JIT?
 “A philosophy of manufacturing based on
planned elimination of waste and continuous
improvement of productivity ……”
Bottlenecks in
implementing
JIT in an
Industry
JIT improvement won`t do any good.
Its sounds like a good thing but we still don’t want to do it
Look good on paper but…..
Costs are already as low as that can possibly get
But we already been doing things that way
We can`t lower costs any more without lowering quality
Everything is going just fine now ,Why change it?
That`s a lousy idea! We already tried that 20 years ago
Look we understand this stuff better than anybody(so don’t tell us
what to do)
8/17/2023
3 bvarun.weebly.com
Histor
y of JIT
 Evolved in Japan after World War II, as a result
of their diminishing market share in the auto
industry.
 Toyota Motor Company- first to implement
fully functioning and successful JIT system, in
1970’s.
 Japanese Manufacturers looked for a way to
gain the most efficient use of limited
resources. They worked on "optimal
cost/quality relationship.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT
originated in Japan as the Toyota Production System. W. Edwards Deming’s
lesson of variability reduction was a huge influence.
8/17/2023
5 bvarun.weebly.com
• ZERO INVENTORY
• ZERO LEAD TIME
• ZERO FAILURE
JIT
(JUST-IN-TIME)
8/17/2023
6 bvarun.weebly.com
 Eliminates waste .
 Achieves streamlined production .
 Eliminate disruptions in production … caused by poor quality,
schedule changes, late deliveries.
 Makes the manufacturing delivery system flexible by allowing it to
handle a variety of products and changes in the level of output.
 Reduces setup and delivery times .
8/17/2023
7 bvarun.weebly.com
Waste Definition
1. Overproduction Manufacturing an item before it is needed.
2. Inappropriate Processing Using expensive high precision equipment when
simpler machines would suffice.
3. Waiting Wasteful time incurred when product is not being
moved or processed.
4. Transportation Excessive movement and material handling of
product between processes.
5. Motion Unnecessary effort related to the ergonomics of
bending, stretching, reaching, lifting, and walking.
6. Inventory Excess inventory hides problems on the shop
floor, consumes space, increases lead times, and
inhibits communication.
7. Defects Quality defects result in rework and scrap, and
add wasteful costs to the system in the form of
lost capacity, rescheduling effort, increased
inspection, and loss of customer good will.
8. Underutilization of Employees Failure of the firm to learn from and capitalize on
its employees’ knowledge and creativity impedes
long term efforts to eliminate waste.
8/17/2023
8 bvarun.weebly.com
 Overproduction
 Waiting time
 Unnecessary transportation
 Processing waste
 Inefficient work methods
 Product defects
8/17/2023
9 bvarun.weebly.com
Strategies For Minimizing Waste
By Using JIT
 Manufacturing in smaller lot sizes reduces excess inventory
 Reducing inventory levels allows the problems to be uncovered … thus
creating opportunities for manufacturing process improvement
8/17/2023
10 bvarun.weebly.com
8/17/2023
11 bvarun.weebly.com
Principles Of JIT Manufacturing
 Total quality Management
 Production Management
 Supplier Management
 Inventory Management
 Human Resource
Management
8/17/2023
12 bvarun.weebly.com
JIT Manufacturing Building Blocks
 Product design
 Process design
 Personnel/organizational
elements
 Manufacturing
planning and control
8/17/2023
13 bvarun.weebly.com
1. Product Design
 Standard parts
 Design Simplification
 Highly capable production systems
 Concurrent engineering
8/17/2023
14 bvarun.weebly.com
2. Process Design
 Small lot sizes
 Setup time reduction
 Limited work in process
 Quality improvement
 Production flexibility
 Little inventory storage
8/17/2023
15 bvarun.weebly.com
Benefits of Small Lot Sizes
Reduced Inventory
Less Rework
Less Storage Space
Problems are more apparent
Increase Product Flexibility
Easier to balance operation
8/17/2023
16 bvarun.weebly.com
3. Personnel/Organizational Elements
 Workers as assets
 Cross-trained workers
 Continuous improvement
 Leadership
8/17/2023
17 bvarun.weebly.com
4. Manufacturing Planning and Control
 Pull systems
 Visual systems (kanban)
 Close vendor relationships
 Reduced transaction processing (delays in
delivery)
 Preventive maintenance
8/17/2023
18 bvarun.weebly.com
Evaluation and selection of vendor (suppliers)
network to develop a tiered supplier network –
reducing the number of primary suppliers
Traditional supplier Network
Buyer
Supplier
Supplier Supplier
Supplier
Supplier supplier
Tiered Supplier Network
Buyer
supplier supplier supplier supplier
8/17/2023
19 bvarun.weebly.com
8/17/2023
20 bvarun.weebly.com
8/17/2023
21 bvarun.weebly.com
In McDonald’s
8/17/2023
22 bvarun.weebly.com
In McDonald’s
 High holding costs are the nature of the fast food
industries.
 Wastage.
 Time.
8/17/2023
23 bvarun.weebly.com
In McDonald’s
 JIT system wherein McDonald's doesn't begin to cook
its orders until a customer has placed a specific order.
8/17/2023
24 bvarun.weebly.com
Implementation of JIT
 Sophisticated burger-making technology (including a
record-breaking bun toaster)
 McDonald's is able to make food fast enough to wait until
it's been ordered.
 Reduction in wastage.
8/17/2023
25 bvarun.weebly.com
Implementing in JIT
Production Systems
 Criteria for success
 Service
 Quality
 People
 Food preparation
 Profitability
.
8/17/2023
26 bvarun.weebly.com
Supply Chain Integration
8/17/2023
27 bvarun.weebly.com
Benefits
 Improved Quality – The burgers are prepared freshly and
hence the quality has improved.
 Customer service – As the burger is made only after the
order is placed, making special orders is not an issue.
 Cost Reduction – Due to significant reduction in wastage
