SlideShare a Scribd company logo
1 of 2
Download to read offline
Jonathan Iley
crane operator
Pineville, LA 71360
iley608@gmail.com - 318-305-2842 318 787-3852
A position where my extensive experience can contribute to your customers' satisfaction and your company's
success.
NCCER crane certified up to date physical
WORK EXPERIENCE
crane operator
johson brother - Lake Charles, LA - October 2014 to January 2015
Responsibilities
Assist with crane set up and assembly for Manitowoc 777 and unload other equipment such as air hammer
and steel beams for piledriveing.
Accomplishments
Finished driving concrete pile and poured caps and deck for bridge on I 210 in lake charles.
Skills Used
Operating crane safely and efficiently for crew also operated bulldozer and trackhoe for dirt crew when needed
crane operator
massman construction co - Convent, LA - June 2013 to April 2014
work nucor steel meal in convent LA building dock and conveyor system to off load raw material to make
steel.operated Manitowoc 4100w on a bardge working with welding crews hanging sheer lugs for false work to
set on to build concrete platform. setting rebar and efco forms for the walls. hanging steel with iron workers for
structures on platform some were as high as 140ft. excavations with clam bucket in temples for pile driveing
operation aslo operated Manitowoc 888 on a bardge hanging iron.
crane operator
jensen construction company - Alexandria, LA - January 2011 to April 2013
operated various ton cranes on fort bulow bridge replacement in alexandria. La work preformed was on land
and water driveing sheet pile with disel hamer for coffer dam in the river for main span pier excavated cofferdam
with clam bucket.drove 24 in 70ft pipe pile in cofferdam with hydro hammer underwater then poured seal slab
for dewatering of cofferdam flying rebar and setting concrete forms pouring concrete with bucket i was aslo
responsible for moveing barges with tug boat.also worked on land diging footers with trackhoe and operateing
the crane driveing concrete pile with disel hammer.pouring footer with bucket setting rebar cage column form
back filling set up to build cap. hanging steel girders and concrete girders cranes that i operated on the job
werw american 9310, 9299, 9260, 7260, 5299, terex hc110 manitowoc 3900
crane operator
MTI - New Orleans, LA - June 2010 to January 2011
operated Manitowoc, 999 on work bridge hang iron for section of bridge to be lifted with strand jacks for perment
placement.
crane operator
chalmette levee construction - Chalmette, LA - December 2009 to June 2010
operates 4100w 999 manitowoc & 9299 american fro piledriveing operations drove battered steel h pile for
flood wall construction pour concrete with concrete bucket
crane operator
inThibodaux Louisiana - August 2009 to December 2009
worked in south louisiana on small projectes piledriveing for work on pump stations and other foundations
crane was a LS 118 linkbelt with 80ft fixed leads and an airhammer drove 12,10, 8 in pipe pile spliced three
50 ft joints also operated dirt equiptment dozer trackhoe backhoe for stie preparation.
project foreman
cecil d gassiott - Alexandria, LA - May 2008 to August 2009
crane operator
projecet foreman in lake auther louisiana. built a pump station in lake with flood gates and sheet pileing wing
wall to drain the water from the city of lake auther.put flexie floats togather and loaded american 5299 position
barge to drive first bent of 14in 45ft concrete pile with ICE disel hammer four plum and two batters per bent
five bents total. after each bent was driven we set prestress concrete cap and grouted it in place once all the
pile were driven we set precast deck panels and two 48in pumps with indendent disel power supply daming
off a small canl with sheet pile. used ICE vibro hammer to shake sheets down to grade
pile driver
Flatiron, Granite - New Roads, LA - September 2007 to April 2009
labor/piledriver/leadman on drill shafts
work on jhon james audubon bridge in new roads louisiana. started on pile driveing crew building work bridge
to river drove 24in 180 ft pipe pile with vibro then did restrike with disel hammer set steel cap and track girder
and placed crane mats on top. they moved to operations on the river driveing 48in160ft pipe pile to suspend
templets in water for drill shaft installation 96in 120ft permanent casson then placed oscillator over 96in casson
then place 130ft temp casson airlifted material while oscillating down temp casson to add next joint to 130ft
temp casson total length was 240ft after airlifting was complete rebar was placed then we put tremmie pipe in
and pumped 280 + yards of concrete into drill shaft while oscillating out temp casson.
ADDITIONAL INFORMATION
Skills:
* crane operator friction&hydrolic
* abillity to operator trackhoe bulldozer frontend loader
* cutting torch welding experince
* able to read blue prints and survaing
* ability to direct a crew for task at hand
* over look to see that the proper ppe is being in use by my self and the crew

