We've updated our privacy policy. Click here to review the details. Tap here to review the details.
Activate your 30 day free trial to unlock unlimited reading.
Activate your 30 day free trial to continue reading.
Download to read offline
Addis Ababa City Administration
Technical, Vocational, Education, And Training Agency
Bole Manufacturing College
Efficient Plant Layout Design Project For A Small Scale Garment Workshop
One of the most common industrial problems is proper use of man, material, and machines properly. Some organizations are thriving to solve this problem even educational institutes. The key idea of this project is proper to use or efficient use of resources with available area. So this project begins with analyzing the total area used by a college and I have found that the college has 31,719.685 m2 area, from this much amount of space building of 8562 m2, a road 5149 m2, a green area of 5900 m2 is used, so by rough calculation the collage will have 12,108.685m2 space but the collage need much more space than this because students need a playground for football, there is no entertainment center even tv room, there is no lab workshop building area for maximizing college aim finally there is 2 building this to be planted with this area. This calculation will give us the college must maximize its efficiency with minimum requirements and available resources. So, I begin to solve this illusion by reduction of three garment workshops into two workshops and freeing the remaining workshop. In the methodology part there is a calculation based on every machinery manual and ISO standard specification, some of the data also counts from the literature. But finally using the requirements I found that the plant needs to place one workshop for garments only so other departments can use the remaining. This is a great opportunity for the college to increase its efficiency. Also, from my sample point yearly graduating class is very minimum like 24.6% only in garments this tells us the college must change its policy by adding more departments depending on customer needs. Finally, I will recommend deeply analyzing every system for future better work and to fulfill the components or materials need to build the facility.
Addis Ababa City Administration, Bole Manufacturing College, Haileyesus Wondwossen
Addis Ababa City Administration
Technical, Vocational, Education, And Training Agency
Bole Manufacturing College
Efficient Plant Layout Design Project For A Small Scale Garment Workshop
One of the most common industrial problems is proper use of man, material, and machines properly. Some organizations are thriving to solve this problem even educational institutes. The key idea of this project is proper to use or efficient use of resources with available area. So this project begins with analyzing the total area used by a college and I have found that the college has 31,719.685 m2 area, from this much amount of space building of 8562 m2, a road 5149 m2, a green area of 5900 m2 is used, so by rough calculation the collage will have 12,108.685m2 space but the collage need much more space than this because students need a playground for football, there is no entertainment center even tv room, there is no lab workshop building area for maximizing college aim finally there is 2 building this to be planted with this area. This calculation will give us the college must maximize its efficiency with minimum requirements and available resources. So, I begin to solve this illusion by reduction of three garment workshops into two workshops and freeing the remaining workshop. In the methodology part there is a calculation based on every machinery manual and ISO standard specification, some of the data also counts from the literature. But finally using the requirements I found that the plant needs to place one workshop for garments only so other departments can use the remaining. This is a great opportunity for the college to increase its efficiency. Also, from my sample point yearly graduating class is very minimum like 24.6% only in garments this tells us the college must change its policy by adding more departments depending on customer needs. Finally, I will recommend deeply analyzing every system for future better work and to fulfill the components or materials need to build the facility.
Addis Ababa City Administration, Bole Manufacturing College, Haileyesus Wondwossen
You just clipped your first slide!
Clipping is a handy way to collect important slides you want to go back to later. Now customize the name of a clipboard to store your clips.The SlideShare family just got bigger. Enjoy access to millions of ebooks, audiobooks, magazines, and more from Scribd.
Cancel anytime.Unlimited Reading
Learn faster and smarter from top experts
Unlimited Downloading
Download to take your learnings offline and on the go
You also get free access to Scribd!
Instant access to millions of ebooks, audiobooks, magazines, podcasts and more.
Read and listen offline with any device.
Free access to premium services like Tuneln, Mubi and more.
We’ve updated our privacy policy so that we are compliant with changing global privacy regulations and to provide you with insight into the limited ways in which we use your data.
You can read the details below. By accepting, you agree to the updated privacy policy.
Thank you!