Outline
• INTRODUCTION
• METHODS
• RESULTS AND DISCUSSION
• CONCLUSION
INTRODUCTION
• Phewa Lake is second largest lake of the country
• Phewa Lake and its sub watersheds contributing different
ecological services
• The Lake also contributes to the livelihoods in several ways
• The ES by the lake is valued at over US$43 million per year
• Sustainability of this benefit depends on the life of the lake
• Sedimentation is the major problem of the lake
• This paper aims to document the quantity of sediment
loads coming from sub watersheds and explores
possibilities for sediment retention in the upper
catchments through establishment of Payment of
Ecosystem Service (PES)
METHODS
The methodology adopted for the
study were:
1. desk review of wide range of
secondary information
2. focused groups discussion
3. Consultations with
stakeholders
4. mapping of Phewa sub-
watershed with sediment
transfer in Phewa lake; and
5. Scenario maps creation using
InVEST software
RESULTS AND DISCUSSION
Total area of watersheds:
11,351Ha.
Present Capacity
42.18 million m3
Annual siltation rate (1990-
1994):
about 175,000-225,000 m3
If the lake is considered to be
dead, when 80% of the storage
is silted up and if the average
sedimentation rate of about
180,000 cubic meters
continues, the lake will be
filled up with sediments in
about 190 year from the year
1998 (Singh, 2013).
0
2
4
6
8
10
12
1950 1960 1970 1980 1990 2000 2010
Size of Phewa Lake is decreasing)
Capacity (Km2)
(JICA/SILT, 2002)
RESULTS AND DISCUSSION contd..
Major sources of
sedimentation:
– Big landslides
– Rural road
construction using
bulldozer
– Traditional agricultural
system
– Increased
development
activities
Soil loss intensity of the different sub watersheds
Sub-watersheds categorization based on
Sediment transfer
• Category 1: Sarankot, Kaskikot, and Dhikur
Pokhari VDCs
• Category 2: Eastern hill slope of Sarankot VDC,
Pokhara Municipality (Ward No. 2, 4, 5, 6, 7 & 8)
• Category 3: Bhadaure Tamagi, Chapakot and
Pumdi Bhumdi VDCs.
• immediate actions are required in category 1
– Major contributing factors: agricultural activities -
mono-cropping, cultivation in small terraces and
heavy tillage
Conclusion
• Sediments can be retained by
– improving farming practices
• use of sediment laden diverting
runoff
• in-situ manuring,
• plantation of nitrogen fixing plants;
• terrace riser slicing; and
• use of compost and farm yard
manure (FYM)
• terrace improvement;
• Sloping Agriculture Land Technology
(SALT);
• Some of the other recommended
activities for sediment retention are
strip cropping; multiple cropping
and high density planting and
mulching.
– PES for sediment retention could
be a feasible option
Recommended actions for PES
• Establish Phewa Lake Conservation and
Management Interim Board with membership
from the upstream communities and Phewa
dependent stakeholders
• Establishment of Payers Association (fund
collection and performance based payments) and
Service Providers’ Association to ensure the
continuous sediment retention service delivery
• MoU between the upstream communities and
Phewa Lake beneficiaries
• Make provision for Third Party Monitoring and
verification of the service provided
Key messages
• Phewa Lake provides different Ecosystem Services and
the livelihoods for thousands of people around the
Lake.
• The lake is decreasing in area and depth due to heavy
sedimentation.
• Both the upstream communities and downstream Lake
dependent communities could get mutual benefit from
the PES; particularly sediment retention
• PES for sediment retention is feasible in Phewa
watershed through establishment of independent
Phewa Management Authority and other appropriate
institutions for the effective delivery of sediment
retention ES and payments against the performance of
the services.
Acknowledgements
• Local communities of Phewa catchments and ,
• Hotel Association- Pokhara, Nepal Toursim Board,
district government line agencies of Kaski district
and other stakeholders provided information.
• Mr. Gokarna Jung Thapa of WWF Nepal-
mapping the sub watershed based on sediment
load contribution to Phewa lake and projecting
the future scenario of sedimentation problem in
the lake using InVEST tool.
This paper is made possible by the
generous support of the American
people through the United States
Agency for International
Development (USAID). The content
is the responsibility of authors and
does not necessarily reflect the
views of USAID or the United States
Government.