More Related Content

What's hot

Lynn Johnson Jr Resume - Copy 2016 06-13
Lynn Johnson Jr Resume - Copy 2016 06-13Lynn Johnson Jr Resume - Copy 2016 06-13
Lynn Johnson Jr Resume - Copy 2016 06-13
MR LYNN JOHNSON
 
Linkedinupload
LinkedinuploadLinkedinupload
Linkedinupload
skaff2002
 
David Matthew Resume2
David Matthew Resume2David Matthew Resume2
David Matthew Resume2
David Matthew
 
History Document
History DocumentHistory Document
History Document
Joe Wagner
 
M Marshall Resume 2015
M Marshall Resume 2015M Marshall Resume 2015
M Marshall Resume 2015
Matt Marshall
 
Oberto Scotts resume 1
Oberto Scotts resume 1Oberto Scotts resume 1
Oberto Scotts resume 1
Lewis Jones
 

What's hot (20)

I-95 HOV HOT Lanes
I-95 HOV HOT LanesI-95 HOV HOT Lanes
I-95 HOV HOT Lanes
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Resume 2.1
Resume 2.1Resume 2.1
Resume 2.1
 
Lynn Johnson Jr Resume - Copy 2016 06-13
Lynn Johnson Jr Resume - Copy 2016 06-13Lynn Johnson Jr Resume - Copy 2016 06-13
Lynn Johnson Jr Resume - Copy 2016 06-13
 
John A resume
John A resumeJohn A resume
John A resume
 
Linkedinupload
LinkedinuploadLinkedinupload
Linkedinupload
 
ray resume (1)
ray resume (1)ray resume (1)
ray resume (1)
 
johannas-blatter (1)
johannas-blatter (1)johannas-blatter (1)
johannas-blatter (1)
 
David Matthew Resume2
David Matthew Resume2David Matthew Resume2
David Matthew Resume2
 
Scotts Resume. New
Scotts Resume. NewScotts Resume. New
Scotts Resume. New
 
History Document
History DocumentHistory Document
History Document
 
Construction update 20111013
Construction update 20111013Construction update 20111013
Construction update 20111013
 
richie CV 2015
richie CV 2015richie CV 2015
richie CV 2015
 
M Marshall Resume 2015
M Marshall Resume 2015M Marshall Resume 2015
M Marshall Resume 2015
 
Oberto Scotts resume 1
Oberto Scotts resume 1Oberto Scotts resume 1
Oberto Scotts resume 1
 
Bridge Construction Methods
Bridge Construction MethodsBridge Construction Methods
Bridge Construction Methods
 
Resume 2014
Resume 2014Resume 2014
Resume 2014
 
Willis Towers Watson Feature Stair
Willis Towers Watson Feature StairWillis Towers Watson Feature Stair
Willis Towers Watson Feature Stair
 
John Hanson
John HansonJohn Hanson
John Hanson
 

Viewers also liked

Relieving letters and format
Relieving letters and formatRelieving letters and format
Relieving letters and format
Vinayaka Mc
 
GrameenPhone Experience Certificate
GrameenPhone Experience CertificateGrameenPhone Experience Certificate
GrameenPhone Experience Certificate
Fahad Rahman
 

