Session 4H
Dave McCreary – President, NewAgeAerial.com
Peter Wade P.E. - Hydroelectric Manager, Merced Irrigation District
Case use for sUAV (small Unmanned Aerial Vehicle)
for large dam spillway monitoring,
data sets and inspections
All slides & white paper
are posted online
New Exchequer Dam
Constructed between 1964 and 1967
Rockfilled dam
Gated Spillway
Emergency Spillway
95 MW power generator
Low Level outlet Valve (108” = 9,000 cfs)
Drone use in the 2017
Spillway armoring project
New Exchequer Dam – Merced Irrigation District, Northern California
Constructed between 1964 and 1967 (Oroville was also completed in 1967)
rock filled dam | gated spillway | emergency spillway
95 MW power generator | Low Level outlet Valve (108” = 9,000 cfs)
Drones documenting & contributing to
the 2017 spillway armoring project
All slides & white paper
are posted online
6 gates (40’wide
x 30’ high)
apron and
cutoff wall
once used
spillway flows
into 1.8 mile
long unlined
channel
Gated spillway
& unlined
spillway channel
All slides & white paper
are posted online
Spillway first used
in 1967 for 33 days
and up to 10,000
cfs. 1967 unlined
channel armored
after use to repair
damage
2017 we all watched events at Oroville spillway
unfold in a perfect storm…
All slides & white paper
are posted online
MID decided to add armoring
All slides & white paper
are posted online
Below the apron and
1967 armoring
highly fractured,
erodible geologic
conditions, it was
decided to armor
where the rock is
softer than concrete.
Extending the
armor for a
reasonable
distance
downstream of
existing apron and
cutoff wall.
Removal of loose & undesired material
All slides & white paper
are posted online
Mechanical scraping by use of 4 legged spider | Pressure washing | Removing loosened
material | Vac trucks used in conjunction with 4 legged spider
Bouldering & pumping concrete
All slides & white paper
are posted online
2017 Finished Product
All slides & white paper
are posted online
1967 repair
1967 repair
1967 repair
1967 repair
Point cloud &
modeling of spillway
All slides & white paper
are posted online
Sub 2cm accuracy for the entire spillway, 1.8 mile downstream
channel and dam / powerhouse complex. +1TB of data collected
Point cloud mesh rendering Very dense color point cloud
Point cloud ray trace
Flow testing in July
(2nd time in use in 50 years)
All slides & white paper
are posted online
4 days, with 18 hours of flow and 6 hours of inspections
Day 1 = 500 cfs
Day 2 = 1,000 cfs
Day 3 = 2,000 cfs
Day 4 = 3,000 cfs – real time drone videos of the gates opening and run offs for this test
are posted on website, address on the last slide of this presentation
Material movement in un-lined spillway channel monitored
sUAV use and processing recap
All slides & white paper
are posted online
Phase I: Before cleaning documentation
Phase II: After cleaning, before addition of new material
Phase III: After construction, prior to spill and after spill erosion analysis
Deliverables: Point clouds, 4k images and HD videos, 3D printed & painted scale models,
interactive overlays showing phases I and III
“how do you monitor sub-centimeter change if you do not have a visual record of the ‘before’…”
NAA used Pix4D for: point | mesh | DTM | DSM | volumetrics | animation | elevation maps
GEI/HDR and other consultants where able to use same final dataset for their
evaluation reports, that were submitted back to MID.
Q & A
Slides, additional content & white paper
available at:
NewAgeAerial.com/Hydrovision2018
Drone drawing!
HD camera | IR avoidance sensors | 13 min flight time
iNTEL & DJI’s latest project!
Make sure your business card is in the jar, must be
present to win. Drawing in the lobby right after we are
dismissed, so the next session can get started on time!
Available on the floor for the rest
of the day in this cool vest,
I shouldn’t be hard to spot to
answer any questions!

