1 | P a g e I M O P E R F O R M A N C E S T A N D A R D S
F O R E C D I S : G E N E R A L
For more details please visit: www.captyashpal.blogspot.com
IMO PERFORMANCE STANDARDS FOR ELECTRONIC CHART
DISPLAY AND INFORMATION SYSTEMS (ECDIS)
(For MMD Phase II Examination Purposes)
GENERAL PERFORMANCE STANDARDS:
1. The primary function of the ECDIS is to contribute to safe navigation.
2. In addition to the general requirements for ship borne radio equipment
forming part of the global maritime distress and safety system (GMDSS)
and the requirements for electronic navigational aids, ECDIS should meet
the requirements of this performance standard.
3. ECDIS should be capable of displaying all chart information necessary for
safe and efficient navigation originated by, and distributed on the authority
of, government-authorized hydrographic offices.
4. ECDIS should facilitate simple and reliable updating of the electronic
navigational chart.
5. Use of ECDIS should reduce the navigational workload as compared to use
of a paper chart. It should enable the mariner to execute in a convenient and
timely manner all route planning, route monitoring and positioning
currently performed on paper charts. It should be capable of continuously
plotting the ship's position.
6. ECDIS should have at least the same reliability and availability of
presentation as the paper chart published by government-authorized
hydrographic offices.
7. ECDIS should not degrade the performance of any equipment providing
sensor inputs. Nor should the connection of optional equipment degrade the
performance of ECDIS below this standard. ECDIS should be connected to
systems providing continuous position fixing, heading and speed
information.
8. ECDIS should provide appropriate alarms or indications with respect to the
information displayed or malfunction of the equipment.
9. ECDIS should be provided with means for carrying out on-board tests of
major functions either automatically or manually. In case of failure, the test
should provide a suitable alarm or indication of system malfunction.
BACK-UP ARRANGEMENTS:
1. Adequate back-up arrangements should be provided to ensure safe
navigation in case of an ECDIS failure. Facilities enabling a safe take-over
of the ECDIS functions should be provided in order to ensure that an
ECDIS failure does not result in a critical situation.
2 | P a g e I M O P E R F O R M A N C E S T A N D A R D S
F O R E C D I S : G E N E R A L
For more details please visit: www.captyashpal.blogspot.com
2. A back-up arrangement should be provided facilitating means for safe
navigation of the remaining part of the voyage in case of an ECDIS
failure.
POWER SUPPLY:
1. It should be possible to operate ECDIS and all equipment necessary for
its normal functioning when supplied by an emergency source of
electrical power in accordance with the appropriate requirements of
chapter II-1 of the 1974 SOLAS Convention.
2. Changing from one source of power supply to another or any interruption
of the supply for a period of up to 45 s should not require the equipment
to be re-initialized manually.

More Related Content

What's hot

Final Year Project report on quadcopter
Final Year Project report on quadcopter Final Year Project report on quadcopter
Final Year Project report on quadcopter Er. Ashutosh Mishra
 
Construction of Quadcopter
Construction of QuadcopterConstruction of Quadcopter
Construction of QuadcopterMichael Bseliss
 
Vehicle tracking Using GPS,GSM & ARM7
Vehicle tracking Using GPS,GSM & ARM7Vehicle tracking Using GPS,GSM & ARM7
Vehicle tracking Using GPS,GSM & ARM7Ashutosh Upadhayay
 
gps gsm based vehicle tracking system seminar
gps gsm based vehicle tracking system seminargps gsm based vehicle tracking system seminar
gps gsm based vehicle tracking system seminarhiharshal277
 
Anti collision devices (ACD)
Anti collision devices (ACD)Anti collision devices (ACD)
Anti collision devices (ACD)Tarun Khaneja
 
Autonomous ship
Autonomous shipAutonomous ship
Autonomous shipjamaju56
 
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMSACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMSKrishna Moparthi
 
Autonomous cruise control ppt
Autonomous cruise control pptAutonomous cruise control ppt
Autonomous cruise control pptDeepak kango
 
Report of quadcopter
Report of quadcopterReport of quadcopter
Report of quadcopterAshish Patel
 
UAV Building a quadcopter project
UAV Building a quadcopter projectUAV Building a quadcopter project
UAV Building a quadcopter projecthossam gouda
 

What's hot (20)

Presentation1
Presentation1Presentation1
Presentation1
 
Qaudcopters
QaudcoptersQaudcopters
Qaudcopters
 
Final Year Project report on quadcopter
Final Year Project report on quadcopter Final Year Project report on quadcopter
Final Year Project report on quadcopter
 