as uncooked material has a higher shelf life.
 Reduction in waiting – Customer’s waiting time reduce
11 min. to just 1 and half min.
8/17/2023
28 bvarun.weebly.com
Companies adopted JIT
8/17/2023
29 bvarun.weebly.com
TOYOTA PRODUCTION SYSTEM
8/17/2023
30 bvarun.weebly.com
Minimizing Waste:
Focused Factory
Networks
Coordination
System Integration
These are small specialized plants
that limit the range of products
produced (sometimes only one
type of product for an entire facility)
Some plants in
Japan have as
few as 30 and as
many as 1000
employees
8/17/2023
31 bvarun.weebly.com
Minimizing Waste: Group Technology (Part 1)
 Using Departmental Specialization for plant layout can cause a lot of
unnecessary material movement
Saw Saw
Lathe Press
Press
Grinder
Lathe
Lathe
Saw
Press
Heat Treat
Grinder
Note how the flow lines are going back and forth
8/17/2023
32 bvarun.weebly.com
Minimizing Waste:
Group Technology (Part 2)
 Revising by using Group Technology Cells can reduce movement and
improve product flow .
Press
Lathe
Grinder
Grinder
A
2
B
Saw
Heat Treat
Lathe
Saw Lathe
Press
Lathe
1
8/17/2023
33 bvarun.weebly.com
Minimizing Waste: Just-In-Time Production
 Management philosophy
 “Pull” system though the plant
 Hydraulic Push Systems
WHAT IT IS
 Employee participation
 Industrial engineering/basics
 Continuing improvement
 Total quality control
 Small lot sizes
WHAT IT REQUIRES
 Attacks waste
 Exposes problems and bottlenecks
 Achieves streamlined production
WHAT IT DOES
 Stable environment
WHAT IT ASSUMES
8/17/2023
34 bvarun.weebly.com
Minimizing Waste: Inventory
Hides Problems
Work in
process
queues
(banks)
Change
orders
Engineering design
redundancies
Vendor
delinquencies
Scrap
Design
backlogs
Machine
downtime
Decision
backlogs
Inspection
backlogs
Paperwork
backlog
Example: By identifying
defective items from a
vendor early in the
production process the
downstream work is saved
Example: By identifying
defective work by employees
upstream, the downstream
work is saved
8/17/2023
35 bvarun.weebly.com
Minimizing Waste: Kanban Production Control
Systems
Storage
Part A
Storage
Part A
Machine
Center
Assembly
Line
Material Flow
Card (signal) Flow
Withdrawal
kanban
Once the Production kanban
is received, the Machine
Center produces a unit to
replace the one taken by the
Assembly Line people in the
first place
This puts the
system back were it
was before the item
was pulled
The process begins by the Assembly
Line people pulling Part A from Storage
Production kanban
8/17/2023
36 bvarun.weebly.com
Determining the Number of Kanban Needed
 Setting up a kanban system requires determining the number of kanban
cards (or containers) needed.
 Each container represents the minimum production lot size.
 An accurate estimate of the lead time required to produce a container is
key to determining how many kanban are required.
 Side Bar – In Japan space is a very important consideration since there is so
little of it. This process saves on space requirements.
8/17/2023
37 bvarun.weebly.com
Example of Kanban Card Determination:
Problem Data
 A switch assembly is assembled in batches of 4 units from an “upstream”
assembly area and delivered in a special container to a “downstream”
control-panel assembly operation.
 The control-panel assembly area requires 5 switch assemblies per hour.
 The switch assembly area can produce a container of switch assemblies in
2 hours.
 Safety stock has been set at 10% of needed inventory.
8/17/2023
38 bvarun.weebly.com
Example of Kanban Card Determination:
Calculations
Always round up!
8/17/2023
39 bvarun.weebly.com
8/17/2023
40 bvarun.weebly.com
 A.gunasekaran and J.lyu in their research implementation of just-in-
time in a small company has depicted its advantage in SMEs. he depicted
that implementation of JIT in SMEs should start with layout revision,
schedule stability and the development of long-term supplier-customer
relationships.
 A new purchasing policy supporting frequent purchases of small lot sizes
may help SMEs in implementing a JIT system.
 Education and training of workers in SMEs about JIT concept and their
high leverage opportunity would tremendously support the
implementation of JIT system in SMEs.
8/17/2023
41 bvarun.weebly.com
Requirement for the implementation
of JIT in Indian industry
8/17/2023
42 bvarun.weebly.com
 Management Support And Understanding Of the System.
 Management And Labour Responsibilities.
 Training.
 Supplier Management.
 Production Layout And Work Flow.
 Long‐term Planning.
 Government Support.
8/17/2023
43 bvarun.weebly.com
JIT Benefits
 Reduced Inventory
 Improved quality
 Lower costs
 Reduced space requirements
 Shorter lead-time
 Increased productivity
 Greater flexibility
 Improved vendor relations
8/17/2023
44 bvarun.weebly.com
JIT Benefits (contd.)
 Simplified scheduling & control
 Increased capacity
 Better utilization of personnel
 More product variety
 Increased equipment utilization
 Reduced paperwork
 Valid production priorities
 Work force participation
8/17/2023
45 bvarun.weebly.com
Disadvantages of JIT
 Danger of disrupted production due to non-arrival of supplies.
 Danger of lost sales.
 High dependence on suppliers.
 Less time for quality control on arrival of materials.
 Increased ordering and admin costs.
 May lose bulk-buying discounts.
8/17/2023
46 bvarun.weebly.com
JIT … Not For Everyone
 JIT concepts work best when goods can be produced in response to
consumer demand (e.g. automobiles, etc.)
 JIT is less effective for the production of standardized consumer
goods (e.g. basic clothing, food, soft drinks, toasters, etc.)
 There are cases where JIT concepts apply to sub-processes of a make
to stock environment. (e.g. computers etc.)
8/17/2023
47 bvarun.weebly.com
8/17/2023
48 bvarun.weebly.com

