In addition to our Energy saving side of the business we are able to offer an all services interior solution, from full refurbishment and fit outs, cat A & Cat B, a dilapidation service main contractor facilities..
1. Unit A 7 Gore Road, Burnham, Buckinghamshire, SL1 8AA
Tel: +44 (0) 1628 202 747 | Fax: +44 (0) 1628 661 331
Email: info@emf-ltd.co.uk
2. 1. An Insight to Electrical Minimisation Facilities Ltd
2. The Team
3. “Modern Methods for Modern Installations”
3.1 Stephenson House & Knollys House
3.2 Jubilee House, Marsh Wall
3.3 Gatwick 23
3.4 Agilent Technologies
3.5 Tandberg
3.6 No. 1 Premiere Park
3.7 HPH Hayes
3.8 Great West Plaza Brentford
3.9 Ascot Racecourse
3.10 Society General (Gibraltar)
4. Client Testimonials
CONTENTS
4. EMF is an Electrical contractor with over 25 years experience in the Commercial and Industrial field
The Company was formed in 1991 by Eoin Healy, Who has steadily Developed the Business and Bringing in
Senior Management to assist with the increasing Work load
Our Directors along with the Management Team work very Closely with our Clients to supply a professional and
Friendly service ensuring the that our usual high standards are maintained from start to finish
The Day to day running of Office is managed by Pat Healy and his operational team, Who are responsible for
Customer support , Accounts, Credit control ,Logistics and also have an active involvement in the overall cost
control of our Works in progress
Estimating, Surveying, Business development, and Running of the Sites are carried out by our project
management team, Who have Regular In-house & on site meetings to ensure full co-ordination between all
departments and Site
We have also found that having a close working relationship with the client allows us to be Part of “The Team”
and assists bringing the Project in on time and Within Budget with the minimum of fuss
Our recent projects have included both new build & refurbishment, either on a Design & Build basis or
Traditional specification and Drawings ,
Whilst these have been our ‘staple’ for the past couple of years, our team has wide experience in the ‘fast-
track’ sector, with brands such as Fujitsu , Tandberg , Fullerton’s, Ascot Race Course , Windsor Castle, Societe
Generale ( Gibraltar ) to name but a few.
The M&E contractor these days needs to attain many strings to their bow, and subsequently we have
considerable expertise in data/telecommunications, BMS installations, fire alarm, intruder alarm, access
control, CCTV/security systems, disabled refuge, induction loop, television/media, high security systems and
lightning protection systems, as examples of a few, that will no doubt be prevalent in the projects that you
manage.
1.0 AN INSIGHT TO ELECTRICAL MINIMISATION FACILITIES LTD
5. All our Management and Site Staff are Fully Qualified in there areas of Expertise and all hold Site safety ESCS
certificates
We also Hold weekly toolbox talks on site and Ensure that our site operatives are Fully Qualified to carry out
any task set. Site safety Documentation is produced in house and regular site visits are Made to ensure that the
Site and EMF are working Safely
EMF hold professional Indemnity to cover the size and requirement of each Project to a maximum of £2 Million
We also Have Public Liability of £5 million for any one claim
All design, drawings and CDM requirements are carried out in-house, as are all of our administration and
financial facilities. We have affiliations with NICEIC, Safe Contractor, etc.
1.0 AN INSIGHT TO ELECTRICAL MINIMIASTION FACILITIES LTD
7. Eoin Healy
2.0 THE TEAM
Title: Managing Director
Qualifications: Completed Electrical Engineering Apprenticeship
City & Guilds 2360
City & Guilds 2391
City & Guilds Electrical Aspects
NICEIC approved Supervisor
Management Courses –CSES card holder
Experience: Over 25 years as a Qualified Electrician
Current Role & Responsibilities
Managing Director’s day to day duties- negotiation with Customers, General management duties, decision making on all business activities, overseeing &
running the Business, with direct responsibility for all Health & Safety matters.
Sales – Surveys, over seeing the Design, Quotation’s for all new projects
Future Planning.