Quadcopter ppt
Quadcopter pptQuadcopter ppt
Quadcopter ppt
 
Quadcopter Technology
Quadcopter TechnologyQuadcopter Technology
Quadcopter Technology
 
Quadcopter
QuadcopterQuadcopter
Quadcopter
 
Helicopter With Gps
Helicopter With GpsHelicopter With Gps
Helicopter With Gps
 
Construction of Quadcopter
Construction of QuadcopterConstruction of Quadcopter
Construction of Quadcopter
 
Vehicle tracking Using GPS,GSM & ARM7
Vehicle tracking Using GPS,GSM & ARM7Vehicle tracking Using GPS,GSM & ARM7
Vehicle tracking Using GPS,GSM & ARM7
 
gps gsm based vehicle tracking system seminar
gps gsm based vehicle tracking system seminargps gsm based vehicle tracking system seminar
gps gsm based vehicle tracking system seminar
 
Anti collision devices (ACD)
Anti collision devices (ACD)Anti collision devices (ACD)
Anti collision devices (ACD)
 
Autonomous ship
Autonomous shipAutonomous ship
Autonomous ship
 
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMSACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
 
Making of Drone
Making of  DroneMaking of  Drone
Making of Drone
 
Autonomous shipping
Autonomous shippingAutonomous shipping
Autonomous shipping
 
Adaptive cruise control
Adaptive cruise controlAdaptive cruise control
Adaptive cruise control
 
Autonomous cruise control ppt
Autonomous cruise control pptAutonomous cruise control ppt
Autonomous cruise control ppt
 
Report of quadcopter
Report of quadcopterReport of quadcopter
Report of quadcopter
 
UAV Building a quadcopter project
UAV Building a quadcopter projectUAV Building a quadcopter project
UAV Building a quadcopter project
 
Adaptive cruise control’
Adaptive cruise control’Adaptive cruise control’
Adaptive cruise control’
 

Similar to 74008431 imo-ps-ecdis-general

Maritime studies ECDIS Backup System ecsis.pdf
Maritime studies ECDIS Backup System ecsis.pdfMaritime studies ECDIS Backup System ecsis.pdf
Maritime studies ECDIS Backup System ecsis.pdfnth69mksdg
 
74007963 imo-ps-ecdis-display
74007963 imo-ps-ecdis-display74007963 imo-ps-ecdis-display
74007963 imo-ps-ecdis-displayDheeraj Kaushal
 
74009510 imo-ps-ecdis-rpnm
74009510 imo-ps-ecdis-rpnm74009510 imo-ps-ecdis-rpnm
74009510 imo-ps-ecdis-rpnmDheeraj Kaushal
 
ECDIS: New standards & old underwater rocks
ECDIS: New standards & old underwater rocksECDIS: New standards & old underwater rocks
ECDIS: New standards & old underwater rocksLearnmarine
 
Control of aircraft from the base station using eog siganl transmission
Control of aircraft from the base station using eog siganl transmissionControl of aircraft from the base station using eog siganl transmission
Control of aircraft from the base station using eog siganl transmissiontheijes
 
Control of aircraft from the base station using eog siganl transmission
Control of aircraft from the base station using eog siganl transmissionControl of aircraft from the base station using eog siganl transmission
Control of aircraft from the base station using eog siganl transmissiontheijes
 
Airside Transportation Systems ITS
Airside Transportation Systems ITSAirside Transportation Systems ITS
Airside Transportation Systems ITSPeter Ashley
 
IRJET- Improving Network Life Time using High Populated Harmony Search Al...
IRJET-  	  Improving Network Life Time using High Populated Harmony Search Al...IRJET-  	  Improving Network Life Time using High Populated Harmony Search Al...
IRJET- Improving Network Life Time using High Populated Harmony Search Al...IRJET Journal
 
Emergency and role equipment of Helicopter
 Emergency and role equipment of Helicopter Emergency and role equipment of Helicopter
Emergency and role equipment of HelicopterBai Haqi
 
Triton UAS Technical Design Paper 2020-2021
Triton UAS Technical Design Paper 2020-2021Triton UAS Technical Design Paper 2020-2021
Triton UAS Technical Design Paper 2020-2021KennyPham19
 
NAVIGATION AIDS GROUP 3 for topic 2-Final.pptx
NAVIGATION AIDS GROUP 3 for topic 2-Final.pptxNAVIGATION AIDS GROUP 3 for topic 2-Final.pptx
NAVIGATION AIDS GROUP 3 for topic 2-Final.pptxssuserdc25cd
 