More Related Content

Similar to jit.pptx

kanban an integrated jit system
kanban an integrated jit systemkanban an integrated jit system
kanban an integrated jit systemSridhar Siddu
 
Session 8
Session 8Session 8
Session 8thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean productionهشام جملة
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptrahul368457
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsTanuj Kujur
 
PPC Chapter 8.pdf
PPC Chapter 8.pdfPPC Chapter 8.pdf
PPC Chapter 8.pdfMywife15
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory managementiWriteEssays
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations ManagementMuhammad Talha
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationLaukik Raut
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Reviewvivatechijri
 
Planning for high volume standardised product
Planning for high volume standardised productPlanning for high volume standardised product
Planning for high volume standardised productNidhi Vats
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jitsree19881988
 
Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Haileyesus Wondwossen
 

Similar to jit.pptx (20)

Production methods
Production methodsProduction methods
Production methods
 
kanban an integrated jit system
kanban an integrated jit systemkanban an integrated jit system
kanban an integrated jit system
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 
PPC Chapter 8.pdf
PPC Chapter 8.pdfPPC Chapter 8.pdf
PPC Chapter 8.pdf
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
 
Just in time
Just in timeJust in time
Just in time
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Management
 
Toyota
ToyotaToyota
Toyota
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its Implementation
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 
Planning for high volume standardised product
Planning for high volume standardised productPlanning for high volume standardised product
Planning for high volume standardised product
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...
 

More from dharma raja`

unit_iv23587911111110000222221254822.ppt
unit_iv23587911111110000222221254822.pptunit_iv23587911111110000222221254822.ppt
unit_iv23587911111110000222221254822.pptdharma raja`
 
UNIT 4-002356566 - FLEXIBLE MANUFACTURING SYSTEM (FMS) AND AUTOMATED GUIDED V...
UNIT 4-002356566 - FLEXIBLE MANUFACTURING SYSTEM (FMS) AND AUTOMATED GUIDED V...UNIT 4-002356566 - FLEXIBLE MANUFACTURING SYSTEM (FMS) AND AUTOMATED GUIDED V...
UNIT 4-002356566 - FLEXIBLE MANUFACTURING SYSTEM (FMS) AND AUTOMATED GUIDED V...dharma raja`
 
UNIT -3-02225265555- CELLULA MANUFACTURING .ppt
UNIT -3-02225265555- CELLULA MANUFACTURING .pptUNIT -3-02225265555- CELLULA MANUFACTURING .ppt
UNIT -3-02225265555- CELLULA MANUFACTURING .pptdharma raja`
 
UNIT -5-0001235689- INDUSTRIAL ROBOTICS .ppt
UNIT -5-0001235689- INDUSTRIAL ROBOTICS .pptUNIT -5-0001235689- INDUSTRIAL ROBOTICS .ppt
UNIT -5-0001235689- INDUSTRIAL ROBOTICS .pptdharma raja`
 
CIM- 1-120000000-UNIT-1 INTRODUCTION.ppt
CIM- 1-120000000-UNIT-1 INTRODUCTION.pptCIM- 1-120000000-UNIT-1 INTRODUCTION.ppt
CIM- 1-120000000-UNIT-1 INTRODUCTION.pptdharma raja`
 
ppt-3. III-Desgn of riveted joint12314.pptx
ppt-3. III-Desgn of riveted joint12314.pptxppt-3. III-Desgn of riveted joint12314.pptx
ppt-3. III-Desgn of riveted joint12314.pptxdharma raja`
 
ppt-1.Unit -III Design of Cotter joint-12222.pptx
ppt-1.Unit -III Design of Cotter joint-12222.pptxppt-1.Unit -III Design of Cotter joint-12222.pptx
ppt-1.Unit -III Design of Cotter joint-12222.pptxdharma raja`
 
