ASCENT MANUFACTURING, INC.
Est. 2001
“To provide products to our customers, internal and external, that
conform to current requirements, and to continuously improve our
processes and systems. To promote the company by reputation alone.”
Supplier Background
• Website: WWW.ASCENTMFG.COM
• Management:
• Frank Power – President, CEO
• David Kramer – Sales
• Brendan Power – Production Control Manager
• Colin Power – Customer Account Manager
 Jorge Juarez – Engineering Manager
 Kathy Kramer – Accounting Manager
 Barbara Gillian – Office Manager
 Keith Kramer Jr. – Quality Manager
• Founded:
 September, 2001
• Location:
 2545 W Via Palma
 Anaheim, CA 92801
• Annual Revenue / Sales:
 $4,000,000
• Headquarters:
 2545 W Via Palma
 Anaheim, CA 92801
• Operations:
 Manufacturer of machine fabricated parts and assemblies, primarily for the aerospace industry
Organizational Chart
President
Frank Power
VP of Sales
David
Kramer
Quality
Manager
Keith Kramer
Jr.
Purchasing
Barbara
Gillian
Vice
President/
Engineering
Manager
Jorge Juarez
Accounting
Kathy
Kramer
Executive
Assistant/HR
Maricela Power
Chief
Inspector
Tuan Nguyen
Shop is
organized by
work cell.
Lathe Dept.
Lead
Mario Ayala
Customer
Account
Manager
Colin Power
Shipping &
Receiving
Steve Ewer
Production
Control
Manager
Brendan
Power
Inspectors
Tyler Gillian
Jym
Denatale
Office
Manager
Barbara
Gillian
Office
Admin.
Lauren
Fisher
Facility
•Ascent Manufacturing, Inc. has recently
moved from a 5,000 sq. ft. facility in Santa
Ana, CA to a 17,000 sq. ft. facility in
Anaheim, CA
•Main reasons for this move:
-Increase safety conditions
-To create a professional looking/feeling workspace
-Boost productivity
•2 new machines added
•Better value streaming
•Proper organization
Process Mapping
Potential Failure Mode Effects Analysis (PFMEA)
Machining
17 CNC Vertical Mills
- 1 5th Axis mill
-4 multi-pallet Horizontal mills
4 CNC Lathes
Machining
Programming
•3 full time programmers
•Once verified, programs are
“locked down” to prevent any
modifications by unauthorized
personnel
•Model based engineering
•Software:
Mastercam X9 v15.0.3.28
CATIA V5
Quality
•Certified to ISO 9001:2008/AS9100: Rev. C
•Comprehensive quality manual
•Sub-tier certification review
•Corrective and preventative action reports
•Internal auditing
Sub-Tier Management
• To ensure sub-tier suppliers
understand the requirements,
Ascent Manufacturing, Inc. flows
down all customer quality notes on
every purchase order along with
specific detailed instructions
• To ensure best value pricing, a
minimum of 3 vendors are quoted
for every job
• To ensure consistent quality and
delivery, risk mitigating activities
are performed on all vendors from
information gathered through
required vendor surveys and on-site
audits.
Inspection
2 Coordinate Measurement Machines
•Mitutoyo FN1108
•Numerex 2440-18
1 Romer Absolute Arm – 6 Axis
•RA-7520-2
Software:
QC5000 V2.82
Verisurf X7
CATIA V22
Virtual DMIS V6.0
Inspection
•CpK Analysis
•AS9102
•Control Charts
•Ballooned drawings
•AS9102 forms
Software:
InspectionXpert OnDemand
v4.3.0.55
•Model based
inspection
Assembly
•Click-bond hardware installation
•Adhesive bonding of nut plates and
gaskets
•Paint fogging and touch-up
•Installation of inserts
•Dowel pin insertion
•Riveting
•Ink marking
•Bushings
Testing
•Ascent Manufacturing, Inc.
now does all of it’s own peel
testing in house
•Ensures quality adhesive
bonding during assemblies
with gaskets.
•Up to 110lbs. of tension or
compression
•Full certification of testing
•Software:
WinWedge v3.4.3
IMADA Force
Measurement
Model: MX2-110
Gauge: DS2-110
Shipping
•RFID DOD96 Capable
•Secure Packaging
•IUID labeling
•Shipping inspection
•FOD prevention plan
Process Improvement
•Ascent Manufacturing,
Inc. has recently hired
an experienced tool crib
manager to ensure the
proper use, repair and
organization of all tools
used to manufacture
parts.
•Improved set-up times
and cost of tooling
Process Improvement
Ascent Manufacturing, Inc. has recently
hired an experienced shop foreman to
manage shop floor execution.
•Production signs are now affixed to every machine so
that status of parts are clearly visible.
•Manage machine operators to ensure quality parts are
manufactured before entering inspection.
•In-process inspection sheets are now required for every
job before the parts are put on the machines.
Process Improvement
•In-process inspection sheets
are now required for every job
running on a machine.
•This will ensure only
compliant parts come through
QC and decrease the amount
of inspection time needed for
each job.
•Internal key characteristics
are determined by Quality

