Siemens Solar Industries and Shell
Solar Industries Wire Saws Improved
   Productivity Through Vibration
               Analysis

                 A Case Study
                 M Miskus Director FM&E (2001-
                 2004)
                 Siemens SI and Shell SI
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




                                 Site Background on SSI

   The increasing demand for renewable forms of energy is making photovoltaic
    (PV) products an important part of the energy supply future.

   The costs of producing photovoltaic modules have been significantly reduced
    during the last 15 years as manufacturing costs per watt have dropped from
    over $6 per peak watt to less than half of that value now.

   Condition monitoring (vibration analysis) used in PV manufacturing has
    contributed to this reduction.
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Crystal growth improvements, both in yield and machine design, have reduced
    the PV manufacturing energy consumption by a factor of 3 and improved silicon
    utilization by 40%.

   Wafer slicing process changes have resulted in 66% more wafers being
    produced for a given amount of silicon.

   Cell production improvements in both automation and improved efficiency have
    reduced the labor cost contribution by over 40% per watt.
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Larger modules and better materials have added another 10% reduction in the
    cost to produce photovoltaics.

   These improvements have contributed to a better energy payback time,
    reducing it from over 5 years to approximately 3.

   Reductions in cost and improvements in energy efficiency have made
    photovoltaic products a commercially viable alternate energy source.
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




                                     Why?
                                     How?
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Introduce Predictive Maintenance Practices
   Subject Matter Expert – Miscon Associates
    Mannheim
   Identify high risk assets and failure modes
   Correct application of sensors
   Adequate data acquisition
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Interpretation of data via report
   Action to prevent breakdown
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Identify Asset/Equipment for Pdm
   Survey Asset/Equipment for sensor
   Pre survey data for baseline
   Install sensors, preliminary data
   Review Data Collection Intervals
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Review Data for Abnormalities
   Review Baseline Data
   Determine Asset Pre Failure
   Run time to Failure
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Scientific Maintenance
   Life Cycle Cost Reduction
   Increase Overall Equipment Effectivity
   Operational Productivity Enhancement
   Lean Manufacturing
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Develop and manage five-year strategic plan
    for equipment reliability through reliability
    based maintenance. SOP review.
   Implement predictive maintenance
    technologies and interval based actions
   Manage utility energy usage for Camarillo
    Campus and Vancouver, WA
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Manage long term utility energy use plan for
    equipment

   Manage routine review for ISO compliance
    on all equipment preventive maintenance
    procedures effectiveness
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Manage performance based projects to
    exceed PM/Downtime ratio for all areas –
    measured 3.5/1

   Establish OEE measurement for equipment
    performance reviews
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Develop Five-year strategic plan for
    equipment reliability through reliability based
    maintenance and introduction of sound
    methods and systems

   reduce $15MM expense budget by 15% per
    year for 3 year period 2001-2003.
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Integrate computerization with technical staff for on line equipment
    status.
   Achieve uptime average of 96% from 60% in 2.5 years.
   Administer review of all equipment preventive maintenance
    procedures
   effectiveness. Manage ISO 9000 compliance for manufacturing
    support role.
   Develop talent pool optimization for technical support of production
    areas.
   Established OEE measurement for equipment performance reviews.
   Exceeded PM/Downtime ratio for all areas – 3.5/1 from .5/1 in 2003.
   Reduced redundant parts in maintenance stores and establish critical
    spares.
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis
A Case Study
M Miskus Director FM&E (2001-2004)




   Developed talent pool optimization for
    technical support of production areas.
   Established OEE measurement for
    equipment performance reviews.
   Exceeded PM/Downtime ratio for all areas –
    3.5/1 from .5/1 in 2003.
   Reduced redundant parts in maintenance
    stores and establish critical spares.
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration
Analysis




                        Solar Power Supply Chain
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration
Analysis



   Wire Saw Technology
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration
Analysis
(Typical Equipment)
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration
Analysis
(Typical Equipment)
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration
Analysis
(Typical Equipment)
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration
Analysis
(Typical Equipment)
Siemens Solar Industries Wire Saws Improved Productivity Through Vibration
Analysis
(Typical Equipment)

More Related Content

Similar to Miscon Assoc Mannheim Siemens Vibration Analysis

Mark Williams_Res_Final_V2
Mark Williams_Res_Final_V2Mark Williams_Res_Final_V2
Mark Williams_Res_Final_V2
Mark Williams
 
2009 2013 deep research report on china wind power equipment industry chain
2009 2013 deep research report on china wind power equipment industry chain2009 2013 deep research report on china wind power equipment industry chain
2009 2013 deep research report on china wind power equipment industry chain
qyresearch
 
