome the challenges
faced by employees. The effectiveness of solutions and
strategies is also measured in this stage.
• Checking Phase
Checking phase is the stage where people actually do a
comparison analysis of before and after data to confirm
the effectiveness of the processes and measure the
results.
• Acting Phase
In this phase employees document their results and
prepare themselves to address other problems
• Advantages: 1. Quality Improvement 2. Productivity
Improvement / Cost Reduction 3. Sales Expansion 4. Profit
Enhancement 5. Ensured Performance of Management
Plan 6. Fulfillment of Top Management’s Ambition 7.
Company-wide Participation 8. Improved Management
and Promotion of Standardization 9. Bottom-up Assembly
and Morale Improvement 10. Establishment of
Management System
• Principle of six sigma:
1. Focus on Customer Requirements:
2. Use data to identify the variation in the process
3. Continually improving the process to eliminate the variation:
4. Involve people from different levels of management and process
5. Be flexible and thorough:
1. Focus on Customer Requirements:
The initial phase in Six Sigma process is defining the “quality"
from the point of customers. Every customer defines quality
differently. A business needs to measure quality in a similar way
its customers do. By addressing the needs of the customer
business can define the quality to the customer.
2. Use data to identify the variation in the process
Variations in the process are of two types; Special cause variation and
Natural variation. Special cause variation is caused by external factors.
Natural variation is random variation present in the process. Six Sigma
aims to reduce the special cause variation. To identify the root cause of the
variation, understating the process is necessary. The understanding of the
process should be deep and extensive. Knowledge about the process
cannot be gained unless it is studied. To understand the process clearly,
detailed data about the process is important.
3.Continually improving the process to eliminate the variation:
After identifying root causes, make changes to eliminate variation in the
process. Thus the defects in the process are removed. Additionally,
search for ways to remove steps that do not add value to the customer.
This will eliminate waste in the process. Identify variation and eliminate
it. Don't wait for the variation to show itself. Collect data, talk to people,
and study the data to identify variations in the process. variation may
have become the routine because “that's the way we've always done
things.”
4. Involve people from different levels of management and process
Six Sigma is formed on the foundation of good teams. The good teams
comprise of peoples who take responsibility for the Six Sigma processes.
The people on the team need training in Six Sigma's methods. Forming a
cross-functional team with peoples from different backgrounds will help
identify variation. For example, six sigma team from health care project
consists of top management people, doctors, nurses, managers, people
from operations and purchasing.
5. Be flexible and thorough
Six Sigma requires adaptability from various points of view. The business’s
management system needs to acknowledge positive changes. People
should be motivated to accept the changes in the system to eliminate the
variation. To motivate the employee, the benefits of the six sigma system
should be made clear to all levels of employees. This will make the
changes easily acceptable.
Six Sigma also requires reducing variation to be thorough. So understand
all the aspects of a process—the steps, stakeholders, and methods
involved. This will help to ensure that any new or updated process works.
Importance of principles
• Increased Productivity
• Increased Quality
• Reduced Operation Cost
• High Customer Satisfaction
• Improved Employee Morale
• Efficient Work environment

More Related Content

What's hot

Quality and performance excellence chapter 5
Quality and performance excellence chapter 5Quality and performance excellence chapter 5
Quality and performance excellence chapter 5Christian James Mingoy
 
Quality Management
Quality ManagementQuality Management
Quality ManagementGeorgeLasluisa
 
Managing Quality and Productivity
Managing Quality and Productivity Managing Quality and Productivity
Managing Quality and Productivity Krishantha Jayasundara
 
Six sigma control in total quality management copy
Six sigma control in total quality management   copySix sigma control in total quality management   copy
Six sigma control in total quality management copyVijay Vuriti
 
TQM (Total Quality Management)
TQM (Total Quality Management)TQM (Total Quality Management)
TQM (Total Quality Management)amarchand
 
Lecture of TQM
Lecture of TQMLecture of TQM
Lecture of TQMZubair Memon
 
Key Factors required to Implement Total Quality Management within the Textile...
Key Factors required to Implement Total Quality Management within the Textile...Key Factors required to Implement Total Quality Management within the Textile...
Key Factors required to Implement Total Quality Management within the Textile...Subhi Pradhan
 