More Related Content

What's hot

Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds
 
Cox Resume (1)
Cox Resume (1)Cox Resume (1)
Cox Resume (1)Ted Cox
 
Sage 100 2018 and Beyond
Sage 100 2018 and BeyondSage 100 2018 and Beyond
Sage 100 2018 and BeyondNet at Work
 
The Financial Countdown: 3 Budgeting Secrets for 2017
The Financial Countdown: 3 Budgeting Secrets for 2017The Financial Countdown: 3 Budgeting Secrets for 2017
The Financial Countdown: 3 Budgeting Secrets for 2017AppFolio
 
End of Year Presentation Adham Abdulqader
End of Year Presentation Adham AbdulqaderEnd of Year Presentation Adham Abdulqader
End of Year Presentation Adham AbdulqaderAdham Abdulqader
 
Baltimore machine shop
Baltimore machine shopBaltimore machine shop
Baltimore machine shopclass3co
 
Ge cooley resume 1 29-2016
Ge cooley resume 1 29-2016Ge cooley resume 1 29-2016
Ge cooley resume 1 29-2016Gar Cooley
 
DianeBaker_Resume1
DianeBaker_Resume1DianeBaker_Resume1
DianeBaker_Resume1Diane Baker
 
Capital City Electrical Services, Inc. Trifold E-Brochure PMA Program
Capital City Electrical Services, Inc. Trifold E-Brochure PMA ProgramCapital City Electrical Services, Inc. Trifold E-Brochure PMA Program
Capital City Electrical Services, Inc. Trifold E-Brochure PMA ProgramSarah Haygood
 
TomLanceResume
TomLanceResumeTomLanceResume
TomLanceResumeTom Lance
 
Bridget kitchings.pptx photo essay
Bridget kitchings.pptx photo essayBridget kitchings.pptx photo essay
Bridget kitchings.pptx photo essayBKitchings
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric Reneker
 

What's hot (17)

Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016
 
resume
resumeresume
resume
 
Mohit chaudhary link
Mohit chaudhary linkMohit chaudhary link
Mohit chaudhary link
 
Cox Resume (1)
Cox Resume (1)Cox Resume (1)
Cox Resume (1)
 
Sage 100 2018 and Beyond
Sage 100 2018 and BeyondSage 100 2018 and Beyond
Sage 100 2018 and Beyond
 
The Financial Countdown: 3 Budgeting Secrets for 2017
The Financial Countdown: 3 Budgeting Secrets for 2017The Financial Countdown: 3 Budgeting Secrets for 2017
The Financial Countdown: 3 Budgeting Secrets for 2017
 
NRGCompliance
NRGComplianceNRGCompliance
NRGCompliance
 
End of Year Presentation Adham Abdulqader
End of Year Presentation Adham AbdulqaderEnd of Year Presentation Adham Abdulqader
End of Year Presentation Adham Abdulqader
 
Baltimore machine shop
Baltimore machine shopBaltimore machine shop
Baltimore machine shop
 
Ge cooley resume 1 29-2016
Ge cooley resume 1 29-2016Ge cooley resume 1 29-2016
Ge cooley resume 1 29-2016
 
