1. Brian Miller
#36 1263 Kootenay Way| Kamloops, BC |Cell: 250.320-2963, Home: 250 377-1135|
bmil1951@yahoo.com
OBJECTIVE MiningProfessional withextensive experience insupervising, managing,scheduling,
relatingtodiverse employees,managingsafetyperformance,controllingcost,
engineering,budgetingandoverseeingbusinessoperationsseeksachallengingposition
withinyourteam.
CAREERPROFILE Miningprofessionalwithprovenexperience inprovidingstrongleadershipand
directionanddevelopingandimplementingsustainable programsandstrategiesto
improve operationandfinances of bothsurface and underground operations
40+ years’experience intechnical andoperationsmanagementwithexpert
knowledge of hardrockundergroundandsurface mining.
Experiencedindevelopingminesafetyinitiativesandprograms,
facilitating/participatinginstaff safetymeetingsandensuringcomplianceto
company polices/regulationswithrespecttoOH&S andenvironmentalissues
Diversifiedexperience inprovidingstrongleadershipanddirection,motivation,
optimizingundergroundandsurface miningperformance,ensuringqualitycontrol
and employeeadherence tocompanyminingstandardsandregulations
Experiencedinfinancial management,costcontrol,managingcapital acquisitions,
preparingoperational budgets,anddevelopingandimplementingcostinitiativesto
improve bothefficiencyandmine profitability
Demonstratedsuccessatmeetingobjectivesandproductiondeadlinesusing
exceptionalmulti-taskingandtime managementskills
Effective liaisonwithVPof Operations,mine officials,foreman,suppliers,relevant
agenciesandemployeesfromdiverse backgrounds andculturesinaneffective and
professionalmanner
Strongverbal,writtencommunicationsandinterpersonal skillswithexceptional
organizational,problem-solvingandseniordecision-makingcapabilities
Establishedtrustwithrespecttoprotectionof sensitive informationanddocuments
Achieved the Ryan Small Mine Safety Award for two consecutive years
WORK HISTORY GENERAL MINE MANAGER,CANICKEL – BUCKO LAKE MINE, WABOWDEN,MB
May 2012 to February2015
Managed approximately 120people including all undergroundminingproduction
personnel, 1000/tpdfloatationmillandsupportingpersonnelandthe technical services
departmentmade of Superintendents,SupervisorsandotherEmployees
Developedcapital andoperationalbudgets
Reducedcostwhile increasingmine profitability
2. Developedannual reclamationreports
Successfullyoptimizedundergroundminingcrewstoachieve bestthroughputin3years
and bestdevelopmentratesin3 yearsas well
Changedthe miningmethodandmine plan fromconventional roomandpillartolong-
hole andavoca miningmethods,which substantiallyincreasedprofitabilityandreduced
overall underground miningcosts
Developedandmaintainedundergroundoperationbudgetsthatmetor exceeded
Corporate expectations
Increasedequipmentefficiencybychangingore haulage systemswhichincreased
undergroundtosurface tonnage by25%
Streamlinedandalignedminingrotationstofurtherimproveminingefficiencies
GENERAL MINE MANAGER,ROCA MINES LTD – MAX MINE, TROUT LAKE, BC
December2010 to April 2012
Managed approximately70employeesincludingall undergroundminingproduction
personnel,500/tpdfloatationmill andsupportingpersonnel
Coordinatedall mine design,includingstandards,development,scheduling,drill and
blastdesignandlongtermplanning
Implementedcontrol systemstoensure adherence toQA/QCstandards
Due to highCanadiandollarvsmolybdenumprices miningoperationswere temporarily
suspended,duringthattime Iwas responsible for redefiningthe reserves,develop
miningproposalsthatreducedoperatingbudgets,preparedcapital expenditure plans
and developedareclamationplan
CONTRACT MINE SUPERINTENDENT,CENTURY MINING –LAMAQUEMINE, VAL D’OR, QC
July2010 to October2010
Scheduledproductionanddevelopmentforoperationsandchairedweeklyplanning
meetings
Designeddrive andstope layouts,developeddrill/blastdesignandreconciliation’s,
revisedminingplanasneeded
Responsible forall engineeringand groundsupport plans
Routinelychairedmonthlysafetymeetingswithstaff personnel
Providedmentoringanddirectiontoayoungtechnical servicesdepartmentand
undergroundsupervisingteam
RELIEF MINE MANAGER, PROCONMINING AND TUNNELLING – QR MINE, QUESNEL,BC
September2009 to July2010
Managed approximately110employeesincludingminingandmill personnel
Managed a 1200/tpd CIPgoldmill
PreparedLife of Mine PlanandClosure Plan