UNIT 17: QUALITY MANAGEMENT IN BUSINESS
UNIT 17: QUALITY MANAGEMENT IN BUSINESSUNIT 17: QUALITY MANAGEMENT IN BUSINESS
UNIT 17: QUALITY MANAGEMENT IN BUSINESSPremium Assignment Help
 
Quality Management Principles Become CEO Management Practices!
Quality Management Principles Become CEO Management Practices!Quality Management Principles Become CEO Management Practices!
Quality Management Principles Become CEO Management Practices!Phi Jack
 
Framework of tqm
Framework of tqmFramework of tqm
Framework of tqmRajeeKrishnan
 
Eight principle of tqm
Eight principle of tqmEight principle of tqm
Eight principle of tqmAman Kumar
 
Quality and Excellence in Healthcare: Best Practices
Quality and Excellence in Healthcare: Best PracticesQuality and Excellence in Healthcare: Best Practices
Quality and Excellence in Healthcare: Best PracticesReynaldo Joson
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality ManagementHarshika Yadav
 
Strategic quality planning
Strategic quality planningStrategic quality planning
Strategic quality planningBalaji Tamilselvam
 

What's hot (20)

Quality and performance excellence chapter 5
Quality and performance excellence chapter 5Quality and performance excellence chapter 5
Quality and performance excellence chapter 5
 
TQM Unit 2
TQM Unit 2TQM Unit 2
TQM Unit 2
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Managing Quality and Productivity
Managing Quality and Productivity Managing Quality and Productivity
Managing Quality and Productivity
 
Six sigma control in total quality management copy
Six sigma control in total quality management   copySix sigma control in total quality management   copy
Six sigma control in total quality management copy
 
TQM (Total Quality Management)
TQM (Total Quality Management)TQM (Total Quality Management)
TQM (Total Quality Management)
 
Tqm final
Tqm finalTqm final
Tqm final
 
Lecture of TQM
Lecture of TQMLecture of TQM
Lecture of TQM
 
Key Factors required to Implement Total Quality Management within the Textile...
Key Factors required to Implement Total Quality Management within the Textile...Key Factors required to Implement Total Quality Management within the Textile...
Key Factors required to Implement Total Quality Management within the Textile...
 
UNIT 17: QUALITY MANAGEMENT IN BUSINESS
UNIT 17: QUALITY MANAGEMENT IN BUSINESSUNIT 17: QUALITY MANAGEMENT IN BUSINESS
UNIT 17: QUALITY MANAGEMENT IN BUSINESS
 
Total Quality Management report on FBR BWN unit by Saniah Saleem Rao
Total Quality Management report on FBR BWN unit by Saniah Saleem RaoTotal Quality Management report on FBR BWN unit by Saniah Saleem Rao
Total Quality Management report on FBR BWN unit by Saniah Saleem Rao
 
Quality Management Principles Become CEO Management Practices!
Quality Management Principles Become CEO Management Practices!Quality Management Principles Become CEO Management Practices!
Quality Management Principles Become CEO Management Practices!
 
Framework of tqm
Framework of tqmFramework of tqm
Framework of tqm
 
TQM
TQMTQM
TQM
 
Eight principle of tqm
Eight principle of tqmEight principle of tqm
Eight principle of tqm
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Quality and Excellence in Healthcare: Best Practices
Quality and Excellence in Healthcare: Best PracticesQuality and Excellence in Healthcare: Best Practices
Quality and Excellence in Healthcare: Best Practices
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Strategic quality planning
Strategic quality planningStrategic quality planning
Strategic quality planning
 
Total quality management in government
Total quality management in governmentTotal quality management in government
Total quality management in government
 

Similar to Quality Management System & Six Sigma Principles Explained

Software quality models
Software quality modelsSoftware quality models
Software quality modelsONKAR PANDE
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)Sheetal Wagh
 
DOC-20221125-WA0012..pdf
DOC-20221125-WA0012..pdfDOC-20221125-WA0012..pdf
DOC-20221125-WA0012..pdfAmanShawRollno127C
 
Total quality control
Total quality controlTotal quality control
Total quality controlAakash Bhongade
 
