DMAIC Define:
DEFINING THE PROBLEM:
 Consumption of extra material
 Only virgin material used
 Spruce and Runners were discarded
GOAL:
 Reduce virgin material consumption.
CONSTRAINTS:
 Dimensional changes are not significant.
 torque performance should not go below Cpk/Ppk of 1.25 minimum.
Measure:
Torque Test Capability
 Minimum breakage torque for Gear and Cam Fixture
 Gauge repeatability and reproducibility
Analyze:
 Dimensional Comparison
 Torque Capability Comparison Virgin Nylon vs Regrind
 Relationship of regrind percentage to breakage torque
 Capability Analysis for Gear and Cam Breakage
 Gage R&R Study – Nested ANOVA
Improve
 Improvements to fixture and test process
Control
 Statistical Process Control of Gear and Cam Breakage
Team Assumption
 Cost Analysis is given more priority than Cpk.
 Any Dimensional change less than 0.0005 are considered insignificant.
DELIVERABLES
CAPABILITY STUDY Cam 25% vs Cam 50%
CAPABILITY STUDY Cam 25% vs Cam 0%
CAPABILITY STUDY Gear 25% vs Gear 50%
CAPABILITY STUDY Gear 25% vs Gear 0%
REGRESSION MODEL
HYPOTHESIS TESTING
ANOVA TEST OF GRR 1 vs GRR 2 -
CAM
ANOVA TEST OF GRR 1 vs GRR 2 - GEAR
Economic Analysis
SPC
Conclusion
 25 % is better options than 50% and 0%.
Lean Six Sigma Greenbelt Project B - Regrind

More Related Content

What's hot (7)

Balanced Mix Design & Cracking Test
Balanced Mix Design & Cracking TestBalanced Mix Design & Cracking Test
Balanced Mix Design & Cracking Test
 
Environmental Research & Asphalt Pavements
Environmental Research & Asphalt PavementsEnvironmental Research & Asphalt Pavements
Environmental Research & Asphalt Pavements
 
Demonstration on How to Extend the Life a 1.5MW Class Gearbox
Demonstration on How to Extend the Life a 1.5MW Class GearboxDemonstration on How to Extend the Life a 1.5MW Class Gearbox
Demonstration on How to Extend the Life a 1.5MW Class Gearbox
 
New research into asphalt pavements, and long-life (perpetual) asphalt
New research into asphalt pavements, and long-life (perpetual) asphaltNew research into asphalt pavements, and long-life (perpetual) asphalt
New research into asphalt pavements, and long-life (perpetual) asphalt
 
Managing Performance of High Recycle Asphalt Mixtures
Managing Performance of High Recycle Asphalt MixturesManaging Performance of High Recycle Asphalt Mixtures
Managing Performance of High Recycle Asphalt Mixtures
 
Enacting Changes to the Hamburg Wheel Track Test
Enacting Changes to the Hamburg Wheel Track TestEnacting Changes to the Hamburg Wheel Track Test
Enacting Changes to the Hamburg Wheel Track Test
 
Caltrans Asphalt Specification Update
Caltrans Asphalt Specification UpdateCaltrans Asphalt Specification Update
Caltrans Asphalt Specification Update
 

Viewers also liked

Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS ProjectsJohn Smith
 
Lean Six Sigma and the principles of Kaizen for your business
Lean Six Sigma and the principles of Kaizen for your business   Lean Six Sigma and the principles of Kaizen for your business
Lean Six Sigma and the principles of Kaizen for your business Brent Spilkin
 
System Engineering Project - Team 2
System Engineering Project - Team 2System Engineering Project - Team 2
System Engineering Project - Team 2Chawal Ukesh
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs KaizenBART RADKA
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Eng Marzouk
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizenGopala P.
 

Viewers also liked (8)

Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS Projects
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Lean Six Sigma and the principles of Kaizen for your business
Lean Six Sigma and the principles of Kaizen for your business   Lean Six Sigma and the principles of Kaizen for your business
Lean Six Sigma and the principles of Kaizen for your business
 
System Engineering Project - Team 2
System Engineering Project - Team 2System Engineering Project - Team 2
System Engineering Project - Team 2
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
Lean six sigma customer service
Lean six sigma customer serviceLean six sigma customer service
Lean six sigma customer service
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 

Similar to Lean Six Sigma Greenbelt Project B - Regrind

Energy Management Case Studies - Nissan North America Inc.
Energy Management Case Studies - Nissan North America Inc.Energy Management Case Studies - Nissan North America Inc.
Energy Management Case Studies - Nissan North America Inc.TNenergy
 
6. process capability analysis (variable data)
6. process capability analysis (variable data)6. process capability analysis (variable data)
6. process capability analysis (variable data)Hakeem-Ur- Rehman
 