More Related Content

What's hot

Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of riversAshwath Sriram
 
Issues of water conservation in Bengallaru_Thippeswamy _2013
Issues of water conservation in Bengallaru_Thippeswamy _2013Issues of water conservation in Bengallaru_Thippeswamy _2013
Issues of water conservation in Bengallaru_Thippeswamy _2013India Water Portal
 
Engaging with lakes in Bangalore
Engaging with lakes in BangaloreEngaging with lakes in Bangalore
Engaging with lakes in Bangalorebiometrust
 
Multi sector cooperation on conjunctive management of aquifers and river basi...
Multi sector cooperation on conjunctive management of aquifers and river basi...Multi sector cooperation on conjunctive management of aquifers and river basi...
Multi sector cooperation on conjunctive management of aquifers and river basi...Shammy Puri
 
Mumbai Lakes Restoration
Mumbai Lakes RestorationMumbai Lakes Restoration
Mumbai Lakes RestorationPigtail Pundits
 
Shankaraiah N :Watershed Program Present
Shankaraiah N :Watershed Program  PresentShankaraiah N :Watershed Program  Present
Shankaraiah N :Watershed Program Presentshankaraiah, N
 
Waters and Communities Water Framework Directive guide and community involvem...
Waters and Communities Water Framework Directive guide and community involvem...Waters and Communities Water Framework Directive guide and community involvem...
Waters and Communities Water Framework Directive guide and community involvem...Environmental Protection Agency, Ireland
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]'Denish Makvana'
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGEkonnect
 
Adyar River Restoration, Chennai
Adyar River Restoration, Chennai Adyar River Restoration, Chennai
Adyar River Restoration, Chennai Geeva Chandana
 
Lake Privatisation
Lake PrivatisationLake Privatisation
Lake PrivatisationBhargavi Rao
 
Disaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodDisaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodmadhura92
 
Inter linking of river in india...
Inter linking of river in india...Inter linking of river in india...
Inter linking of river in india...Puspendu Samanta
 
Climate Change and Water Supply in the Mekong Delta. Workshop Results
Climate Change and Water Supply in the Mekong Delta. Workshop ResultsClimate Change and Water Supply in the Mekong Delta. Workshop Results
Climate Change and Water Supply in the Mekong Delta. Workshop ResultsHanna Stahlberg
 
Urban watershed management
Urban watershed managementUrban watershed management
Urban watershed managementpreetijaycobe
 
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...Environmental Protection Agency, Ireland
 

What's hot (20)

Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
 
Issues of water conservation in Bengallaru_Thippeswamy _2013
Issues of water conservation in Bengallaru_Thippeswamy _2013Issues of water conservation in Bengallaru_Thippeswamy _2013
Issues of water conservation in Bengallaru_Thippeswamy _2013
 
flood
 flood flood
flood
 
East Side Coastal Resiliency Project
East Side Coastal Resiliency ProjectEast Side Coastal Resiliency Project
East Side Coastal Resiliency Project
 
Engaging with lakes in Bangalore
Engaging with lakes in BangaloreEngaging with lakes in Bangalore
Engaging with lakes in Bangalore
 
Multi sector cooperation on conjunctive management of aquifers and river basi...
Multi sector cooperation on conjunctive management of aquifers and river basi...Multi sector cooperation on conjunctive management of aquifers and river basi...
Multi sector cooperation on conjunctive management of aquifers and river basi...
 
Mumbai Lakes Restoration
Mumbai Lakes RestorationMumbai Lakes Restoration
Mumbai Lakes Restoration
 
Shankaraiah N :Watershed Program Present
Shankaraiah N :Watershed Program  PresentShankaraiah N :Watershed Program  Present
Shankaraiah N :Watershed Program Present
 
Waters and Communities Water Framework Directive guide and community involvem...
Waters and Communities Water Framework Directive guide and community involvem...Waters and Communities Water Framework Directive guide and community involvem...
Waters and Communities Water Framework Directive guide and community involvem...
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESG
 
Adyar River Restoration, Chennai
Adyar River Restoration, Chennai Adyar River Restoration, Chennai
Adyar River Restoration, Chennai
 
Lake Privatisation
Lake PrivatisationLake Privatisation
Lake Privatisation
 
Disaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodDisaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai flood
 
Inter linking of river in india...
Inter linking of river in india...Inter linking of river in india...
Inter linking of river in india...
 
