Name________Brian Elliott_____________________________________ Date _April 19, 2012__

Product ______Blueprints for the First and Second Floor Plans of a Residential Home______



Date/Time:              Activity:                                 Comment/Suggestions:
                        Researching floor plans
October 10-14, 2011     Sketches
5 hours                 Starting basic design



                        Commentary:
                        This was my introductory phase, I was
                        able to get frequent help from my
                        facilitator because I see her on every
                        school day




Date/Time:              Activity:
                        Began designing the final floor plan in
October 17-21, 2011     detail on Autodesk Revit.
5 hours


                        Commentary:
                        I was able to get several opportunities
                        to work on this at school, and
                        sometimes after on my personal
                        computer. It averaged out to around an
                        hour a day.
Date/Time:            Activity:                                  Comment/Suggestions:
                      Added surrounding virtual
October 24-           environment
November 4, 2011      Added a roof structure
7 hours               Fixing errors and mistakes
                      Semi-finalization of the design



                      Commentary:
                      The majority of my floor plan and
                      virtual model is done by this point.




Date/Time:            Activity:
November 7-18, 2011   Researching and writing the research
6 hours               paper over the Subprime Mortgage
                      crisis.




                      Commentary:
                      We had time to research our topic in
                      the library at school, and I finished my
                      paper in the weeks leading to its due
                      date. It helped me discern my possible
                      job outlook.
Date/Time:           Activity:                               Comment/Suggestions:
                     Writing and practicing senior boards
March 31- April 9,   speech.
2012




                     Commentary:
                     I tried to at least learn some of the
                     speech before I created the power-
                     point presentation.




Date/Time:           Activity:
April 10-16, 2012    Finish power-point presentation and
                     my wiki. Finalize all parts of the
                     project.




                     Commentary:
                     Finally getting everything ready to
                     present.

Product Work Log

  • 1.
    Product Work Log Name________BrianElliott_____________________________________ Date _April 19, 2012__ Product ______Blueprints for the First and Second Floor Plans of a Residential Home______ Date/Time: Activity: Comment/Suggestions: Researching floor plans October 10-14, 2011 Sketches 5 hours Starting basic design Commentary: This was my introductory phase, I was able to get frequent help from my facilitator because I see her on every school day Date/Time: Activity: Began designing the final floor plan in October 17-21, 2011 detail on Autodesk Revit. 5 hours Commentary: I was able to get several opportunities to work on this at school, and sometimes after on my personal computer. It averaged out to around an hour a day.
  • 2.
    Date/Time: Activity: Comment/Suggestions: Added surrounding virtual October 24- environment November 4, 2011 Added a roof structure 7 hours Fixing errors and mistakes Semi-finalization of the design Commentary: The majority of my floor plan and virtual model is done by this point. Date/Time: Activity: November 7-18, 2011 Researching and writing the research 6 hours paper over the Subprime Mortgage crisis. Commentary: We had time to research our topic in the library at school, and I finished my paper in the weeks leading to its due date. It helped me discern my possible job outlook.
  • 3.
    Date/Time: Activity: Comment/Suggestions: Writing and practicing senior boards March 31- April 9, speech. 2012 Commentary: I tried to at least learn some of the speech before I created the power- point presentation. Date/Time: Activity: April 10-16, 2012 Finish power-point presentation and my wiki. Finalize all parts of the project. Commentary: Finally getting everything ready to present.