SlideShare a Scribd company logo
1 of 3
Download to read offline
1 | P a g e I M O P E R F O R M A N C E S T A N D A R D S F O R
E C D I S : R O U T E P L N N I N G a n d M O N I T O R I N G
For more details please visit: www.captyashpal.blogspot.com
IMO PERFORMANCE STANDARDS FOR ELECTRONIC CHART
DISPLAY AND INFORMATION SYSTEMS (ECDIS)
(For MMD Phase II Examination Purposes)
ROUTE PLANNING, MONITORING AND VOYAGE RECORDING:
1. It should be possible to carry out route planning and route monitoring in a
simple and reliable manner.
2. ECDIS should be designed following ergonomic principles for user-
friendly operation.
3. The largest scale data available in the SENC for the area given should
always be used by the ECDIS for all alarms or indications of crossing the
ship's safety contour and of entering a prohibited area, and for alarms and
indications.
 ROUTE PLANNING:
1. It should be possible to carry out route planning including both straight and
curved segments.
2. It should be possible to adjust a planned route by, for example: adding
waypoints to a route; deleting waypoints from a route; changing the
position of a waypoint; changing the order of the waypoints in the route.
3. It should be possible to plan an alternative route in addition to the selected
route. The selected route should be clearly distinguishable from the other
routes.
4. An indication is required if the mariner plans a route across an own ship's
safety contour.
5. An indication is required if the mariner plans a route across the boundary of
a prohibited area or of a geographical area for which special conditions
exist.
6. It should be possible for the mariner to specify a limit of deviation from the
planned route at which activation of an automatic off-track alarm should
occur.
 ROUTE MONITORING :
1. For route monitoring the selected route and own ship's position should
appear whenever the display covers that area.
2. It should be possible to display a sea area that does not have the ship on
the display (e.g., for look ahead, route planning), while route monitoring.
If this is done on the display used for route monitoring, the automatic
route monitoring functions (e.g., updating ship's position, and providing
alarms and indications) should be continuous. It should be possible to
return to the route monitoring display covering own ship's position
immediately by single operator action.
2 | P a g e I M O P E R F O R M A N C E S T A N D A R D S F O R
E C D I S : R O U T E P L N N I N G a n d M O N I T O R I N G
For more details please visit: www.captyashpal.blogspot.com
3. ECDIS should give an alarm if the ship, within a specified time set by the
mariner, is going to cross the safety contour.
4. ECDIS should give an alarm or indication, as selected by the mariner, if
the ship, within a specified time set by the mariner, is going to cross the
boundary of a prohibited area or of a geographical area for which special
conditions exist.
5. An alarm should be given when the specified limit for deviation from the
planned route is exceeded.
6. The ship's position should be derived from a continuous positioning
system of accuracy consistent with the requirements of safe navigation.
Whenever possible, a second independent positioning method of a
different type should be provided; ECDIS should be capable of
identifying discrepancies between the two systems.
7. ECDIS should provide an indication when the input from the position-
fixing system is lost. ECDIS should also repeat, but only as an indication,
any alarm or indication passed to it from a position-fixing system.
8. An alarm should be given by ECDIS if the ship, within a specified time or
distance set by the mariner, is going to reach a critical point on the
planned route.
9. The positioning system and the SENC should be on the same geodetic
datum. ECDIS should give an alarm if this is not the case.
10.It should be possible to display an alternative route in addition to the
selected route. The selected route should be clearly distinguishable from
the other routes. During the voyage, it should be possible for the mariner
to modify the selected sailing route or change to an alternative route.
11.It should be possible to display time-labels along ship's track, manually
on demand and automatically at intervals selected between 1 and 120 m;
and an adequate number of points, free movable electronic bearing lines,
variable and fixed-range markers and other symbols required for
navigation purposes.
12.It should be possible to enter the geographical co-ordinates of any
position and then display that position on demand. It should also be
possible to select any point (features, symbol or position) on the display
and to read its geographical co-ordinates on demand.
13.It should be possible to adjust the ship's geographical position manually.
This manual adjustment should be noted alpha-numerically on the screen,
maintained until altered by the mariner, and automatically recorded.
3 | P a g e I M O P E R F O R M A N C E S T A N D A R D S F O R
E C D I S : R O U T E P L N N I N G a n d M O N I T O R I N G
For more details please visit: www.captyashpal.blogspot.com
 VOYAGE RECORDING:
1. ECDIS should store and be able to reproduce certain minimum elements
required to reconstruct the navigation and verify the official database used
during the previous 12 hours.
2. The following data should be recorded at one-minute intervals:
(a) To ensure a record of own ship's past track: time, position,
heading, and speed; and
(b) To ensure a record of official data used: ENC source, edition,
date, cell and update history.
3. In addition, ECDIS should record the complete track for the entire voyage,
with time marks at intervals not exceeding 4 hours. It should not be
possible to manipulate or change the recorded information. ECDIS should
have the capability to preserve the record of the previous 12 hours and of
the voyage track.