Ppt-Design of Helical Springs11211111.ppt
Ppt-Design of Helical Springs11211111.pptPpt-Design of Helical Springs11211111.ppt
Ppt-Design of Helical Springs11211111.pptdharma raja`
 
PPT-Design - Leaf Springs235468921122.ppt
PPT-Design - Leaf Springs235468921122.pptPPT-Design - Leaf Springs235468921122.ppt
PPT-Design - Leaf Springs235468921122.pptdharma raja`
 
Ppt-Flywheel 12354862525qwerrrrrvgbbb.ppt
Ppt-Flywheel 12354862525qwerrrrrvgbbb.pptPpt-Flywheel 12354862525qwerrrrrvgbbb.ppt
Ppt-Flywheel 12354862525qwerrrrrvgbbb.pptdharma raja`
 
friction-stir-welding.ppt
friction-stir-welding.pptfriction-stir-welding.ppt
friction-stir-welding.pptdharma raja`
 
Soldering and brazing.pptx
Soldering and brazing.pptxSoldering and brazing.pptx
Soldering and brazing.pptxdharma raja`
 
SPECIAL CASTING PROCESSES.pptx
SPECIAL CASTING PROCESSES.pptxSPECIAL CASTING PROCESSES.pptx
SPECIAL CASTING PROCESSES.pptxdharma raja`
 
Presentation3.pptx
Presentation3.pptxPresentation3.pptx
Presentation3.pptxdharma raja`
 
introduction cad.ppt
introduction cad.pptintroduction cad.ppt
introduction cad.pptdharma raja`
 
Ethics UNIT 2.pptx
Ethics UNIT 2.pptxEthics UNIT 2.pptx
Ethics UNIT 2.pptxdharma raja`
 

More from dharma raja` (20)

unit_iv23587911111110000222221254822.ppt
unit_iv23587911111110000222221254822.pptunit_iv23587911111110000222221254822.ppt
unit_iv23587911111110000222221254822.ppt
 
UNIT 4-002356566 - FLEXIBLE MANUFACTURING SYSTEM (FMS) AND AUTOMATED GUIDED V...
UNIT 4-002356566 - FLEXIBLE MANUFACTURING SYSTEM (FMS) AND AUTOMATED GUIDED V...UNIT 4-002356566 - FLEXIBLE MANUFACTURING SYSTEM (FMS) AND AUTOMATED GUIDED V...
UNIT 4-002356566 - FLEXIBLE MANUFACTURING SYSTEM (FMS) AND AUTOMATED GUIDED V...
 
UNIT -3-02225265555- CELLULA MANUFACTURING .ppt
UNIT -3-02225265555- CELLULA MANUFACTURING .pptUNIT -3-02225265555- CELLULA MANUFACTURING .ppt
UNIT -3-02225265555- CELLULA MANUFACTURING .ppt
 
UNIT -5-0001235689- INDUSTRIAL ROBOTICS .ppt
UNIT -5-0001235689- INDUSTRIAL ROBOTICS .pptUNIT -5-0001235689- INDUSTRIAL ROBOTICS .ppt
UNIT -5-0001235689- INDUSTRIAL ROBOTICS .ppt
 
CIM- 1-120000000-UNIT-1 INTRODUCTION.ppt
CIM- 1-120000000-UNIT-1 INTRODUCTION.pptCIM- 1-120000000-UNIT-1 INTRODUCTION.ppt
CIM- 1-120000000-UNIT-1 INTRODUCTION.ppt
 
ppt-3. III-Desgn of riveted joint12314.pptx
ppt-3. III-Desgn of riveted joint12314.pptxppt-3. III-Desgn of riveted joint12314.pptx
ppt-3. III-Desgn of riveted joint12314.pptx
 
ppt-1.Unit -III Design of Cotter joint-12222.pptx
ppt-1.Unit -III Design of Cotter joint-12222.pptxppt-1.Unit -III Design of Cotter joint-12222.pptx
ppt-1.Unit -III Design of Cotter joint-12222.pptx
 
Ppt-Design of Helical Springs11211111.ppt
Ppt-Design of Helical Springs11211111.pptPpt-Design of Helical Springs11211111.ppt
Ppt-Design of Helical Springs11211111.ppt
 
PPT-Design - Leaf Springs235468921122.ppt
PPT-Design - Leaf Springs235468921122.pptPPT-Design - Leaf Springs235468921122.ppt
PPT-Design - Leaf Springs235468921122.ppt
 
Ppt-Flywheel 12354862525qwerrrrrvgbbb.ppt
Ppt-Flywheel 12354862525qwerrrrrvgbbb.pptPpt-Flywheel 12354862525qwerrrrrvgbbb.ppt
Ppt-Flywheel 12354862525qwerrrrrvgbbb.ppt
 
Laser 1.pptx
Laser 1.pptxLaser 1.pptx
Laser 1.pptx
 
friction-stir-welding.ppt
friction-stir-welding.pptfriction-stir-welding.ppt
friction-stir-welding.ppt
 