Similar to 74008431 imo-ps-ecdis-general (20)

Maritime studies ECDIS Backup System ecsis.pdf
Maritime studies ECDIS Backup System ecsis.pdfMaritime studies ECDIS Backup System ecsis.pdf
Maritime studies ECDIS Backup System ecsis.pdf
 
74007963 imo-ps-ecdis-display
74007963 imo-ps-ecdis-display74007963 imo-ps-ecdis-display
74007963 imo-ps-ecdis-display
 
ECDIS TEST
ECDIS TESTECDIS TEST
ECDIS TEST
 
74009510 imo-ps-ecdis-rpnm
74009510 imo-ps-ecdis-rpnm74009510 imo-ps-ecdis-rpnm
74009510 imo-ps-ecdis-rpnm
 
Ecdis
EcdisEcdis
Ecdis
 
Ecdis
EcdisEcdis
Ecdis
 
ECDIS: New standards & old underwater rocks
ECDIS: New standards & old underwater rocksECDIS: New standards & old underwater rocks
ECDIS: New standards & old underwater rocks
 
Ibs
IbsIbs
Ibs
 
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR GuideRADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
 
2.2-2 Egypt B0-SURF
2.2-2 Egypt B0-SURF2.2-2 Egypt B0-SURF
2.2-2 Egypt B0-SURF
 
Control of aircraft from the base station using eog siganl transmission
Control of aircraft from the base station using eog siganl transmissionControl of aircraft from the base station using eog siganl transmission
Control of aircraft from the base station using eog siganl transmission
 
Control of aircraft from the base station using eog siganl transmission
Control of aircraft from the base station using eog siganl transmissionControl of aircraft from the base station using eog siganl transmission
Control of aircraft from the base station using eog siganl transmission
 
Airside Transportation Systems ITS
Airside Transportation Systems ITSAirside Transportation Systems ITS
Airside Transportation Systems ITS
 
IRJET- Improving Network Life Time using High Populated Harmony Search Al...
IRJET-  	  Improving Network Life Time using High Populated Harmony Search Al...IRJET-  	  Improving Network Life Time using High Populated Harmony Search Al...
IRJET- Improving Network Life Time using High Populated Harmony Search Al...
 
Emergency and role equipment of Helicopter
 Emergency and role equipment of Helicopter Emergency and role equipment of Helicopter
Emergency and role equipment of Helicopter
 
Triton UAS Technical Design Paper 2020-2021
Triton UAS Technical Design Paper 2020-2021Triton UAS Technical Design Paper 2020-2021
Triton UAS Technical Design Paper 2020-2021
 
NAVIGATION AIDS GROUP 3 for topic 2-Final.pptx
NAVIGATION AIDS GROUP 3 for topic 2-Final.pptxNAVIGATION AIDS GROUP 3 for topic 2-Final.pptx
NAVIGATION AIDS GROUP 3 for topic 2-Final.pptx
 
SAIF ABU HATAB C.V.
SAIF ABU HATAB C.V.SAIF ABU HATAB C.V.
SAIF ABU HATAB C.V.
 
ECDIS - A change in direction
ECDIS - A change in directionECDIS - A change in direction
ECDIS - A change in direction
 
ΕΛΙΣΜΕ ΓΕΕΘΑ 20181126 2.1 Κωνσταντίνος Μέλλος «Αντιμετωπίζοντας τις Σύγχρονες...
ΕΛΙΣΜΕ ΓΕΕΘΑ 20181126 2.1 Κωνσταντίνος Μέλλος «Αντιμετωπίζοντας τις Σύγχρονες...ΕΛΙΣΜΕ ΓΕΕΘΑ 20181126 2.1 Κωνσταντίνος Μέλλος «Αντιμετωπίζοντας τις Σύγχρονες...
ΕΛΙΣΜΕ ΓΕΕΘΑ 20181126 2.1 Κωνσταντίνος Μέλλος «Αντιμετωπίζοντας τις Σύγχρονες...
 