More Related Content

What's hot

C 130 j hercules, usa - tactical transport aircraft
C 130 j hercules, usa - tactical transport aircraftC 130 j hercules, usa - tactical transport aircraft
C 130 j hercules, usa - tactical transport aircrafthindujudaic
 
68898351 imo-performance-standards-for-echo-sounder
68898351 imo-performance-standards-for-echo-sounder68898351 imo-performance-standards-for-echo-sounder
68898351 imo-performance-standards-for-echo-sounderDheeraj Kaushal
 
Incheon international airport
Incheon international airportIncheon international airport
Incheon international airportShubham Bathwal
 
Trajectory estimation studies for long coasting phase of mars mission
Trajectory estimation studies for long coasting phase of mars missionTrajectory estimation studies for long coasting phase of mars mission
Trajectory estimation studies for long coasting phase of mars missioneSAT Journals
 
Air Traffic System Technologies
Air Traffic System TechnologiesAir Traffic System Technologies
Air Traffic System TechnologiesÜlger Ahmet
 
Everything About Aviation Charts
Everything About Aviation ChartsEverything About Aviation Charts
Everything About Aviation ChartsAhsan Zahid
 
AIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJANAIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJANNiranjan Varma
 
Accelerometer-Based Transportation Mode Detection
Accelerometer-Based Transportation Mode DetectionAccelerometer-Based Transportation Mode Detection
Accelerometer-Based Transportation Mode DetectionAlice Valentini
 
FAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield ConstructionFAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield Constructionoffthewallsafety
 

What's hot (18)

PERKINS_ICOS
PERKINS_ICOSPERKINS_ICOS
PERKINS_ICOS
 
C 130 j hercules, usa - tactical transport aircraft
C 130 j hercules, usa - tactical transport aircraftC 130 j hercules, usa - tactical transport aircraft
C 130 j hercules, usa - tactical transport aircraft
 
68899162 imo-ps-gps
68899162 imo-ps-gps68899162 imo-ps-gps
68899162 imo-ps-gps
 
GPS IN AVIATION SYSTEM
GPS IN AVIATION SYSTEMGPS IN AVIATION SYSTEM
GPS IN AVIATION SYSTEM
 
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR GuideRADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
 
Digitam
DigitamDigitam
Digitam
 
68898351 imo-performance-standards-for-echo-sounder
68898351 imo-performance-standards-for-echo-sounder68898351 imo-performance-standards-for-echo-sounder
68898351 imo-performance-standards-for-echo-sounder
 
Incheon international airport
Incheon international airportIncheon international airport
Incheon international airport
 
Gps waas class 5 nov10
Gps waas class 5 nov10Gps waas class 5 nov10
Gps waas class 5 nov10
 
GAGAN ISRO
GAGAN ISROGAGAN ISRO
GAGAN ISRO
 
69116612 imo-ps-s-vdr
69116612 imo-ps-s-vdr69116612 imo-ps-s-vdr
69116612 imo-ps-s-vdr
 
