SlideShare a Scribd company logo
1 of 4
Download to read offline
Daniel Brady
very knowlegable in the in the industrial construction field,i am a team player as well
as a leader safety first
480 Brooks Lane - Poteet, TX 78065
ironmandan1978@gmail.com - 8018093820
• I am currently seeking a career with a safety oriented company.
WORK EXPERIENCE
structural steel general foreman
matrix services - Evanston, WY - July 2014 to Present
Responsibilities
ryckman creek gas plant fire rebuild project,in charge of 20 men jourymen,welders and ironworker helpers
along with 2 foreman,rebuilt nru unit installing steel members ,equipment,and piping,along with tandem picks of
towers,mcc building,built 2 structures in nru unit with all internals and external piping and equipment,standing
bents aka columns and beams grouond erected all away around plant for underground piping to be re routed
that includes 246 column lines along with building new h2s unit,amine unit,assisting pipe department in setting
of piping on cords along with suppoprt instalation,lead game box meetings every morning before shift,get
foreman set up on next task as well as J.S.A being filled out correctly had good comunication with plant
operators
Accomplishments
my crew completed each unit 1 month ahead of schedule making my guys available to assist the other crafts
in completing there scope of work,i have worked in negative tempatures and never give up i have no lost
time ,and no near misses on my reccord,i complete my daily reports in a timely manner
Skills Used
structural steel skill,rigging skills leader ship skills i do not push my men i lead them.great comunication
skills,and familiar with Navis works
structural foreman/ structural general foreman
matrix sevices - Salt Lake City, UT - October 2012 to July 2014
Responsibilities
FCC expansion and overhaul at tesoro refinery I was a leader amongst my peers lead men to demo out existing
structural members and install need fitting welding bull rigging connecting heavy rigging adding on to unit
Accomplishments
Set my men up to win I was promoted to general foreman in July 2013 had good communications with tesoro
operations did job walks and kick off meetings taught men the safe way to work and how to plan there day
with safety involved in daily tasks
Skills Used
Pick plans helped men understand prints and weld maps i have always been a leader I take charge along with
making sure job is done safely and in a timely manor
lead ironworker
tic holdings - Battle Mountain, NV - March 2012 to October 2012
expansion on newmont gold mine installing structural steel and conveyor systems along with teaching nicer
ironwork classes at the corporate training center
Lead Ironworker/Rigger
TEI/TIC/KEWEIT - Gonzales, TX - July 2011 to February 2012
Installing Conveyers
Structual Steel
Spouting
Rigging
Flagging Loads
Lead Ironworker/Rigger
TEI/TIC/KEWEIT - Longview, WA - September 2010 to July 2011
Flagging 4600 Tower Crane
Installing structural members
Installing Conveyers
Bullrigging equipment
ironworker/rigging foremen
Matrix Service Inc - Port Lavaca, TX - November 2009 to August 2010
• Making sure job gets done safely and efficiently walking job scope with client,installing vessels and piping
systems with crane for pipe department,installing structural members overseeing a crew of 7
Rigger / Boilermaker
Matrix Service Inc - El Dorado, KS - November 2009 to November 2009
• Installing platforms
• Flagging cranes on turn around refineries
Lead Ironworker / Rigger
Matrix Service Inc - Glenrock, WY - January 2009 to September 2009
• In charge of crew, 4 Ironworkers
• Hanging iron on a 500 ft. stack
• Installing Liner using Scanada strand jacking system
Lead Ironworker / Rigger
Matrix Service Inc - San Antonio, TX - February 2008 to December 2008
• In charge of crew of Ironworkers and helpers
• Hanging iron on a 604 Ft. stack
• Installing platforms
• Scanada jacking systems
• Demolition and helicopter picks
Lead Ironworker
Matrix Service Inc - February 2008 to June 2008
Flagging Crane on a LNG plant
• Hanging Iron
• Making sure crew was working safely and staying busy
Lead Rigger
Matrix Service Inc - Cheyenne, WY - November 2007 to June 2008
• Support all crafts with lift plans
• Lead rigger on 4100 and back up connector
Boilermaker Foreman
Wyatt Field Services - Corpus Christi, TX - September 2007 to November 2007
• Line out and walk job scope with 7 man crew
• Rebuilding Cat Cracker
Lead Ironworker
Titan Contracting - Ponca City, OK - May 2007 to September 2007
• Building structure for a new scrubber unit
• Connecting, Bolting up, detail
Lead Ironworker / Rigger
Matrix Service Inc - January 2007 to May 2007
• Hanging Vessels, Pipe Racks
• Installing pipe for Fitters
• Building Fin Fan Units
• Making sure crew was working safely and efficiently
Lead Ironworker
T.I.C - Battle Mtn, NV - October 2006 to January 2007
• Detail and Bolt up
• Fixing fabrication errors
ironworker
Saline Steel Erectors - Little Rock, AR - January 2004 to October 2006
• Hanging Iron on all different types of projects
• Precast and tilt panel
ironworker/rigger/forklift operator
C & S Fabcon - Cabot, AR - August 2001 to January 2004
• Building Churches, Office buildings, ect.
• Hanging iron, bolting up and detail
lead ironworker
Hydco General Contractors - N Little Rock, AR - December 1998 to August 2001
• Worked on a lot of commercial projects
• Precast construction and tilt panel with structural steel
EDUCATION
Island High School - Oakland, CA
1997
CERTIFICATIONS
nccer industrial ironworker
nccer rigging fundamentals
nccer rigger
nccer safety orientation
nccer ironworker plus
nccer rigging plus
nccer rigging fundamentals plus
msha-24
cpr/first aid and aed
December 2013 to December 2015
CPR certified trained in first aid and familiar with aed machine
advance rigger written
Nccer
ADDITIONAL INFORMATION
Skills
Familiar with reading blueprints/Isos
Forklift Operator
• Lining out crews on job scope
• Making sure the job gets done safely and efficiently
• Hanging Iron in high elevations
Bullrigging
Structual fitting