Total Quality Management Project Charter for HP India
Total Quality Management Project Charter for HP IndiaTotal Quality Management Project Charter for HP India
Total Quality Management Project Charter for HP IndiaKaustav Lahiri
 
Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2akkie16
 
Interactive activity1 tqm_diana priscila montesdeoca benitez
Interactive activity1 tqm_diana priscila montesdeoca benitezInteractive activity1 tqm_diana priscila montesdeoca benitez
Interactive activity1 tqm_diana priscila montesdeoca benitezPriscila Montesdeoca
 
Total Quality Management - Diana Priscila Montesdeoca Benitez
Total Quality Management - Diana Priscila Montesdeoca BenitezTotal Quality Management - Diana Priscila Montesdeoca Benitez
Total Quality Management - Diana Priscila Montesdeoca BenitezPriscila Montesdeoca
 
DHL Quality Control Manual Quality Management (BADM370).docx
DHL Quality Control Manual Quality Management (BADM370).docxDHL Quality Control Manual Quality Management (BADM370).docx
DHL Quality Control Manual Quality Management (BADM370).docxmariona83
 
Qualioty management system
Qualioty management systemQualioty management system
Qualioty management systemNamdeo Shinde
 
Tqm and six sigma
Tqm and six sigmaTqm and six sigma
Tqm and six sigmaMadhu Chauhan
 
Quality Management
Quality ManagementQuality Management
Quality Managementmanobili17
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management SystemDhawal_Raghuvanshi
 
How to implement operational excellence in organizations
How to implement operational excellence in organizationsHow to implement operational excellence in organizations
How to implement operational excellence in organizationsglobalsevensteps
 
Total Quality Management & 6 Sigma
Total Quality Management & 6 SigmaTotal Quality Management & 6 Sigma
Total Quality Management & 6 SigmaChirag Tewari
 

Similar to Quality Management System & Six Sigma Principles Explained (20)

Software quality models
Software quality modelsSoftware quality models
Software quality models
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
DOC-20221125-WA0012..pdf
DOC-20221125-WA0012..pdfDOC-20221125-WA0012..pdf
DOC-20221125-WA0012..pdf
 
Total quality control
Total quality controlTotal quality control
Total quality control
 
Total Quality Management Project Charter for HP India
Total Quality Management Project Charter for HP IndiaTotal Quality Management Project Charter for HP India
Total Quality Management Project Charter for HP India
 
Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2
 
Interactive activity1 tqm_diana priscila montesdeoca benitez
Interactive activity1 tqm_diana priscila montesdeoca benitezInteractive activity1 tqm_diana priscila montesdeoca benitez
Interactive activity1 tqm_diana priscila montesdeoca benitez
 
Total Quality Management - Diana Priscila Montesdeoca Benitez
Total Quality Management - Diana Priscila Montesdeoca BenitezTotal Quality Management - Diana Priscila Montesdeoca Benitez
Total Quality Management - Diana Priscila Montesdeoca Benitez
 
qms.pptx
qms.pptxqms.pptx
qms.pptx
 
DHL Quality Control Manual Quality Management (BADM370).docx
DHL Quality Control Manual Quality Management (BADM370).docxDHL Quality Control Manual Quality Management (BADM370).docx
DHL Quality Control Manual Quality Management (BADM370).docx
 
FUNDAMENTALS OF TOTAL QUALITY ...
FUNDAMENTALS              OF                                   TOTAL QUALITY ...FUNDAMENTALS              OF                                   TOTAL QUALITY ...
FUNDAMENTALS OF TOTAL QUALITY ...
 
Qualioty management system
Qualioty management systemQualioty management system
Qualioty management system
 
Tqm and six sigma
Tqm and six sigmaTqm and six sigma
Tqm and six sigma
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management System
 
How to implement operational excellence in organizations
How to implement operational excellence in organizationsHow to implement operational excellence in organizations
How to implement operational excellence in organizations
 
Quality management
Quality managementQuality management
Quality management
 
Total Quality Management & 6 Sigma
Total Quality Management & 6 SigmaTotal Quality Management & 6 Sigma
Total Quality Management & 6 Sigma
 