Trajectory estimation studies for long coasting phase of mars mission
Trajectory estimation studies for long coasting phase of mars missionTrajectory estimation studies for long coasting phase of mars mission
Trajectory estimation studies for long coasting phase of mars mission
 
Air Traffic System Technologies
Air Traffic System TechnologiesAir Traffic System Technologies
Air Traffic System Technologies
 
Everything About Aviation Charts
Everything About Aviation ChartsEverything About Aviation Charts
Everything About Aviation Charts
 
AIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJANAIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJAN
 
Accelerometer-Based Transportation Mode Detection
Accelerometer-Based Transportation Mode DetectionAccelerometer-Based Transportation Mode Detection
Accelerometer-Based Transportation Mode Detection
 
Rule 05 look-out
Rule 05     look-outRule 05     look-out
Rule 05 look-out
 
FAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield ConstructionFAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield Construction
 

Viewers also liked

Istigazione al lavoro - il lavoro logora chi non ce l'ha
Istigazione al lavoro - il lavoro logora chi non ce l'haIstigazione al lavoro - il lavoro logora chi non ce l'ha
Istigazione al lavoro - il lavoro logora chi non ce l'haClientecontento
 
[WEB UI BASIC] WEB과 HTML
[WEB UI BASIC] WEB과 HTML[WEB UI BASIC] WEB과 HTML
[WEB UI BASIC] WEB과 HTMLJae Woo Woo
 
25 Misconceptions About God
25 Misconceptions About God25 Misconceptions About God
25 Misconceptions About GodDavid Newby
 
71800938 errors-gyro-compass
71800938 errors-gyro-compass71800938 errors-gyro-compass
71800938 errors-gyro-compassDheeraj Kaushal
 
Pick of the Week (PIDILITE INDUSTRIES)
Pick of the Week (PIDILITE INDUSTRIES)Pick of the Week (PIDILITE INDUSTRIES)
Pick of the Week (PIDILITE INDUSTRIES)choice broking
 
74007963 imo-ps-ecdis-display
74007963 imo-ps-ecdis-display74007963 imo-ps-ecdis-display
74007963 imo-ps-ecdis-displayDheeraj Kaushal
 
74008431 imo-ps-ecdis-general
74008431 imo-ps-ecdis-general74008431 imo-ps-ecdis-general
74008431 imo-ps-ecdis-generalDheeraj Kaushal
 
Оккупация Смоленщины (Челябинск, А. Манин)
Оккупация Смоленщины (Челябинск, А. Манин)Оккупация Смоленщины (Челябинск, А. Манин)
Оккупация Смоленщины (Челябинск, А. Манин)Danila Val'ko
 

Viewers also liked (15)

Programing
ProgramingPrograming
Programing
 
Computer language
Computer languageComputer language
Computer language
 
Media question 3
Media question 3Media question 3
Media question 3
 
Istigazione al lavoro - il lavoro logora chi non ce l'ha
Istigazione al lavoro - il lavoro logora chi non ce l'haIstigazione al lavoro - il lavoro logora chi non ce l'ha
Istigazione al lavoro - il lavoro logora chi non ce l'ha
 
[WEB UI BASIC] WEB과 HTML
[WEB UI BASIC] WEB과 HTML[WEB UI BASIC] WEB과 HTML
[WEB UI BASIC] WEB과 HTML
 
25 Misconceptions About God
25 Misconceptions About God25 Misconceptions About God
25 Misconceptions About God
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
 
71166455 lrit
71166455 lrit71166455 lrit
71166455 lrit
 
71800938 errors-gyro-compass
71800938 errors-gyro-compass71800938 errors-gyro-compass
71800938 errors-gyro-compass
 
74784234 gyro-compass
74784234 gyro-compass74784234 gyro-compass
74784234 gyro-compass
 
71166793 vdr
71166793 vdr71166793 vdr
71166793 vdr
 
Pick of the Week (PIDILITE INDUSTRIES)
Pick of the Week (PIDILITE INDUSTRIES)Pick of the Week (PIDILITE INDUSTRIES)
Pick of the Week (PIDILITE INDUSTRIES)
 
