Community Action Pathways Center (608) 313-1335
20 Eclipse Center, 1701 Riverside Drive
Beloit, WI 53511
June 1, 2011
To: Dave Somppi, Community Development Manager
Brian Christiansen, Chair, Rock County Housing Authority
Paul Benjamin, Director, Rock County Planning & Development Agency
From: John Ramstad, Director of Housing and Energy Programs
Re: Status of 1423 Hull
I appreciate your support of our project at 1423 Hull and your patience in our slow progress.
The distractions caused ARRA funding and the continued chaos in the housing market has
things moving more slowly than anticipated. That said, this project, along with two others
on that same block has allowed us to make a sustained effort on reducing the level of drug
and gang activity on one of Beloit’s most challenge streets, the primary objective for this
project.
The original purchase/rehab project budget included the following:
$15,000 County HOME Funds – Purchase and rehab
$11,250 City of Beloit Lead Funds
$ 9,000 Community Action Weatherization Funds
$35,250 Total projected costs
Ultimately, we decided to expand the scope of the project to include the full gutting and
reconfiguration of the second floor and the stairway leading up to it. This house was
originally a single family home, poorly converted to a duplex, then poorly retrofitted back
into a single family, followed by a fire on the second floor. This made access to the second
floor from the first floor a real challenge and the configuration of the second floor pathetic.
This decision added another $23.5k to the project, which we intend to cover using HOME
program income available to Community Action. This would bring the total cost of the
project to $58,750. A copy of the current project budget/expenses is attached.
On the interior of the house, the last of the flooring work is being completed this week.
Currently, a crew is working on completing the residing of portions of the house we altered.
That should get wrapped up next week. Our next steps are to remove the remaining
construction equipment and do the lead clearance testing. After that, we are down to punch
list items such as door hardware, closet doors,… I would expect that the house will be
completed by no later than July 15th
. At that point, we would be looking to start the process
to rent the property, something that would need to be done to officially close out the project.
It would be my recommendation that we draw all but $1,000 of the remaining HOME funds
from the county at this time. I need to get specific instructions on how Dave wants to see the
documentation for making this draw. The remaining $1,000 would be drawn at the point we
are ready to move someone in. Pulling all of the funds starts certain time clocks with HUD
that we generally like to avoid. With the lead clearance testing, I will receive the final check
from the city of Beloit. I will then draw any remaining gap out of program income that
Community Action holds.
I understand the pressures that everyone in the Rock County HOME Consortium is facing
with HUD’s enhanced attention. I also want folks to understand that these projects are
significantly more complicated and impactful as they are part of our overall neighborhood
stabilization efforts in Beloit’s most challenged neighborhood. We appreciate Rock
County’s support of this effort.
Category Line Item Description
Approved
Budget
Current
Forecast
Invoiced So
Far
Remaining
(Over)
Comments
Income Sources and Offsets
Rock Co: Home 15,000 15,000 4,264 10,736
Beloit Lead 11,250 11,250 8,100 3,150
Other 23,500 23,500 - 23,500
Total Income Sources and Offsets: 49,750 12,364 37,386
Acquisition 4,263.50 4,263.50 -
Lead Program Costs 1,006.86 1,006.86 - Lead Clearance Tests & Crew Labor
General Costs
Allocated Costs 18 18 -
Taxes and Insurance 850 777 73
Design 578.66 578.66 -
Utilities 2,300 1,889 411
Permits 245 245 -
Total General Costs: 3,992 3,509 483
Garage
Site Work 2,300 2,300 - Demo Garage
Materials - - -
Total Garage: 2,300 2,300 -
Site Work
Foundation and Flat work 500 125 375
Demo 2,986 2,986 0 Dumpsters etc
Excavation - - -
Drivewall Prep - - -
Asphalt/Cement - - -
Landscaping 500 - 500
Total Site Work: 3,986 3,111 875
Housing Framing/Materials Costs
Framing Materials 1,841 1,841 (0)
Drywall Materials 3,900 3,900 -
Roofing Materials 516 516 0
Siding Materials 500 - 500
Insulation Materials 486 186 300
Flooring 3,500 1,262 2,238
Cabinets and tops 465 465 (0)
Trim and Doors 1,700 1,656 44
Windows and Exterior Doors 3,871 3,871 0
Paint 2,100 1,352 748
Deck Materials 1,100 1,100 (0)
Gutters and Downspouts 750 - 750
Nails and Misc Supplies 1,000 685 316
Total Housing Framing: 21,729 16,835 4,894
Mechanical Systems
Plumbing 5,319 5,319 -
HVAC 1,260 1,260 -
Electrical 3,162 3,162 -
Electrical Fixtures 1,285 835 450 Stove
Total Mechanical Systems: 11,026 10,576 450
Total Project Costs: 48,303 41,601 6,702
Net project Gain/(Loss) 1,447 (29,237)
1423 Hull - As of 5-19-11
Costs