PQMS.pptx
PQMS.pptxPQMS.pptx
PQMS.pptx
 
Tqm
TqmTqm
Tqm
 

More from DhrutiPatel61

Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection modelDhrutiPatel61
 
Total quality management and six sigma
Total quality management and six sigmaTotal quality management and six sigma
Total quality management and six sigmaDhrutiPatel61
 
Ich Q8 Pharmaceutical Development( comparison with Q9 and Q10 )
Ich Q8 Pharmaceutical Development( comparison with Q9 and Q10 )Ich Q8 Pharmaceutical Development( comparison with Q9 and Q10 )
Ich Q8 Pharmaceutical Development( comparison with Q9 and Q10 )DhrutiPatel61
 
Cost of quality
Cost of qualityCost of quality
Cost of qualityDhrutiPatel61
 
Ch. 4 drug stability
Ch. 4 drug stabilityCh. 4 drug stability
Ch. 4 drug stabilityDhrutiPatel61
 
Ch.1 itroduction to quality
Ch.1 itroduction to qualityCh.1 itroduction to quality
Ch.1 itroduction to qualityDhrutiPatel61
 

More from DhrutiPatel61 (6)

Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection model
 
Total quality management and six sigma
Total quality management and six sigmaTotal quality management and six sigma
Total quality management and six sigma
 
Ich Q8 Pharmaceutical Development( comparison with Q9 and Q10 )
Ich Q8 Pharmaceutical Development( comparison with Q9 and Q10 )Ich Q8 Pharmaceutical Development( comparison with Q9 and Q10 )
Ich Q8 Pharmaceutical Development( comparison with Q9 and Q10 )
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Ch. 4 drug stability
Ch. 4 drug stabilityCh. 4 drug stability
Ch. 4 drug stability
 
Ch.1 itroduction to quality
Ch.1 itroduction to qualityCh.1 itroduction to quality
Ch.1 itroduction to quality
 

Recently uploaded

_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 

Recently uploaded (20)