74007963 imo-ps-ecdis-display
74007963 imo-ps-ecdis-display74007963 imo-ps-ecdis-display
74007963 imo-ps-ecdis-display
 
74008431 imo-ps-ecdis-general
74008431 imo-ps-ecdis-general74008431 imo-ps-ecdis-general
74008431 imo-ps-ecdis-general
 
Оккупация Смоленщины (Челябинск, А. Манин)
Оккупация Смоленщины (Челябинск, А. Манин)Оккупация Смоленщины (Челябинск, А. Манин)
Оккупация Смоленщины (Челябинск, А. Манин)
 

Similar to 74009510 imo-ps-ecdis-rpnm

PLANNING AND EXECUTION OF BLIND PILOTAGE.pptx
PLANNING AND EXECUTION OF BLIND PILOTAGE.pptxPLANNING AND EXECUTION OF BLIND PILOTAGE.pptx
PLANNING AND EXECUTION OF BLIND PILOTAGE.pptxMaryJannahVelasco
 
Maritime studies ECDIS Backup System ecsis.pdf
Maritime studies ECDIS Backup System ecsis.pdfMaritime studies ECDIS Backup System ecsis.pdf
Maritime studies ECDIS Backup System ecsis.pdfnth69mksdg
 
d/c nicolas
d/c nicolasd/c nicolas
d/c nicolasrolnics
 
Bridge watchkeeping 2 lrg
Bridge watchkeeping 2 lrg Bridge watchkeeping 2 lrg
Bridge watchkeeping 2 lrg Lance Grindley
 
titanic-remembrance-day.pptx
titanic-remembrance-day.pptxtitanic-remembrance-day.pptx
titanic-remembrance-day.pptxjohnlordmangila
 
Amsa notice 18-2012 navigation practices
Amsa notice 18-2012 navigation practicesAmsa notice 18-2012 navigation practices
Amsa notice 18-2012 navigation practicesanilrai
 
FINAL PRESENTATION Final
FINAL PRESENTATION FinalFINAL PRESENTATION Final
FINAL PRESENTATION FinalRyan Slimmon
 
GPS & its application in mining
GPS & its application in miningGPS & its application in mining
GPS & its application in miningAmit Debnath
 
Terminal Part 3
Terminal Part 3Terminal Part 3
Terminal Part 3tomrickard
 
Topic 1.2- Electronic Equipment used on ships (Navigational Equipment).pptx
Topic 1.2- Electronic Equipment used on ships (Navigational Equipment).pptxTopic 1.2- Electronic Equipment used on ships (Navigational Equipment).pptx
Topic 1.2- Electronic Equipment used on ships (Navigational Equipment).pptxMartMantilla1
 

Similar to 74009510 imo-ps-ecdis-rpnm (20)

Ecdis
EcdisEcdis
Ecdis
 
PLANNING AND EXECUTION OF BLIND PILOTAGE.pptx
PLANNING AND EXECUTION OF BLIND PILOTAGE.pptxPLANNING AND EXECUTION OF BLIND PILOTAGE.pptx
PLANNING AND EXECUTION OF BLIND PILOTAGE.pptx
 
Passage planning
Passage planningPassage planning
Passage planning
 
Ibs
IbsIbs
Ibs
 
Maritime studies ECDIS Backup System ecsis.pdf
Maritime studies ECDIS Backup System ecsis.pdfMaritime studies ECDIS Backup System ecsis.pdf
Maritime studies ECDIS Backup System ecsis.pdf
 
d/c nicolas
d/c nicolasd/c nicolas
d/c nicolas
 
Bridge watchkeeping 2 lrg
Bridge watchkeeping 2 lrg Bridge watchkeeping 2 lrg
Bridge watchkeeping 2 lrg
 
leqcia 4.pptx
leqcia 4.pptxleqcia 4.pptx
leqcia 4.pptx
 
leq.pptx
leq.pptxleq.pptx
leq.pptx
 
Voyage-Planning PPT.ppt
Voyage-Planning PPT.pptVoyage-Planning PPT.ppt
Voyage-Planning PPT.ppt
 
titanic-remembrance-day.pptx
titanic-remembrance-day.pptxtitanic-remembrance-day.pptx
titanic-remembrance-day.pptx
 
