SlideShare a Scribd company logo
1 of 18
1
Case study:
William Pitt Union—Energy and Atmosphere
Graduate Group 3
Dejia Kong
Wanting Jiang
Liying Yin
Yazheng Song
Yaning Liu
4/20/2014
2
1. Description and requirement of 2030 DISTRICT
The Pittsburgh 2030 District is a collaborative community of high performance
buildings in Downtown Pittsburgh working towards 50% reductions in energy use, water
use, and transportation emission and with new construction reaching carbon neutrality by
the year 2030 (Pittsburgh 2030 District Team , 2013).
In order to reach these 50% reduction goals, The Pittsburgh 2030 has sets baselines
for each reduction category. For energy part, which matters to our project the most, they
use Environmental Protection Agency’s (EPA) Energy Star Portfolio Manager tool, which
based on 2003 Commercial Building Energy Consumption Survey (CBECS) data as their
measuring tools for reduction goals. Specific information such as location, space use profile,
and number of regular occupants, operating hours, and other parameters are being
included during the measuring process.
 Case studies under 2030 District
We found two successful cases in Seattle 2030 District that has some similarities
with our project; we set them as our study cases.
1) The Dexter Horton
The Dexter Horton building is a historic landmark located in the core of downtown
Seattle, it was built in 1922, which has a similar history span with WilliamPitt Union. In
order to make efficiency improvements, the building management team started their
renovations in 2006. Within one year of implementing retrofits, the Dexter Horton building
jumped from an energy rating of 60 to 78 and is currently holding a rating of 96 and got
LEED-EB Gold Certification (Seattle 2030 District, 2007). Innovative Measures include
motion and occupancy light sensors in stairwells, variable frequency drive air conditioning,
install heat exchanger and ongoing energy commissioning. The first three methods will also
be utilized in our project.
2) Joseph Vance Building
The Joseph Vance Building was built in 1929 in downtown Seattle, also has a similar
history span with WilliamPitt Union. Since the Rose Smart Growth Investment Fund
acquired this building in 2006, the Fund has made significant investments in renovating the
buildings to improve energy efficiency and environmental performance. Through the
reconstruction, the Vance Building achieved LEED-EB Gold certification and already exceeds
the 2030 energy goal. Innovative Measures used in this building include energy Star rated
reflective roof system, restoration of operable windows, mecco shades and light shelves,
3
weather stripping, all lighting fixtures updated with high efficiency fixtures, commissioning
of steam system, replacement of steam traps, local temperature control valves at radiators,
new mechanical ventilation systems in corridors
2. William Pitt Union background
The WilliamPitt Union, which was created as the Schenley Hotel in 1898, was now
changed into the student union building of the University of Pittsburgh. Schenley Hotel
designed by architects Rutan&Russell. The entrepreneur Franklin Nocola and his first
stockholders erected the beaux-arts structure on land. Schenley Hotel was the first large,
steel-framed hotel in Pittsburgh. Then it was sold to the University of Pittsburgh in 1956 and
underwent a $1million ($8.67 million in 2014 dollars) renovation to convert it to university
use. The top four floors served as a men’s dormitory called Schenley House, the rest of the
floors served as a student union named Schenley Hall. After that, the Schenley Hall ballroom
in the Union was the site of a luncheon for Nikita Khrushchev, chairman of the Soviet Union,
and various Soviet and U.S. officials during the height of the cold war in September 1959.
In 1980, the University of Pittsburgh spent a $ 13.9 million ($39.8 million in 2014
dollars) renovation and restoration for the Union because the increasing population of the
student. The duration of this project is 18-month and led by Williams Trebilcock Whitehead.
Seven upper floors served as modern offices for students and the student affairs
administration. The 10th floor, which had been added several years after the hotel was first
built, was removed to relieve stress on the building.
The turn-of-the-century character of the main floor was restored through careful
restoration of the Louis XV mirrored ballroom, the lower lounge that had enclosed the
original Bigelow Boulevard-side porch 13 years after the hotel was originally built, and the
marbled-wall former hotel lobby, now called the Tansky Family Lounge. Moreover, the
basement was transformed into a functional lower level with a new Forbes Avenue Entrance
and plaza. The original wooden hotel room doors salvage from the upstairs renovationswere
used for the walls of the lower level student recreation room, now called "Nordy's Place".
Further, a third west entrance facing the university's Schenley Quadrangle and Litchfield
Tower dormitories was added and included a new multi-level glass roofed atrium just inside
the new entrance. The renovations were completed in 1983 and the building was renamed
the WilliamPitt Union. Now the WilliamPitt Union serves as the student union and hub of
the University of Pittsburgh and includes a variety of lounges, ballrooms, reception,
performance, and meeting spaces.
In 2007, the recreation room on the ground floor of the union was renovated and by
resolution of the Pitt Student Government Board in December 2007, was named "Nordy's
Place" in honor of Chancellor Mark Nordenberg whom the board resolved was a student
favorite and worthy of the honor.
4
In 2009, renovations to the second floor improved the accommodations of the
student careers center and renovations to the fifth floor provided six new meeting spaces
for student organizations. Moreover, a formal area was created where student
organizations can host special events such as workshops and award presentations. In 2010,
a $2 million project was undertaken to renovate 9,200 square feet (850 m2) of space on the
ninth floor and created a new student study and lounge area, a 20-person conference room,
a kitchen/coffee area, file/storage areas, and new offices for Residence Life, and Pitt Arts,
and Student Volunteer Outreach.
A $1.93 million renovation of the Assembly Room included uncovering three large
windows to allow in natural light, a stage extension and technology upgrades. Moreover, a
$390,000 renovation of first floor restrooms and $1.85 million renovation of the lower levels
of the union included its food court and dining spaces. All of these renovations were
completed in 2013.
3. Project description and goals
Our primary object of this project is to change the WilliamPitt Union into a more
environmental friendly building. By doing so, we will make several modifications based on
the existing building. And the whole process will follow the LEED—Energy and atmosphere
step by step with a special focus on prerequisite: minimum energy performance and also
credit2: optimize energy performance. After finishing all the changes by using Revit, Green
Building Studio and Tally, we are going to make a cost plan in order to find out the total
savings for the building and analysis the impacts of these changes.
 LEED Analysis
Energy efficiency in a green building starts with a focus on design that reduces
overall energy needs, such as building orientation and glazing selection, and the choice of
climate-appropriate building materials. Strategies such as passive heating and cooling,
natural ventilation, and high-efficiency HVAC systems partnered with smart controls further
reduce a building’s energy use.
We did the step-by-step guidance for prerequisite credit. First, we determine
Pittsburgh Climate Zone 5A from ASHRAE APPENDIX B; and then, we review and address
ASHRAE mandatory requirements and set up our baseline model by using Revit. After that,
we set our energy saving target as 20% comparing with the 50% reduction for 2030 District
since we do not include water usage and transportation factors in our case, so we think 20%
reduction is a reasonable number. The last step is by following the flowchart in the LEED
reference guide, we select Option 1—whole-building energy simulation as our final option.
5
 Modeling
First of all, we built the model of WilliamPitt Union (Figure 1) by using the Revit
software based on the information that got from the building manager and our own
investigation. Since we are not permitted to get the data of the WPU so what we have now
are just building area and the HVAC system. The building is 10 stories above grade with
178,726 sq. area. The heating systemis hot water perimeter through a 4 pipe systemon
floors 1 through 9. The main floor and lower levels are steam heat and chilled water. We
consider all exterior windows and doors into account to make sure that the estimate be
more realistic. Then we adjust the location to the exact location of WPU, WilliamPitt Union,
Forbes Avenue, Pittsburgh, PA 15213. By doing so, it guarantees that all the energy and cost
analysis are based on the real situation of Pittsburgh.
 Pre-design/Planning
To improve the performance of the WPU and to meet the requirements for LEED
rating system, we used a Design-Build process. Considering the practical situation of
WilliamPitt Union and the information that we can get, we just analyzed and improved one
aspect of the building: energy and atmosphere and the alternatives that we decided to
change are roofing, glazing, lighting and HVAC system.
1) Roofing
We decided to use the Cool Roof - R50 continuous ins. over roof deck. Cool roofs are
highly reflective and emissive, which means they reflect sunlight and reradiate absorbed
heat as light energy back to the atmosphere, rather than transferring absorbed heat to the
building below. However, traditional dark roofs do not reflect light and emit heat, so heat is
