Commitment to Safety and Quality
SMWP does not subscribe to the “Police Action” approach to Safety and Quality. We realize that Safety and Quality are a
culture. Through leadership and mentoring we implement a Behavior Based Safety and Quality program. Through vigilant
observation, analysis, and modification of behaviors at all levels of our organization, we are able to continually achieve Ex-
cellence in Safety and Quality.
Introduction
Welcome to SMW Projects, Inc. (SMWP). We are a full service EPC firm with specialized, unique
proprietary systems and processes. We achieve World Class performance in Safety, Quality and
Productivity; specializing in Engineering, Procurement, Construction, Project Controls, Turnaround
and Asset Management, Commissioning and Start-up, Instrumentation and Electrical, Heat Trace,
Fabrication and Inspection Services. Our top executives have an average of 40+ years of major pro-
ject experience. With three offices located in the Gulf Coast region, two offices in Texas (Baytown
& Beaumont) and one office in Louisiana, we service the entire United States, coast to coast. We
define project completion as “On-time Startup” with systems and processes oriented towards
providing the Owner with control of the project. Our management teams’ extensive owner/
operator experience and culture ensures a smooth, team integrated approach. We provide ser-
vices for the Refining, Petrochemical, Specialty Chemicals, Power Generation, Mid-Stream, Paper,
and other heavy industrial related fields.
SMWP, formerly Watco, Inc., was established in 1987 at the request of several clients who needed
Project Management and Construction expertise. From those early days, SMWP has grown into a
specialized management and EPC company with owner oriented goals. SMWP was affiliated with
two larger EPC companies during the years 2006 through July, 2013 and successfully completed
numerous EPC, Capital and Turnaround projects all over the US; totaling well in excess of $1.5B,
ranging from $50K - $350M. In July of 2013, SMWP emerged as a separate entity poised to ser-
vice our Owners/Clients with a more customer oriented approach.
SMWP specializes in the following business services:
 Project Controls
 Turnaround Management and
Execution
 EPC Projects
 Direct Hire Construction
 Commissioning and Startup
 Asset Management
 Construction Management
 Project Management Consulting
and Staffing
 Instrumentation and Electrical
 Thermal Energy Management
 Fabrication
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
The SMW Projects’ Services Offered
Project Controls
SMWP provides Project Controls Systems and Project Controls Specialist for Capital
Projects and Turnarounds. We pride ourselves on being able to supply real time costs
and progress. Our system will provide the Owner with enough reaction time to cor-
rect deficiencies in cost and schedule. The hub of our process is our proprietary Pro-
ject Control Book. More specifically the book consists of: Budget/Estimate; Cost Sum-
mary Report; Quantity and Man hour Report, (Q&M); Productivity profiles, (by major
activity); Progress charts; Rules of credit; and Dash Board Indicators. Our scheduling
tool of choice is Primavera. We can supply a complete Control Team or individual per-
sonnel. Samples of our Control Book can be supplied upon request. (We can also
supply a contract strategy that will interface with our Control Process.)
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
EPC Projects
SMWP offers a unique approach to EPC Projects. We use unconventional Engineering and Construction
methods when executing EPC Projects. Our goal is to minimize your facility installed costs while maintaining
safety and quality and reduce the overall project duration.
Our extreme systems and processes will enable you to complete your project ahead of traditional execution
methods; therefore saving 12% to 18% of TIC and reduce schedule duration by months. We break projects
into 6 silos versus the conventional 3 silos of Engineering, Procurement, and Construction. This allows us to
perform perpetual activities at the same time and fill all six silos: (Engineering, Procurement, Construction,
Maintenance, Startup/Commissioning, and Operations).
We strive for economical design standards and realize that Construction must have sufficient reaction time
in order to achieve optimal cost and schedule reductions. Engineering and Procurement activities are orga-
nized around the needs of Construction. We also utilize a backward integration process which is driven by
Owner’s start up criteria. We combine mechanical completion and commissioning activities in order to re-
duce redundant resources, improve schedule, and reduce costs.
We excel on fast track projects. By getting us involved early in the project life, we are able to have a greater
influence on lowering the facility installed cost and reducing project schedules. Constructability impact on
Engineering and Procurement has its greatest effect early in the project life cycle. We strive on understand-
ing each Owner’s design, maintenance, and operations philosophies, and we build this execution methodol-
ogy into the project. Give us the opportunity to present this unique approach on your next EPC Project.