Viewers also liked (9)

El conflicto y los equipos de trabajo
El conflicto y los equipos de trabajoEl conflicto y los equipos de trabajo
El conflicto y los equipos de trabajo
 
Experience Certificate
Experience CertificateExperience Certificate
Experience Certificate
 
Relieving letters and format
Relieving letters and formatRelieving letters and format
Relieving letters and format
 
GrameenPhone Experience Certificate
GrameenPhone Experience CertificateGrameenPhone Experience Certificate
GrameenPhone Experience Certificate
 
Experience Letter
Experience LetterExperience Letter
Experience Letter
 
Job Experience Letter Format
Job Experience Letter FormatJob Experience Letter Format
Job Experience Letter Format
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
 
CEO Turnover - Research Spotlight
CEO Turnover - Research SpotlightCEO Turnover - Research Spotlight
CEO Turnover - Research Spotlight
 
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job? Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
 

Similar to Resume_Jonathan-Iley_GetHired (20)

Hoover dam bypass_bridge25
Hoover dam bypass_bridge25Hoover dam bypass_bridge25
Hoover dam bypass_bridge25
 
Hoover dam bypass_bridge
Hoover dam bypass_bridgeHoover dam bypass_bridge
Hoover dam bypass_bridge
 
Hoover dam bypass_bridge2
Hoover dam bypass_bridge2Hoover dam bypass_bridge2
Hoover dam bypass_bridge2
 
Poster
PosterPoster
Poster
 
San francisco oakland bay bridge
San francisco oakland bay bridgeSan francisco oakland bay bridge
San francisco oakland bay bridge
 
072014_Bunker Mentality
072014_Bunker Mentality072014_Bunker Mentality
072014_Bunker Mentality
 
Advance Prestress Bridge
Advance Prestress BridgeAdvance Prestress Bridge
Advance Prestress Bridge
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
summer-quarterly-magazine
summer-quarterly-magazinesummer-quarterly-magazine
summer-quarterly-magazine
 
May 2016 M37 RH Milner AS PUBLISHED
May 2016 M37 RH Milner AS PUBLISHEDMay 2016 M37 RH Milner AS PUBLISHED
May 2016 M37 RH Milner AS PUBLISHED
 
Newest
NewestNewest
Newest
 
Shane Pyke Resume
Shane Pyke ResumeShane Pyke Resume
Shane Pyke Resume
 
Justin Updated 3.1.15
Justin Updated 3.1.15Justin Updated 3.1.15
Justin Updated 3.1.15
 
Hoover Dam
Hoover DamHoover Dam
Hoover Dam
 
Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15
 
bridgesafety2017-170426112039.pptx
bridgesafety2017-170426112039.pptxbridgesafety2017-170426112039.pptx
bridgesafety2017-170426112039.pptx
 
St.kitts tunnel - project references
St.kitts tunnel - project referencesSt.kitts tunnel - project references
St.kitts tunnel - project references
 
richie CV 2015
richie CV 2015richie CV 2015
richie CV 2015
 
Lenny Roderick's Resume
Lenny Roderick's ResumeLenny Roderick's Resume
Lenny Roderick's Resume
 