Soldering and brazing.pptx
Soldering and brazing.pptxSoldering and brazing.pptx
Soldering and brazing.pptx
 
SPECIAL CASTING PROCESSES.pptx
SPECIAL CASTING PROCESSES.pptxSPECIAL CASTING PROCESSES.pptx
SPECIAL CASTING PROCESSES.pptx
 
Presentation3.pptx
Presentation3.pptxPresentation3.pptx
Presentation3.pptx
 
Cupola.ppt
Cupola.pptCupola.ppt
Cupola.ppt
 
ie5505.ppt
ie5505.pptie5505.ppt
ie5505.ppt
 
introduction cad.ppt
introduction cad.pptintroduction cad.ppt
introduction cad.ppt
 
Ethics UNIT 2.pptx
Ethics UNIT 2.pptxEthics UNIT 2.pptx
Ethics UNIT 2.pptx
 
Ethics 5.pptx
Ethics 5.pptxEthics 5.pptx
Ethics 5.pptx
 

Recently uploaded

Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...lizamodels9
 
Call Girls Hongasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Hongasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Hongasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Hongasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...amitlee9823
 
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men 🔝Bhiwandi🔝 Escor...
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men  🔝Bhiwandi🔝   Escor...➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men  🔝Bhiwandi🔝   Escor...
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men 🔝Bhiwandi🔝 Escor...amitlee9823
 
Somya Surve Escorts Service Bilaspur ❣️ 7014168258 ❣️ High Cost Unlimited Har...
Somya Surve Escorts Service Bilaspur ❣️ 7014168258 ❣️ High Cost Unlimited Har...Somya Surve Escorts Service Bilaspur ❣️ 7014168258 ❣️ High Cost Unlimited Har...
Somya Surve Escorts Service Bilaspur ❣️ 7014168258 ❣️ High Cost Unlimited Har...nirzagarg
 
Madiwala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Madiwala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...Madiwala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Madiwala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...amitlee9823
 
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5Bavarian Workshop
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Delhi Call girls
 
➥🔝 7737669865 🔝▻ pathankot Call-girls in Women Seeking Men 🔝pathankot🔝 Esc...
➥🔝 7737669865 🔝▻ pathankot Call-girls in Women Seeking Men  🔝pathankot🔝   Esc...➥🔝 7737669865 🔝▻ pathankot Call-girls in Women Seeking Men  🔝pathankot🔝   Esc...
➥🔝 7737669865 🔝▻ pathankot Call-girls in Women Seeking Men 🔝pathankot🔝 Esc...nirzagarg
 
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...amitlee9823
 
➥🔝 7737669865 🔝▻ Moradabad Call-girls in Women Seeking Men 🔝Moradabad🔝 Esc...
➥🔝 7737669865 🔝▻ Moradabad Call-girls in Women Seeking Men  🔝Moradabad🔝   Esc...➥🔝 7737669865 🔝▻ Moradabad Call-girls in Women Seeking Men  🔝Moradabad🔝   Esc...
➥🔝 7737669865 🔝▻ Moradabad Call-girls in Women Seeking Men 🔝Moradabad🔝 Esc...amitlee9823
 
Top Rated Call Girls Navi Mumbai : 9920725232 We offer Beautiful and sexy Cal...
Top Rated Call Girls Navi Mumbai : 9920725232 We offer Beautiful and sexy Cal...Top Rated Call Girls Navi Mumbai : 9920725232 We offer Beautiful and sexy Cal...
Top Rated Call Girls Navi Mumbai : 9920725232 We offer Beautiful and sexy Cal...amitlee9823
 
Vip Mumbai Call Girls Mumbai Call On 9920725232 With Body to body massage wit...
Vip Mumbai Call Girls Mumbai Call On 9920725232 With Body to body massage wit...Vip Mumbai Call Girls Mumbai Call On 9920725232 With Body to body massage wit...
Vip Mumbai Call Girls Mumbai Call On 9920725232 With Body to body massage wit...amitlee9823
 
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理ezgenuh
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Vip Mumbai Call Girls Colaba Call On 9920725232 With Body to body massage wit...
Vip Mumbai Call Girls Colaba Call On 9920725232 With Body to body massage wit...Vip Mumbai Call Girls Colaba Call On 9920725232 With Body to body massage wit...
Vip Mumbai Call Girls Colaba Call On 9920725232 With Body to body massage wit...amitlee9823
 
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best ServiceMarathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Dubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls DubaiDubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls Dubaikojalkojal131
 
8377087607, Door Step Call Girls In Majnu Ka Tilla (Delhi) 24/7 Available
8377087607, Door Step Call Girls In Majnu Ka Tilla (Delhi) 24/7 Available8377087607, Door Step Call Girls In Majnu Ka Tilla (Delhi) 24/7 Available
8377087607, Door Step Call Girls In Majnu Ka Tilla (Delhi) 24/7 Availabledollysharma2066
 
Why Does My Porsche Cayenne's Exhaust Sound So Loud
Why Does My Porsche Cayenne's Exhaust Sound So LoudWhy Does My Porsche Cayenne's Exhaust Sound So Loud
Why Does My Porsche Cayenne's Exhaust Sound So LoudRoyalty Auto Service
 

Recently uploaded (20)

Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
 
Call Girls Hongasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Hongasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Hongasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Hongasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
 
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men 🔝Bhiwandi🔝 Escor...
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men  🔝Bhiwandi🔝   Escor...➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men  🔝Bhiwandi🔝   Escor...
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men 🔝Bhiwandi🔝 Escor...
 
