Quality Assurance and Quality
Control (QA/QC)
Organized by:
Construction Development Board, CDB
College of Science and Technology, CST
Karma Tempa
What, Why and Who?
Quality?
What we need?
Quality Control Process
What we need?
Construction Quality Control Process
Quality
Assurance (QA)
Quality
Control (QC)
Construction Quality Control Process
Quality: A degree or grade of excellence or worth.
Assurance: The act of giving confidence, the state of
being certain or the act of making certain.
Quality Assurance: The planned and systematic
activities implemented in a quality system so that
quality requirements for a product or service will be
fulfilled.
Control: An evaluation to indicate needed corrective
responses; the act of guiding a process in which
variability is attributed.
The observation techniques and activities used to
fulfil requirements for quality.
Construction Quality Control Process
Quality
Control (QC)
Quality
Assurance
(QA)
Usually the CONTRACTOR (or a
third party) is responsible for
performing Quality Control
(QC) making sure that the
standards are meet for
production.
Usually the GOVERNMENT or
outside third party is
responsible for performing
Quality Assurance (QA). QA is
spot checking of contract
compliance, test results, and
ultimately making sure that the
quality control process is
working.
Who?
Construction Quality Control Process
Quality Assurance (QA)
A government organizations/clients like
BSB, MoWHS or any executing agencies will
have very clear guidance on what is
required per contract as far as the QA/QC
is concerned.
 Policy and Guidelines
 Standards and Specifications
 Rules and Regulations
 Terms and conditions of the contract
Construction Quality Control Process
Construction Quality Control Process
Construction Quality Control Process
Construction Quality Control Process
Construction Quality Control Process
Quality Assurance (QA): Responsibility??
Involves REGULAR BUT RANDOM TESTING OF
MATERIALS and workmanship (time-based or
work-based intervals)
Prevent, identify, and correct quality-related
problems
During the construction process, QA instructors
mostly provide guidance and leadership to the
construction people
Construction Quality Control Process
Quality Control (QC)
 The Construction contract defines the quality
standards and the quality control testing requirements.
 The contractor must prepare a detailed quality control
plan for each definable feature of work detailing on how
the quality standard will be achieved. (Do we apply?)
 The quality control plan must be approved before the
start of the particular work.
 The contract requires that the QC testing lab be
validated by the approved source (Institutions,
consultant, competent testing house /firm or
agency..etc).
Construction Quality Control Process
Quality Control vs. Quality Assurance: What’s the
Difference?
Analogy: You Driving on a Freeway
• Quality Assurance-: “Do it
right the first time“--Preventive
Quality checks.
• Quality Control: Fix it when
ever it goes or is going wrong.
• In recent years, QA is defined
to include QC
Construction Quality Control Process
Quality Control vs. Quality Assurance: What’s the
Difference?
Driving Quality Assurance
Before Driving: adjust seats, mirrors, temp, etc.
During Driving:
Occasional glances at:
- speed gage to ensure speed is not excessive
- side mirror before changing lane
- road sides to read road signs, etc.
No distractive activities (reading, eating, etc.)
Analogy: You Driving on a Freeway
These are preventive
measures
Construction Quality Control Process
Quality Control vs. Quality Assurance: What’s the
Difference?
Driving Quality Control
Swerving to avoid deer crossing the
highway
Steering to right if car is straying into left
lane
Braking to avoid hitting slowed car in front
Analogy: You Driving on a Freeway
These are corrective
measures
Construction Quality Control Process
When?
Contract formulation: Quality Assurance
Specifications for Building and Road Works
Project Specific Specifications
Concrete Mix Design (Grade) or Job Mix formula (Usually concrete mix design for
RCC structures and JMF for road design).
Construction Phase: Quality Control
Planning and setting of site amenities
Construction process
Supervision, inspection and monitoring
Material testing and verification
Construction Quality Control Process