Climate Change and Water Supply in the Mekong Delta. Workshop Results
Climate Change and Water Supply in the Mekong Delta. Workshop ResultsClimate Change and Water Supply in the Mekong Delta. Workshop Results
Climate Change and Water Supply in the Mekong Delta. Workshop Results
 
Urban watershed management
Urban watershed managementUrban watershed management
Urban watershed management
 
Hydropower Reservoir Livelihood
Hydropower Reservoir Livelihood Hydropower Reservoir Livelihood
Hydropower Reservoir Livelihood
 
Interlinking of rivers (NRLP)
Interlinking of rivers (NRLP)Interlinking of rivers (NRLP)
Interlinking of rivers (NRLP)
 
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
 

Similar to Keshav prasad khanal

SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...ICIMOD
 
Science and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.pptScience and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.pptUmangi Mehta
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront DevelopmentBeda Choudhury
 
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...WaterCap
 
Shankaraiah N:Rural Sociology Record
Shankaraiah N:Rural Sociology RecordShankaraiah N:Rural Sociology Record
Shankaraiah N:Rural Sociology Recordshankaraiah, N
 
Nile Basin Initiative Presentation at WLE Nile Basin Focal Region Consultation
Nile Basin Initiative Presentation at WLE Nile Basin Focal Region ConsultationNile Basin Initiative Presentation at WLE Nile Basin Focal Region Consultation
Nile Basin Initiative Presentation at WLE Nile Basin Focal Region ConsultationWater, Land and Ecosystems (WLE)
 
Reaping the rewards
Reaping the rewardsReaping the rewards
Reaping the rewardsifadseahub
 
Hydrogeology-of-the-Dry-Zone-Central-Myanmar PART-1
Hydrogeology-of-the-Dry-Zone-Central-Myanmar PART-1Hydrogeology-of-the-Dry-Zone-Central-Myanmar PART-1
Hydrogeology-of-the-Dry-Zone-Central-Myanmar PART-1MYO AUNG Myanmar
 
Stakeholder mapping and engagement: Bringing together stakeholders for robust...
Stakeholder mapping and engagement: Bringing together stakeholders for robust...Stakeholder mapping and engagement: Bringing together stakeholders for robust...
Stakeholder mapping and engagement: Bringing together stakeholders for robust...biometrust
 
CaBA Startup Conference 02 - A response to the challenge from the third sector
CaBA Startup Conference 02 - A response to the challenge from the third sectorCaBA Startup Conference 02 - A response to the challenge from the third sector
CaBA Startup Conference 02 - A response to the challenge from the third sectorCaBASupport
 
IWRM in Karnataka, India. Crafting a New Future
IWRM in Karnataka, India. Crafting a New FutureIWRM in Karnataka, India. Crafting a New Future
IWRM in Karnataka, India. Crafting a New FutureOswar Mungkasa
 

Similar to Keshav prasad khanal (20)

Volta Basin
Volta BasinVolta Basin
Volta Basin
 
IWMI in Nepal
IWMI in NepalIWMI in Nepal
IWMI in Nepal
 
Water civilisation_mp
Water civilisation_mpWater civilisation_mp
Water civilisation_mp
 
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...
 
Science and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.pptScience and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.ppt
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront Development
 
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
 
B0361011021
B0361011021B0361011021
B0361011021
 
Shankaraiah N:Rural Sociology Record
Shankaraiah N:Rural Sociology RecordShankaraiah N:Rural Sociology Record
Shankaraiah N:Rural Sociology Record
 
Nile Basin Initiative Presentation at WLE Nile Basin Focal Region Consultation
Nile Basin Initiative Presentation at WLE Nile Basin Focal Region ConsultationNile Basin Initiative Presentation at WLE Nile Basin Focal Region Consultation
Nile Basin Initiative Presentation at WLE Nile Basin Focal Region Consultation
 
Reaping the rewards
Reaping the rewardsReaping the rewards
Reaping the rewards
 
Hydrogeology-of-the-Dry-Zone-Central-Myanmar PART-1
Hydrogeology-of-the-Dry-Zone-Central-Myanmar PART-1Hydrogeology-of-the-Dry-Zone-Central-Myanmar PART-1
Hydrogeology-of-the-Dry-Zone-Central-Myanmar PART-1
 
Strengthening Communication between Stakeholders: The Experience of Imarisha ...
Strengthening Communication between Stakeholders: The Experience of Imarisha ...Strengthening Communication between Stakeholders: The Experience of Imarisha ...
Strengthening Communication between Stakeholders: The Experience of Imarisha ...
 
Wetland Resource Management: Wise Use and Conservation
Wetland Resource Management: Wise Use and ConservationWetland Resource Management: Wise Use and Conservation
Wetland Resource Management: Wise Use and Conservation
 
GVM PDBI Presentation
GVM PDBI PresentationGVM PDBI Presentation
GVM PDBI Presentation
 
Stakeholder mapping and engagement: Bringing together stakeholders for robust...
Stakeholder mapping and engagement: Bringing together stakeholders for robust...Stakeholder mapping and engagement: Bringing together stakeholders for robust...
Stakeholder mapping and engagement: Bringing together stakeholders for robust...
 