Somya Surve Escorts Service Bilaspur ❣️ 7014168258 ❣️ High Cost Unlimited Har...
Somya Surve Escorts Service Bilaspur ❣️ 7014168258 ❣️ High Cost Unlimited Har...Somya Surve Escorts Service Bilaspur ❣️ 7014168258 ❣️ High Cost Unlimited Har...
Somya Surve Escorts Service Bilaspur ❣️ 7014168258 ❣️ High Cost Unlimited Har...
 
Madiwala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Madiwala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...Madiwala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Madiwala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
 
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
 
Call Girls in Patel Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Patel Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Patel Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Patel Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
 
➥🔝 7737669865 🔝▻ pathankot Call-girls in Women Seeking Men 🔝pathankot🔝 Esc...
➥🔝 7737669865 🔝▻ pathankot Call-girls in Women Seeking Men  🔝pathankot🔝   Esc...➥🔝 7737669865 🔝▻ pathankot Call-girls in Women Seeking Men  🔝pathankot🔝   Esc...
➥🔝 7737669865 🔝▻ pathankot Call-girls in Women Seeking Men 🔝pathankot🔝 Esc...
 
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
 
➥🔝 7737669865 🔝▻ Moradabad Call-girls in Women Seeking Men 🔝Moradabad🔝 Esc...
➥🔝 7737669865 🔝▻ Moradabad Call-girls in Women Seeking Men  🔝Moradabad🔝   Esc...➥🔝 7737669865 🔝▻ Moradabad Call-girls in Women Seeking Men  🔝Moradabad🔝   Esc...
➥🔝 7737669865 🔝▻ Moradabad Call-girls in Women Seeking Men 🔝Moradabad🔝 Esc...
 
Top Rated Call Girls Navi Mumbai : 9920725232 We offer Beautiful and sexy Cal...
Top Rated Call Girls Navi Mumbai : 9920725232 We offer Beautiful and sexy Cal...Top Rated Call Girls Navi Mumbai : 9920725232 We offer Beautiful and sexy Cal...
Top Rated Call Girls Navi Mumbai : 9920725232 We offer Beautiful and sexy Cal...
 
Vip Mumbai Call Girls Mumbai Call On 9920725232 With Body to body massage wit...
Vip Mumbai Call Girls Mumbai Call On 9920725232 With Body to body massage wit...Vip Mumbai Call Girls Mumbai Call On 9920725232 With Body to body massage wit...
Vip Mumbai Call Girls Mumbai Call On 9920725232 With Body to body massage wit...
 
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
 
Vip Mumbai Call Girls Colaba Call On 9920725232 With Body to body massage wit...
Vip Mumbai Call Girls Colaba Call On 9920725232 With Body to body massage wit...Vip Mumbai Call Girls Colaba Call On 9920725232 With Body to body massage wit...
Vip Mumbai Call Girls Colaba Call On 9920725232 With Body to body massage wit...
 
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best ServiceMarathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
 
Dubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls DubaiDubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls Dubai
 
8377087607, Door Step Call Girls In Majnu Ka Tilla (Delhi) 24/7 Available
8377087607, Door Step Call Girls In Majnu Ka Tilla (Delhi) 24/7 Available8377087607, Door Step Call Girls In Majnu Ka Tilla (Delhi) 24/7 Available
8377087607, Door Step Call Girls In Majnu Ka Tilla (Delhi) 24/7 Available
 
Why Does My Porsche Cayenne's Exhaust Sound So Loud
Why Does My Porsche Cayenne's Exhaust Sound So LoudWhy Does My Porsche Cayenne's Exhaust Sound So Loud
Why Does My Porsche Cayenne's Exhaust Sound So Loud
 