easily absorbed by the roof and penetrates through to the building interior, increasing
cooling costs. So, by using cool roof, it can reduce cooling load during hot summer months
and equate to substantial annual energy and cost savings.
Cool roofs, through mitigation of the urban heat island effect and reduction of
ambient air temperatures, in turn improve air quality. Smog is created by photochemical
reactions of air pollutants and these reactions increase at higher temperatures. Therefore,
Figure1 Model of William Pitt Union
6
by reducing the air temperature, cool roofs decrease the rate of smog formation. Cool roofs
directly reduce the air conditioning use for buildings by reducing heat gain in the building
below, but they also indirectly reduce air conditioning use in urban areas by helping lower
ambient air temperatures. Therefore, with cooler daytime temperatures, buildings and
vehicles use less air conditioning and save additional energy. In turn, this results in a
reduction in the CO2 emissions from electricity generating power plants.
What’s more, Cities can be 2° to 8°F warmer than surrounding areas due to dark
materials, including roofs, which absorb the sun’s light energy as heat during the day and
release it at night as heat.3 This phenomenon removes the opportunity for air to cool down
at night and results in higher temperatures being maintained longer. By immediately
reflecting solar radiation back into the atmosphere and reemitting some portion of it as
infrared light, cool roofs result in cooler air temperatures for the surrounding urban
environment during hot summer months.
2) Glazing
Considering the weather condition of Pittsburgh, we decided to apply the insulated
Clear Low-e (Low-emissive) Cold Climate material to the windows. A low-e glass window
(which stands for low emissivity) is simply a windowpane coated in microscopic layers of
metallic oxides. The coating appears invisible to the naked eye, allowing as much natural
light into the house as possible. Windows treated with Low-e coatings are proven to reduce
energy consumption, decrease fading of fabrics, such as window treatments, and increase
overall comfort in your home. Since Pittsburgh’s winter is long and cold, we think by using
low-e glass windows, it can help keep the room warm and reduce the usage of electric. Even
if windows manufactured with low-e coatings typically cost about 10 to 15 percent
more than regular windows, they reduce energy loss by as much as 30 to 50 percent.
Furthermore, this improvement in the building envelope—particularly when coupled
with other strategies that improve the efficiency of the building envelope—ultimately
impacts the demands of building HVAC systems. These benefits should be included in
evaluating the lifecycle costs of installing efficient windows.
3) Lighting
For several parts of the building, like the restrooms, there is no need to turn on the
lights all day. So we are considering using occupancy sensors during renovations. Sensors
are considered most suitable when the space is intermittently occupied, meaning it is
unoccupied for two or more hours per day, and where the lights are typically left on when
the space is unoccupied. Appropriate applications include offices, classrooms, copy rooms,
restrooms, storage areas, conference rooms, warehouses, break rooms, corridors, filing
areas, and other spaces. There are several benefits of using the sensors. First, less energy is
wasted with motion sensors because the light turns off after a short period of time. Since
7
they do not run continually, the bulbs will burn out less frequently in a motion sensor light
than in a traditional fixture. Besides, lighting up the path to your front door reduces the
chances you will trip on a bush or other obstruction. The brief illumination also helps you
find your keys, unlock the door and get inside the home faster.
4) HVAC system
The intent of this item is to reduce ozone depletion. We changed the WPU’s HVAC
system from Central VAV Electric Residential Heat to Central VAV, HW Heat, Chiller 5.96
COP, and Boilers 84.5 eff. HVAC systems are classified as either self-contained unit packages
or as central systems. With central systems, the primary conversion from fuel such as gas or
electricity takes place in a central location, with some form of thermal energy distributed
throughout the building or facility.
Central systems are a combination of central supply subsystem and multiple end use
subsystems. There are many variations of combined central supply and end use zone
systems. The most frequently used combination is central hot and chilled water distributed
to multiple fan systems. The fan systems use water-to-air heat exchangers called coils to
provide hot and/or cold air for the controlled spaces. End-use subsystems can be fan
systems or terminal units. If the end use subsystems are fan systems, they can be single or
multiple zone type. The benefits of this HVAC system are below: 1) Maintain thermal
comfort conditions; 2) Maintain optimum indoor air quality; 3) Reduce energy use; 4) Safe
plant operation; 5) To reduce manpower costs; 6) Identify maintenance problems; 7)
Efficient plant operation to match the load; 8) Monitoring system performance.
 Conceptual Energy Analysis
Conceptual energy analysis is one way to perform energy analysis on conceptual
mass and building element models within design workflow. The energy analytical model
feature in Revit building design software provides tools for fast, flexible creation of models
for energy simulation. We can get whole building energy analysis results within Revit,
powered by Green Building Studio cloud-based energy analysis service. Green Building
Studio provides a wide variety of energy use data so that we can improve analysis quality
and find potential opportunities for energy savings.
With this analysis, owners can make sustainable design decisions early in the design
process. It also can gain insight into energy consumption and building lifecycle costs early in
the design process without disrupting workflow. Using Revit to do the conceptual energy
analysis. The energy analyze result not only show the energy performance of the building,
but also can compare the energy performance of multiple alternative designs. Often
comparing the construction cost to the lifecycle cost is an important metric for balancing
environmental design and construction. EUI, or energy use intensity, is a per-floor-area unit
of measurement that describes a building’s energy use by area. EUI represents the energy
8
consumed by a building relative to its size and as such can be informative when comparing
options of different sizes.
Total EUI sums these two and incorporates all transmission, delivery, and production
losses, thereby enabling a complete assessment of energy efficiency (Conceptual Energy
Analysis Results and Compare). We are also going to use the Tally and Green Building Studio
to acquire a basic energy simulation. Since we will do the conceptual analysis without
accurate data, we leave out some specific parts, like porches and elevator shaft. To do a
closer analyze, we don’t omit the glass roof because of the high cost of a roof. Instead, we
expand the glass roof to the whole podium building area to make up the parts that we
skipped.
Green Building Studio is another useful energy analysis software. It enables
architects and designers to perform whole building analysis, optimize energy consumption,
and work toward carbon-neutral building designs earlier in the process. Cloud-based
energy-efficiency software helps teams achieve sustainable building designs faster and more
accurately with powerful energy and carbon analysis tools. For every project located in the
United States, Green Building Studio provides an ENERGYSTAR score to compare the energy
efficiency of your design to similar energy-efficient buildings, including a LEED point
estimate for glazing factor and water credits. For this project, since the glass roof is set to
make up other skipped parts, the glass area is greater than 2%, which required by LEED that
project achieve a minimum glazing factor of 2% in a minimum of 75% of all regularly
occupied areas.
 Energy analysis for the original building
Before analyzing, it is necessary to define some words. First is the functional unit of
this project, it means the usable floor space of WPU. Then reference flow represents the
amount of material required to produce WPU designed in order to save more energy, over
the full life of the building. We assure that reference buildings are functionally equivalent in
terms of scope, size, and relevant performance of WPU. The LCA results in the report
represent an analysis of WPU. The object of study represents the complete architectural,
structural, and finish systems of WPU, and it is used to compare the relative contributions of
building systems to environmental impacts and for comparative study with one or more
reference buildings.
The analysis accounts for the full cradle-to-grave life cycle of WPU studied, including
material manufacturing, maintenance and replacement, and eventual end-of-life (disposal,
incineration, and/or recycling), the materials and energy used across all life cycle stages are
also included. Manufacturing includes cradle-to-gate manufacturing wherever possible. This
includes raw material extraction and processing, intermediate transportation, and final
manufacturing and assembly.
9
However, due to data limitations, some manufacturing steps have been excluded
such as the material and energy requirements for assembling doors and windows. The
manufacturing scope is listed for each entry, detailing any specific inclusions or exclusions
that fall outside of the cradle-to-gate scope. We analyze environmental impacts of WPU
from the following aspects: acidification potential (AP), eutrophication potential (EP), global
warming potential (GWP), ozone depletion potential (ODP), smog formation potential (SFP),