Project Management – Site meetings Liaison with Main Contractors, over sees all project matters assisted by EMF Contract Managers
Others – New Customer Development , attending Main contracts Meetings dealing with business concerns, initiating future Training & Project Development.
instituting changes to comply with new Legislation
8. Pat Healy
2.0 THE TEAM
Title: Director & Co Secretary – HASWA Advisor
Qualifications British Safety Council MIISM
Slough College NEBSS 1 & 2
Specialist Subjects costing & finance combined with Industrial relations
Various external courses with Govt. Agencies
Including HM Factory Inspectorate
Training Boards & Local further Education Colleges on Technician & Craft apprentice’s training, CSES card Holder
Experience: Having 40 plus years experience in Industry combining production management & facilities management in the Aviation industry with
responsibility for Health & Safety for a number of large industrial sites.
Personnel Training & Safety manager for a large group of companies.
For the past 2 years combining Health & Safety with other duties as Company Secretary for EMF
Current Role & Responsibilities
Main Office Management, responsible to the Managing Director for all the business commercial activities, Safety advice, Training, Purchase control,
administration ,accounts.
Liaison with external suppliers & administration, Credit Control
9. Amanda Pottow
2.0 THE TEAM
Title: Accounts Manager
Qualifications n/a
Experience: n/a
Current Role & Responsibilities
Maintaining the accounts function ensuring that the business meets all Its responsibilities with regard to good accounting practices.
Maintaining the accounts, Liaison with the Company accountant and Government agencies.
Maintaining relation with Suppliers and EMF Main Contractor accounts departments.
10. 2.0 THE TEAM
Ms F Lawrence
Title: Office Assistant
Qualifications n/a
Experience: n/a
Current Role & Responsibilities
General Office duties and administration
11. 2.0 THE TEAM
Terry Kirby
Title: Technical Manager – Projects Manager
Qualifications City & Guilds 2360 Part 1 & 2
City & Guilds C Course
City & Guilds T3,4 & 5 courses
City & Guilds Level 3 BS 7671-2008.
City & Guilds CAD
HV AC Managing M-E Safety
NICEIC qualified supervisor for the past 12 years
17th Edition 2382-10 BS 7671 IEE Regs.
CSCE Card Holder
Experience: Approximately 35 years experience with Electrical Contractors, originally as an apprentice Electrician then as an Engineer with a JIB
company ,then as a Design / Project Manager with a Consultancy and Installation’s Company.
The past 2 years with EMF
Current Role & Responsibilities
Technical day to day duties – over seeing and advising on design and technical issues to management, customers and engineering staff, IT management.
Health & Safety, credit control, CDM requirement, decision making for all technical aspects of the business.
Sales –Liaison, Site Surveying, with responsibility for preparation of quotations for new projects and innovation.
Project Management –design development, site meetings. negotiation’s with customers, engineering staff, suppliers & sub contractors.
NICEIC qualified supervisor
12. 2.0 THE TEAM
Title: Basic PM requirements Projects Managers Which are Brought on board to Manage Specific Projects
Min Qualifications City & Guilds 2391 part 1 & 2
City & Guilds 2391
City & Guilds Level 3 BS 7671-2008
17th edition 2382-10 BS 7671 IEE Regs.
CSES Card Holder
Experience: Min 10 years in the Electrical construction industry.
Prior Experience Within This Field Essential
Expected Role & Responsibilities
Project Management – site meetings, negotiating with customers, engineering Staff, Suppliers & Sub Contractors.
13. 2.0 THE TEAM
Chris Powell
Title: Business Development Manager
Qualifications N/A
Experience: Approximately 29 years in the sales Industry.
Employed as Business Development manager for the past year with EMF
Previously running his own successful network components business looking after development and sales.
Current Role & Responsibilities
Sales & Business Development – Contacting new customers, establishing links & maintaining links with the existing clients and their project managers – buyers –
engineers.
Liaison with the other members of the in house & external team’s.
Progressing new business enquiries through to introduction stage and beyond.
Materials purchases, dealing with sub contractors & suppliers.
Sales – Liaison, Site Surveying, with responsibility for preparation of quotations for new projects and innovation.
15. Client: Trident Building Services
Consultant: Silcock Dawson and Partners
Project: Cat A fit out of Two adjoining Buildings in Croydon's Town Centre.
Cat A Fit out of 9 Floors over 2 wings of approx 10,500 Square Feet per floor.