jit.pptx

  • 2. JIT?  “A philosophy of manufacturing based on planned elimination of waste and continuous improvement of productivity ……”
  • 3. Bottlenecks in implementing JIT in an Industry JIT improvement won`t do any good. Its sounds like a good thing but we still don’t want to do it Look good on paper but….. Costs are already as low as that can possibly get But we already been doing things that way We can`t lower costs any more without lowering quality Everything is going just fine now ,Why change it? That`s a lousy idea! We already tried that 20 years ago Look we understand this stuff better than anybody(so don’t tell us what to do) 8/17/2023 3 bvarun.weebly.com
  • 4. Histor y of JIT  Evolved in Japan after World War II, as a result of their diminishing market share in the auto industry.  Toyota Motor Company- first to implement fully functioning and successful JIT system, in 1970’s.  Japanese Manufacturers looked for a way to gain the most efficient use of limited resources. They worked on "optimal cost/quality relationship.
  • 5. The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson of variability reduction was a huge influence. 8/17/2023 5 bvarun.weebly.com
  • 6. • ZERO INVENTORY • ZERO LEAD TIME • ZERO FAILURE JIT (JUST-IN-TIME) 8/17/2023 6 bvarun.weebly.com
  • 7.  Eliminates waste .  Achieves streamlined production .  Eliminate disruptions in production … caused by poor quality, schedule changes, late deliveries.  Makes the manufacturing delivery system flexible by allowing it to handle a variety of products and changes in the level of output.  Reduces setup and delivery times . 8/17/2023 7 bvarun.weebly.com
  • 8. Waste Definition 1. Overproduction Manufacturing an item before it is needed. 2. Inappropriate Processing Using expensive high precision equipment when simpler machines would suffice. 3. Waiting Wasteful time incurred when product is not being moved or processed. 4. Transportation Excessive movement and material handling of product between processes. 5. Motion Unnecessary effort related to the ergonomics of bending, stretching, reaching, lifting, and walking. 6. Inventory Excess inventory hides problems on the shop floor, consumes space, increases lead times, and inhibits communication. 7. Defects Quality defects result in rework and scrap, and add wasteful costs to the system in the form of lost capacity, rescheduling effort, increased inspection, and loss of customer good will. 8. Underutilization of Employees Failure of the firm to learn from and capitalize on its employees’ knowledge and creativity impedes long term efforts to eliminate waste. 8/17/2023 8 bvarun.weebly.com
  • 9.  Overproduction  Waiting time  Unnecessary transportation  Processing waste  Inefficient work methods  Product defects 8/17/2023 9 bvarun.weebly.com
  • 10. Strategies For Minimizing Waste By Using JIT  Manufacturing in smaller lot sizes reduces excess inventory  Reducing inventory levels allows the problems to be uncovered … thus creating opportunities for manufacturing process improvement 8/17/2023 10 bvarun.weebly.com
  • 12. Principles Of JIT Manufacturing  Total quality Management  Production Management  Supplier Management  Inventory Management  Human Resource Management 8/17/2023 12 bvarun.weebly.com
  • 13. JIT Manufacturing Building Blocks  Product design  Process design  Personnel/organizational elements  Manufacturing planning and control 8/17/2023 13 bvarun.weebly.com
  • 14. 1. Product Design  Standard parts  Design Simplification  Highly capable production systems  Concurrent engineering 8/17/2023 14 bvarun.weebly.com
  • 15. 2. Process Design  Small lot sizes  Setup time reduction  Limited work in process  Quality improvement  Production flexibility  Little inventory storage 8/17/2023 15 bvarun.weebly.com
  • 16. Benefits of Small Lot Sizes Reduced Inventory Less Rework Less Storage Space Problems are more apparent Increase Product Flexibility Easier to balance operation 8/17/2023 16 bvarun.weebly.com
  • 17. 3. Personnel/Organizational Elements  Workers as assets  Cross-trained workers  Continuous improvement  Leadership 8/17/2023 17 bvarun.weebly.com
  • 18. 4. Manufacturing Planning and Control  Pull systems  Visual systems (kanban)  Close vendor relationships  Reduced transaction processing (delays in delivery)  Preventive maintenance 8/17/2023 18 bvarun.weebly.com
  • 19. Evaluation and selection of vendor (suppliers) network to develop a tiered supplier network – reducing the number of primary suppliers Traditional supplier Network Buyer Supplier Supplier Supplier Supplier Supplier supplier Tiered Supplier Network Buyer supplier supplier supplier supplier 8/17/2023 19 bvarun.weebly.com
  • 23. In McDonald’s  High holding costs are the nature of the fast food industries.  Wastage.  Time. 8/17/2023 23 bvarun.weebly.com
  • 24. In McDonald’s  JIT system wherein McDonald's doesn't begin to cook its orders until a customer has placed a specific order. 8/17/2023 24 bvarun.weebly.com
  • 25. Implementation of JIT  Sophisticated burger-making technology (including a record-breaking bun toaster)  McDonald's is able to make food fast enough to wait until it's been ordered.  Reduction in wastage. 8/17/2023 25 bvarun.weebly.com
  • 26. Implementing in JIT Production Systems  Criteria for success  Service  Quality  People  Food preparation  Profitability . 8/17/2023 26 bvarun.weebly.com
  • 28. Benefits  Improved Quality – The burgers are prepared freshly and hence the quality has improved.  Customer service – As the burger is made only after the order is placed, making special orders is not an issue.  Cost Reduction – Due to significant reduction in wastage as uncooked material has a higher shelf life.  Reduction in waiting – Customer’s waiting time reduce 11 min. to just 1 and half min. 8/17/2023 28 bvarun.weebly.com