Compressed Air Powered Engine
Compressed Air Powered EngineCompressed Air Powered Engine
Compressed Air Powered EngineAbhishek Hingmire
 
Baja Aerodynamics Poster
Baja Aerodynamics PosterBaja Aerodynamics Poster
Baja Aerodynamics PosterRahul Rughani
 
Dynamics of an IC Engine Valvetrain
Dynamics of an IC Engine ValvetrainDynamics of an IC Engine Valvetrain
Dynamics of an IC Engine ValvetrainNARAYAN SUSANGE
 
ModulED. Next generation powertrains for electric vehicles
ModulED. Next generation powertrains for electric vehiclesModulED. Next generation powertrains for electric vehicles
ModulED. Next generation powertrains for electric vehiclesLeonardo ENERGY
 
Ruben Wiggers - Transformer short-circuit withstand capability
Ruben Wiggers - Transformer short-circuit withstand capabilityRuben Wiggers - Transformer short-circuit withstand capability
Ruben Wiggers - Transformer short-circuit withstand capabilityDutch Power
 
Final Year Paper-Designing the 2016 RMIT Aero Package - Hashan Mendis
Final Year Paper-Designing the 2016 RMIT Aero Package - Hashan MendisFinal Year Paper-Designing the 2016 RMIT Aero Package - Hashan Mendis
Final Year Paper-Designing the 2016 RMIT Aero Package - Hashan MendisHashan Mendis
 
Design and Analysis to Improve Buckling Strength of Light Vehicle Connecting Rod
Design and Analysis to Improve Buckling Strength of Light Vehicle Connecting RodDesign and Analysis to Improve Buckling Strength of Light Vehicle Connecting Rod
Design and Analysis to Improve Buckling Strength of Light Vehicle Connecting RodIRJET Journal
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...Niranjana B
 
IRJET- Value Analysis of Upright for an All-Terrain Vehicle
IRJET- Value Analysis of Upright for an All-Terrain VehicleIRJET- Value Analysis of Upright for an All-Terrain Vehicle
IRJET- Value Analysis of Upright for an All-Terrain VehicleIRJET Journal
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Process Capability
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Process CapabilityJavier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Process Capability
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Process CapabilityJ. García - Verdugo
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Raja Ratnam
 
IRJET- Static Analysis of Pulsar Bike Frame Made Up of Aluminum Alloy 6063
IRJET- Static Analysis of Pulsar Bike Frame Made Up of Aluminum Alloy 6063IRJET- Static Analysis of Pulsar Bike Frame Made Up of Aluminum Alloy 6063
IRJET- Static Analysis of Pulsar Bike Frame Made Up of Aluminum Alloy 6063IRJET Journal
 
Project Experience Overview
Project Experience OverviewProject Experience Overview
Project Experience OverviewEric Pruden
 
Matt presentation arizona-pavement-conference-2018-final
Matt presentation arizona-pavement-conference-2018-finalMatt presentation arizona-pavement-conference-2018-final
Matt presentation arizona-pavement-conference-2018-finalDebatosh Roy
 
Six Sigma Empirical Application at a Tile Manufacturing Company
Six Sigma Empirical Application at a Tile Manufacturing Company Six Sigma Empirical Application at a Tile Manufacturing Company
Six Sigma Empirical Application at a Tile Manufacturing Company maxdup90
 
Pres final rev1.pptx
Pres final rev1.pptxPres final rev1.pptx
Pres final rev1.pptxJacob Ellis
 

Similar to Lean Six Sigma Greenbelt Project B - Regrind (20)

Energy Management Case Studies - Nissan North America Inc.
Energy Management Case Studies - Nissan North America Inc.Energy Management Case Studies - Nissan North America Inc.
Energy Management Case Studies - Nissan North America Inc.
 
6. process capability analysis (variable data)
6. process capability analysis (variable data)6. process capability analysis (variable data)
6. process capability analysis (variable data)
 
Compressed Air Powered Engine
Compressed Air Powered EngineCompressed Air Powered Engine
Compressed Air Powered Engine
 
Poster Baja 6
Poster Baja 6Poster Baja 6
Poster Baja 6
 
Baja Aerodynamics Poster
Baja Aerodynamics PosterBaja Aerodynamics Poster
Baja Aerodynamics Poster
 
Dynamics of an IC Engine Valvetrain
Dynamics of an IC Engine ValvetrainDynamics of an IC Engine Valvetrain
Dynamics of an IC Engine Valvetrain
 
ModulED. Next generation powertrains for electric vehicles
ModulED. Next generation powertrains for electric vehiclesModulED. Next generation powertrains for electric vehicles
ModulED. Next generation powertrains for electric vehicles
 