More Related Content

Viewers also liked

Paul Ryan’s political skills sharpened in cross currents of Wisconsin home - ...
Paul Ryan’s political skills sharpened in cross currents of Wisconsin home - ...Paul Ryan’s political skills sharpened in cross currents of Wisconsin home - ...
Paul Ryan’s political skills sharpened in cross currents of Wisconsin home - ...Brian Christianson
 
Entertainment Branding Ashot Arytyunyan Brandspoint10
Entertainment Branding Ashot Arytyunyan Brandspoint10Entertainment Branding Ashot Arytyunyan Brandspoint10
Entertainment Branding Ashot Arytyunyan Brandspoint10BrandsPoint
 
Lifestyle Branding Martyn Tipping Brandspoint10
Lifestyle Branding Martyn  Tipping Brandspoint10Lifestyle Branding Martyn  Tipping Brandspoint10
Lifestyle Branding Martyn Tipping Brandspoint10BrandsPoint
 
Bank Lifestyle Branding Martyn Tipping Brandspoint10
Bank  Lifestyle Branding   Martyn Tipping Brandspoint10Bank  Lifestyle Branding   Martyn Tipping Brandspoint10
Bank Lifestyle Branding Martyn Tipping Brandspoint10BrandsPoint
 
Os ríos curiosidades
Os ríos curiosidadesOs ríos curiosidades
Os ríos curiosidadesiesasorey
 
Burns by himasri reddy
Burns by himasri  reddyBurns by himasri  reddy
Burns by himasri reddyHima Reddy
 
Arthur Jefferson's Resume V 3.0
Arthur Jefferson's Resume V 3.0Arthur Jefferson's Resume V 3.0
Arthur Jefferson's Resume V 3.0Arthur Jefferson
 
Access regulation. Challenges and Solutions - Marc Lebourges:
Access regulation. Challenges and Solutions - Marc Lebourges: Access regulation. Challenges and Solutions - Marc Lebourges:
Access regulation. Challenges and Solutions - Marc Lebourges: FSR Communications and Media
 
Actividad 1.3 Corrientes economicas. fase 2
Actividad 1.3 Corrientes economicas. fase 2Actividad 1.3 Corrientes economicas. fase 2
Actividad 1.3 Corrientes economicas. fase 2Paola Ramírez
 
Cerbera thevetia
Cerbera thevetiaCerbera thevetia
Cerbera thevetia683546
 
Introduction to fmt
Introduction to fmtIntroduction to fmt
Introduction to fmtImran Sabri
 
toxicological samples and sampling
toxicological samples and sampling toxicological samples and sampling
toxicological samples and sampling DrNawras
 

Viewers also liked (17)

Paul Ryan’s political skills sharpened in cross currents of Wisconsin home - ...
Paul Ryan’s political skills sharpened in cross currents of Wisconsin home - ...Paul Ryan’s political skills sharpened in cross currents of Wisconsin home - ...
Paul Ryan’s political skills sharpened in cross currents of Wisconsin home - ...
 