DianeBaker_Resume1
DianeBaker_Resume1DianeBaker_Resume1
DianeBaker_Resume1
 
No.1 Supplier into Cameron
No.1 Supplier into CameronNo.1 Supplier into Cameron
No.1 Supplier into Cameron
 
Capital City Electrical Services, Inc. Trifold E-Brochure PMA Program
Capital City Electrical Services, Inc. Trifold E-Brochure PMA ProgramCapital City Electrical Services, Inc. Trifold E-Brochure PMA Program
Capital City Electrical Services, Inc. Trifold E-Brochure PMA Program
 
TomLanceResume
TomLanceResumeTomLanceResume
TomLanceResume
 
Resume 1
Resume 1Resume 1
Resume 1
 
Bridget kitchings.pptx photo essay
Bridget kitchings.pptx photo essayBridget kitchings.pptx photo essay
Bridget kitchings.pptx photo essay
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
 

Viewers also liked

Viewers also liked (13)

Integradora I
Integradora IIntegradora I
Integradora I
 
Gabriella Oakley (Inspiring the future) WiPM240915
Gabriella Oakley (Inspiring the future) WiPM240915Gabriella Oakley (Inspiring the future) WiPM240915
Gabriella Oakley (Inspiring the future) WiPM240915
 
Joy
JoyJoy
Joy
 
Barnes Group Inc. Investor Overview - April 2016
Barnes Group Inc. Investor Overview - April 2016Barnes Group Inc. Investor Overview - April 2016
Barnes Group Inc. Investor Overview - April 2016
 
Bacana Pessoas(バカナ・ピソエス)プレゼン資料
Bacana Pessoas(バカナ・ピソエス)プレゼン資料Bacana Pessoas(バカナ・ピソエス)プレゼン資料
Bacana Pessoas(バカナ・ピソエス)プレゼン資料
 
Hentbol
Hentbol Hentbol
Hentbol
 
The blessing’ series 1
The blessing’ series 1The blessing’ series 1
The blessing’ series 1
 
Computed Tomography
Computed TomographyComputed Tomography
Computed Tomography
 
Java EE, un ami qui vous veut du bien
Java EE, un ami qui vous veut du bienJava EE, un ami qui vous veut du bien
Java EE, un ami qui vous veut du bien
 
Head ct
Head ctHead ct
Head ct
 
Personal Hygine & Grooming
Personal Hygine & GroomingPersonal Hygine & Grooming
Personal Hygine & Grooming
 
The importance of people, Miles Shepherd, 16th June 2016
The importance of people, Miles Shepherd, 16th June 2016The importance of people, Miles Shepherd, 16th June 2016
The importance of people, Miles Shepherd, 16th June 2016
 
Knowledge management and lessons learned
Knowledge management and lessons learnedKnowledge management and lessons learned
Knowledge management and lessons learned
 

Similar to ASCENT MANUFACTURING INC

VMA Company PowerPoint Presentation
VMA Company PowerPoint PresentationVMA Company PowerPoint Presentation
VMA Company PowerPoint PresentationBill Reagan
 
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceDenholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceBSAMARKETING
 
Skips New Resume
Skips New ResumeSkips New Resume
Skips New ResumeSkip Carter
 
Kinetic Gears Corporate Presentation
Kinetic Gears Corporate PresentationKinetic Gears Corporate Presentation
Kinetic Gears Corporate Presentationkineticgears
 
Virdi transformers B2B project
Virdi transformers B2B projectVirdi transformers B2B project
Virdi transformers B2B projectLal Sivaraj
 
EPIC Capabilities Overview Presentation
EPIC Capabilities Overview PresentationEPIC Capabilities Overview Presentation
EPIC Capabilities Overview PresentationEPIC Systems
 
How to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoofHow to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoofSu Butcher
 
Industrial Stamping & Mfg
Industrial Stamping & MfgIndustrial Stamping & Mfg
Industrial Stamping & Mfgadamtomlan
 
Dyna-Flo Manufacturing Processes & Best Practices
Dyna-Flo Manufacturing Processes & Best PracticesDyna-Flo Manufacturing Processes & Best Practices
Dyna-Flo Manufacturing Processes & Best PracticesGrant Pegden-Wright
 