CaBA Startup Conference 02 - A response to the challenge from the third sector
CaBA Startup Conference 02 - A response to the challenge from the third sectorCaBA Startup Conference 02 - A response to the challenge from the third sector
CaBA Startup Conference 02 - A response to the challenge from the third sector
 
IWRM in Karnataka, India. Crafting a New Future
IWRM in Karnataka, India. Crafting a New FutureIWRM in Karnataka, India. Crafting a New Future
IWRM in Karnataka, India. Crafting a New Future
 
Ganga action plan 2014
Ganga action plan 2014Ganga action plan 2014
Ganga action plan 2014
 
Adrian shepherd
Adrian shepherdAdrian shepherd
Adrian shepherd
 

More from ClimDev15

Nir y. krakauer
Nir y. krakauerNir y. krakauer
Nir y. krakauerClimDev15
 
Nicky shree shrestha
Nicky shree shresthaNicky shree shrestha
Nicky shree shresthaClimDev15
 
Gerald spreitzhofer
Gerald spreitzhoferGerald spreitzhofer
Gerald spreitzhoferClimDev15
 
Dibas shrestha
Dibas shresthaDibas shrestha
Dibas shresthaClimDev15
 
Anita khadka
Anita khadkaAnita khadka
Anita khadkaClimDev15
 
Md. abu hanif
Md. abu hanifMd. abu hanif
Md. abu hanifClimDev15
 
Gokarna jung thapa
Gokarna jung thapaGokarna jung thapa
Gokarna jung thapaClimDev15
 
Bhawani s. dongol
Bhawani s. dongolBhawani s. dongol
Bhawani s. dongolClimDev15
 
Sarah mc kune
Sarah mc kuneSarah mc kune
Sarah mc kuneClimDev15
 
Smrittee kala panta
Smrittee kala pantaSmrittee kala panta
Smrittee kala pantaClimDev15
 
Praju gurung
Praju gurungPraju gurung
Praju gurungClimDev15
 
Netra p. osti
Netra p. ostiNetra p. osti
Netra p. ostiClimDev15
 
Md. monowar hossain ronee
Md. monowar hossain roneeMd. monowar hossain ronee
Md. monowar hossain roneeClimDev15
 
Dinesh pandey
Dinesh pandeyDinesh pandey
Dinesh pandeyClimDev15
 
Soni m pradhanang
Soni m pradhanangSoni m pradhanang
Soni m pradhanangClimDev15
 
Prakash tiwari
Prakash tiwariPrakash tiwari
Prakash tiwariClimDev15
 
Narayan prasad gaire
Narayan prasad gaireNarayan prasad gaire
Narayan prasad gaireClimDev15
 

More from ClimDev15 (20)

Nir y. krakauer
Nir y. krakauerNir y. krakauer
Nir y. krakauer
 
Nicky shree shrestha
Nicky shree shresthaNicky shree shrestha
Nicky shree shrestha
 
Gerald spreitzhofer
Gerald spreitzhoferGerald spreitzhofer
Gerald spreitzhofer
 
Dibas shrestha
Dibas shresthaDibas shrestha
Dibas shrestha
 
Anita khadka
Anita khadkaAnita khadka
Anita khadka
 
Rinku verma
Rinku vermaRinku verma
Rinku verma
 
Md. abu hanif
Md. abu hanifMd. abu hanif
Md. abu hanif
 
Gokarna jung thapa
Gokarna jung thapaGokarna jung thapa
Gokarna jung thapa
 
Bhawani s. dongol
Bhawani s. dongolBhawani s. dongol
Bhawani s. dongol
 
Sarah mc kune
Sarah mc kuneSarah mc kune
Sarah mc kune
 
Smrittee kala panta
Smrittee kala pantaSmrittee kala panta
Smrittee kala panta
 
Praju gurung
Praju gurungPraju gurung
Praju gurung
 
Metthew
MetthewMetthew
Metthew
 
Madhav giri
Madhav giriMadhav giri
Madhav giri
 
Netra p. osti
Netra p. ostiNetra p. osti
Netra p. osti
 
Md. monowar hossain ronee
Md. monowar hossain roneeMd. monowar hossain ronee
Md. monowar hossain ronee
 