  • 31. Minimizing Waste: Focused Factory Networks Coordination System Integration These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility) Some plants in Japan have as few as 30 and as many as 1000 employees 8/17/2023 31 bvarun.weebly.com
  • 32. Minimizing Waste: Group Technology (Part 1)  Using Departmental Specialization for plant layout can cause a lot of unnecessary material movement Saw Saw Lathe Press Press Grinder Lathe Lathe Saw Press Heat Treat Grinder Note how the flow lines are going back and forth 8/17/2023 32 bvarun.weebly.com
  • 33. Minimizing Waste: Group Technology (Part 2)  Revising by using Group Technology Cells can reduce movement and improve product flow . Press Lathe Grinder Grinder A 2 B Saw Heat Treat Lathe Saw Lathe Press Lathe 1 8/17/2023 33 bvarun.weebly.com
  • 34. Minimizing Waste: Just-In-Time Production  Management philosophy  “Pull” system though the plant  Hydraulic Push Systems WHAT IT IS  Employee participation  Industrial engineering/basics  Continuing improvement  Total quality control  Small lot sizes WHAT IT REQUIRES  Attacks waste  Exposes problems and bottlenecks  Achieves streamlined production WHAT IT DOES  Stable environment WHAT IT ASSUMES 8/17/2023 34 bvarun.weebly.com
  • 35. Minimizing Waste: Inventory Hides Problems Work in process queues (banks) Change orders Engineering design redundancies Vendor delinquencies Scrap Design backlogs Machine downtime Decision backlogs Inspection backlogs Paperwork backlog Example: By identifying defective items from a vendor early in the production process the downstream work is saved Example: By identifying defective work by employees upstream, the downstream work is saved 8/17/2023 35 bvarun.weebly.com
  • 36. Minimizing Waste: Kanban Production Control Systems Storage Part A Storage Part A Machine Center Assembly Line Material Flow Card (signal) Flow Withdrawal kanban Once the Production kanban is received, the Machine Center produces a unit to replace the one taken by the Assembly Line people in the first place This puts the system back were it was before the item was pulled The process begins by the Assembly Line people pulling Part A from Storage Production kanban 8/17/2023 36 bvarun.weebly.com
  • 37. Determining the Number of Kanban Needed  Setting up a kanban system requires determining the number of kanban cards (or containers) needed.  Each container represents the minimum production lot size.  An accurate estimate of the lead time required to produce a container is key to determining how many kanban are required.  Side Bar – In Japan space is a very important consideration since there is so little of it. This process saves on space requirements. 8/17/2023 37 bvarun.weebly.com
  • 38. Example of Kanban Card Determination: Problem Data  A switch assembly is assembled in batches of 4 units from an “upstream” assembly area and delivered in a special container to a “downstream” control-panel assembly operation.  The control-panel assembly area requires 5 switch assemblies per hour.  The switch assembly area can produce a container of switch assemblies in 2 hours.  Safety stock has been set at 10% of needed inventory. 8/17/2023 38 bvarun.weebly.com
  • 39. Example of Kanban Card Determination: Calculations Always round up! 8/17/2023 39 bvarun.weebly.com
  • 41.  A.gunasekaran and J.lyu in their research implementation of just-in- time in a small company has depicted its advantage in SMEs. he depicted that implementation of JIT in SMEs should start with layout revision, schedule stability and the development of long-term supplier-customer relationships.  A new purchasing policy supporting frequent purchases of small lot sizes may help SMEs in implementing a JIT system.  Education and training of workers in SMEs about JIT concept and their high leverage opportunity would tremendously support the implementation of JIT system in SMEs. 8/17/2023 41 bvarun.weebly.com
  • 42. Requirement for the implementation of JIT in Indian industry 8/17/2023 42 bvarun.weebly.com
  • 43.  Management Support And Understanding Of the System.  Management And Labour Responsibilities.  Training.  Supplier Management.  Production Layout And Work Flow.  Long‐term Planning.  Government Support. 8/17/2023 43 bvarun.weebly.com
  • 44. JIT Benefits  Reduced Inventory  Improved quality  Lower costs  Reduced space requirements  Shorter lead-time  Increased productivity  Greater flexibility  Improved vendor relations 8/17/2023 44 bvarun.weebly.com
  • 45. JIT Benefits (contd.)  Simplified scheduling & control  Increased capacity  Better utilization of personnel  More product variety  Increased equipment utilization  Reduced paperwork  Valid production priorities  Work force participation 8/17/2023 45 bvarun.weebly.com
  • 46. Disadvantages of JIT  Danger of disrupted production due to non-arrival of supplies.  Danger of lost sales.  High dependence on suppliers.  Less time for quality control on arrival of materials.  Increased ordering and admin costs.  May lose bulk-buying discounts. 8/17/2023 46 bvarun.weebly.com
  • 47. JIT … Not For Everyone  JIT concepts work best when goods can be produced in response to consumer demand (e.g. automobiles, etc.)  JIT is less effective for the production of standardized consumer goods (e.g. basic clothing, food, soft drinks, toasters, etc.)  There are cases where JIT concepts apply to sub-processes of a make to stock environment. (e.g. computers etc.) 8/17/2023 47 bvarun.weebly.com

Editor's Notes

  1. What is just-in-time manufacturing Jit is philosophy of manufacturing based on planned elimination of all waste and continuous improvement of productivity it encompasses the successful execution of all manufacturing activities required to produce a final product from design engineering to delivery and including all the states of conversion from raw material onward.
  2. 7
  3. 8
  4. 9
  5. 13
  6. 14
  7. 15
  8. 16
  9. 18
  10. 19