Kieffer Sales Presentation Retail
Kieffer Sales Presentation RetailKieffer Sales Presentation Retail
Kieffer Sales Presentation Retailcjwrobel
 
CBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN2014
 
Industrial Solutions Business Line Overview (06-2016) LinkedIn
Industrial Solutions Business Line Overview (06-2016) LinkedInIndustrial Solutions Business Line Overview (06-2016) LinkedIn
Industrial Solutions Business Line Overview (06-2016) LinkedInMatthew King
 
Automan Engineering company profile
Automan Engineering company profileAutoman Engineering company profile
Automan Engineering company profileautoman-eng
 
Control Panels USA - custom industiral control solutions
Control Panels USA - custom industiral control solutionsControl Panels USA - custom industiral control solutions
Control Panels USA - custom industiral control solutionsMichael Holan
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 

Similar to ASCENT MANUFACTURING INC (20)

VMA Company PowerPoint Presentation
VMA Company PowerPoint PresentationVMA Company PowerPoint Presentation
VMA Company PowerPoint Presentation
 
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceDenholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
 
Skips New Resume
Skips New ResumeSkips New Resume
Skips New Resume
 
Kinetic Gears Corporate Presentation
Kinetic Gears Corporate PresentationKinetic Gears Corporate Presentation
Kinetic Gears Corporate Presentation
 
sharon
sharon sharon
sharon
 
KI Brochure
KI BrochureKI Brochure
KI Brochure
 
Virdi transformers B2B project
Virdi transformers B2B projectVirdi transformers B2B project
Virdi transformers B2B project
 
EPIC Capabilities Overview Presentation
EPIC Capabilities Overview PresentationEPIC Capabilities Overview Presentation
EPIC Capabilities Overview Presentation
 
Edvin - CV -1
Edvin - CV -1Edvin - CV -1
Edvin - CV -1
 
How to avoid Leaky Roofs #PerfectRoof
How to avoid Leaky Roofs #PerfectRoofHow to avoid Leaky Roofs #PerfectRoof
How to avoid Leaky Roofs #PerfectRoof
 
How to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoofHow to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoof
 
Industrial Stamping & Mfg
Industrial Stamping & MfgIndustrial Stamping & Mfg
Industrial Stamping & Mfg
 
Dyna-Flo Manufacturing Processes & Best Practices
Dyna-Flo Manufacturing Processes & Best PracticesDyna-Flo Manufacturing Processes & Best Practices
Dyna-Flo Manufacturing Processes & Best Practices
 
National Retail 2012
National Retail 2012National Retail 2012
National Retail 2012
 
Kieffer Sales Presentation Retail
Kieffer Sales Presentation RetailKieffer Sales Presentation Retail
Kieffer Sales Presentation Retail
 
CBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN SALES PRESENTATION
CBN SALES PRESENTATION
 
Industrial Solutions Business Line Overview (06-2016) LinkedIn
Industrial Solutions Business Line Overview (06-2016) LinkedInIndustrial Solutions Business Line Overview (06-2016) LinkedIn
Industrial Solutions Business Line Overview (06-2016) LinkedIn
 
Automan Engineering company profile
Automan Engineering company profileAutoman Engineering company profile
Automan Engineering company profile
 
Control Panels USA - custom industiral control solutions
Control Panels USA - custom industiral control solutionsControl Panels USA - custom industiral control solutions
Control Panels USA - custom industiral control solutions
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 