and primary energy demand (PED). Acidification potential refers to the emission of SO2.
The acidification potential is a measure of a molecule’s capacity to increase the hydrogen
ion (H+) concentration in the presence of water, thus decreasing the pH value. Potential
effects include fish mortality, forest decline, and the deterioration of building materials.
Eutrophication covers all potential impacts of excessively high levels of macronutrients, the
most important of which are nitrogen (N) and phosphorus (P). Nutrient enrichment may
cause an undesirable shift in species composition and elevated biomass production in both
aquatic and terrestrial ecosystems. In aquatic ecosystems increased biomass production
may lead to depressed oxygen levels, because of the additional consumption of oxygen in
biomass decomposition. Global warming potential refers to the greenhouse gas emissions,
such as CO2 and methane. These emissions are causing an increase in the absorption of
radiation emitted by the earth, increasing the natural greenhouse effect. This may in turn
have adverse impacts on ecosystemhealth, human health, and material welfare. The results
that Tally provides are based on different classification methods.
Through this figure, we can learn that the emission of SO2 is mostly caused by wood
and plastics, then caused by concrete; the emission of N is mostly caused by wood and
plastics; the emission of CO2 is caused by every materials averagely; the emission of CFC is
mostly caused by wood and plastics, then caused by concrete; the emission of O3 is mostly
caused by wood and plastics, than caused by concrete. As a result, it shows us wood and
plastics of WPU impact the environment greatly, then comes to the concrete.
10
Figure2 Tally per CSI Division, itemized by Material
 Analysis results of Green Building Studio(GBS)
GBS is a Web-based service provider on energy analysis of the building design. GBS
enables architects and engineers to perceive the energy impact prior to the actual
construction of the projected building. GBS is practical means of avoiding unnecessary
expenditure in energy consumption. So we used the GBS to compare the proposed model
with the baseline model to determine the anticipated energy cost savings. Figure 3 is
the baseline energy, carbon and cost summary of WPU.
Figure3 Baseline energy analysis of WPU
11
1) Energy cost Results of Roofing
After changing the roofing from traditional one to the Cool-Roof, we can easily find
that the annual energy cost, lifecycle cost decreased by 2.72% and 2.80% separately and
annual CO2 emission also decreased 84.2 tons per year. Besides, the electronic
consumption decreased by 2.76%. Figure 4 shows the details. The reason for the decreasing
is that the cool roof has the heat insulation effect, which can reduce the use of air condition.
As a consequence, both the emissions of CO2 and usage of electric will decrease. And figure
5 shows annual electric end use after changing the roof. From the chart, we can see that
misc. equipment and lights consumed relatively more electric.
Figure4 Energy analysis for alternative one-roofing
12
Figure5 Annual Electric end use for alternative one- roofing
2) Energy cost Results of glazing
Then we altered the glazing type. However, due to the size of windows in William
Pitt Union are not very large, the energy saving effect was limited and was not as obvious as
the effect of changing the roofing material. The annual energy costs decrease $1,542 after
doing this change. The most significant change is the annual usage of electric, it decreased
from 2,835,723 kWh per year to 2,819,733 kWh per year. Figure 5 and 6 shows the details of
these.
Figure6 Energy analysis for alternative two-glazing
13
Figure7 Annual Electric end use for alternative two-glazing
3) Energy cost Results of lighting
For the lighting, we found that the annual energy cost, lifecycle cost and annual CO2
emission decreased by less than 1%. Details shows on figure 7.
Figure8 Energy analysis for alternative three-lighting
4) Energy cost Results of HVAC system
Finally, we altered the HVAC. In this table, the annual energy cost, lifecycle cost
largely decreased by 18.97% and electronic in annual CO2 emission also reduced by 41.65%.
However, the onsite fuel increased significantly. Details show on figure8.
14
Figure9 Energy analysis for alternative four-HVAC
Figure10 Annual Electric end usefor alternative four-HVAC
Here we want to talk about the energy use intensity. The EUI is expressed as energy
per square foot per year. It’s calculated by dividing the total energy consumed by the
building in one year (measured in kBtu or GJ) by the total gross floor area of the building.
Generally, a low EUI signifies good energy performance. Figure 10 shows the details.
In electricity aspect, obviously, HVAC lead to the best energy performance due to the
low energy consumption for space heat. However, in natural gas aspect, we can see that
HVAC consumed a considerable energy for space heat. It leads to the intensity of fuel use in
a high level. Therefore, the total energy use of electricity and natural gas, cool roof- R 50,
15
shows a better energy performance. And HVAC consumed too much energy for space heat;
therefore, it reflects a disappointed energy performance.
4. Cost Plan
Much money will be spent to finish all these modifications. So, we used the data, like
the unit price of labor, materials from the website, and calculate the total cost to finish all
these works. Then we made a comparison between the total cost and the energy savings to
find out the results of this project and the credits that we will get. Table 1 shows the labor
costs to do the changings. Table 2 shows the material cost. Table 3 shows the total savings.
Labor Costs
Roof
Unit cost ($/h) Units Durations (hours) Total costs ($)
Labor 30 4 20 2400
Windows
Carpenter 45 6 40 10800
Lighting
Labor 30 5 35 5250
HVAC
Labor 30 4 48 5,760
Total Costs 24,210
Table 1 Labor Cost
Roof
Material Unit price ($/sq.ft) Quantity (sq) Total cost ($)
Original material
Steel-Insulation on metal
EPDM
2 16049 32098
Alternative material
Cool roof-R50 coutinuous ins.
Roof deck
3.5 16049 56171.5
Lighting
Material Unit price ($) Quantity(Num) Total cost ($)
Original material ordinary lightingcontrols 18 90 1620
Alternative material
Occupancy/Daylighting
sensors & controls
30 90 2700
Glazing
Material Unit price ($/sq.ft) Quantity (sq) Total cost ($)
Original material ordinary glazing 13 5,472 71136
Alternative material
Insulated Clear
Low-e Cold Climate
18 5,472 98496
HVAC system
Material Unit price ($) Quantity (sq) Total cost ($)
Original material
Central VAV Electric
Residential Heat
480 1 480
16
Table2: Material cost
Labor
cost($)
Material cost
($)
Annual energy cost
($)
Lifecycle cost ($)
Roof Original 0 32098 276,637 3,767,795
Alternative 2400 56171.5 269,105 3,665,211
Savings -2400 -24073.5 7532 102,584
Windows Original 0 71136 276,637 3,767,795
Alternative 9600 98496 275,095 3,746,800
Savings -9600 -27360 1542 20,995
Lighting Original 0 1620 276,637 3,767,795
Alternative 5250 2700 275,498 3,752,282
Savings -5250 -1080 1,139 15,513
HVAC Original 0 480 276,637 3,767,795
Alternative 5,760 569 224,156 3,052,998
Savings -5,760 89 52,481 714,797
Table 3: savings
So after changing all these, the annual energy cost can reduces $38,559. The labor
cost is $24,210.And the total cost of the material and devices increases $52,602.5. So it will
take almost 1 year to gain benefit from those changes (See equation 1).
Equation1:
52,513 .5+24,210
62,694
= 1.22
 Conclusions and Limitations
In this project, we used Revit to build the WPU model, Tally to analysis the original
building’s energy cost. Then, we choose the alternatives through the GBS software in order
to make WPU more environmental friendly. Then GBS made comparisons between the old
building and the new one. The results all came out automatic, like the energy consumption
and cost consumption. After we calculated the cost to change all these materials, we put all
these data together, followed by the LEED Reference Guide to score our project. Since we
just considered the energy and atmosphere of the LEED category, we just got 10 points of
LEED evaluation system(See equation 2).
Equation2:
276 ,637 −213 ,943
276 ,637
= 22.66%
5. Limitations
There are some limitations of our project. Firstly, transportation requirements
between the manufacturer and installation or use of the product, and at the end-of-life of
the product, are excluded from this report. Secondly, infrastructure required for the
manufacturing and assembly of building materials, as well as packaging materials, is not
Alternative material
Central VAV,
HW Heat, Chiller
569 1 569
17
included and are considered outside the scope of assessment. So the analysis of WPU is not
so comprehensive and there still a lot can be improved.
18
Bibliography
About the Pittsburgh 2030 District. (n.d.). Retrieved from Pittsburgh 2030 District:
http://www.2030districts.org/pittsburgh/about
Auroras. (2014, 01 17). Pittsburgh 2030 District Energy Baseline Finalized! . Retrieved from
Pittsburgh 2030 District : w.2030districts.org/pittsburgh/news/pittsburgh-2030-district-
energy-baseline-finalized
Pittsburgh 2030 District Team . (2013). PITTSBURGH 2030 DISTRICT ENERGY BASELINE .
Pittsburgh: Pittsburgh 2030 District.
Seattle 2030 District. (2007). Dexter Horton Building Statistics. Seattle.
Blake, Sharon S. (August 20, 2013). "Changing Spaces: WilliamPitt Union Eatery and
Litchfield Towers Food Court Get Facelifts". Pitt Chronicle (Pittsburgh, PA: University of
Pittsburgh). Retrieved August 26, 2013.
"Hotel Schenley - associated architects, engineers, etc. - Philadelphia Architects and
Buildings". Philadelphiabuildings.org. Retrieved 2014-02-03.
"Pittsburgh History and Landmarks Foundation: PHLF Plaques & Registries". 2007-01-27.
Archived from the original on 2007-01-27. Retrieved 2009-07-10.
"Pitt photo tour: WilliamPitt Union". University of Pittsburgh. Retrieved 2010-10-06.