Cat A fit out of 12 Floors approx 6,600 Square feet
M&E Services: The following services were provided:-
New VRV A/C System to all floors.
Fire Alarm system with Voice announcement.
Future containment for Data Installation.
Mains Upgrade through out.
Including new LG7 Lighting with intelligent control.
Small Power distribution Via Floor boxes and Compartment trunking.
3.0 MODERN METHODS FOR MODERN INSTALLATION
Stephenson House & Knollys House
16. Client: Orion Interiors
Consultant: Ralph T. King – Project Management by Slater Michael LLP
Project: Complete Cat A Fit out of Jubilee House, 197 Marsh Wall, E14
M&E Services: The following services were provided:-
Mechanical works consisted of additional Heater Batteries, new fan coil Wet
system to each floor with upgraded air conditioning plant & a BMS System
complete with inverter Drives.
New boilers installed into the roof plant area.
Electrical up grades to suit new plant.
Overhaul of Rising Mains Bus bar system.
Addition of a Power factor correction unit to Plant mains.
New LG7 Compliant lighting throughout and Lighting control system.
Feature Lighting to Reception area.
New Fire alarm System Throughout.
Security System and CCTV.
Containment For Future Specialist Installations.
3.0 MODERN METHODS FOR MODERN INSTALLATION
Jubilee House – Marsh Wall
17. Client: Orion Interiors
Consultant: FHP – Project Management by Slater Michael LLP
Project: Total Cat A fit out including Electrical and Mechanical Services.
Substantial refurbishment of 62,500 square feet of office accommodation over two floors.
M&E Services: The following services were provided:-
New VRV Multi A/C System to all floors,
New Extract System
Mains Intake Refurbishment and New sub main distribution
New LG7 Compliant lighting throughout and Intelligent Lighting control system
LED Lighting to Reception and feature Lighting to the Atrium areas
External Lighting System to Buildings and Car parks
New Fire detection System Through out
Containment For Future Specialist Installations
3.0 MODERN METHODS FOR MODERN INSTALLATION
Gatwick 23
18. Client: Modus Interiors
Project: Cat B Fit out of 20,000 square feet office and Electronic Equipment Calibration Centre
Including Full catering facilities. Electrical Design and Build
M&E Services: The following services were provided:-
Up grade of Existing Supply.
New Mains System throughout.
Dual Frequency Supplies within the Laboratory complete with Dedicated UPS
backup.
Supplies for Mechanical contractors Equipment.
New LG7 Compliant lighting and Lighting control system to office areas.
Unique Bench Lighting to Laboratory areas.
High specification AV and Lighting system in boardroom.
Security, Access Control, Fire Alarm System.
Containment for all services.
3.0 MODERN METHODS FOR MODERN INSTALLATION
Agilent Technologies
19. Client: Orion Interiors
Project: High Quality Cat B Fit out
Design and Build / Fully designed M&E Specification by EMF / Full BMS System.
M&E Services: The following services were provided:-
Mechanical works consisted of fan coil units to each floor with upgraded air
conditioning plant
New VRV A/C System to all Comms Rooms.
Up grade of the Existing Hot water System.
New LG7 Compliant lighting and Lighting control system to office areas.
Feature Lighting to Reception, Conference Suites, Training Areas with Specialist
interactive Touch Pads, Which also controlled :Tele conferencing, Blinds, Privacy
Glass, A.V, Lighting etc.
Specialist services Including , Fire detection, Security ,CCTV, Interactive Control
system wiring , Data Comms, Integrated Digital & Terrestrial Sat/TV system.
3.0 MODERN METHODS FOR MODERN INSTALLATION
Tandberg
20. Client: Orion Interiors
Project: Cat A&B Fit out of Warehouse Unit & Offices.
Design and Build / Fully Designed Electrical Installation by EMF.
M&E Services: The following services were provided:-
New Mains Distribution.
Small Power and Containment.
LG3/LG7 Lighting Installation to Office areas.
High bay Lighting to Warehouse area.
Feature Lighting to Show room, Museum Lobby areas.
Cat 6 Data cabling.
Fire alarm system.
Containment.