ASCENT MANUFACTURING INC

  • 1. ASCENT MANUFACTURING, INC. Est. 2001 “To provide products to our customers, internal and external, that conform to current requirements, and to continuously improve our processes and systems. To promote the company by reputation alone.”
  • 2. Supplier Background • Website: WWW.ASCENTMFG.COM • Management: • Frank Power – President, CEO • David Kramer – Sales • Brendan Power – Production Control Manager • Colin Power – Customer Account Manager  Jorge Juarez – Engineering Manager  Kathy Kramer – Accounting Manager  Barbara Gillian – Office Manager  Keith Kramer Jr. – Quality Manager • Founded:  September, 2001 • Location:  2545 W Via Palma  Anaheim, CA 92801 • Annual Revenue / Sales:  $4,000,000 • Headquarters:  2545 W Via Palma  Anaheim, CA 92801 • Operations:  Manufacturer of machine fabricated parts and assemblies, primarily for the aerospace industry
  • 3. Organizational Chart President Frank Power VP of Sales David Kramer Quality Manager Keith Kramer Jr. Purchasing Barbara Gillian Vice President/ Engineering Manager Jorge Juarez Accounting Kathy Kramer Executive Assistant/HR Maricela Power Chief Inspector Tuan Nguyen Shop is organized by work cell. Lathe Dept. Lead Mario Ayala Customer Account Manager Colin Power Shipping & Receiving Steve Ewer Production Control Manager Brendan Power Inspectors Tyler Gillian Jym Denatale Office Manager Barbara Gillian Office Admin. Lauren Fisher
  • 4. Facility •Ascent Manufacturing, Inc. has recently moved from a 5,000 sq. ft. facility in Santa Ana, CA to a 17,000 sq. ft. facility in Anaheim, CA •Main reasons for this move: -Increase safety conditions -To create a professional looking/feeling workspace -Boost productivity •2 new machines added •Better value streaming •Proper organization
  • 6. Potential Failure Mode Effects Analysis (PFMEA)
  • 7. Machining 17 CNC Vertical Mills - 1 5th Axis mill -4 multi-pallet Horizontal mills 4 CNC Lathes
  • 9. Programming •3 full time programmers •Once verified, programs are “locked down” to prevent any modifications by unauthorized personnel •Model based engineering •Software: Mastercam X9 v15.0.3.28 CATIA V5
  • 10. Quality •Certified to ISO 9001:2008/AS9100: Rev. C •Comprehensive quality manual •Sub-tier certification review •Corrective and preventative action reports •Internal auditing
  • 11. Sub-Tier Management • To ensure sub-tier suppliers understand the requirements, Ascent Manufacturing, Inc. flows down all customer quality notes on every purchase order along with specific detailed instructions • To ensure best value pricing, a minimum of 3 vendors are quoted for every job • To ensure consistent quality and delivery, risk mitigating activities are performed on all vendors from information gathered through required vendor surveys and on-site audits.
  • 12. Inspection 2 Coordinate Measurement Machines •Mitutoyo FN1108 •Numerex 2440-18 1 Romer Absolute Arm – 6 Axis •RA-7520-2 Software: QC5000 V2.82 Verisurf X7 CATIA V22 Virtual DMIS V6.0
  • 13. Inspection •CpK Analysis •AS9102 •Control Charts •Ballooned drawings •AS9102 forms Software: InspectionXpert OnDemand v4.3.0.55 •Model based inspection
  • 14. Assembly •Click-bond hardware installation •Adhesive bonding of nut plates and gaskets •Paint fogging and touch-up •Installation of inserts •Dowel pin insertion •Riveting •Ink marking •Bushings
  • 15. Testing •Ascent Manufacturing, Inc. now does all of it’s own peel testing in house •Ensures quality adhesive bonding during assemblies with gaskets. •Up to 110lbs. of tension or compression •Full certification of testing •Software: WinWedge v3.4.3 IMADA Force Measurement Model: MX2-110 Gauge: DS2-110
  • 16. Shipping •RFID DOD96 Capable •Secure Packaging •IUID labeling •Shipping inspection •FOD prevention plan
  • 17. Process Improvement •Ascent Manufacturing, Inc. has recently hired an experienced tool crib manager to ensure the proper use, repair and organization of all tools used to manufacture parts. •Improved set-up times and cost of tooling
  • 18. Process Improvement Ascent Manufacturing, Inc. has recently hired an experienced shop foreman to manage shop floor execution. •Production signs are now affixed to every machine so that status of parts are clearly visible. •Manage machine operators to ensure quality parts are manufactured before entering inspection. •In-process inspection sheets are now required for every job before the parts are put on the machines.
  • 19. Process Improvement •In-process inspection sheets are now required for every job running on a machine. •This will ensure only compliant parts come through QC and decrease the amount of inspection time needed for each job. •Internal key characteristics are determined by Quality