More Related Content

What's hot

Lunch and Learn Risk Management
Lunch and Learn Risk ManagementLunch and Learn Risk Management
Lunch and Learn Risk ManagementGlen Alleman
 
Man andmachinerests
Man andmachinerestsMan andmachinerests
Man andmachinerestsCasey Ng
 
CHiMaD Hackathon 2: Pennsylvania State University
CHiMaD Hackathon 2: Pennsylvania State UniversityCHiMaD Hackathon 2: Pennsylvania State University
CHiMaD Hackathon 2: Pennsylvania State UniversityDaniel Wheeler
 
Man andmachinerests
Man andmachinerestsMan andmachinerests
Man andmachinerestsCasey Ng
 
CHiMaD Hackathon 2: University of Michigan
CHiMaD Hackathon 2: University of MichiganCHiMaD Hackathon 2: University of Michigan
CHiMaD Hackathon 2: University of MichiganDaniel Wheeler
 
Final Presentation-DATNYC
Final Presentation-DATNYCFinal Presentation-DATNYC
Final Presentation-DATNYCKaren Zellner
 
CHiMaD Hackathon 2: Team mcgill
CHiMaD Hackathon 2: Team mcgillCHiMaD Hackathon 2: Team mcgill
CHiMaD Hackathon 2: Team mcgillDaniel Wheeler
 
CHiMaD Phase Field Hackathon 2: University of Connecticut
CHiMaD Phase Field Hackathon 2: University of ConnecticutCHiMaD Phase Field Hackathon 2: University of Connecticut
CHiMaD Phase Field Hackathon 2: University of ConnecticutDaniel Wheeler
 
Multi Limn Leica Hds Conference 2009
Multi Limn   Leica Hds Conference 2009Multi Limn   Leica Hds Conference 2009
Multi Limn Leica Hds Conference 2009timbeach
 

What's hot (9)

Lunch and Learn Risk Management
Lunch and Learn Risk ManagementLunch and Learn Risk Management
Lunch and Learn Risk Management
 
Man andmachinerests
Man andmachinerestsMan andmachinerests
Man andmachinerests
 
CHiMaD Hackathon 2: Pennsylvania State University
CHiMaD Hackathon 2: Pennsylvania State UniversityCHiMaD Hackathon 2: Pennsylvania State University
CHiMaD Hackathon 2: Pennsylvania State University
 
Man andmachinerests
Man andmachinerestsMan andmachinerests
Man andmachinerests
 
CHiMaD Hackathon 2: University of Michigan
CHiMaD Hackathon 2: University of MichiganCHiMaD Hackathon 2: University of Michigan
CHiMaD Hackathon 2: University of Michigan
 
Final Presentation-DATNYC
Final Presentation-DATNYCFinal Presentation-DATNYC
Final Presentation-DATNYC
 
CHiMaD Hackathon 2: Team mcgill
CHiMaD Hackathon 2: Team mcgillCHiMaD Hackathon 2: Team mcgill
CHiMaD Hackathon 2: Team mcgill
 
CHiMaD Phase Field Hackathon 2: University of Connecticut
CHiMaD Phase Field Hackathon 2: University of ConnecticutCHiMaD Phase Field Hackathon 2: University of Connecticut
CHiMaD Phase Field Hackathon 2: University of Connecticut
 
Multi Limn Leica Hds Conference 2009
Multi Limn   Leica Hds Conference 2009Multi Limn   Leica Hds Conference 2009
Multi Limn Leica Hds Conference 2009
 

Similar to Naa mid-hv2018-final-presentation

ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEMADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEMiQHub
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technologyAbhishek Paul
 
April 2016 PM Magazine - Ken Neyer Plumbing
April 2016 PM Magazine - Ken Neyer PlumbingApril 2016 PM Magazine - Ken Neyer Plumbing
April 2016 PM Magazine - Ken Neyer PlumbingJim Mercer
 
Using a Canary Microservice to Validate the Software Delivery Pipeline
Using a Canary Microservice to Validate the Software Delivery PipelineUsing a Canary Microservice to Validate the Software Delivery Pipeline
Using a Canary Microservice to Validate the Software Delivery PipelineXebiaLabs
 
Invention Catalogue Pictures
Invention Catalogue  PicturesInvention Catalogue  Pictures
Invention Catalogue PicturesMehdi Afshar
 
C004 60190 02238 1 Roberts Stuart
C004 60190 02238 1 Roberts StuartC004 60190 02238 1 Roberts Stuart
C004 60190 02238 1 Roberts StuartStuartRoberts
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdffreezefreeze2
 