Entertainment Branding Ashot Arytyunyan Brandspoint10
Entertainment Branding Ashot Arytyunyan Brandspoint10Entertainment Branding Ashot Arytyunyan Brandspoint10
Entertainment Branding Ashot Arytyunyan Brandspoint10
 
DISEÑO WEB
DISEÑO  WEBDISEÑO  WEB
DISEÑO WEB
 
Lifestyle Branding Martyn Tipping Brandspoint10
Lifestyle Branding Martyn  Tipping Brandspoint10Lifestyle Branding Martyn  Tipping Brandspoint10
Lifestyle Branding Martyn Tipping Brandspoint10
 
Bank Lifestyle Branding Martyn Tipping Brandspoint10
Bank  Lifestyle Branding   Martyn Tipping Brandspoint10Bank  Lifestyle Branding   Martyn Tipping Brandspoint10
Bank Lifestyle Branding Martyn Tipping Brandspoint10
 
Os ríos curiosidades
Os ríos curiosidadesOs ríos curiosidades
Os ríos curiosidades
 
Burns by himasri reddy
Burns by himasri  reddyBurns by himasri  reddy
Burns by himasri reddy
 
A Spencer CES 2
A Spencer CES 2A Spencer CES 2
A Spencer CES 2
 
Arthur Jefferson's Resume V 3.0
Arthur Jefferson's Resume V 3.0Arthur Jefferson's Resume V 3.0
Arthur Jefferson's Resume V 3.0
 
Access regulation. Challenges and Solutions - Marc Lebourges:
Access regulation. Challenges and Solutions - Marc Lebourges: Access regulation. Challenges and Solutions - Marc Lebourges:
Access regulation. Challenges and Solutions - Marc Lebourges:
 
ResumeNonProfit12-18
ResumeNonProfit12-18ResumeNonProfit12-18
ResumeNonProfit12-18
 
Economía act 1.0
Economía act 1.0Economía act 1.0
Economía act 1.0
 
Actividad 1.3 Corrientes economicas. fase 2
Actividad 1.3 Corrientes economicas. fase 2Actividad 1.3 Corrientes economicas. fase 2
Actividad 1.3 Corrientes economicas. fase 2
 
CONCEPTOS DE EXCEL
CONCEPTOS DE EXCELCONCEPTOS DE EXCEL
CONCEPTOS DE EXCEL
 
Cerbera thevetia
Cerbera thevetiaCerbera thevetia
Cerbera thevetia
 
Introduction to fmt
Introduction to fmtIntroduction to fmt
Introduction to fmt
 
toxicological samples and sampling
toxicological samples and sampling toxicological samples and sampling
toxicological samples and sampling
 

Similar to Community Action Status June 2011 copy

Sj Hauck Construction Presentation
Sj Hauck Construction PresentationSj Hauck Construction Presentation
Sj Hauck Construction PresentationMichaelDayer
 
Sj Hauck Construction - Learn More
Sj Hauck Construction - Learn MoreSj Hauck Construction - Learn More
Sj Hauck Construction - Learn MoreSteveHauck2
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentationpennsouthoffice
 
CE 162 Design Presentation
CE 162 Design PresentationCE 162 Design Presentation
CE 162 Design PresentationRyan Maidrand
 
Foundations for New Champlain Bridge Corridor Project
Foundations for New Champlain Bridge Corridor ProjectFoundations for New Champlain Bridge Corridor Project
Foundations for New Champlain Bridge Corridor ProjectDaksh Raj Chopra
 
Item # 1a - July 12, 2023 Budget WS Minutes
Item # 1a - July 12, 2023 Budget WS MinutesItem # 1a - July 12, 2023 Budget WS Minutes
Item # 1a - July 12, 2023 Budget WS Minutesahcitycouncil
 
2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bondF. X. Flinn
 
Ham Lake Grand Stay Overview 2016
Ham Lake Grand Stay Overview 2016Ham Lake Grand Stay Overview 2016
Ham Lake Grand Stay Overview 2016Paul Reese
 
Auberry Proposal 20110318
Auberry Proposal 20110318Auberry Proposal 20110318
Auberry Proposal 20110318Jon Zuber
 
Local Govt Policy Sheet - August EC
Local Govt Policy Sheet - August ECLocal Govt Policy Sheet - August EC
Local Govt Policy Sheet - August ECJames Touchton, MPA
 
ACC May 19, 2014 Meeting Presentation
ACC May 19, 2014 Meeting Presentation ACC May 19, 2014 Meeting Presentation
ACC May 19, 2014 Meeting Presentation acclwv
 
May 19 2014 meeting
May 19 2014 meetingMay 19 2014 meeting
May 19 2014 meetingacclwv
 