More Related Content

What's hot (19)

Resume Geoff Colvin Sept 2015
Resume Geoff Colvin Sept 2015Resume Geoff Colvin Sept 2015
Resume Geoff Colvin Sept 2015
 
docs-1
docs-1docs-1
docs-1
 
abdi cv
abdi cvabdi cv
abdi cv
 
Kristian Nienhouse Resume 1 (1)
Kristian Nienhouse Resume 1 (1)Kristian Nienhouse Resume 1 (1)
Kristian Nienhouse Resume 1 (1)
 
James_Beckham
James_BeckhamJames_Beckham
James_Beckham
 
Poly excavator 220115
Poly excavator 220115Poly excavator 220115
Poly excavator 220115
 
FLORA resume 2
FLORA resume 2FLORA resume 2
FLORA resume 2
 
Intern operations project
Intern operations projectIntern operations project
Intern operations project
 
Robert Sasser (1) (1) (1)
Robert Sasser (1) (1) (1)Robert Sasser (1) (1) (1)
Robert Sasser (1) (1) (1)
 
Resume 2014
Resume 2014Resume 2014
Resume 2014
 
ARLY OCAMPO2
ARLY OCAMPO2ARLY OCAMPO2
ARLY OCAMPO2
 
Rayford resume
Rayford resumeRayford resume
Rayford resume
 
Colin-Coleman
Colin-ColemanColin-Coleman
Colin-Coleman
 
Resume 1
Resume 1Resume 1
Resume 1
 
keithCV2016 new
keithCV2016 newkeithCV2016 new
keithCV2016 new
 
Stewart McGleish CV
Stewart McGleish CVStewart McGleish CV
Stewart McGleish CV
 
John A resume
John A resumeJohn A resume
John A resume
 
Resume- Boyd Wilson
Resume- Boyd WilsonResume- Boyd Wilson
Resume- Boyd Wilson
 
Oberto Scotts resume 1
Oberto Scotts resume 1Oberto Scotts resume 1
Oberto Scotts resume 1
 

Similar to Daniel-Brady

Similar to Daniel-Brady (20)