Ruben Wiggers - Transformer short-circuit withstand capability
Ruben Wiggers - Transformer short-circuit withstand capabilityRuben Wiggers - Transformer short-circuit withstand capability
Ruben Wiggers - Transformer short-circuit withstand capability
 
Final Year Paper-Designing the 2016 RMIT Aero Package - Hashan Mendis
Final Year Paper-Designing the 2016 RMIT Aero Package - Hashan MendisFinal Year Paper-Designing the 2016 RMIT Aero Package - Hashan Mendis
Final Year Paper-Designing the 2016 RMIT Aero Package - Hashan Mendis
 
Design and Analysis to Improve Buckling Strength of Light Vehicle Connecting Rod
Design and Analysis to Improve Buckling Strength of Light Vehicle Connecting RodDesign and Analysis to Improve Buckling Strength of Light Vehicle Connecting Rod
Design and Analysis to Improve Buckling Strength of Light Vehicle Connecting Rod
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
GDP Viva Slides
GDP Viva SlidesGDP Viva Slides
GDP Viva Slides
 
IRJET- Value Analysis of Upright for an All-Terrain Vehicle
IRJET- Value Analysis of Upright for an All-Terrain VehicleIRJET- Value Analysis of Upright for an All-Terrain Vehicle
IRJET- Value Analysis of Upright for an All-Terrain Vehicle
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Process Capability
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Process CapabilityJavier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Process Capability
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Process Capability
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
IRJET- Static Analysis of Pulsar Bike Frame Made Up of Aluminum Alloy 6063
IRJET- Static Analysis of Pulsar Bike Frame Made Up of Aluminum Alloy 6063IRJET- Static Analysis of Pulsar Bike Frame Made Up of Aluminum Alloy 6063
IRJET- Static Analysis of Pulsar Bike Frame Made Up of Aluminum Alloy 6063
 
Project Experience Overview
Project Experience OverviewProject Experience Overview
Project Experience Overview
 
Matt presentation arizona-pavement-conference-2018-final
Matt presentation arizona-pavement-conference-2018-finalMatt presentation arizona-pavement-conference-2018-final
Matt presentation arizona-pavement-conference-2018-final
 
Six Sigma Empirical Application at a Tile Manufacturing Company
Six Sigma Empirical Application at a Tile Manufacturing Company Six Sigma Empirical Application at a Tile Manufacturing Company
Six Sigma Empirical Application at a Tile Manufacturing Company
 
Pres final rev1.pptx
Pres final rev1.pptxPres final rev1.pptx
Pres final rev1.pptx
 

More from Chawal Ukesh

Stochastic final report
Stochastic final reportStochastic final report
Stochastic final reportChawal Ukesh
 
Linear Programming Project
Linear Programming ProjectLinear Programming Project
Linear Programming ProjectChawal Ukesh
 
MLR Project (Onion)
MLR Project (Onion)MLR Project (Onion)
MLR Project (Onion)Chawal Ukesh
 
Ukesh Work Sampling Project - Time Study
Ukesh  Work Sampling Project - Time StudyUkesh  Work Sampling Project - Time Study
Ukesh Work Sampling Project - Time StudyChawal Ukesh
 
Senior Design Project
Senior Design ProjectSenior Design Project
Senior Design ProjectChawal Ukesh
 
Material handling student design competition
Material handling student design competitionMaterial handling student design competition
Material handling student design competitionChawal Ukesh
 
Ukesh Simulation Project
Ukesh Simulation ProjectUkesh Simulation Project
Ukesh Simulation ProjectChawal Ukesh
 

More from Chawal Ukesh (9)

Stochastic final report
Stochastic final reportStochastic final report
Stochastic final report
 
Final Report
Final ReportFinal Report
Final Report
 
Linear Programming Project
Linear Programming ProjectLinear Programming Project
Linear Programming Project
 
MLR Project (Onion)
MLR Project (Onion)MLR Project (Onion)
MLR Project (Onion)
 
DP Project Report
DP Project ReportDP Project Report
DP Project Report
 
Ukesh Work Sampling Project - Time Study
Ukesh  Work Sampling Project - Time StudyUkesh  Work Sampling Project - Time Study
Ukesh Work Sampling Project - Time Study
 
Senior Design Project
Senior Design ProjectSenior Design Project
Senior Design Project
 
Material handling student design competition
Material handling student design competitionMaterial handling student design competition
Material handling student design competition
 
Ukesh Simulation Project
Ukesh Simulation ProjectUkesh Simulation Project
Ukesh Simulation Project
 

Lean Six Sigma Greenbelt Project B - Regrind