Statement of Qualifications (SOQ)
Statement of Qualifications (SOQ)Statement of Qualifications (SOQ)
Statement of Qualifications (SOQ)Brian Elkins
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects UpdateTownofAddison
 
Haverhill Cooperative School District October 2 Bond Hearing Presentation
Haverhill Cooperative School District October 2 Bond Hearing PresentationHaverhill Cooperative School District October 2 Bond Hearing Presentation
Haverhill Cooperative School District October 2 Bond Hearing Presentationahoughton
 

Similar to Community Action Status June 2011 copy (20)

Sj Hauck Construction Presentation
Sj Hauck Construction PresentationSj Hauck Construction Presentation
Sj Hauck Construction Presentation
 
Sj Hauck Construction - Learn More
Sj Hauck Construction - Learn MoreSj Hauck Construction - Learn More
Sj Hauck Construction - Learn More
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentation
 
CE 162 Design Presentation
CE 162 Design PresentationCE 162 Design Presentation
CE 162 Design Presentation
 
Foundations for New Champlain Bridge Corridor Project
Foundations for New Champlain Bridge Corridor ProjectFoundations for New Champlain Bridge Corridor Project
Foundations for New Champlain Bridge Corridor Project
 
Charlie Harris, CASA of Oregon
Charlie Harris, CASA of OregonCharlie Harris, CASA of Oregon
Charlie Harris, CASA of Oregon
 
Item # 1a - July 12, 2023 Budget WS Minutes
Item # 1a - July 12, 2023 Budget WS MinutesItem # 1a - July 12, 2023 Budget WS Minutes
Item # 1a - July 12, 2023 Budget WS Minutes
 
2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond
 
Ministry teams minutes 10-09-13
Ministry teams minutes 10-09-13Ministry teams minutes 10-09-13
Ministry teams minutes 10-09-13
 
Ham Lake Grand Stay Overview 2016
Ham Lake Grand Stay Overview 2016Ham Lake Grand Stay Overview 2016
Ham Lake Grand Stay Overview 2016
 
Auberry Proposal 20110318
Auberry Proposal 20110318Auberry Proposal 20110318
Auberry Proposal 20110318
 
TO Blvd Outreach City Info Mtg PPT Final
TO Blvd Outreach City Info Mtg PPT FinalTO Blvd Outreach City Info Mtg PPT Final
TO Blvd Outreach City Info Mtg PPT Final
 
Local Govt Policy Sheet - August EC
Local Govt Policy Sheet - August ECLocal Govt Policy Sheet - August EC
Local Govt Policy Sheet - August EC
 
ACC May 19, 2014 Meeting Presentation
ACC May 19, 2014 Meeting Presentation ACC May 19, 2014 Meeting Presentation
ACC May 19, 2014 Meeting Presentation
 
May 19 2014 meeting
May 19 2014 meetingMay 19 2014 meeting
May 19 2014 meeting
 
Statement of Qualifications (SOQ)
Statement of Qualifications (SOQ)Statement of Qualifications (SOQ)
Statement of Qualifications (SOQ)
 
FY17 Budget Amendment No. 2
FY17 Budget Amendment No. 2FY17 Budget Amendment No. 2
FY17 Budget Amendment No. 2
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects Update
 
Haverhill Cooperative School District October 2 Bond Hearing Presentation
Haverhill Cooperative School District October 2 Bond Hearing PresentationHaverhill Cooperative School District October 2 Bond Hearing Presentation
Haverhill Cooperative School District October 2 Bond Hearing Presentation
 
Working Group Recommendations
Working Group RecommendationsWorking Group Recommendations
Working Group Recommendations
 