TRENCHLESS-TECHNOLOGY.pdf
TRENCHLESS-TECHNOLOGY.pdfTRENCHLESS-TECHNOLOGY.pdf
TRENCHLESS-TECHNOLOGY.pdfKARTHIKGOUD64
 
Automated Grade Control Assists with Grading, Capping 28-acre N.Y. Landfill
Automated Grade Control Assists with Grading, Capping 28-acre N.Y. LandfillAutomated Grade Control Assists with Grading, Capping 28-acre N.Y. Landfill
Automated Grade Control Assists with Grading, Capping 28-acre N.Y. LandfillDon Talend
 
"Big Data" in the Energy Industry
"Big Data" in the Energy Industry"Big Data" in the Energy Industry
"Big Data" in the Energy IndustryPaige Bailey
 
Mekanchi - Work @ heights - Drone Services
Mekanchi - Work @ heights - Drone ServicesMekanchi - Work @ heights - Drone Services
Mekanchi - Work @ heights - Drone ServicesShashank Arya
 
Cudgen Road Tunnel Deformation Monitoring
Cudgen Road Tunnel Deformation MonitoringCudgen Road Tunnel Deformation Monitoring
Cudgen Road Tunnel Deformation MonitoringNeil Kennedy
 
Digital Oil Field
Digital Oil FieldDigital Oil Field
Digital Oil Fieldijtsrd
 
Bridge Construction Methods
Bridge Construction MethodsBridge Construction Methods
Bridge Construction MethodsDavid H Moloney
 

Similar to Naa mid-hv2018-final-presentation (20)

ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEMADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
 
Future Proof
Future ProofFuture Proof
Future Proof
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technology
 
Automation construction
Automation constructionAutomation construction
Automation construction
 
April 2016 PM Magazine - Ken Neyer Plumbing
April 2016 PM Magazine - Ken Neyer PlumbingApril 2016 PM Magazine - Ken Neyer Plumbing
April 2016 PM Magazine - Ken Neyer Plumbing
 
Using a Canary Microservice to Validate the Software Delivery Pipeline
Using a Canary Microservice to Validate the Software Delivery PipelineUsing a Canary Microservice to Validate the Software Delivery Pipeline
Using a Canary Microservice to Validate the Software Delivery Pipeline
 
Presentation_Niraj_Final
Presentation_Niraj_Final Presentation_Niraj_Final
Presentation_Niraj_Final
 
Invention Catalogue Pictures
Invention Catalogue  PicturesInvention Catalogue  Pictures
Invention Catalogue Pictures
 
C004 60190 02238 1 Roberts Stuart
C004 60190 02238 1 Roberts StuartC004 60190 02238 1 Roberts Stuart
C004 60190 02238 1 Roberts Stuart
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdf
 
TRENCHLESS-TECHNOLOGY.pdf
TRENCHLESS-TECHNOLOGY.pdfTRENCHLESS-TECHNOLOGY.pdf
TRENCHLESS-TECHNOLOGY.pdf
 
Automated Grade Control Assists with Grading, Capping 28-acre N.Y. Landfill
Automated Grade Control Assists with Grading, Capping 28-acre N.Y. LandfillAutomated Grade Control Assists with Grading, Capping 28-acre N.Y. Landfill
Automated Grade Control Assists with Grading, Capping 28-acre N.Y. Landfill
 
"Big Data" in the Energy Industry
"Big Data" in the Energy Industry"Big Data" in the Energy Industry
"Big Data" in the Energy Industry
 
Mekanchi - Work @ heights - Drone Services
Mekanchi - Work @ heights - Drone ServicesMekanchi - Work @ heights - Drone Services
Mekanchi - Work @ heights - Drone Services
 
2015 CRW - Project Spotlight: New NY Bridge Project
2015 CRW -  Project Spotlight: New NY Bridge Project2015 CRW -  Project Spotlight: New NY Bridge Project
2015 CRW - Project Spotlight: New NY Bridge Project
 
Cudgen Road Tunnel Deformation Monitoring
Cudgen Road Tunnel Deformation MonitoringCudgen Road Tunnel Deformation Monitoring
Cudgen Road Tunnel Deformation Monitoring
 