More Related Content

What's hot

James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009jelser4228
 
Northern Illinois University_Cole Hall2 CHI cs
Northern Illinois University_Cole Hall2 CHI csNorthern Illinois University_Cole Hall2 CHI cs
Northern Illinois University_Cole Hall2 CHI csMonica LaBrot
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalChris Humphries
 
Southeast Quadrant Bailey's Demolition
Southeast Quadrant Bailey's DemolitionSoutheast Quadrant Bailey's Demolition
Southeast Quadrant Bailey's DemolitionFairfax County
 
Lane Miles Standish Redevelopment Top Project 2008
Lane Miles Standish Redevelopment Top Project 2008Lane Miles Standish Redevelopment Top Project 2008
Lane Miles Standish Redevelopment Top Project 2008Chris Humphries
 
Architecture eNews #1 - #5
Architecture eNews #1 - #5Architecture eNews #1 - #5
Architecture eNews #1 - #5unionsquare
 
Jefferson Fire Station #18
Jefferson Fire Station #18Jefferson Fire Station #18
Jefferson Fire Station #18Fairfax County
 
Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAlfred Socias
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction OverviewLeah Blackman
 
Construction portfolio pdf 7-9-09
Construction portfolio   pdf 7-9-09Construction portfolio   pdf 7-9-09
Construction portfolio pdf 7-9-09LisaSnyder
 
Sample Of Work - Drafting Portfolio
Sample Of Work - Drafting PortfolioSample Of Work - Drafting Portfolio
Sample Of Work - Drafting PortfolioBryon Kunz
 
Hencken & Gaines Portfolio of Building Projects in Maryland
Hencken & Gaines Portfolio of Building Projects in MarylandHencken & Gaines Portfolio of Building Projects in Maryland
Hencken & Gaines Portfolio of Building Projects in MarylandThomas Gaines
 

What's hot (20)

James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009
 
Northern Illinois University_Cole Hall2 CHI cs
Northern Illinois University_Cole Hall2 CHI csNorthern Illinois University_Cole Hall2 CHI cs
Northern Illinois University_Cole Hall2 CHI cs
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
 
02 Chicago Teaming Presentation Part 2
02 Chicago Teaming Presentation Part 202 Chicago Teaming Presentation Part 2
02 Chicago Teaming Presentation Part 2
 
Southeast Quadrant Bailey's Demolition
Southeast Quadrant Bailey's DemolitionSoutheast Quadrant Bailey's Demolition
Southeast Quadrant Bailey's Demolition
 
Lane Miles Standish Redevelopment Top Project 2008
Lane Miles Standish Redevelopment Top Project 2008Lane Miles Standish Redevelopment Top Project 2008
Lane Miles Standish Redevelopment Top Project 2008
 
Project list
Project listProject list
Project list
 
Salt Lake Costume Project (1701 S 1100 E)
Salt Lake Costume Project (1701 S 1100 E)Salt Lake Costume Project (1701 S 1100 E)
Salt Lake Costume Project (1701 S 1100 E)
 
Item #7 111 Redwood
Item #7   111 RedwoodItem #7   111 Redwood
Item #7 111 Redwood
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010
 
Architecture eNews #1 - #5
Architecture eNews #1 - #5Architecture eNews #1 - #5
Architecture eNews #1 - #5
 
Jefferson Fire Station #18
Jefferson Fire Station #18Jefferson Fire Station #18
Jefferson Fire Station #18
 
Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - Commercial
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction Overview
 
Construction portfolio pdf 7-9-09
Construction portfolio   pdf 7-9-09Construction portfolio   pdf 7-9-09
Construction portfolio pdf 7-9-09
 
Case Study 2- June 14Ro 2016
Case Study 2-  June 14Ro  2016Case Study 2-  June 14Ro  2016
Case Study 2- June 14Ro 2016
 
Sample Of Work - Drafting Portfolio
Sample Of Work - Drafting PortfolioSample Of Work - Drafting Portfolio
Sample Of Work - Drafting Portfolio
 
Park hill fire station & water co script 2009
Park hill fire station & water co script 2009Park hill fire station & water co script 2009
Park hill fire station & water co script 2009
 
Hencken & Gaines Portfolio of Building Projects in Maryland
Hencken & Gaines Portfolio of Building Projects in MarylandHencken & Gaines Portfolio of Building Projects in Maryland
Hencken & Gaines Portfolio of Building Projects in Maryland
 

Viewers also liked

The French and Indian War
The French and Indian WarThe French and Indian War
The French and Indian WarPhilsfan
 
The French and Indian War
The French and Indian WarThe French and Indian War
The French and Indian Warjohnspicer
 
The French And Indian War
The French And Indian WarThe French And Indian War
The French And Indian Warmmisuraca
 
The Seven Years War
The Seven Years WarThe Seven Years War
The Seven Years WarTracey Ellis
 
French and Indian War 1754 1763
French and Indian War 1754 1763French and Indian War 1754 1763
French and Indian War 1754 1763Santiago Betancur
 

Viewers also liked (7)

French and indian war
French and indian warFrench and indian war
French and indian war
 
The French and Indian War
The French and Indian WarThe French and Indian War
The French and Indian War
 