PreparedAnnual Reclamationand ARDPredictionandPreventionPlan
CAMP MANAGER,REDCORP – TULSEQUAHCHIEF MINE,NORTHERN BC
3. August2008 to September2009
Managed 300 employee camp
Scheduledinbound/outboundfreightandconstructionsuppliesformine construction
LiaisonbetweencompanyandHealthCanada
Ensuredregulatorystandardswere followed
Chairedweeklysafetymeeting,developedcompanysafetymanual
Providedmentoringtoyoungengineers
WorkedwithEPCMcontractor to optimize logistics
SAWMILL SUPERINTENDENT,M&K SAWMILL, QUESNEL, BC
December2002 to August2008
Facilitatedandpromotedasafe andpositive workingenvironment,ensuredthe highest
level of workplace safety
Ensuredcompliance withhealth,safetyandenvironmentalpoliciesandprocedures,and
applicable governmentregulations
Optimizedproductionandmaintenance performance toimprove operational efficiency
Facilitateddevelopmentforsupervisorypersonnel
Participatedinbudgeting,forecastingandcostcontrol as itrelatedtothe operationand
maintenance of the plant
Participatedincapital planningandthe implementationof those plans
GENERAL MINE MANAGER,KINROSS GOLD – QR MINE, QUESNEL, BC
August1996 to December2002
Managed an openpitandundergroundgoldmine
Spearheadedthe adoptionof aminingsystemthatgreatlyimproveddevelopment
advance at a time whenthe mine wasindifficultiesarisingfromearlierdesigndecisions.
Optimized bothsurface andunderground miningcontractorcontracts that increased
mine profitabilityduringatime whengoldpriceswere atanall-time low
Demonstratedsuccessatmeetingobjectivesandproductiondeadlinesusing
exceptionalmulti-taskingandtime managementskills
DevelopedLife of Mine Plan
CORPORATE SENIOR EVALUATOR/UNDERDROUND SUPERINTENDENT,WETMIN RESOURSES,
VANCOUVER,BC
August1991 to August1996
Workingfromthe corporate office inVancouver,aidedexisting operations to reduce
costs and increase production
At Myra Falls, a copper zinc lead mine, proposed and spearheaded the
implementation of a mining method that reduced costs from $72/ton to $48/ton
Reducedmechanical costsbyupdatingequipment and promoting better mechanical
training
At PremierGold,agoldsilveropenpitmine,streamlinedpitoperationsbydeveloping
4. bench plans that utilized previous drilling and sampling from the old underground
operation thereby increasing grade and reducing costs
Workingwithsurface mechanical groupsIhelpedtodevelopwaysandmeans to train
people and reduce costs.
Working with the Corporate Exploration teams, evaluated various opportunities in
Western Canada and the Western States in terms of mining potential
(1992-1996) Proposed and implemented a feasibility study for an underground
operation at Premier Gold.
Upon approval, engineered the mine design, secured appropriate equipment,
developedthe miningandtechnical staff andactedas Manager/Mine Superintendent
for the four years of operation
As a “stand alone” operation, the underground operation was able to contribute
financially to Premier Gold as a whole and to Westmin Resources
Achieved the Ryan Small Mine Safety Award for two consecutive years
CHIEF OF ENGINEERING SERVICESAND MINECAPTAIN, NORANDA– GOLDEN GIANTMINE,
MANITOUWADGE,ON
July1986 to August1991
WorkingwithconsultinggroupsandNoranda Researchdevelopedthe miningplanfor
Hemlo Gold Mines
Developedaminingmethod(avocamining) toreduce waste rockskippingandensure
commitment to produce gold on time and within cost.
Coordinated mining activities with the mining contractor (shaft sinking and
underground development).
Prepared studies for major underground equipment purchases
Developed a strong engineering staff
(1989-1991) Mine Captain responsible for nine shift bosses and 135 underground
miners.
Preparedminingbudgets,responsibleforsafetyandproduction of the underground.
In 1990 we were presented with the National Safety Award for Underground Mines
ADDITIONAL POSITIONS:
1983-1986 Senior Mine Engineer, Mattabi Mines, Ignace, ON
1982-1983 Project Engineer, Timmins Gold, Timmins, ON
1981 Project Engineer, Ontario Project, Park City, Utah
1974-1979 (Student) Mine Planner, Pamour Group , Timmins, ON
1972-1974 (Student) Kidd Creek Mine, Geologic Tech. Timmins, ON
1968-1970 Grade Control Technician, McIntyre Gold, Timmins, ON
EDUCATION MINE ENGINEERING,MICHIGANTECH,HOUGHTON,MI, 1979-1981
GEOLOGICALTECHNOLOGIST,CAMBIRANCOLLEGE, SUDBURY,ON, 1972-1974
REFERENCES AVAILABLE UPON REQUEST