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
Turnaround Management Services
SMWP provides Turnaround Management professionals and proprietary processes for the Petro-
chemical, Refining, Specialty Chemicals, Paper, and Power industries. More specifically, we provide prov-
en processes and experienced specialists that work as part of the Owner’s integrated team. Our proprie-
tary processes and systems will be managed and installed by our professionals and will remain with the
Owners for future use.
Very seldom can you succeed in developing a tool, which can be utilized by all levels of
management, from the Turnaround Management team in the office, to the supervision,
foreman and craftsmen in the field. Development of such a tool and system would en-
sure success, and improve communication and productivity of Turnarounds. Truly, this
would be a “cradle to the grave” approach. We have accomplished this feat with our
Turnaround Management Process.
Our system is based upon Turnaround Planning Documents (TPDs) that contain detailed work steps simi-
lar to MAXIMO Work Order Tasks and SAP Maintenance Order Operations. This makes it possible for
SMWP to record asset history, and Turnaround labor activities and material costs on the asset level. In-
formation from the TPDs can then be extracted into flat formats acceptable for upload into either sys-
tem using the Client’s existing update software; therefore adding the TPDs to the Client’s existing Relia-
bility/Maintenance Work Library for timely scheduling, activity and cost tracing, and maintaining infor-
mation for all future Turnarounds.
Our Turnaround Management processes have been developed over the past 22 years and are continu-
ously updated. Our processes are easily integrated with the Owner’s systems and processes; or they
may be utilized as a stand-alone system. Through the use of our “copyright pending” Turnaround Plan-
ning Documents (TPD’s) and Capital Project Planning Documents (CPPD’s), data can be entered into
any planning or scheduling system and if preferred uploaded into the Owner’s Computerized Mainte-
nance Management System (CMMS). With this powerful capability the data is stored forever and can
be utilized by the Owner for future Turnarounds.
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
Turnaround Management Services
Integration of Capital Projects
When planning a Capital Project with Maintenance and Reliability work, it is very important to inte-
grate the two. Lack of successful integration will result in failure. It is also paramount to increase the
amount of pre tar Capital work. In other words, design to maximize pre tar work and remove it from
the Turnaround window. Our CPPDs (Capital Project Planning Documents) and our experienced per-
sonnel ensure that this process is successful.
Turnaround Planning for new Projects
On new Capital projects, why not have your turnaround planning complete, (except for work orders that
hit your system between cycles), when you achieve mechanical completion? SMWP can accomplish this by
integrating their processes and experienced personnel with the Owner and Engineer during the exe-
cution phases of the project. At this phase of the project information is easily accessible and the plan-
ning process is more productive. We estimate that we can lower planning costs by 40% to 50%. Once
completed you will only need to check the items to be executed during the respective turnaround
from the Global Turnaround list and your turnaround is ready to continue to the next gate.
SMWP’s Turnaround Management process will save the Owners up to 70% of the planning cost for all
future Turnarounds. Our process has proven to improve contractor efficiency, equipment management,
material management, cost control, reduce bid package preparation time and costs, and force complete
integration between Capital and Turnaround tasks while shortening Turnaround durations and reducing
cost by as much as 15% to 20%. The end result is a well-managed on schedule and within budget Turna-
round that produces a smooth, uneventful start up.
Execution Options
With SMWP you have several options for your next Turnaround.
We can develop and install a global turnaround system for you.
We develop and install the system and manage your turnaround or turnarounds.
We can develop and install the system and execute the complete turnaround.
We can develop and install the system, execute the mechanical portion of your turna-
round, and manage the remainder of the turnaround.
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
Direct Hire Construction
When executing a construction project, SMWP utilizes an approach that includes a checklist to assure
that lessons learned, best practices and new construction technology is always considered. The Con-
struction Execution Plan (CEP) is detailed strategy describing Home Office and Field Construction ac-
tivities, as well as interfaces necessary to plan and execute the project. Elements included in the CEP
are as follows: Staffing, Constructability, Construction Project Controls, Infrastructure, Subcontracting,
Material Control, Quality Control, Safety/ Security, Logistics, Rigging and Lifting.