The French and Indian War
The French and Indian WarThe French and Indian War
The French and Indian War
 
The French And Indian War
The French And Indian WarThe French And Indian War
The French And Indian War
 
French and Indian War
French and Indian War French and Indian War
French and Indian War
 
The Seven Years War
The Seven Years WarThe Seven Years War
The Seven Years War
 
French and Indian War 1754 1763
French and Indian War 1754 1763French and Indian War 1754 1763
French and Indian War 1754 1763
 

Similar to William Pitt Union Energy Improvement Report

Living Laboratory Final Report
Living Laboratory Final ReportLiving Laboratory Final Report
Living Laboratory Final ReportDejia Kong
 
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...Armani Ferdaous
 
Case study on Bank of America Tower, KUET BECM 2k15.
Case study on Bank of America Tower, KUET BECM 2k15.Case study on Bank of America Tower, KUET BECM 2k15.
Case study on Bank of America Tower, KUET BECM 2k15.Arafat Akash
 
End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module Jonathan Flanagan
 
Impacts of Sustainable Design - Quentin Torbert
Impacts of Sustainable Design - Quentin TorbertImpacts of Sustainable Design - Quentin Torbert
Impacts of Sustainable Design - Quentin TorbertQuin T
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Centeraiahouston
 
AA Project 1: Presentation Slide
AA Project 1: Presentation SlideAA Project 1: Presentation Slide
AA Project 1: Presentation SlideBahirah Rahman
 
Greening What's Already Here
Greening What's Already HereGreening What's Already Here
Greening What's Already Hereaiahouston
 
W Palmer Portfolio
W Palmer  PortfolioW Palmer  Portfolio
W Palmer Portfoliobillp511
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportNgo Quan
 
046-057_Monterey Bay
046-057_Monterey Bay046-057_Monterey Bay
046-057_Monterey BayJeff Blaevoet
 
The Cotocon Group Case Studies
The Cotocon Group Case Studies The Cotocon Group Case Studies
The Cotocon Group Case Studies Jimmy Carchietta
 

Similar to William Pitt Union Energy Improvement Report (20)

The bullitt center
The bullitt centerThe bullitt center
The bullitt center
 
Green leed projects
Green leed projectsGreen leed projects
Green leed projects
 
Green building prepared eh
Green building prepared ehGreen building prepared eh
Green building prepared eh
 
Living Laboratory Final Report
Living Laboratory Final ReportLiving Laboratory Final Report
Living Laboratory Final Report
 
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
 
Case study on Bank of America Tower, KUET BECM 2k15.
Case study on Bank of America Tower, KUET BECM 2k15.Case study on Bank of America Tower, KUET BECM 2k15.
Case study on Bank of America Tower, KUET BECM 2k15.
 
End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module
 
Impacts of Sustainable Design - Quentin Torbert
Impacts of Sustainable Design - Quentin TorbertImpacts of Sustainable Design - Quentin Torbert
Impacts of Sustainable Design - Quentin Torbert
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
 
AA Project 1: Presentation Slide
AA Project 1: Presentation SlideAA Project 1: Presentation Slide
AA Project 1: Presentation Slide
 
WTP4 Maintenance Building - LEED Report
WTP4 Maintenance Building - LEED ReportWTP4 Maintenance Building - LEED Report
WTP4 Maintenance Building - LEED Report
 
Greening What's Already Here
Greening What's Already HereGreening What's Already Here
Greening What's Already Here
 
Workfolio
WorkfolioWorkfolio
Workfolio
 
Sustainibility Report
Sustainibility ReportSustainibility Report
Sustainibility Report
 
W Palmer Portfolio
W Palmer  PortfolioW Palmer  Portfolio
W Palmer Portfolio
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY report
 
046-057_Monterey Bay
046-057_Monterey Bay046-057_Monterey Bay
046-057_Monterey Bay
 
Kanika Arora Sharma_Harvard GSD_Portfolio
Kanika Arora Sharma_Harvard GSD_PortfolioKanika Arora Sharma_Harvard GSD_Portfolio
Kanika Arora Sharma_Harvard GSD_Portfolio
 
Greenroof
GreenroofGreenroof
Greenroof
 
The Cotocon Group Case Studies
The Cotocon Group Case Studies The Cotocon Group Case Studies
The Cotocon Group Case Studies
 

More from Dejia Kong

Practice Project
Practice ProjectPractice Project
Practice ProjectDejia Kong
 
☀Kong Dejia Resume
☀Kong Dejia Resume☀Kong Dejia Resume
☀Kong Dejia ResumeDejia Kong
 
Practice Project
Practice ProjectPractice Project
Practice ProjectDejia Kong
 
☀Kong Dejia Resume
☀Kong Dejia Resume☀Kong Dejia Resume
☀Kong Dejia ResumeDejia Kong
 
☀Kong Dejia Resume
☀Kong Dejia Resume☀Kong Dejia Resume
☀Kong Dejia ResumeDejia Kong
 
Life Cycle Assessment final report
Life Cycle Assessment final reportLife Cycle Assessment final report
Life Cycle Assessment final reportDejia Kong
 

More from Dejia Kong (7)

Cover letter
Cover letterCover letter
Cover letter
 
Practice Project
Practice ProjectPractice Project
Practice Project
 
☀Kong Dejia Resume
☀Kong Dejia Resume☀Kong Dejia Resume
☀Kong Dejia Resume
 
Practice Project
Practice ProjectPractice Project
Practice Project
 
☀Kong Dejia Resume
☀Kong Dejia Resume☀Kong Dejia Resume
☀Kong Dejia Resume
 
☀Kong Dejia Resume
☀Kong Dejia Resume☀Kong Dejia Resume
☀Kong Dejia Resume
 
Life Cycle Assessment final report
Life Cycle Assessment final reportLife Cycle Assessment final report
Life Cycle Assessment final report
 