_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 

Quality Management System & Six Sigma Principles Explained

  • 1. Ch.2 Pharmaceutical Quality Management Q.1) What is Quality Management System (QMS) ? (2) • Ans. - A quality management system (QMS) is a collection of business processes focused on consistently meeting customer requirements and enhancing their satisfaction. It is aligned with an organization's purpose and strategic direction (ISO9001:2015). It is expressed as the organizational goals and aspirations, policies, processes, documented information and resources needed to implement and maintain it. • Quality management ensures that an organization, product or service is consistent. It has four main components: quality planning, quality assurance, quality control and quality improvement.[1] Quality management is focused not only on product and service quality, but also on the means to achieve it. Quality management, therefore, uses quality assurance and control of processes as well as products to achieve more consistent quality. • ‘A quality management system (QMS) is a set of policies, processes and procedures required for planning and execution (production/development/service) in the core business area of an organization. (i.e. areas that can impact the organization's ability to meet customer requirements.)’ Q.2) What is Total Quality Management ? what are basic concept of TQM? (2) • Total – Made up of the whole(or) Complete. Quality – Degree of Excellence of a product or service provides to the customer in present and future. Management – Act , art, or manner of handling , controlling, directing, etc. TQM is the art of managing the whole to achieve excellence. • “TQM is a set of systematic activities carried out by the entire organization to effectively and efficiently achieve company objectives so
  • 2. as to provide products and services with a level of quality that satisfies customers, at the appropriate time and price”. • The process to produce a perfect product by a series of measures requiring an organized effort by the entire company to prevent or eliminate errors at every stage in production is called TQM. • Concept: A successful TQM programme requires the following six basic concepts: • 1. Top management commitment 2. Focus on the customer 3. Effective involvement and utilization of the entire work 4. Continuous improvement 5. Treating suppliers as partners 6. Establishing performance measures for the processes. 7. Team work 8. Productivity improvement 9. Customer satisfaction 10. Reduced costs. Q.3) What are the quality management tools ? • Check List - Check lists are useful in collecting data and information easily .Check list also helps employees to identify problems which prevent an organization to deliver quality products which would meet and exceed customer expectations. • Pareto Chart - The credit for Pareto Chart goes to Italian Economist - Wilfredo Pareto. Pareto Chart helps employees to identify the problems, prioritize them and also determine their frequency in the system. • The Cause and Effect Diagram - Cause and Effect Diagram records causes of a particular and specific problem .The cause and effect diagram plays a crucial role in identifying the root cause of a particular problem and also potential factors which give rise to a common problem at the workplace. • Histogram - Histogram, introduced by Karl Pearson is nothing but a graphical representation showing intensity of a particular problem. Histogram helps identify the cause of problems in the system by the shape as well as width of the distribution • Scatter Diagram - Scatter Diagram is a quality management tool which helps to analyze relationship between two variables. In a scatter chart, data is represented as points, where each point denotes a value on the horizontal axis and vertical axis. • Graphs - Graphs are the simplest and most commonly used quality management tools. Graphs help to identify whether processes and systems are as per the expected level or not and if not also record the level of deviation from the standard specifications. Q.4) Define Six Sigma. What is the role of sig sigma in QM? (2)
  • 3. • Six Sigma is a method that provides organizations tools to improve the capability of their business processes. This increase in performance and decrease in process variation helps lead to defect reduction and improvement in profits, employee morale, and quality of products or services. • Six Sigma (6σ) is a set of techniques and tools for process improvement. • A six sigma process is one in which 99.99966% of all opportunities to produce some feature of a part are statistically expected to be free of defects. • The term "six sigma" comes from statistics and is used in statistical quality control, which evaluates process capability. Originally, it referred to the ability of manufacturing processes to produce a very high proportion of output within specification. Processes that operate with "six sigma quality" over the short term are assumed to produce long-term defect levels below 3.4 defects per million opportunities. • Role: • 1. It eliminate waste and inefficiency, thus increases customer satisfaction by delivering what the customer is expecting. 2. Six Sigma is strictly structured methodology, which is very specific for the particular participants. 3. Six Sigma is statistical data driven methodology which requires accurate or error-less data to perfectly analyse the process. 4. Six Sigma put results on financial statements. 5. Six Sigma is a business-driven, multi- dimensional structured approach for: • Upgrading Processes • Decreasing Defects
  • 4. • Diminishing process variability • Diminishing costs • Extending customer satisfaction • Widening profits Q.5) Describe principle components of TQM. (2.5) • Leadership commitment • Customer focus • Training • Empowerment and involvement • Measurement • Empowerment and involvement • Recognition and awards • Communication 1. Leadership : Leaders establish unity of purpose and direction of the organization. The should create and maintain the internal environment in which people can become fully involved in achieving the organization’s objectives. 2. Customer Focus : The main objective for a product or service design is to meet or exceed the customers’ expectation and thus to satisfy the customer while making a reasonable profit. Customers are the driving force for product and service design. A customer oriented or customer focused organization maintains its competitive advantage. 3. Training: The organization must access the current skill level & awareness of the total quality principles of all employees. Employee training is an important factor of quality management. Training is an efficient way to increase employees’ ability to perform better. 4. Empowerment & involvement: After training period the organization must provide opportunities for employees to