Resume.2015
Resume.2015Resume.2015
Resume.2015
 
Resume mark shuttleworth
Resume mark shuttleworthResume mark shuttleworth
Resume mark shuttleworth
 
Lynn's Resume 1
Lynn's Resume 1Lynn's Resume 1
Lynn's Resume 1
 
Updated Resume May 2016 Neil Chadwick
Updated Resume May 2016 Neil ChadwickUpdated Resume May 2016 Neil Chadwick
Updated Resume May 2016 Neil Chadwick
 
Stephen_LeeAlmond
Stephen_LeeAlmondStephen_LeeAlmond
Stephen_LeeAlmond
 
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015
 
mathys eugene cv
mathys eugene cvmathys eugene cv
mathys eugene cv
 
Geoff Fox GF1 (1)
Geoff Fox GF1 (1)Geoff Fox GF1 (1)
Geoff Fox GF1 (1)
 
Brent Golemiec resume march 2016
Brent Golemiec resume march 2016Brent Golemiec resume march 2016
Brent Golemiec resume march 2016
 
TKS Resume 2
TKS Resume 2TKS Resume 2
TKS Resume 2
 
Glenn Dowling CV
Glenn Dowling CVGlenn Dowling CV
Glenn Dowling CV
 
Elpidio Gomez Cert Welder
Elpidio Gomez Cert WelderElpidio Gomez Cert Welder
Elpidio Gomez Cert Welder
 
scooby cv4
scooby cv4scooby cv4
scooby cv4
 
Bobby's Resume
Bobby's ResumeBobby's Resume
Bobby's Resume
 
WILLIAM HILDING RESUME
WILLIAM HILDING RESUMEWILLIAM HILDING RESUME
WILLIAM HILDING RESUME
 
ATT_1442257750728_matt resume
ATT_1442257750728_matt resumeATT_1442257750728_matt resume
ATT_1442257750728_matt resume
 
James Stafford's resume
James Stafford's resumeJames Stafford's resume
James Stafford's resume
 
Ernesto Bojorquez Resume Jan. 07 2017
Ernesto Bojorquez Resume Jan. 07 2017Ernesto Bojorquez Resume Jan. 07 2017
Ernesto Bojorquez Resume Jan. 07 2017
 
MacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger DogmanMacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger Dogman
 