CV_Valentin Daniel Giurgiu
CV_Valentin Daniel GiurgiuCV_Valentin Daniel Giurgiu
CV_Valentin Daniel Giurgiu
Valentin Giurgiu
 
Owi monitoring-reduced
Owi monitoring-reducedOwi monitoring-reduced
Owi monitoring-reduced
BruWind
 
Fuelcellapplicationspresentation
FuelcellapplicationspresentationFuelcellapplicationspresentation
Fuelcellapplicationspresentation
Zondits
 
VIDMAP_Aviation_2014_Souma
VIDMAP_Aviation_2014_SoumaVIDMAP_Aviation_2014_Souma
VIDMAP_Aviation_2014_Souma
MDO_Lab
 
AIAA-Aviation-Vidmap-2014
AIAA-Aviation-Vidmap-2014AIAA-Aviation-Vidmap-2014
AIAA-Aviation-Vidmap-2014
OptiModel
 
wepik-optimizing-performance-the-design-of-seed-antenna-20240318082926rOJG.pdf
wepik-optimizing-performance-the-design-of-seed-antenna-20240318082926rOJG.pdfwepik-optimizing-performance-the-design-of-seed-antenna-20240318082926rOJG.pdf
wepik-optimizing-performance-the-design-of-seed-antenna-20240318082926rOJG.pdf
aryansingh3997
 

Similar to Miscon Assoc Mannheim Siemens Vibration Analysis (20)

Vel Linked In CV
Vel Linked In CVVel Linked In CV
Vel Linked In CV
 
Design and development of a multi configuration beam vibration test setup
Design and development of a multi configuration beam vibration test setupDesign and development of a multi configuration beam vibration test setup
Design and development of a multi configuration beam vibration test setup
 
Design and development of a multi configuration beam vibration test setup
Design and development of a multi configuration beam vibration test setupDesign and development of a multi configuration beam vibration test setup
Design and development of a multi configuration beam vibration test setup
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
 
Sasmos Report
Sasmos ReportSasmos Report
Sasmos Report
 
Mark Williams_Res_Final_V2
Mark Williams_Res_Final_V2Mark Williams_Res_Final_V2
Mark Williams_Res_Final_V2
 
first_solar_presentation.pdf
first_solar_presentation.pdffirst_solar_presentation.pdf
first_solar_presentation.pdf
 
Kec international ltd.
Kec international ltd.Kec international ltd.
Kec international ltd.
 
2009 2013 deep research report on china wind power equipment industry chain
2009 2013 deep research report on china wind power equipment industry chain2009 2013 deep research report on china wind power equipment industry chain
2009 2013 deep research report on china wind power equipment industry chain
 
CV_Valentin Daniel Giurgiu
CV_Valentin Daniel GiurgiuCV_Valentin Daniel Giurgiu
CV_Valentin Daniel Giurgiu
 
Owi monitoring-reduced
Owi monitoring-reducedOwi monitoring-reduced
Owi monitoring-reduced
 
Fuelcellapplicationspresentation
FuelcellapplicationspresentationFuelcellapplicationspresentation
Fuelcellapplicationspresentation
 
PES Wind Magazine - The development of a MV power converter for FC wind turbi...
PES Wind Magazine - The development of a MV power converter for FC wind turbi...PES Wind Magazine - The development of a MV power converter for FC wind turbi...
PES Wind Magazine - The development of a MV power converter for FC wind turbi...
 
Todd Griffith: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Todd Griffith: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopTodd Griffith: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Todd Griffith: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
 
IRJET- Development of Multitest System for Solar PV
IRJET- Development of Multitest System for Solar PVIRJET- Development of Multitest System for Solar PV
IRJET- Development of Multitest System for Solar PV
 
VIDMAP_Aviation_2014_Souma
VIDMAP_Aviation_2014_SoumaVIDMAP_Aviation_2014_Souma
VIDMAP_Aviation_2014_Souma
 
AIAA-Aviation-Vidmap-2014
AIAA-Aviation-Vidmap-2014AIAA-Aviation-Vidmap-2014
AIAA-Aviation-Vidmap-2014
 
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...
 