ACO COURSE 6
ACO COURSE 6ACO COURSE 6
ACO COURSE 6
 
Autonomous Navigation System Architecture
Autonomous Navigation System ArchitectureAutonomous Navigation System Architecture
Autonomous Navigation System Architecture
 
Amsa notice 18-2012 navigation practices
Amsa notice 18-2012 navigation practicesAmsa notice 18-2012 navigation practices
Amsa notice 18-2012 navigation practices
 
Ais guide
Ais guideAis guide
Ais guide
 
Ecdis
EcdisEcdis
Ecdis
 
FINAL PRESENTATION Final
FINAL PRESENTATION FinalFINAL PRESENTATION Final
FINAL PRESENTATION Final
 
GPS & its application in mining
GPS & its application in miningGPS & its application in mining
GPS & its application in mining
 
Terminal Part 3
Terminal Part 3Terminal Part 3
Terminal Part 3
 
Topic 1.2- Electronic Equipment used on ships (Navigational Equipment).pptx
Topic 1.2- Electronic Equipment used on ships (Navigational Equipment).pptxTopic 1.2- Electronic Equipment used on ships (Navigational Equipment).pptx
Topic 1.2- Electronic Equipment used on ships (Navigational Equipment).pptx
 

More from Dheeraj Kaushal (16)

PERFORMANCE STANDARDS FOR AUTOPILOT
PERFORMANCE STANDARDS FOR AUTOPILOTPERFORMANCE STANDARDS FOR AUTOPILOT
PERFORMANCE STANDARDS FOR AUTOPILOT
 
69116166 iamsar
69116166 iamsar69116166 iamsar
69116166 iamsar
 
68902251 imo-ps-roti
68902251 imo-ps-roti68902251 imo-ps-roti
68902251 imo-ps-roti
 
Naval arch incline test
Naval arch incline testNaval arch incline test
Naval arch incline test
 
Naval arch fuel consumptn
Naval arch fuel consumptnNaval arch fuel consumptn
Naval arch fuel consumptn
 
Autopilot
AutopilotAutopilot
Autopilot
 
91121543 roti
91121543 roti91121543 roti
91121543 roti
 
91121543 roti (1)
91121543 roti (1)91121543 roti (1)
91121543 roti (1)
 
ORALS
ORALSORALS
ORALS
 
80920328 vdr
80920328 vdr80920328 vdr
80920328 vdr
 
80918797 gyro-numericals-solved
80918797 gyro-numericals-solved80918797 gyro-numericals-solved
80918797 gyro-numericals-solved
 
78998058 chk-lists
78998058 chk-lists78998058 chk-lists
78998058 chk-lists
 
78239585 orals-met
78239585 orals-met78239585 orals-met
78239585 orals-met
 
78238898 imo-ps-bnwas
78238898 imo-ps-bnwas78238898 imo-ps-bnwas
78238898 imo-ps-bnwas
 