3.0 MODERN METHODS FOR MODERN INSTALLATION
No 1 – Premier Park
21. Client: Modus Interiors
Consultant: Cundall Ltd
Project: Cat A Fit out for Electrical and Mechanical Services.
M&E Services: The following services were provided:-
New VRV a/c system to the Ground floors
Flushing of the Chilled water and LPH piped system
Refurbished Existing fan coil units and Connections to all other areas
New sanitary Ware to all WC’s
Overhaul to the Chillers, Boilers and Pump sets
Refurbishment of Underfloor Power
Refurbishment of the Existing Luminaries throughout
Reconfiguration of the Existing Lighting System
LED lighting to the Main reception area
External car park and pedestrian walk way Lighting including all Ground works
3.0 MODERN METHODS FOR MODERN INSTALLATION
HPH Hayes
22. Client: Marlin Services Ltd
Consultant: Lamorbey Associates – Project Management by Martin Bates Ltd
Project: Total Cat A Fit out including Electrical and Mechanical Services.
10 Floors over 3 Buildings – 65,000 square feet
M&E Services: The following services were provided:-
New VRV A/C System to all floors.
New Extract System.
New Boiler Systems to the plant rooms.
New Mains Intake Panels to each Building with associated Sub mains distribution.
Intelligent Bus bar system incorporating Lighting and Fan coils.
LG3/LG7 Lighting Installation to Office areas.
Feature Lighting to Reception and WC areas.
External Lighting System to Buildings and internal and External Car parks.
Specialist services Including , Fire detection, Security ,CCTV, Access Control system
wiring , Data Comms etc.
3.0 MODERN METHODS FOR MODERN INSTALLATION
Great West Plaza - Brentford
23. Client: Ascot Racecourse Ltd
Project: Race day Cover and Project Installation to an ever-changing Development.
Refurbishment works to The Queen Anne.
Pavilion and Duke of Devonshire's Dwelling.
M&E Services: The following services were provided:-
Specialist Lighting
Mains Distribution
Small Power
Comms and Fire alarm systems Containment
3.0 MODERN METHODS FOR MODERN INSTALLATION
Ascot Racecourse
24. Client: The Orion Group
Project: Cat B Fit out to Societe General & Hambros Investment Bank in Gibraltar.
Complete Electrical Design by EMF.
M&E Services: The following services were provided:-
New Mains Upgrade and Distribution.
New LG7 Lighting and Intelligent Lighting control system.
Power For Mechanical Contractor.
Small power Distribution Via Compartment Trunking.
Reconfiguration of the Generator and UPS systems to Improve Resilience.
Containment for Specialist Contractors.
Logistics / Procurement.
3.0 MODERN METHODS FOR MODERN INSTALLATION
Societe General (Gibraltar)
26. “We have been delighted by their expertise and speed of
response to our requests. We are particularly impressed by
their willingness to listen and provide the best solution for our
needs and budget"
Michael Symons - Avondale.
4.0 CLIENT TESTIMONIALS
Avondale
“ We have been more than happy with the performance of EMF
Their willingness to pull out all the stops to get the job done,
sometimes at very short notice is a credit to them.
They work very closely with our own M&E team, again this
works very well, we have a extremely good working
relationship with them”
Mr. John Potts – MVO MBIFM
Ascot Racecourse
“EMF are one of our recommended installers, Due to their
undivided attention to detail and ability to service ours and our
Clients requirements ,constraints and time scales”
Due to the Complexity of The Agilent Project, EMF were
selected to provide the Full Electrical design and Installation.
Ourselves and Agilent were extremely pleased with the
outcome of this Project which ES played a large part in”
For and on behalf of Modus Group
Modus Interiors
27. “EMF were a key part of the Fit out team which transformed a
once basic shell to what is now our state of the art EMEA Sales
Head Office and Executive Briefing Center in Staines Middlesex;
this was a large project which was brought together in a very
short amount of time”
Eric Nissenfeld – Tandberg
Tandberg
“As one of our main Electrical Sub-contractors, EMF maintain
the high standards required by Orion Group in providing our
customers with an excellent quality of service, ensuring that
our projects are completed smoothly, on time and on budget”
Roger Huntingdon (CEO) – Orion Group
Orion Group
4.0 CLIENT TESTIMONIALS