William Pitt Union Energy Improvement Report

  • 1. 1 Case study: William Pitt Union—Energy and Atmosphere Graduate Group 3 Dejia Kong Wanting Jiang Liying Yin Yazheng Song Yaning Liu 4/20/2014
  • 2. 2 1. Description and requirement of 2030 DISTRICT The Pittsburgh 2030 District is a collaborative community of high performance buildings in Downtown Pittsburgh working towards 50% reductions in energy use, water use, and transportation emission and with new construction reaching carbon neutrality by the year 2030 (Pittsburgh 2030 District Team , 2013). In order to reach these 50% reduction goals, The Pittsburgh 2030 has sets baselines for each reduction category. For energy part, which matters to our project the most, they use Environmental Protection Agency’s (EPA) Energy Star Portfolio Manager tool, which based on 2003 Commercial Building Energy Consumption Survey (CBECS) data as their measuring tools for reduction goals. Specific information such as location, space use profile, and number of regular occupants, operating hours, and other parameters are being included during the measuring process.  Case studies under 2030 District We found two successful cases in Seattle 2030 District that has some similarities with our project; we set them as our study cases. 1) The Dexter Horton The Dexter Horton building is a historic landmark located in the core of downtown Seattle, it was built in 1922, which has a similar history span with WilliamPitt Union. In order to make efficiency improvements, the building management team started their renovations in 2006. Within one year of implementing retrofits, the Dexter Horton building jumped from an energy rating of 60 to 78 and is currently holding a rating of 96 and got LEED-EB Gold Certification (Seattle 2030 District, 2007). Innovative Measures include motion and occupancy light sensors in stairwells, variable frequency drive air conditioning, install heat exchanger and ongoing energy commissioning. The first three methods will also be utilized in our project. 2) Joseph Vance Building The Joseph Vance Building was built in 1929 in downtown Seattle, also has a similar history span with WilliamPitt Union. Since the Rose Smart Growth Investment Fund acquired this building in 2006, the Fund has made significant investments in renovating the buildings to improve energy efficiency and environmental performance. Through the reconstruction, the Vance Building achieved LEED-EB Gold certification and already exceeds the 2030 energy goal. Innovative Measures used in this building include energy Star rated reflective roof system, restoration of operable windows, mecco shades and light shelves,
  • 3. 3 weather stripping, all lighting fixtures updated with high efficiency fixtures, commissioning of steam system, replacement of steam traps, local temperature control valves at radiators, new mechanical ventilation systems in corridors 2. William Pitt Union background The WilliamPitt Union, which was created as the Schenley Hotel in 1898, was now changed into the student union building of the University of Pittsburgh. Schenley Hotel designed by architects Rutan&Russell. The entrepreneur Franklin Nocola and his first stockholders erected the beaux-arts structure on land. Schenley Hotel was the first large, steel-framed hotel in Pittsburgh. Then it was sold to the University of Pittsburgh in 1956 and underwent a $1million ($8.67 million in 2014 dollars) renovation to convert it to university use. The top four floors served as a men’s dormitory called Schenley House, the rest of the floors served as a student union named Schenley Hall. After that, the Schenley Hall ballroom in the Union was the site of a luncheon for Nikita Khrushchev, chairman of the Soviet Union, and various Soviet and U.S. officials during the height of the cold war in September 1959. In 1980, the University of Pittsburgh spent a $ 13.9 million ($39.8 million in 2014 dollars) renovation and restoration for the Union because the increasing population of the student. The duration of this project is 18-month and led by Williams Trebilcock Whitehead. Seven upper floors served as modern offices for students and the student affairs administration. The 10th floor, which had been added several years after the hotel was first built, was removed to relieve stress on the building. The turn-of-the-century character of the main floor was restored through careful restoration of the Louis XV mirrored ballroom, the lower lounge that had enclosed the original Bigelow Boulevard-side porch 13 years after the hotel was originally built, and the marbled-wall former hotel lobby, now called the Tansky Family Lounge. Moreover, the basement was transformed into a functional lower level with a new Forbes Avenue Entrance and plaza. The original wooden hotel room doors salvage from the upstairs renovationswere used for the walls of the lower level student recreation room, now called "Nordy's Place". Further, a third west entrance facing the university's Schenley Quadrangle and Litchfield Tower dormitories was added and included a new multi-level glass roofed atrium just inside the new entrance. The renovations were completed in 1983 and the building was renamed the WilliamPitt Union. Now the WilliamPitt Union serves as the student union and hub of the University of Pittsburgh and includes a variety of lounges, ballrooms, reception, performance, and meeting spaces. In 2007, the recreation room on the ground floor of the union was renovated and by resolution of the Pitt Student Government Board in December 2007, was named "Nordy's Place" in honor of Chancellor Mark Nordenberg whom the board resolved was a student favorite and worthy of the honor.
  • 4. 4 In 2009, renovations to the second floor improved the accommodations of the student careers center and renovations to the fifth floor provided six new meeting spaces for student organizations. Moreover, a formal area was created where student organizations can host special events such as workshops and award presentations. In 2010, a $2 million project was undertaken to renovate 9,200 square feet (850 m2) of space on the ninth floor and created a new student study and lounge area, a 20-person conference room, a kitchen/coffee area, file/storage areas, and new offices for Residence Life, and Pitt Arts, and Student Volunteer Outreach. A $1.93 million renovation of the Assembly Room included uncovering three large windows to allow in natural light, a stage extension and technology upgrades. Moreover, a $390,000 renovation of first floor restrooms and $1.85 million renovation of the lower levels of the union included its food court and dining spaces. All of these renovations were completed in 2013. 3. Project description and goals Our primary object of this project is to change the WilliamPitt Union into a more environmental friendly building. By doing so, we will make several modifications based on the existing building. And the whole process will follow the LEED—Energy and atmosphere step by step with a special focus on prerequisite: minimum energy performance and also credit2: optimize energy performance. After finishing all the changes by using Revit, Green Building Studio and Tally, we are going to make a cost plan in order to find out the total savings for the building and analysis the impacts of these changes.  LEED Analysis Energy efficiency in a green building starts with a focus on design that reduces overall energy needs, such as building orientation and glazing selection, and the choice of climate-appropriate building materials. Strategies such as passive heating and cooling, natural ventilation, and high-efficiency HVAC systems partnered with smart controls further reduce a building’s energy use. We did the step-by-step guidance for prerequisite credit. First, we determine Pittsburgh Climate Zone 5A from ASHRAE APPENDIX B; and then, we review and address ASHRAE mandatory requirements and set up our baseline model by using Revit. After that, we set our energy saving target as 20% comparing with the 50% reduction for 2030 District since we do not include water usage and transportation factors in our case, so we think 20% reduction is a reasonable number. The last step is by following the flowchart in the LEED reference guide, we select Option 1—whole-building energy simulation as our final option.
  • 5. 5  Modeling First of all, we built the model of WilliamPitt Union (Figure 1) by using the Revit software based on the information that got from the building manager and our own investigation. Since we are not permitted to get the data of the WPU so what we have now are just building area and the HVAC system. The building is 10 stories above grade with 178,726 sq. area. The heating systemis hot water perimeter through a 4 pipe systemon floors 1 through 9. The main floor and lower levels are steam heat and chilled water. We consider all exterior windows and doors into account to make sure that the estimate be more realistic. Then we adjust the location to the exact location of WPU, WilliamPitt Union, Forbes Avenue, Pittsburgh, PA 15213. By doing so, it guarantees that all the energy and cost analysis are based on the real situation of Pittsburgh.  Pre-design/Planning To improve the performance of the WPU and to meet the requirements for LEED rating system, we used a Design-Build process. Considering the practical situation of WilliamPitt Union and the information that we can get, we just analyzed and improved one aspect of the building: energy and atmosphere and the alternatives that we decided to change are roofing, glazing, lighting and HVAC system. 1) Roofing We decided to use the Cool Roof - R50 continuous ins. over roof deck. Cool roofs are highly reflective and emissive, which means they reflect sunlight and reradiate absorbed heat as light energy back to the atmosphere, rather than transferring absorbed heat to the building below. However, traditional dark roofs do not reflect light and emit heat, so heat is easily absorbed by the roof and penetrates through to the building interior, increasing cooling costs. So, by using cool roof, it can reduce cooling load during hot summer months and equate to substantial annual energy and cost savings. Cool roofs, through mitigation of the urban heat island effect and reduction of ambient air temperatures, in turn improve air quality. Smog is created by photochemical reactions of air pollutants and these reactions increase at higher temperatures. Therefore, Figure1 Model of William Pitt Union