Ground Based Inspection and Monitoring of Wind Turbine Blades
Ground Based Inspection and Monitoring of Wind Turbine BladesGround Based Inspection and Monitoring of Wind Turbine Blades
Ground Based Inspection and Monitoring of Wind Turbine Blades
 
wepik-optimizing-performance-the-design-of-seed-antenna-20240318082926rOJG.pdf
wepik-optimizing-performance-the-design-of-seed-antenna-20240318082926rOJG.pdfwepik-optimizing-performance-the-design-of-seed-antenna-20240318082926rOJG.pdf
wepik-optimizing-performance-the-design-of-seed-antenna-20240318082926rOJG.pdf
 

Recently uploaded

Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
LR1709MUSIC
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
yulianti213969
 
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Klinik kandungan
 
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
bleessingsbender
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 

Recently uploaded (20)

WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
UJJAIN CALL GIRL ❤ 8272964427❤ CALL GIRLS IN UJJAIN ESCORTS SERVICE PROVIDE
UJJAIN CALL GIRL ❤ 8272964427❤ CALL GIRLS IN UJJAIN ESCORTS SERVICE PROVIDEUJJAIN CALL GIRL ❤ 8272964427❤ CALL GIRLS IN UJJAIN ESCORTS SERVICE PROVIDE
UJJAIN CALL GIRL ❤ 8272964427❤ CALL GIRLS IN UJJAIN ESCORTS SERVICE PROVIDE
 
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
 
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
 
Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024
 
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docxManagerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEJIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertainty
 

Miscon Assoc Mannheim Siemens Vibration Analysis

  • 1. Siemens Solar Industries and Shell Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001- 2004) Siemens SI and Shell SI
  • 2. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004) Site Background on SSI  The increasing demand for renewable forms of energy is making photovoltaic (PV) products an important part of the energy supply future.  The costs of producing photovoltaic modules have been significantly reduced during the last 15 years as manufacturing costs per watt have dropped from over $6 per peak watt to less than half of that value now.  Condition monitoring (vibration analysis) used in PV manufacturing has contributed to this reduction.
  • 3. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Crystal growth improvements, both in yield and machine design, have reduced the PV manufacturing energy consumption by a factor of 3 and improved silicon utilization by 40%.  Wafer slicing process changes have resulted in 66% more wafers being produced for a given amount of silicon.  Cell production improvements in both automation and improved efficiency have reduced the labor cost contribution by over 40% per watt.
  • 4. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Larger modules and better materials have added another 10% reduction in the cost to produce photovoltaics.  These improvements have contributed to a better energy payback time, reducing it from over 5 years to approximately 3.  Reductions in cost and improvements in energy efficiency have made photovoltaic products a commercially viable alternate energy source.
  • 5. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004) Why? How?
  • 6. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Introduce Predictive Maintenance Practices  Subject Matter Expert – Miscon Associates Mannheim  Identify high risk assets and failure modes  Correct application of sensors  Adequate data acquisition
  • 7. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Interpretation of data via report  Action to prevent breakdown
  • 8. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Identify Asset/Equipment for Pdm  Survey Asset/Equipment for sensor  Pre survey data for baseline  Install sensors, preliminary data  Review Data Collection Intervals
  • 9. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Review Data for Abnormalities  Review Baseline Data  Determine Asset Pre Failure  Run time to Failure
  • 10. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Scientific Maintenance  Life Cycle Cost Reduction  Increase Overall Equipment Effectivity  Operational Productivity Enhancement  Lean Manufacturing
  • 11. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Develop and manage five-year strategic plan for equipment reliability through reliability based maintenance. SOP review.  Implement predictive maintenance technologies and interval based actions  Manage utility energy usage for Camarillo Campus and Vancouver, WA
  • 12. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Manage long term utility energy use plan for equipment  Manage routine review for ISO compliance on all equipment preventive maintenance procedures effectiveness
  • 13. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Manage performance based projects to exceed PM/Downtime ratio for all areas – measured 3.5/1  Establish OEE measurement for equipment performance reviews
  • 14. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Develop Five-year strategic plan for equipment reliability through reliability based maintenance and introduction of sound methods and systems  reduce $15MM expense budget by 15% per year for 3 year period 2001-2003.
  • 15. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Integrate computerization with technical staff for on line equipment status.  Achieve uptime average of 96% from 60% in 2.5 years.  Administer review of all equipment preventive maintenance procedures  effectiveness. Manage ISO 9000 compliance for manufacturing support role.  Develop talent pool optimization for technical support of production areas.  Established OEE measurement for equipment performance reviews.  Exceeded PM/Downtime ratio for all areas – 3.5/1 from .5/1 in 2003.  Reduced redundant parts in maintenance stores and establish critical spares.
  • 16. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis A Case Study M Miskus Director FM&E (2001-2004)  Developed talent pool optimization for technical support of production areas.  Established OEE measurement for equipment performance reviews.  Exceeded PM/Downtime ratio for all areas – 3.5/1 from .5/1 in 2003.  Reduced redundant parts in maintenance stores and establish critical spares.
  • 17. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis Solar Power Supply Chain
  • 18. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis  Wire Saw Technology
  • 19. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis (Typical Equipment)
  • 20. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis (Typical Equipment)
  • 21. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis (Typical Equipment)
  • 22. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis (Typical Equipment)
  • 23. Siemens Solar Industries Wire Saws Improved Productivity Through Vibration Analysis (Typical Equipment)