Where?
Infrastructure development projects
1. Building construction
2. Road construction
3. Bridge construction
Details will be discussed in training session-2
and session 3.
Construction Quality Plan
Construction quality plan is that procuring agency
want to know how you are going to control the quality
on their projects.
So, when you write your plan, make it clear how you will
control all areas of the project that affect quality – not
just what inspections and tests you’ll perform.
For example, controlling materials, personnel,
subcontractors, and work procedures also play an
important role in ensuring quality results.
So how you propose quality plan !!
1. Project personnel
2. Quality Communication
3. Quality assurance surveillance
4. Subcontractors and suppliers.
5. Project quality specifications
6. Inspections and tests.
7. Control of non-conformances
8. Project completion inspections.
Construction Quality Plan
Construction Quality Plan
Construction Quality Plan
Inspection and Test Plans (ITP)
Construction Quality Plan
Project completion inspections.
Project handing – taking: Committee
-Detail measurements
-Check for defects
-Uncompleted works as per the contract
-Additional works
-Finishing
-Etc......
Most common problems observed
and what can be done
Problems What can be done
Design, drawings,
specifications not
clear, not complete
Documents should undergo
scrutiny by equally
competent persons (human
errors are natural)
No drawings at site Always carry drawings, you
cannot remember
everything
Site engineers do
not read the
documents
• Read, read & read to
understand what you are
supposed to do
• Ask the seniors, architects,
designers if you do not
understand
Problems What can be done
No site
engineer at site
• Contractor is responsible for
day to day supervision
• Make it mandatory in the
contract document to post a
qualified site engineer
• Government engineers
check on contractor’s
engineer and monitor
important quality aspects
Most common problems observed
and what can be done
Problems What can be done
Even physical
parameters of works
and materials not
checked
Checking of size, shape,
slope, length, breath, depth,
weight, volume, diameter,
etc..etc.. is possible….please
do it !!!
Everything is not
possible to be
detailed in the
documents
Make best use of the
engineering knowledge.
Above all, use common sense
to solve practical problems
Most common problems observed
and what can be done
Problems What can be done
Poorly or no
records maintained
Records are important for
many reasons, for
accountability, for future
reference, for improvement,
keep proper records
Inadequate
communication
with the contractor
Conduct regular meetings to
review progress, to resolve
problems, to understand
each other better
Most common problems observed
and what can be done
Problems What can be done
Poor or no management
at the work site (safety
for the workers & general
public)
• Site management is
equally important for
safety & public
convenience
• Need little extra efforts
to guide the contractor’s
site engineers & workers
on storage of materials,
equipment, tools &
cleaning up of site after a
day’s work
Most common problems observed
and what can be done
Why Quality?
Safety
Utility Economy
Comfort Aesthetic
The Root of all Evils
QUALITY ???
WHO’S RESPONSIBILITY
Indication of:
Overall Structural Failure
QUALITY ???
WHO’S RESPONSIBILITY
QUALITY ???
WHO’S RESPONSIBILITY
Indication of:
Bonding failure
Application of inappropriate cement motor ratios
Improper placement of masonry course
Weak connections
QUALITY ???
WHO’S RESPONSIBILITY
Indication of:
•Bonding failure
•Application of inappropriate cement motor ratios
•Wrong placement of masonry course
•Weak connections
QUALITY ???
WHO’S RESPONSIBILITY
Indication of:
•Bonding failure
•Application of inappropriate cement motor ratios
•Mistake in placement of masonry course
QUALITY ???
WHO’S RESPONSIBILITY
Important Notes on Construction
Quality
• Quality is not separate from construction; it is an integral part
• Quality is not only on the end product after completion; it is in
the process during construction
• Ensuring quality is everyone’s responsibility; the surveyor,
designer, suppliers and supervisors,
• BUT IT IS MOSTLY IN THE HANDS OF THE
BUILDER/CONTRACTOR
End of Session-01
Thank you