Dinesh pandey
Dinesh pandeyDinesh pandey
Dinesh pandey
 
Soni m pradhanang
Soni m pradhanangSoni m pradhanang
Soni m pradhanang
 
Prakash tiwari
Prakash tiwariPrakash tiwari
Prakash tiwari
 
Narayan prasad gaire
Narayan prasad gaireNarayan prasad gaire
Narayan prasad gaire
 

Keshav prasad khanal

  • 1. Enhancing Ecosystem Services through sediment retention in Phewa Lake of Western Nepal Keshav Prasad Khanal and Sunil Kumar Regmi Kathmandu 14 January 2015
  • 2. Outline • INTRODUCTION • METHODS • RESULTS AND DISCUSSION • CONCLUSION
  • 3. INTRODUCTION • Phewa Lake is second largest lake of the country • Phewa Lake and its sub watersheds contributing different ecological services • The Lake also contributes to the livelihoods in several ways • The ES by the lake is valued at over US$43 million per year • Sustainability of this benefit depends on the life of the lake • Sedimentation is the major problem of the lake • This paper aims to document the quantity of sediment loads coming from sub watersheds and explores possibilities for sediment retention in the upper catchments through establishment of Payment of Ecosystem Service (PES)
  • 4. METHODS The methodology adopted for the study were: 1. desk review of wide range of secondary information 2. focused groups discussion 3. Consultations with stakeholders 4. mapping of Phewa sub- watershed with sediment transfer in Phewa lake; and 5. Scenario maps creation using InVEST software
  • 5. RESULTS AND DISCUSSION Total area of watersheds: 11,351Ha. Present Capacity 42.18 million m3 Annual siltation rate (1990- 1994): about 175,000-225,000 m3 If the lake is considered to be dead, when 80% of the storage is silted up and if the average sedimentation rate of about 180,000 cubic meters continues, the lake will be filled up with sediments in about 190 year from the year 1998 (Singh, 2013). 0 2 4 6 8 10 12 1950 1960 1970 1980 1990 2000 2010 Size of Phewa Lake is decreasing) Capacity (Km2) (JICA/SILT, 2002)
  • 6. RESULTS AND DISCUSSION contd.. Major sources of sedimentation: – Big landslides – Rural road construction using bulldozer – Traditional agricultural system – Increased development activities
  • 7. Soil loss intensity of the different sub watersheds
  • 8. Sub-watersheds categorization based on Sediment transfer • Category 1: Sarankot, Kaskikot, and Dhikur Pokhari VDCs • Category 2: Eastern hill slope of Sarankot VDC, Pokhara Municipality (Ward No. 2, 4, 5, 6, 7 & 8) • Category 3: Bhadaure Tamagi, Chapakot and Pumdi Bhumdi VDCs. • immediate actions are required in category 1 – Major contributing factors: agricultural activities - mono-cropping, cultivation in small terraces and heavy tillage
  • 9. Conclusion • Sediments can be retained by – improving farming practices • use of sediment laden diverting runoff • in-situ manuring, • plantation of nitrogen fixing plants; • terrace riser slicing; and • use of compost and farm yard manure (FYM) • terrace improvement; • Sloping Agriculture Land Technology (SALT); • Some of the other recommended activities for sediment retention are strip cropping; multiple cropping and high density planting and mulching. – PES for sediment retention could be a feasible option
  • 10. Recommended actions for PES • Establish Phewa Lake Conservation and Management Interim Board with membership from the upstream communities and Phewa dependent stakeholders • Establishment of Payers Association (fund collection and performance based payments) and Service Providers’ Association to ensure the continuous sediment retention service delivery • MoU between the upstream communities and Phewa Lake beneficiaries • Make provision for Third Party Monitoring and verification of the service provided
  • 11. Key messages • Phewa Lake provides different Ecosystem Services and the livelihoods for thousands of people around the Lake. • The lake is decreasing in area and depth due to heavy sedimentation. • Both the upstream communities and downstream Lake dependent communities could get mutual benefit from the PES; particularly sediment retention • PES for sediment retention is feasible in Phewa watershed through establishment of independent Phewa Management Authority and other appropriate institutions for the effective delivery of sediment retention ES and payments against the performance of the services.
  • 12. Acknowledgements • Local communities of Phewa catchments and , • Hotel Association- Pokhara, Nepal Toursim Board, district government line agencies of Kaski district and other stakeholders provided information. • Mr. Gokarna Jung Thapa of WWF Nepal- mapping the sub watershed based on sediment load contribution to Phewa lake and projecting the future scenario of sedimentation problem in the lake using InVEST tool.
  • 13. This paper is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The content is the responsibility of authors and does not necessarily reflect the views of USAID or the United States Government.