  • 6. 6 by reducing the air temperature, cool roofs decrease the rate of smog formation. Cool roofs directly reduce the air conditioning use for buildings by reducing heat gain in the building below, but they also indirectly reduce air conditioning use in urban areas by helping lower ambient air temperatures. Therefore, with cooler daytime temperatures, buildings and vehicles use less air conditioning and save additional energy. In turn, this results in a reduction in the CO2 emissions from electricity generating power plants. What’s more, Cities can be 2° to 8°F warmer than surrounding areas due to dark materials, including roofs, which absorb the sun’s light energy as heat during the day and release it at night as heat.3 This phenomenon removes the opportunity for air to cool down at night and results in higher temperatures being maintained longer. By immediately reflecting solar radiation back into the atmosphere and reemitting some portion of it as infrared light, cool roofs result in cooler air temperatures for the surrounding urban environment during hot summer months. 2) Glazing Considering the weather condition of Pittsburgh, we decided to apply the insulated Clear Low-e (Low-emissive) Cold Climate material to the windows. A low-e glass window (which stands for low emissivity) is simply a windowpane coated in microscopic layers of metallic oxides. The coating appears invisible to the naked eye, allowing as much natural light into the house as possible. Windows treated with Low-e coatings are proven to reduce energy consumption, decrease fading of fabrics, such as window treatments, and increase overall comfort in your home. Since Pittsburgh’s winter is long and cold, we think by using low-e glass windows, it can help keep the room warm and reduce the usage of electric. Even if windows manufactured with low-e coatings typically cost about 10 to 15 percent more than regular windows, they reduce energy loss by as much as 30 to 50 percent. Furthermore, this improvement in the building envelope—particularly when coupled with other strategies that improve the efficiency of the building envelope—ultimately impacts the demands of building HVAC systems. These benefits should be included in evaluating the lifecycle costs of installing efficient windows. 3) Lighting For several parts of the building, like the restrooms, there is no need to turn on the lights all day. So we are considering using occupancy sensors during renovations. Sensors are considered most suitable when the space is intermittently occupied, meaning it is unoccupied for two or more hours per day, and where the lights are typically left on when the space is unoccupied. Appropriate applications include offices, classrooms, copy rooms, restrooms, storage areas, conference rooms, warehouses, break rooms, corridors, filing areas, and other spaces. There are several benefits of using the sensors. First, less energy is wasted with motion sensors because the light turns off after a short period of time. Since
  • 7. 7 they do not run continually, the bulbs will burn out less frequently in a motion sensor light than in a traditional fixture. Besides, lighting up the path to your front door reduces the chances you will trip on a bush or other obstruction. The brief illumination also helps you find your keys, unlock the door and get inside the home faster. 4) HVAC system The intent of this item is to reduce ozone depletion. We changed the WPU’s HVAC system from Central VAV Electric Residential Heat to Central VAV, HW Heat, Chiller 5.96 COP, and Boilers 84.5 eff. HVAC systems are classified as either self-contained unit packages or as central systems. With central systems, the primary conversion from fuel such as gas or electricity takes place in a central location, with some form of thermal energy distributed throughout the building or facility. Central systems are a combination of central supply subsystem and multiple end use subsystems. There are many variations of combined central supply and end use zone systems. The most frequently used combination is central hot and chilled water distributed to multiple fan systems. The fan systems use water-to-air heat exchangers called coils to provide hot and/or cold air for the controlled spaces. End-use subsystems can be fan systems or terminal units. If the end use subsystems are fan systems, they can be single or multiple zone type. The benefits of this HVAC system are below: 1) Maintain thermal comfort conditions; 2) Maintain optimum indoor air quality; 3) Reduce energy use; 4) Safe plant operation; 5) To reduce manpower costs; 6) Identify maintenance problems; 7) Efficient plant operation to match the load; 8) Monitoring system performance.  Conceptual Energy Analysis Conceptual energy analysis is one way to perform energy analysis on conceptual mass and building element models within design workflow. The energy analytical model feature in Revit building design software provides tools for fast, flexible creation of models for energy simulation. We can get whole building energy analysis results within Revit, powered by Green Building Studio cloud-based energy analysis service. Green Building Studio provides a wide variety of energy use data so that we can improve analysis quality and find potential opportunities for energy savings. With this analysis, owners can make sustainable design decisions early in the design process. It also can gain insight into energy consumption and building lifecycle costs early in the design process without disrupting workflow. Using Revit to do the conceptual energy analysis. The energy analyze result not only show the energy performance of the building, but also can compare the energy performance of multiple alternative designs. Often comparing the construction cost to the lifecycle cost is an important metric for balancing environmental design and construction. EUI, or energy use intensity, is a per-floor-area unit of measurement that describes a building’s energy use by area. EUI represents the energy
  • 8. 8 consumed by a building relative to its size and as such can be informative when comparing options of different sizes. Total EUI sums these two and incorporates all transmission, delivery, and production losses, thereby enabling a complete assessment of energy efficiency (Conceptual Energy Analysis Results and Compare). We are also going to use the Tally and Green Building Studio to acquire a basic energy simulation. Since we will do the conceptual analysis without accurate data, we leave out some specific parts, like porches and elevator shaft. To do a closer analyze, we don’t omit the glass roof because of the high cost of a roof. Instead, we expand the glass roof to the whole podium building area to make up the parts that we skipped. Green Building Studio is another useful energy analysis software. It enables architects and designers to perform whole building analysis, optimize energy consumption, and work toward carbon-neutral building designs earlier in the process. Cloud-based energy-efficiency software helps teams achieve sustainable building designs faster and more accurately with powerful energy and carbon analysis tools. For every project located in the United States, Green Building Studio provides an ENERGYSTAR score to compare the energy efficiency of your design to similar energy-efficient buildings, including a LEED point estimate for glazing factor and water credits. For this project, since the glass roof is set to make up other skipped parts, the glass area is greater than 2%, which required by LEED that project achieve a minimum glazing factor of 2% in a minimum of 75% of all regularly occupied areas.  Energy analysis for the original building Before analyzing, it is necessary to define some words. First is the functional unit of this project, it means the usable floor space of WPU. Then reference flow represents the amount of material required to produce WPU designed in order to save more energy, over the full life of the building. We assure that reference buildings are functionally equivalent in terms of scope, size, and relevant performance of WPU. The LCA results in the report represent an analysis of WPU. The object of study represents the complete architectural, structural, and finish systems of WPU, and it is used to compare the relative contributions of building systems to environmental impacts and for comparative study with one or more reference buildings. The analysis accounts for the full cradle-to-grave life cycle of WPU studied, including material manufacturing, maintenance and replacement, and eventual end-of-life (disposal, incineration, and/or recycling), the materials and energy used across all life cycle stages are also included. Manufacturing includes cradle-to-gate manufacturing wherever possible. This includes raw material extraction and processing, intermediate transportation, and final manufacturing and assembly.