We also emphasize pre assembly and modularization in order to reduce on site man hours. We can
offer select point to point fabrication. In other words we ship our products in complete packages to
ensure optimal productivity. Piping spools are packaged from starting point to ending point thus elimi-
nating stops and starts, temporary supports, number 9 wire, lost materials, etc. We offer turnkey
completion to include documentation, testing, x-ray and stress relieving if required. Some offsite pre-
assembly items are:
SMWP provides direct hire construction professionals and proprietary processes for the Refining, Petro-
chemical, Special Chemicals, Midstream, Paper, and Power industries. More specifically, we provide prov-
en processes and experienced crafts personnel that work to ensure the safety, quality control and quality
assurance of your facility assets. Our Quality Program will document and validate that plant assets have
been engineered properly; constructed and installed per design standards and regulatory requirements;
commissioned correctly; and started up properly, without incident.
● Small bore piping fabrication ● Spool pre-assembly ● Weld in and bolt on valve assembly to pipe ●
● Pump trim complete packages ● Vessel trim complete packages ● Control valve stations ●
● Safety shower pre-assembly ● Precast manholes / catch basins ● Hangers / supports / shoes ●
● Precast spread footing complete with pier ● Precast structural supports and racks ●
● Precast underground electrical ducts ● Complete Procurement & Expediting ●
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
Commissioning and Startup
Systems Completion is a key element of successful project execution where early planning and prepa-
ration in the project cycle is essential. This process will provide the Owner with full control of the pro-
ject for all project phases, from Engineering and Construction through Commissioning and Start-Up. A
well-managed and documented Systems Completion process will result in a smooth transition of the
Facility to Operations, and is founded on the development and execution of a well-defined Systems
Completion Planning Process.
Commissioning and Startup provides a full array of plant completion services, starting in FEED and
completing with operations stabilization. We have “electronic scope documents for every category of
tagged items installed. Our philosophy is as follows:
(the driver to System Completion Process)
 Maintain a laser focus on Commissioning & Start-up Activities
 Provide credible commissioning management and execution team that bring technology, work
processes, subject matter experts, best practices, lessons learned and procedures as part of our
“toolkit.”
 Commitment to deliver a safe, incident free & successful start-up.
Support Owner in the development of the System Completion Process
Industry recognized Commissioning & Start-Up specialists to furnish “Cold Eyes Review” input in support of major capital projects
Field service teams including P&ID walk down, inspection teams, CSS’s, electrical technicians, mechanical specialists.
Direct hire commissioning teams to perform flushing drying, motor run ins, loop sell off and all other commissioning activities.
RFS (Ready for Startup teams and personnel)
Hand over packages and system packages and punch list management.
Project tracking software.
Equipment certification and Factory Acceptance Testing (FAT)
Industry recognized “best practice” Commissioning Planning Applications (SYSTEMS COMPLETION APPROACH)
HAZOPS, PSR’s and PSSR’s
Operator training and procedure writing
Commissioning guidelines and procedures
Training programs, job specific
Services Include:
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
In addition to the above our Backward Integration Process will ensures a reliable Commissioning schedule
designed to meet the needs of Startup. This process works as follows:
 When executing a capital project, we focus on the concept to completion philosophy. A project is not
complete until it is validated and the unit is started up. We schedule the project by working backwards
from Startup Dates obtained from the Client. This information produces dates that are used to develop
target mechanical completion dates.
 As we prepare our execution plan, the project is broken down into Operating Systems. All activities are
assigned an operation system code.
The Operating System Time Line established by this Backward Integration combined with our OWL
(Outstanding Work List) process ensures we achieve our turnover milestones accurately.
Commissioning and Startup (cont.)