More Related Content

What's hot

QUALITY AUDITS
QUALITY AUDITSQUALITY AUDITS
QUALITY AUDITSMcpl Moshi
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationDeekshitha HS
 
EQUIPMENT VALIDATION
EQUIPMENT VALIDATIONEQUIPMENT VALIDATION
EQUIPMENT VALIDATIONSagar Savale
 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspectionSamiksha Sawant
 
Quality Assurance and Quality Management Concepts
Quality Assurance and Quality Management ConceptsQuality Assurance and Quality Management Concepts
Quality Assurance and Quality Management ConceptsVivek Jain
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentshreyashChaudhari6
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalganpat420
 
ISO 9000 AND 14000 PPT
ISO 9000 AND 14000 PPT ISO 9000 AND 14000 PPT
ISO 9000 AND 14000 PPT Sainath Kari
 
GMP Key Elements and Basic Principals
GMP Key Elements and Basic PrincipalsGMP Key Elements and Basic Principals
GMP Key Elements and Basic PrincipalsRai Waqas
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assuranceLeola Ramirez
 
Validation of pharmaceutical dosage form
Validation of pharmaceutical dosage formValidation of pharmaceutical dosage form
Validation of pharmaceutical dosage formanurag chanda
 
Audit and regulatory compliance
Audit  and  regulatory complianceAudit  and  regulatory compliance
Audit and regulatory complianceArchana Chavhan
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process ControlMahmudul Hasan
 

What's hot (20)

CGMP
CGMPCGMP
CGMP
 
QUALITY AUDITS
QUALITY AUDITSQUALITY AUDITS
QUALITY AUDITS
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Corrective and Preventive action (CAPA)
Corrective and Preventive action (CAPA)Corrective and Preventive action (CAPA)
Corrective and Preventive action (CAPA)
 
EQUIPMENT VALIDATION
EQUIPMENT VALIDATIONEQUIPMENT VALIDATION
EQUIPMENT VALIDATION
 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspection
 
Quality Assurance and Quality Management Concepts
Quality Assurance and Quality Management ConceptsQuality Assurance and Quality Management Concepts
Quality Assurance and Quality Management Concepts
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Quality Audit
Quality AuditQuality Audit
Quality Audit
 
calulation of yields, production record review,change control
calulation of yields, production record review,change control calulation of yields, production record review,change control
calulation of yields, production record review,change control
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceutical
 
ISO 9000 AND 14000 PPT
ISO 9000 AND 14000 PPT ISO 9000 AND 14000 PPT
ISO 9000 AND 14000 PPT
 
GMP Key Elements and Basic Principals
GMP Key Elements and Basic PrincipalsGMP Key Elements and Basic Principals
GMP Key Elements and Basic Principals
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
 
PROCESS VALIDATION
PROCESS VALIDATIONPROCESS VALIDATION
PROCESS VALIDATION
 
Validation of pharmaceutical dosage form
Validation of pharmaceutical dosage formValidation of pharmaceutical dosage form
Validation of pharmaceutical dosage form
 
Vendor qualification
Vendor qualification Vendor qualification
Vendor qualification
 
Process validation of oral solid dosage form (tablet)
Process validation of oral solid dosage form (tablet)Process validation of oral solid dosage form (tablet)
Process validation of oral solid dosage form (tablet)
 
Audit and regulatory compliance
Audit  and  regulatory complianceAudit  and  regulatory compliance
Audit and regulatory compliance
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process Control
 

Similar to 1. Quality Assurance and Quality Control.pdf

QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1Thomas Wilson
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slidesDoreen Yeo
 
Total construction quality management by mobile technology mtech
Total construction quality management by mobile technology   mtechTotal construction quality management by mobile technology   mtech
Total construction quality management by mobile technology mtechStephen Au
 
Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...SIBENDU SURAJEET JENA
 
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxChapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxVandaMnica1
 
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxChapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxMohammedAbuBakkerSid2
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1reddvise
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxAhmedAltantawi
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Managementmzedan
 

Similar to 1. Quality Assurance and Quality Control.pdf (20)

QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
KENA PRE.pptx
KENA PRE.pptxKENA PRE.pptx
KENA PRE.pptx
 