More from Dheeraj Kaushal (20)

PERFORMANCE STANDARDS FOR AUTOPILOT
PERFORMANCE STANDARDS FOR AUTOPILOTPERFORMANCE STANDARDS FOR AUTOPILOT
PERFORMANCE STANDARDS FOR AUTOPILOT
 
69116612 imo-ps-s-vdr
69116612 imo-ps-s-vdr69116612 imo-ps-s-vdr
69116612 imo-ps-s-vdr
 
69116166 iamsar
69116166 iamsar69116166 iamsar
69116166 iamsar
 
68902251 imo-ps-roti
68902251 imo-ps-roti68902251 imo-ps-roti
68902251 imo-ps-roti
 
68899162 imo-ps-gps
68899162 imo-ps-gps68899162 imo-ps-gps
68899162 imo-ps-gps
 
68898351 imo-performance-standards-for-echo-sounder
68898351 imo-performance-standards-for-echo-sounder68898351 imo-performance-standards-for-echo-sounder
68898351 imo-performance-standards-for-echo-sounder
 
Naval arch incline test
Naval arch incline testNaval arch incline test
Naval arch incline test
 
Naval arch fuel consumptn
Naval arch fuel consumptnNaval arch fuel consumptn
Naval arch fuel consumptn
 
Autopilot
AutopilotAutopilot
Autopilot
 
91121543 roti
91121543 roti91121543 roti
91121543 roti
 
91121543 roti (1)
91121543 roti (1)91121543 roti (1)
91121543 roti (1)
 
ORALS
ORALSORALS
ORALS
 
80920328 vdr
80920328 vdr80920328 vdr
80920328 vdr
 
80918797 gyro-numericals-solved
80918797 gyro-numericals-solved80918797 gyro-numericals-solved
80918797 gyro-numericals-solved
 
78998058 chk-lists
78998058 chk-lists78998058 chk-lists
78998058 chk-lists
 
78239585 orals-met
78239585 orals-met78239585 orals-met
78239585 orals-met
 
78238898 imo-ps-bnwas
78238898 imo-ps-bnwas78238898 imo-ps-bnwas
78238898 imo-ps-bnwas
 
75347365 em-log
75347365 em-log75347365 em-log
75347365 em-log
 
75346996 a-is
75346996 a-is75346996 a-is
75346996 a-is
 
74784234 gyro-compass
74784234 gyro-compass74784234 gyro-compass
74784234 gyro-compass
 

74008431 imo-ps-ecdis-general

  • 1. 1 | P a g e I M O P E R F O R M A N C E S T A N D A R D S F O R E C D I S : G E N E R A L For more details please visit: www.captyashpal.blogspot.com IMO PERFORMANCE STANDARDS FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEMS (ECDIS) (For MMD Phase II Examination Purposes) GENERAL PERFORMANCE STANDARDS: 1. The primary function of the ECDIS is to contribute to safe navigation. 2. In addition to the general requirements for ship borne radio equipment forming part of the global maritime distress and safety system (GMDSS) and the requirements for electronic navigational aids, ECDIS should meet the requirements of this performance standard. 3. ECDIS should be capable of displaying all chart information necessary for safe and efficient navigation originated by, and distributed on the authority of, government-authorized hydrographic offices. 4. ECDIS should facilitate simple and reliable updating of the electronic navigational chart. 5. Use of ECDIS should reduce the navigational workload as compared to use of a paper chart. It should enable the mariner to execute in a convenient and timely manner all route planning, route monitoring and positioning currently performed on paper charts. It should be capable of continuously plotting the ship's position. 6. ECDIS should have at least the same reliability and availability of presentation as the paper chart published by government-authorized hydrographic offices. 7. ECDIS should not degrade the performance of any equipment providing sensor inputs. Nor should the connection of optional equipment degrade the performance of ECDIS below this standard. ECDIS should be connected to systems providing continuous position fixing, heading and speed information. 8. ECDIS should provide appropriate alarms or indications with respect to the information displayed or malfunction of the equipment. 9. ECDIS should be provided with means for carrying out on-board tests of major functions either automatically or manually. In case of failure, the test should provide a suitable alarm or indication of system malfunction. BACK-UP ARRANGEMENTS: 1. Adequate back-up arrangements should be provided to ensure safe navigation in case of an ECDIS failure. Facilities enabling a safe take-over of the ECDIS functions should be provided in order to ensure that an ECDIS failure does not result in a critical situation.
  • 2. 2 | P a g e I M O P E R F O R M A N C E S T A N D A R D S F O R E C D I S : G E N E R A L For more details please visit: www.captyashpal.blogspot.com 2. A back-up arrangement should be provided facilitating means for safe navigation of the remaining part of the voyage in case of an ECDIS failure. POWER SUPPLY: 1. It should be possible to operate ECDIS and all equipment necessary for its normal functioning when supplied by an emergency source of electrical power in accordance with the appropriate requirements of chapter II-1 of the 1974 SOLAS Convention. 2. Changing from one source of power supply to another or any interruption of the supply for a period of up to 45 s should not require the equipment to be re-initialized manually.