  • 9. 9 However, due to data limitations, some manufacturing steps have been excluded such as the material and energy requirements for assembling doors and windows. The manufacturing scope is listed for each entry, detailing any specific inclusions or exclusions that fall outside of the cradle-to-gate scope. We analyze environmental impacts of WPU from the following aspects: acidification potential (AP), eutrophication potential (EP), global warming potential (GWP), ozone depletion potential (ODP), smog formation potential (SFP), and primary energy demand (PED). Acidification potential refers to the emission of SO2. The acidification potential is a measure of a molecule’s capacity to increase the hydrogen ion (H+) concentration in the presence of water, thus decreasing the pH value. Potential effects include fish mortality, forest decline, and the deterioration of building materials. Eutrophication covers all potential impacts of excessively high levels of macronutrients, the most important of which are nitrogen (N) and phosphorus (P). Nutrient enrichment may cause an undesirable shift in species composition and elevated biomass production in both aquatic and terrestrial ecosystems. In aquatic ecosystems increased biomass production may lead to depressed oxygen levels, because of the additional consumption of oxygen in biomass decomposition. Global warming potential refers to the greenhouse gas emissions, such as CO2 and methane. These emissions are causing an increase in the absorption of radiation emitted by the earth, increasing the natural greenhouse effect. This may in turn have adverse impacts on ecosystemhealth, human health, and material welfare. The results that Tally provides are based on different classification methods. Through this figure, we can learn that the emission of SO2 is mostly caused by wood and plastics, then caused by concrete; the emission of N is mostly caused by wood and plastics; the emission of CO2 is caused by every materials averagely; the emission of CFC is mostly caused by wood and plastics, then caused by concrete; the emission of O3 is mostly caused by wood and plastics, than caused by concrete. As a result, it shows us wood and plastics of WPU impact the environment greatly, then comes to the concrete.
  • 10. 10 Figure2 Tally per CSI Division, itemized by Material  Analysis results of Green Building Studio(GBS) GBS is a Web-based service provider on energy analysis of the building design. GBS enables architects and engineers to perceive the energy impact prior to the actual construction of the projected building. GBS is practical means of avoiding unnecessary expenditure in energy consumption. So we used the GBS to compare the proposed model with the baseline model to determine the anticipated energy cost savings. Figure 3 is the baseline energy, carbon and cost summary of WPU. Figure3 Baseline energy analysis of WPU
  • 11. 11 1) Energy cost Results of Roofing After changing the roofing from traditional one to the Cool-Roof, we can easily find that the annual energy cost, lifecycle cost decreased by 2.72% and 2.80% separately and annual CO2 emission also decreased 84.2 tons per year. Besides, the electronic consumption decreased by 2.76%. Figure 4 shows the details. The reason for the decreasing is that the cool roof has the heat insulation effect, which can reduce the use of air condition. As a consequence, both the emissions of CO2 and usage of electric will decrease. And figure 5 shows annual electric end use after changing the roof. From the chart, we can see that misc. equipment and lights consumed relatively more electric. Figure4 Energy analysis for alternative one-roofing
  • 12. 12 Figure5 Annual Electric end use for alternative one- roofing 2) Energy cost Results of glazing Then we altered the glazing type. However, due to the size of windows in William Pitt Union are not very large, the energy saving effect was limited and was not as obvious as the effect of changing the roofing material. The annual energy costs decrease $1,542 after doing this change. The most significant change is the annual usage of electric, it decreased from 2,835,723 kWh per year to 2,819,733 kWh per year. Figure 5 and 6 shows the details of these. Figure6 Energy analysis for alternative two-glazing
  • 13. 13 Figure7 Annual Electric end use for alternative two-glazing 3) Energy cost Results of lighting For the lighting, we found that the annual energy cost, lifecycle cost and annual CO2 emission decreased by less than 1%. Details shows on figure 7. Figure8 Energy analysis for alternative three-lighting 4) Energy cost Results of HVAC system Finally, we altered the HVAC. In this table, the annual energy cost, lifecycle cost largely decreased by 18.97% and electronic in annual CO2 emission also reduced by 41.65%. However, the onsite fuel increased significantly. Details show on figure8.
  • 14. 14 Figure9 Energy analysis for alternative four-HVAC Figure10 Annual Electric end usefor alternative four-HVAC Here we want to talk about the energy use intensity. The EUI is expressed as energy per square foot per year. It’s calculated by dividing the total energy consumed by the building in one year (measured in kBtu or GJ) by the total gross floor area of the building. Generally, a low EUI signifies good energy performance. Figure 10 shows the details. In electricity aspect, obviously, HVAC lead to the best energy performance due to the low energy consumption for space heat. However, in natural gas aspect, we can see that HVAC consumed a considerable energy for space heat. It leads to the intensity of fuel use in a high level. Therefore, the total energy use of electricity and natural gas, cool roof- R 50,
  • 15. 15 shows a better energy performance. And HVAC consumed too much energy for space heat; therefore, it reflects a disappointed energy performance. 4. Cost Plan Much money will be spent to finish all these modifications. So, we used the data, like the unit price of labor, materials from the website, and calculate the total cost to finish all these works. Then we made a comparison between the total cost and the energy savings to find out the results of this project and the credits that we will get. Table 1 shows the labor costs to do the changings. Table 2 shows the material cost. Table 3 shows the total savings. Labor Costs Roof Unit cost ($/h) Units Durations (hours) Total costs ($) Labor 30 4 20 2400 Windows Carpenter 45 6 40 10800 Lighting Labor 30 5 35 5250 HVAC Labor 30 4 48 5,760 Total Costs 24,210 Table 1 Labor Cost Roof Material Unit price ($/sq.ft) Quantity (sq) Total cost ($) Original material Steel-Insulation on metal EPDM 2 16049 32098 Alternative material Cool roof-R50 coutinuous ins. Roof deck 3.5 16049 56171.5 Lighting Material Unit price ($) Quantity(Num) Total cost ($) Original material ordinary lightingcontrols 18 90 1620 Alternative material Occupancy/Daylighting sensors & controls 30 90 2700 Glazing Material Unit price ($/sq.ft) Quantity (sq) Total cost ($) Original material ordinary glazing 13 5,472 71136 Alternative material Insulated Clear Low-e Cold Climate 18 5,472 98496 HVAC system Material Unit price ($) Quantity (sq) Total cost ($) Original material Central VAV Electric Residential Heat 480 1 480
  • 16. 16 Table2: Material cost Labor cost($) Material cost ($) Annual energy cost ($) Lifecycle cost ($) Roof Original 0 32098 276,637 3,767,795 Alternative 2400 56171.5 269,105 3,665,211 Savings -2400 -24073.5 7532 102,584 Windows Original 0 71136 276,637 3,767,795 Alternative 9600 98496 275,095 3,746,800 Savings -9600 -27360 1542 20,995 Lighting Original 0 1620 276,637 3,767,795 Alternative 5250 2700 275,498 3,752,282 Savings -5250 -1080 1,139 15,513 HVAC Original 0 480 276,637 3,767,795 Alternative 5,760 569 224,156 3,052,998 Savings -5,760 89 52,481 714,797 Table 3: savings So after changing all these, the annual energy cost can reduces $38,559. The labor cost is $24,210.And the total cost of the material and devices increases $52,602.5. So it will take almost 1 year to gain benefit from those changes (See equation 1). Equation1: 52,513 .5+24,210 62,694 = 1.22  Conclusions and Limitations In this project, we used Revit to build the WPU model, Tally to analysis the original building’s energy cost. Then, we choose the alternatives through the GBS software in order to make WPU more environmental friendly. Then GBS made comparisons between the old building and the new one. The results all came out automatic, like the energy consumption and cost consumption. After we calculated the cost to change all these materials, we put all these data together, followed by the LEED Reference Guide to score our project. Since we just considered the energy and atmosphere of the LEED category, we just got 10 points of LEED evaluation system(See equation 2). Equation2: 276 ,637 −213 ,943 276 ,637 = 22.66% 5. Limitations There are some limitations of our project. Firstly, transportation requirements between the manufacturer and installation or use of the product, and at the end-of-life of the product, are excluded from this report. Secondly, infrastructure required for the manufacturing and assembly of building materials, as well as packaging materials, is not Alternative material Central VAV, HW Heat, Chiller 569 1 569
  • 17. 17 included and are considered outside the scope of assessment. So the analysis of WPU is not so comprehensive and there still a lot can be improved.
  • 18. 18 Bibliography About the Pittsburgh 2030 District. (n.d.). Retrieved from Pittsburgh 2030 District: http://www.2030districts.org/pittsburgh/about Auroras. (2014, 01 17). Pittsburgh 2030 District Energy Baseline Finalized! . Retrieved from Pittsburgh 2030 District : w.2030districts.org/pittsburgh/news/pittsburgh-2030-district- energy-baseline-finalized Pittsburgh 2030 District Team . (2013). PITTSBURGH 2030 DISTRICT ENERGY BASELINE . Pittsburgh: Pittsburgh 2030 District. Seattle 2030 District. (2007). Dexter Horton Building Statistics. Seattle. Blake, Sharon S. (August 20, 2013). "Changing Spaces: WilliamPitt Union Eatery and Litchfield Towers Food Court Get Facelifts". Pitt Chronicle (Pittsburgh, PA: University of Pittsburgh). Retrieved August 26, 2013. "Hotel Schenley - associated architects, engineers, etc. - Philadelphia Architects and Buildings". Philadelphiabuildings.org. Retrieved 2014-02-03. "Pittsburgh History and Landmarks Foundation: PHLF Plaques & Registries". 2007-01-27. Archived from the original on 2007-01-27. Retrieved 2009-07-10. "Pitt photo tour: WilliamPitt Union". University of Pittsburgh. Retrieved 2010-10-06.