Total construction quality management by mobile technology mtech
Total construction quality management by mobile technology   mtechTotal construction quality management by mobile technology   mtech
Total construction quality management by mobile technology mtech
 
Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxChapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
 
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxChapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
 
Dnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _ResumeDnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _Resume
 
Balaji CV - 2015
Balaji CV - 2015Balaji CV - 2015
Balaji CV - 2015
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Quality inspection presentation
Quality inspection presentationQuality inspection presentation
Quality inspection presentation
 
Technical Audit
Technical  AuditTechnical  Audit
Technical Audit
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Process and product inspection
Process and product inspectionProcess and product inspection
Process and product inspection
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 

Recently uploaded

The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Roomdivyansh0kumar0
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spiritegoetzinger
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Pooja Nehwal
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 

Recently uploaded (20)

The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spirit
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 

1. Quality Assurance and Quality Control.pdf

  • 1. Quality Assurance and Quality Control (QA/QC) Organized by: Construction Development Board, CDB College of Science and Technology, CST Karma Tempa
  • 2. What, Why and Who? Quality?
  • 3. What we need? Quality Control Process
  • 4. What we need? Construction Quality Control Process Quality Assurance (QA) Quality Control (QC)
  • 5. Construction Quality Control Process Quality: A degree or grade of excellence or worth. Assurance: The act of giving confidence, the state of being certain or the act of making certain. Quality Assurance: The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled. Control: An evaluation to indicate needed corrective responses; the act of guiding a process in which variability is attributed. The observation techniques and activities used to fulfil requirements for quality.
  • 6. Construction Quality Control Process Quality Control (QC) Quality Assurance (QA) Usually the CONTRACTOR (or a third party) is responsible for performing Quality Control (QC) making sure that the standards are meet for production. Usually the GOVERNMENT or outside third party is responsible for performing Quality Assurance (QA). QA is spot checking of contract compliance, test results, and ultimately making sure that the quality control process is working. Who?
  • 7. Construction Quality Control Process Quality Assurance (QA) A government organizations/clients like BSB, MoWHS or any executing agencies will have very clear guidance on what is required per contract as far as the QA/QC is concerned.  Policy and Guidelines  Standards and Specifications  Rules and Regulations  Terms and conditions of the contract
  • 12. Construction Quality Control Process Quality Assurance (QA): Responsibility?? Involves REGULAR BUT RANDOM TESTING OF MATERIALS and workmanship (time-based or work-based intervals) Prevent, identify, and correct quality-related problems During the construction process, QA instructors mostly provide guidance and leadership to the construction people
  • 13. Construction Quality Control Process Quality Control (QC)  The Construction contract defines the quality standards and the quality control testing requirements.  The contractor must prepare a detailed quality control plan for each definable feature of work detailing on how the quality standard will be achieved. (Do we apply?)  The quality control plan must be approved before the start of the particular work.  The contract requires that the QC testing lab be validated by the approved source (Institutions, consultant, competent testing house /firm or agency..etc).
  • 14. Construction Quality Control Process Quality Control vs. Quality Assurance: What’s the Difference? Analogy: You Driving on a Freeway • Quality Assurance-: “Do it right the first time“--Preventive Quality checks. • Quality Control: Fix it when ever it goes or is going wrong. • In recent years, QA is defined to include QC
  • 15. Construction Quality Control Process Quality Control vs. Quality Assurance: What’s the Difference? Driving Quality Assurance Before Driving: adjust seats, mirrors, temp, etc. During Driving: Occasional glances at: - speed gage to ensure speed is not excessive - side mirror before changing lane - road sides to read road signs, etc. No distractive activities (reading, eating, etc.) Analogy: You Driving on a Freeway These are preventive measures