CRESP, Leigh-Resume
CRESP, Leigh-ResumeCRESP, Leigh-Resume
CRESP, Leigh-Resume
 

Resume_Jonathan-Iley_GetHired

  • 1. Jonathan Iley crane operator Pineville, LA 71360 iley608@gmail.com - 318-305-2842 318 787-3852 A position where my extensive experience can contribute to your customers' satisfaction and your company's success. NCCER crane certified up to date physical WORK EXPERIENCE crane operator johson brother - Lake Charles, LA - October 2014 to January 2015 Responsibilities Assist with crane set up and assembly for Manitowoc 777 and unload other equipment such as air hammer and steel beams for piledriveing. Accomplishments Finished driving concrete pile and poured caps and deck for bridge on I 210 in lake charles. Skills Used Operating crane safely and efficiently for crew also operated bulldozer and trackhoe for dirt crew when needed crane operator massman construction co - Convent, LA - June 2013 to April 2014 work nucor steel meal in convent LA building dock and conveyor system to off load raw material to make steel.operated Manitowoc 4100w on a bardge working with welding crews hanging sheer lugs for false work to set on to build concrete platform. setting rebar and efco forms for the walls. hanging steel with iron workers for structures on platform some were as high as 140ft. excavations with clam bucket in temples for pile driveing operation aslo operated Manitowoc 888 on a bardge hanging iron. crane operator jensen construction company - Alexandria, LA - January 2011 to April 2013 operated various ton cranes on fort bulow bridge replacement in alexandria. La work preformed was on land and water driveing sheet pile with disel hamer for coffer dam in the river for main span pier excavated cofferdam with clam bucket.drove 24 in 70ft pipe pile in cofferdam with hydro hammer underwater then poured seal slab for dewatering of cofferdam flying rebar and setting concrete forms pouring concrete with bucket i was aslo responsible for moveing barges with tug boat.also worked on land diging footers with trackhoe and operateing the crane driveing concrete pile with disel hammer.pouring footer with bucket setting rebar cage column form back filling set up to build cap. hanging steel girders and concrete girders cranes that i operated on the job werw american 9310, 9299, 9260, 7260, 5299, terex hc110 manitowoc 3900 crane operator MTI - New Orleans, LA - June 2010 to January 2011 operated Manitowoc, 999 on work bridge hang iron for section of bridge to be lifted with strand jacks for perment placement.
  • 2. crane operator chalmette levee construction - Chalmette, LA - December 2009 to June 2010 operates 4100w 999 manitowoc & 9299 american fro piledriveing operations drove battered steel h pile for flood wall construction pour concrete with concrete bucket crane operator inThibodaux Louisiana - August 2009 to December 2009 worked in south louisiana on small projectes piledriveing for work on pump stations and other foundations crane was a LS 118 linkbelt with 80ft fixed leads and an airhammer drove 12,10, 8 in pipe pile spliced three 50 ft joints also operated dirt equiptment dozer trackhoe backhoe for stie preparation. project foreman cecil d gassiott - Alexandria, LA - May 2008 to August 2009 crane operator projecet foreman in lake auther louisiana. built a pump station in lake with flood gates and sheet pileing wing wall to drain the water from the city of lake auther.put flexie floats togather and loaded american 5299 position barge to drive first bent of 14in 45ft concrete pile with ICE disel hammer four plum and two batters per bent five bents total. after each bent was driven we set prestress concrete cap and grouted it in place once all the pile were driven we set precast deck panels and two 48in pumps with indendent disel power supply daming off a small canl with sheet pile. used ICE vibro hammer to shake sheets down to grade pile driver Flatiron, Granite - New Roads, LA - September 2007 to April 2009 labor/piledriver/leadman on drill shafts work on jhon james audubon bridge in new roads louisiana. started on pile driveing crew building work bridge to river drove 24in 180 ft pipe pile with vibro then did restrike with disel hammer set steel cap and track girder and placed crane mats on top. they moved to operations on the river driveing 48in160ft pipe pile to suspend templets in water for drill shaft installation 96in 120ft permanent casson then placed oscillator over 96in casson then place 130ft temp casson airlifted material while oscillating down temp casson to add next joint to 130ft temp casson total length was 240ft after airlifting was complete rebar was placed then we put tremmie pipe in and pumped 280 + yards of concrete into drill shaft while oscillating out temp casson. ADDITIONAL INFORMATION Skills: * crane operator friction&hydrolic * abillity to operator trackhoe bulldozer frontend loader * cutting torch welding experince * able to read blue prints and survaing * ability to direct a crew for task at hand * over look to see that the proper ppe is being in use by my self and the crew