Community Action Status June 2011 copy

  • 1. Community Action Pathways Center (608) 313-1335 20 Eclipse Center, 1701 Riverside Drive Beloit, WI 53511 June 1, 2011 To: Dave Somppi, Community Development Manager Brian Christiansen, Chair, Rock County Housing Authority Paul Benjamin, Director, Rock County Planning & Development Agency From: John Ramstad, Director of Housing and Energy Programs Re: Status of 1423 Hull I appreciate your support of our project at 1423 Hull and your patience in our slow progress. The distractions caused ARRA funding and the continued chaos in the housing market has things moving more slowly than anticipated. That said, this project, along with two others on that same block has allowed us to make a sustained effort on reducing the level of drug and gang activity on one of Beloit’s most challenge streets, the primary objective for this project. The original purchase/rehab project budget included the following: $15,000 County HOME Funds – Purchase and rehab $11,250 City of Beloit Lead Funds $ 9,000 Community Action Weatherization Funds $35,250 Total projected costs Ultimately, we decided to expand the scope of the project to include the full gutting and reconfiguration of the second floor and the stairway leading up to it. This house was originally a single family home, poorly converted to a duplex, then poorly retrofitted back into a single family, followed by a fire on the second floor. This made access to the second floor from the first floor a real challenge and the configuration of the second floor pathetic. This decision added another $23.5k to the project, which we intend to cover using HOME program income available to Community Action. This would bring the total cost of the project to $58,750. A copy of the current project budget/expenses is attached. On the interior of the house, the last of the flooring work is being completed this week. Currently, a crew is working on completing the residing of portions of the house we altered. That should get wrapped up next week. Our next steps are to remove the remaining construction equipment and do the lead clearance testing. After that, we are down to punch list items such as door hardware, closet doors,… I would expect that the house will be completed by no later than July 15th . At that point, we would be looking to start the process to rent the property, something that would need to be done to officially close out the project.
  • 2. It would be my recommendation that we draw all but $1,000 of the remaining HOME funds from the county at this time. I need to get specific instructions on how Dave wants to see the documentation for making this draw. The remaining $1,000 would be drawn at the point we are ready to move someone in. Pulling all of the funds starts certain time clocks with HUD that we generally like to avoid. With the lead clearance testing, I will receive the final check from the city of Beloit. I will then draw any remaining gap out of program income that Community Action holds. I understand the pressures that everyone in the Rock County HOME Consortium is facing with HUD’s enhanced attention. I also want folks to understand that these projects are significantly more complicated and impactful as they are part of our overall neighborhood stabilization efforts in Beloit’s most challenged neighborhood. We appreciate Rock County’s support of this effort.
  • 3. Category Line Item Description Approved Budget Current Forecast Invoiced So Far Remaining (Over) Comments Income Sources and Offsets Rock Co: Home 15,000 15,000 4,264 10,736 Beloit Lead 11,250 11,250 8,100 3,150 Other 23,500 23,500 - 23,500 Total Income Sources and Offsets: 49,750 12,364 37,386 Acquisition 4,263.50 4,263.50 - Lead Program Costs 1,006.86 1,006.86 - Lead Clearance Tests & Crew Labor General Costs Allocated Costs 18 18 - Taxes and Insurance 850 777 73 Design 578.66 578.66 - Utilities 2,300 1,889 411 Permits 245 245 - Total General Costs: 3,992 3,509 483 Garage Site Work 2,300 2,300 - Demo Garage Materials - - - Total Garage: 2,300 2,300 - Site Work Foundation and Flat work 500 125 375 Demo 2,986 2,986 0 Dumpsters etc Excavation - - - Drivewall Prep - - - Asphalt/Cement - - - Landscaping 500 - 500 Total Site Work: 3,986 3,111 875 Housing Framing/Materials Costs Framing Materials 1,841 1,841 (0) Drywall Materials 3,900 3,900 - Roofing Materials 516 516 0 Siding Materials 500 - 500 Insulation Materials 486 186 300 Flooring 3,500 1,262 2,238 Cabinets and tops 465 465 (0) Trim and Doors 1,700 1,656 44 Windows and Exterior Doors 3,871 3,871 0 Paint 2,100 1,352 748 Deck Materials 1,100 1,100 (0) Gutters and Downspouts 750 - 750 Nails and Misc Supplies 1,000 685 316 Total Housing Framing: 21,729 16,835 4,894 Mechanical Systems Plumbing 5,319 5,319 - HVAC 1,260 1,260 - Electrical 3,162 3,162 - Electrical Fixtures 1,285 835 450 Stove Total Mechanical Systems: 11,026 10,576 450 Total Project Costs: 48,303 41,601 6,702 Net project Gain/(Loss) 1,447 (29,237) 1423 Hull - As of 5-19-11 Costs