  • 5. apply what they have learnt. They check their skills. People at all levels are the essence of an organization, and their full involvement enables their abilities to be used for the organization’s benefit. 5. Measurement: The 1st step is to define the organization’s critical performance indicator(CPI). CPI defined as those measure that contribute to customer’s satisfaction. 6. Recognition and Awards: The form of recognition should fit the accomplishment in other words, the value of the recognition should be common ensurate with the value of the accomplishment. 7. Communication: The organization must communicate with work force, their supplier and their customers all are interface. With in the organization, employees at all level need information on continuous improvement project so they can become aware of progress their contribution and the effect. Business goals should be communicated to suppliers. Q.6) Discuss the concept & give advantages of quality management system with example. Explain the principle of six sigma. (10) • “TQM is a set of systematic activities carried out by the entire organization to effectively and efficiently achieve company objectives so as to provide products and services with a level of quality that satisfies customers, at the appropriate time and price. • Total Quality Management is commonly expressed in conjunction with business excellence. It is a scientific management methodology that values the quality of companies and organizations—quality not only in products, but also in their processes and in their organization for quality management.
  • 6. • TQM is a management method in which quality is required in all manners, to satisfy customer requirements. It involves every employee’s daily commitment in the office, which differentiates TQM from other management systems. • TQM is not a program. It is “a strategy, a way of doing businesses, a way of managing, a way of looking at the organization and its activities” (Anschutz 1995, 13). Therefore, the success of TQM is measured not only by its tangible outcome but also by both the way in which the organizational structure is established and the processes by which corporate objectives are achieved. • One of the significant impacts of Japanese TQM is often explained by describing the development of car industry during the oil crises in the 1970s. During this period, TQM was extended to activities for energy conservation and measures for resource maintenance. It greatly impacted various industries and became more securely established as a valuable quality framework for Japanese industrial development. • Total quality management ensures that every single employee is working towards the improvement of work culture, processes, services, systems and so on to ensure long term success. • Total Quality management can be divided into four categories: • Plan • Do • Check • Act • Also referred to as PDCA cycle. • Planning Phase
  • 7. Planning is the most crucial phase of total quality management. In this phase employees have to come up with their problems and queries which need to be addressed. They need to come up with the various challenges they face in their day to day operations and also analyze the problem’s root cause. Employees are required to do necessary research and collect relevant data which would help them find solutions to all the problems. • Doing Phase In the doing phase, employees develop a solution for the problems defined in planning phase. Strategies are devised and implemented to overcome the challenges faced by employees. The effectiveness of solutions and strategies is also measured in this stage. • Checking Phase Checking phase is the stage where people actually do a comparison analysis of before and after data to confirm the effectiveness of the processes and measure the results. • Acting Phase In this phase employees document their results and prepare themselves to address other problems • Advantages: 1. Quality Improvement 2. Productivity Improvement / Cost Reduction 3. Sales Expansion 4. Profit Enhancement 5. Ensured Performance of Management Plan 6. Fulfillment of Top Management’s Ambition 7. Company-wide Participation 8. Improved Management and Promotion of Standardization 9. Bottom-up Assembly and Morale Improvement 10. Establishment of Management System
  • 8. • Principle of six sigma: 1. Focus on Customer Requirements: 2. Use data to identify the variation in the process 3. Continually improving the process to eliminate the variation: 4. Involve people from different levels of management and process 5. Be flexible and thorough: 1. Focus on Customer Requirements: The initial phase in Six Sigma process is defining the “quality" from the point of customers. Every customer defines quality differently. A business needs to measure quality in a similar way its customers do. By addressing the needs of the customer business can define the quality to the customer. 2. Use data to identify the variation in the process Variations in the process are of two types; Special cause variation and Natural variation. Special cause variation is caused by external factors. Natural variation is random variation present in the process. Six Sigma aims to reduce the special cause variation. To identify the root cause of the variation, understating the process is necessary. The understanding of the process should be deep and extensive. Knowledge about the process cannot be gained unless it is studied. To understand the process clearly, detailed data about the process is important. 3.Continually improving the process to eliminate the variation: After identifying root causes, make changes to eliminate variation in the process. Thus the defects in the process are removed. Additionally, search for ways to remove steps that do not add value to the customer. This will eliminate waste in the process. Identify variation and eliminate it. Don't wait for the variation to show itself. Collect data, talk to people, and study the data to identify variations in the process. variation may have become the routine because “that's the way we've always done things.” 4. Involve people from different levels of management and process Six Sigma is formed on the foundation of good teams. The good teams comprise of peoples who take responsibility for the Six Sigma processes. The people on the team need training in Six Sigma's methods. Forming a cross-functional team with peoples from different backgrounds will help
  • 9. identify variation. For example, six sigma team from health care project consists of top management people, doctors, nurses, managers, people from operations and purchasing. 5. Be flexible and thorough Six Sigma requires adaptability from various points of view. The business’s management system needs to acknowledge positive changes. People should be motivated to accept the changes in the system to eliminate the variation. To motivate the employee, the benefits of the six sigma system should be made clear to all levels of employees. This will make the changes easily acceptable. Six Sigma also requires reducing variation to be thorough. So understand all the aspects of a process—the steps, stakeholders, and methods involved. This will help to ensure that any new or updated process works. Importance of principles • Increased Productivity • Increased Quality • Reduced Operation Cost • High Customer Satisfaction • Improved Employee Morale • Efficient Work environment