Digital Oil Field
Digital Oil FieldDigital Oil Field
Digital Oil Field
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Bridge Construction Methods
Bridge Construction MethodsBridge Construction Methods
Bridge Construction Methods
 
VACUUM DEWATERED FLOORING ( V D F )
VACUUM DEWATERED FLOORING ( V D F )VACUUM DEWATERED FLOORING ( V D F )
VACUUM DEWATERED FLOORING ( V D F )
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 

Naa mid-hv2018-final-presentation

  • 1. Session 4H Dave McCreary – President, NewAgeAerial.com Peter Wade P.E. - Hydroelectric Manager, Merced Irrigation District Case use for sUAV (small Unmanned Aerial Vehicle) for large dam spillway monitoring, data sets and inspections All slides & white paper are posted online
  • 2. New Exchequer Dam Constructed between 1964 and 1967 Rockfilled dam Gated Spillway Emergency Spillway 95 MW power generator Low Level outlet Valve (108” = 9,000 cfs) Drone use in the 2017 Spillway armoring project New Exchequer Dam – Merced Irrigation District, Northern California Constructed between 1964 and 1967 (Oroville was also completed in 1967) rock filled dam | gated spillway | emergency spillway 95 MW power generator | Low Level outlet Valve (108” = 9,000 cfs) Drones documenting & contributing to the 2017 spillway armoring project All slides & white paper are posted online
  • 3. 6 gates (40’wide x 30’ high) apron and cutoff wall once used spillway flows into 1.8 mile long unlined channel Gated spillway & unlined spillway channel All slides & white paper are posted online Spillway first used in 1967 for 33 days and up to 10,000 cfs. 1967 unlined channel armored after use to repair damage
  • 4. 2017 we all watched events at Oroville spillway unfold in a perfect storm… All slides & white paper are posted online
  • 5. MID decided to add armoring All slides & white paper are posted online Below the apron and 1967 armoring highly fractured, erodible geologic conditions, it was decided to armor where the rock is softer than concrete. Extending the armor for a reasonable distance downstream of existing apron and cutoff wall.
  • 6. Removal of loose & undesired material All slides & white paper are posted online Mechanical scraping by use of 4 legged spider | Pressure washing | Removing loosened material | Vac trucks used in conjunction with 4 legged spider
  • 7. Bouldering & pumping concrete All slides & white paper are posted online
  • 8. 2017 Finished Product All slides & white paper are posted online 1967 repair 1967 repair 1967 repair 1967 repair
  • 9. Point cloud & modeling of spillway All slides & white paper are posted online Sub 2cm accuracy for the entire spillway, 1.8 mile downstream channel and dam / powerhouse complex. +1TB of data collected Point cloud mesh rendering Very dense color point cloud Point cloud ray trace
  • 10. Flow testing in July (2nd time in use in 50 years) All slides & white paper are posted online 4 days, with 18 hours of flow and 6 hours of inspections Day 1 = 500 cfs Day 2 = 1,000 cfs Day 3 = 2,000 cfs Day 4 = 3,000 cfs – real time drone videos of the gates opening and run offs for this test are posted on website, address on the last slide of this presentation Material movement in un-lined spillway channel monitored
  • 11. sUAV use and processing recap All slides & white paper are posted online Phase I: Before cleaning documentation Phase II: After cleaning, before addition of new material Phase III: After construction, prior to spill and after spill erosion analysis Deliverables: Point clouds, 4k images and HD videos, 3D printed & painted scale models, interactive overlays showing phases I and III “how do you monitor sub-centimeter change if you do not have a visual record of the ‘before’…” NAA used Pix4D for: point | mesh | DTM | DSM | volumetrics | animation | elevation maps GEI/HDR and other consultants where able to use same final dataset for their evaluation reports, that were submitted back to MID.
  • 12. Q & A Slides, additional content & white paper available at: NewAgeAerial.com/Hydrovision2018 Drone drawing! HD camera | IR avoidance sensors | 13 min flight time iNTEL & DJI’s latest project! Make sure your business card is in the jar, must be present to win. Drawing in the lobby right after we are dismissed, so the next session can get started on time! Available on the floor for the rest of the day in this cool vest, I shouldn’t be hard to spot to answer any questions!