Indeed Resume 2016
Indeed Resume 2016Indeed Resume 2016
Indeed Resume 2016
 

Daniel-Brady

  • 1. Daniel Brady very knowlegable in the in the industrial construction field,i am a team player as well as a leader safety first 480 Brooks Lane - Poteet, TX 78065 ironmandan1978@gmail.com - 8018093820 • I am currently seeking a career with a safety oriented company. WORK EXPERIENCE structural steel general foreman matrix services - Evanston, WY - July 2014 to Present Responsibilities ryckman creek gas plant fire rebuild project,in charge of 20 men jourymen,welders and ironworker helpers along with 2 foreman,rebuilt nru unit installing steel members ,equipment,and piping,along with tandem picks of towers,mcc building,built 2 structures in nru unit with all internals and external piping and equipment,standing bents aka columns and beams grouond erected all away around plant for underground piping to be re routed that includes 246 column lines along with building new h2s unit,amine unit,assisting pipe department in setting of piping on cords along with suppoprt instalation,lead game box meetings every morning before shift,get foreman set up on next task as well as J.S.A being filled out correctly had good comunication with plant operators Accomplishments my crew completed each unit 1 month ahead of schedule making my guys available to assist the other crafts in completing there scope of work,i have worked in negative tempatures and never give up i have no lost time ,and no near misses on my reccord,i complete my daily reports in a timely manner Skills Used structural steel skill,rigging skills leader ship skills i do not push my men i lead them.great comunication skills,and familiar with Navis works structural foreman/ structural general foreman matrix sevices - Salt Lake City, UT - October 2012 to July 2014 Responsibilities FCC expansion and overhaul at tesoro refinery I was a leader amongst my peers lead men to demo out existing structural members and install need fitting welding bull rigging connecting heavy rigging adding on to unit Accomplishments Set my men up to win I was promoted to general foreman in July 2013 had good communications with tesoro operations did job walks and kick off meetings taught men the safe way to work and how to plan there day with safety involved in daily tasks Skills Used Pick plans helped men understand prints and weld maps i have always been a leader I take charge along with making sure job is done safely and in a timely manor lead ironworker
  • 2. tic holdings - Battle Mountain, NV - March 2012 to October 2012 expansion on newmont gold mine installing structural steel and conveyor systems along with teaching nicer ironwork classes at the corporate training center Lead Ironworker/Rigger TEI/TIC/KEWEIT - Gonzales, TX - July 2011 to February 2012 Installing Conveyers Structual Steel Spouting Rigging Flagging Loads Lead Ironworker/Rigger TEI/TIC/KEWEIT - Longview, WA - September 2010 to July 2011 Flagging 4600 Tower Crane Installing structural members Installing Conveyers Bullrigging equipment ironworker/rigging foremen Matrix Service Inc - Port Lavaca, TX - November 2009 to August 2010 • Making sure job gets done safely and efficiently walking job scope with client,installing vessels and piping systems with crane for pipe department,installing structural members overseeing a crew of 7 Rigger / Boilermaker Matrix Service Inc - El Dorado, KS - November 2009 to November 2009 • Installing platforms • Flagging cranes on turn around refineries Lead Ironworker / Rigger Matrix Service Inc - Glenrock, WY - January 2009 to September 2009 • In charge of crew, 4 Ironworkers • Hanging iron on a 500 ft. stack • Installing Liner using Scanada strand jacking system Lead Ironworker / Rigger Matrix Service Inc - San Antonio, TX - February 2008 to December 2008 • In charge of crew of Ironworkers and helpers • Hanging iron on a 604 Ft. stack • Installing platforms • Scanada jacking systems • Demolition and helicopter picks Lead Ironworker Matrix Service Inc - February 2008 to June 2008 Flagging Crane on a LNG plant • Hanging Iron • Making sure crew was working safely and staying busy
  • 3. Lead Rigger Matrix Service Inc - Cheyenne, WY - November 2007 to June 2008 • Support all crafts with lift plans • Lead rigger on 4100 and back up connector Boilermaker Foreman Wyatt Field Services - Corpus Christi, TX - September 2007 to November 2007 • Line out and walk job scope with 7 man crew • Rebuilding Cat Cracker Lead Ironworker Titan Contracting - Ponca City, OK - May 2007 to September 2007 • Building structure for a new scrubber unit • Connecting, Bolting up, detail Lead Ironworker / Rigger Matrix Service Inc - January 2007 to May 2007 • Hanging Vessels, Pipe Racks • Installing pipe for Fitters • Building Fin Fan Units • Making sure crew was working safely and efficiently Lead Ironworker T.I.C - Battle Mtn, NV - October 2006 to January 2007 • Detail and Bolt up • Fixing fabrication errors ironworker Saline Steel Erectors - Little Rock, AR - January 2004 to October 2006 • Hanging Iron on all different types of projects • Precast and tilt panel ironworker/rigger/forklift operator C & S Fabcon - Cabot, AR - August 2001 to January 2004 • Building Churches, Office buildings, ect. • Hanging iron, bolting up and detail lead ironworker Hydco General Contractors - N Little Rock, AR - December 1998 to August 2001 • Worked on a lot of commercial projects • Precast construction and tilt panel with structural steel EDUCATION Island High School - Oakland, CA 1997
  • 4. CERTIFICATIONS nccer industrial ironworker nccer rigging fundamentals nccer rigger nccer safety orientation nccer ironworker plus nccer rigging plus nccer rigging fundamentals plus msha-24 cpr/first aid and aed December 2013 to December 2015 CPR certified trained in first aid and familiar with aed machine advance rigger written Nccer ADDITIONAL INFORMATION Skills Familiar with reading blueprints/Isos Forklift Operator • Lining out crews on job scope • Making sure the job gets done safely and efficiently • Hanging Iron in high elevations Bullrigging Structual fitting