  • 16. Construction Quality Control Process Quality Control vs. Quality Assurance: What’s the Difference? Driving Quality Control Swerving to avoid deer crossing the highway Steering to right if car is straying into left lane Braking to avoid hitting slowed car in front Analogy: You Driving on a Freeway These are corrective measures
  • 17. Construction Quality Control Process When? Contract formulation: Quality Assurance Specifications for Building and Road Works Project Specific Specifications Concrete Mix Design (Grade) or Job Mix formula (Usually concrete mix design for RCC structures and JMF for road design). Construction Phase: Quality Control Planning and setting of site amenities Construction process Supervision, inspection and monitoring Material testing and verification
  • 18. Construction Quality Control Process Where? Infrastructure development projects 1. Building construction 2. Road construction 3. Bridge construction Details will be discussed in training session-2 and session 3.
  • 19. Construction Quality Plan Construction quality plan is that procuring agency want to know how you are going to control the quality on their projects. So, when you write your plan, make it clear how you will control all areas of the project that affect quality – not just what inspections and tests you’ll perform. For example, controlling materials, personnel, subcontractors, and work procedures also play an important role in ensuring quality results. So how you propose quality plan !!
  • 20. 1. Project personnel 2. Quality Communication 3. Quality assurance surveillance 4. Subcontractors and suppliers. 5. Project quality specifications 6. Inspections and tests. 7. Control of non-conformances 8. Project completion inspections. Construction Quality Plan
  • 23. Inspection and Test Plans (ITP) Construction Quality Plan
  • 24. Project completion inspections. Project handing – taking: Committee -Detail measurements -Check for defects -Uncompleted works as per the contract -Additional works -Finishing -Etc......
  • 25. Most common problems observed and what can be done Problems What can be done Design, drawings, specifications not clear, not complete Documents should undergo scrutiny by equally competent persons (human errors are natural) No drawings at site Always carry drawings, you cannot remember everything Site engineers do not read the documents • Read, read & read to understand what you are supposed to do • Ask the seniors, architects, designers if you do not understand
  • 26. Problems What can be done No site engineer at site • Contractor is responsible for day to day supervision • Make it mandatory in the contract document to post a qualified site engineer • Government engineers check on contractor’s engineer and monitor important quality aspects Most common problems observed and what can be done
  • 27. Problems What can be done Even physical parameters of works and materials not checked Checking of size, shape, slope, length, breath, depth, weight, volume, diameter, etc..etc.. is possible….please do it !!! Everything is not possible to be detailed in the documents Make best use of the engineering knowledge. Above all, use common sense to solve practical problems Most common problems observed and what can be done
  • 28. Problems What can be done Poorly or no records maintained Records are important for many reasons, for accountability, for future reference, for improvement, keep proper records Inadequate communication with the contractor Conduct regular meetings to review progress, to resolve problems, to understand each other better Most common problems observed and what can be done
  • 29. Problems What can be done Poor or no management at the work site (safety for the workers & general public) • Site management is equally important for safety & public convenience • Need little extra efforts to guide the contractor’s site engineers & workers on storage of materials, equipment, tools & cleaning up of site after a day’s work Most common problems observed and what can be done
  • 31. The Root of all Evils
  • 32. QUALITY ??? WHO’S RESPONSIBILITY Indication of: Overall Structural Failure
  • 34. QUALITY ??? WHO’S RESPONSIBILITY Indication of: Bonding failure Application of inappropriate cement motor ratios Improper placement of masonry course Weak connections
  • 35. QUALITY ??? WHO’S RESPONSIBILITY Indication of: •Bonding failure •Application of inappropriate cement motor ratios •Wrong placement of masonry course •Weak connections
  • 36. QUALITY ??? WHO’S RESPONSIBILITY Indication of: •Bonding failure •Application of inappropriate cement motor ratios •Mistake in placement of masonry course
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43. Important Notes on Construction Quality • Quality is not separate from construction; it is an integral part • Quality is not only on the end product after completion; it is in the process during construction • Ensuring quality is everyone’s responsibility; the surveyor, designer, suppliers and supervisors, • BUT IT IS MOSTLY IN THE HANDS OF THE BUILDER/CONTRACTOR