75347365 em-log
75347365 em-log75347365 em-log
75347365 em-log
 
75346996 a-is
75346996 a-is75346996 a-is
75346996 a-is
 

74009510 imo-ps-ecdis-rpnm

  • 1. 1 | P a g e I M O P E R F O R M A N C E S T A N D A R D S F O R E C D I S : R O U T E P L N N I N G a n d M O N I T O R I N G For more details please visit: www.captyashpal.blogspot.com IMO PERFORMANCE STANDARDS FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEMS (ECDIS) (For MMD Phase II Examination Purposes) ROUTE PLANNING, MONITORING AND VOYAGE RECORDING: 1. It should be possible to carry out route planning and route monitoring in a simple and reliable manner. 2. ECDIS should be designed following ergonomic principles for user- friendly operation. 3. The largest scale data available in the SENC for the area given should always be used by the ECDIS for all alarms or indications of crossing the ship's safety contour and of entering a prohibited area, and for alarms and indications.  ROUTE PLANNING: 1. It should be possible to carry out route planning including both straight and curved segments. 2. It should be possible to adjust a planned route by, for example: adding waypoints to a route; deleting waypoints from a route; changing the position of a waypoint; changing the order of the waypoints in the route. 3. It should be possible to plan an alternative route in addition to the selected route. The selected route should be clearly distinguishable from the other routes. 4. An indication is required if the mariner plans a route across an own ship's safety contour. 5. An indication is required if the mariner plans a route across the boundary of a prohibited area or of a geographical area for which special conditions exist. 6. It should be possible for the mariner to specify a limit of deviation from the planned route at which activation of an automatic off-track alarm should occur.  ROUTE MONITORING : 1. For route monitoring the selected route and own ship's position should appear whenever the display covers that area. 2. It should be possible to display a sea area that does not have the ship on the display (e.g., for look ahead, route planning), while route monitoring. If this is done on the display used for route monitoring, the automatic route monitoring functions (e.g., updating ship's position, and providing alarms and indications) should be continuous. It should be possible to return to the route monitoring display covering own ship's position immediately by single operator action.
  • 2. 2 | P a g e I M O P E R F O R M A N C E S T A N D A R D S F O R E C D I S : R O U T E P L N N I N G a n d M O N I T O R I N G For more details please visit: www.captyashpal.blogspot.com 3. ECDIS should give an alarm if the ship, within a specified time set by the mariner, is going to cross the safety contour. 4. ECDIS should give an alarm or indication, as selected by the mariner, if the ship, within a specified time set by the mariner, is going to cross the boundary of a prohibited area or of a geographical area for which special conditions exist. 5. An alarm should be given when the specified limit for deviation from the planned route is exceeded. 6. The ship's position should be derived from a continuous positioning system of accuracy consistent with the requirements of safe navigation. Whenever possible, a second independent positioning method of a different type should be provided; ECDIS should be capable of identifying discrepancies between the two systems. 7. ECDIS should provide an indication when the input from the position- fixing system is lost. ECDIS should also repeat, but only as an indication, any alarm or indication passed to it from a position-fixing system. 8. An alarm should be given by ECDIS if the ship, within a specified time or distance set by the mariner, is going to reach a critical point on the planned route. 9. The positioning system and the SENC should be on the same geodetic datum. ECDIS should give an alarm if this is not the case. 10.It should be possible to display an alternative route in addition to the selected route. The selected route should be clearly distinguishable from the other routes. During the voyage, it should be possible for the mariner to modify the selected sailing route or change to an alternative route. 11.It should be possible to display time-labels along ship's track, manually on demand and automatically at intervals selected between 1 and 120 m; and an adequate number of points, free movable electronic bearing lines, variable and fixed-range markers and other symbols required for navigation purposes. 12.It should be possible to enter the geographical co-ordinates of any position and then display that position on demand. It should also be possible to select any point (features, symbol or position) on the display and to read its geographical co-ordinates on demand. 13.It should be possible to adjust the ship's geographical position manually. This manual adjustment should be noted alpha-numerically on the screen, maintained until altered by the mariner, and automatically recorded.
  • 3. 3 | P a g e I M O P E R F O R M A N C E S T A N D A R D S F O R E C D I S : R O U T E P L N N I N G a n d M O N I T O R I N G For more details please visit: www.captyashpal.blogspot.com  VOYAGE RECORDING: 1. ECDIS should store and be able to reproduce certain minimum elements required to reconstruct the navigation and verify the official database used during the previous 12 hours. 2. The following data should be recorded at one-minute intervals: (a) To ensure a record of own ship's past track: time, position, heading, and speed; and (b) To ensure a record of official data used: ENC source, edition, date, cell and update history. 3. In addition, ECDIS should record the complete track for the entire voyage, with time marks at intervals not exceeding 4 hours. It should not be possible to manipulate or change the recorded information. ECDIS should have the capability to preserve the record of the previous 12 hours and of the voyage track.