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
At SMWP we have a senior management team that is experienced in asset management. We can
support the Owner’s team in preparing asset records for all required assets. We have proprietary
templates for every asset class in your facility. We can assist in all phases of Asset Management in-
cluding Reliability in Design, Asset Inspection & Testing Plans (ITP), Asset Database Cataloging and
approved Spare Parts Lists, Reliability Based Preventive/Predictive Maintenance Programs, and
Maintenance Strategic Documents addressing the Life Cycle of the Asset. The focus of all elements
of the Asset Management process is to enhance Equipment Availability thereby providing increased
Facility profitability. Asset management deliverables are as follows:
Asset Management
 Asset records
 Asset inspection and testing plans (ITPs)
 Asset spare parts
 Asset life cycle preventative maintenance plan
 Asset bills of material requirements
 Asset visual inspection program
 Initial asset PM (Preventative maintenance) work orders
 Maintenance strategy framing documents
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
SMWP can offer complete Construction Management services. More specifically experienced Con-
struction Managers, Coordinators, Planners, Schedulers, Cost Engineers, Safety Professionals, Quali-
ty managers and inspectors, and craft discipline subject matter experts. We can work with the pro-
ject team on Constructability issues to include: designing for economical construction; organizing
engineering and procurement around the needs of construction; interactive scheduling sessions;
and pre assembly and modularization planning. Our goal is to reduce installed costs by a target
range of 12% to 18%. The end result of a good Constructability Program is reduced costs through
productivity improvement, reducing redundant resources and activities, reduced design rework,
scope changes and schedules.
We can work as part of the IMPT (Integrated Management Project Team) or as a stand-alone Project
Management team. With our experience in Commissioning and Startup, we can offer a team that
will manage the project from mechanical completion, through pre-commissioning, commissioning,
and start up. Using this approach will guarantee a reduction in cost and schedule.
We can supply a complete management team or pieces of a team. More specifically we can supply
managers, administrators, cost and schedule control personnel, safety and quality professionals.
Our extensive QA/QC program can be easily attached as a separate entity to any project.
Construction Management
Because of our years in the business and our project experience, we can offer a select group
of individuals experienced in the construction of large and small projects. Areas of expertise
include:
Project Management and Construction Staffing
 Constructability
 Reliability in design
 Infrastructure
 Cost controls
 Scheduling
 Project management
 Procurement and expediting
 Safety
 Piping
 Civil / Structural
 Rigging
 Mechanical
 Electrical
 Instrumentation
 Towers / Vessels
 Insulation / Paint
 QA/QC and Inspection
 Commissioning and startup
 Turnaround management
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
The goal of SMWP was to develop highly specialized industrial electrical and instrumentation services.
We feel that we have set ourselves apart from the rest. We recently completed supplying over 130 I&E
Technicians and over 35 Commissioning and Startup specialist performing RFS (Ready for Startup) ser-
vices for Shell / Motiva in Port Arthur. SMWP I & E services include, but not limited to:
Instrumentation and Electrical
 Power Supply
 Lighting
 Underground Electrical Work
 Electrical Instrumentation
 Mechanical Instrumentation
 Calibration, Loop Check, and Start-up Assistance
 Panel Boards and Instrument Rack Fabrication
 Fiber Optic Installation and Testing
 Electrical and Steam Heat Tracing
SMW Projects, Inc.’s technicians provide conduit installations & calibrations and testing ser-
vices to ensure all equipment is fully operational and accurate prior to system start-up.
Plus, we can provide complete system
maintenance to keep the systems reliable &
operational.
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
SMWP is an EPC full service provider for all of your industrial thermal needs. SMWP can design, pro-
cure, construct, install and maintain:
Thermal Energy Management Services
Thermal Insulation Systems (Personnel Protection, Heat Conservation and Cryogenic)
Electric Heat Trace Systems (Freeze Protection, Process Temperature Maintenance, Thermal Heat up)
Steam Tracing Systems
SMWP will work with you to provide your facility’s thermal systems with the highest reliability at the
lowest cost of ownership.
A Valuable Partner
SMW Projects, Inc.’s T.E.M.P. Division keeps its focus on “VALUE ADDED” solutions for our clients’ thermal energy needs.
From Heat Tracing and insulation systems to operating facility optimization, we are committed to system reliability and the
LOWEST TOTAL COST OF OWNERSHIP.
Global Approach
As a Division of SMW Projects, Inc., we maintain the resources to support your facility’s needs anywhere, anytime. Whether
you need design and engineering assistance or turnkey services, SMW Projects, Inc. is the solution.
Flexibility– Competence At Every Level
SMW Projects, Inc. understands that every customer is unique, with different needs and arrangements. We are prepared to
provide whatever level of service our customers request. Our competence in the individual components of the industry guar-
antees our clients professional service and WORLD CLASS RESULTS!
Thermal Energy Management
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
SMWP provides project focused fabrication services for clients across the United States. With a world
class safety and quality record and certified craftsmen, SMWP delivers fabrication solutions that meet
and exceed our clients’ expectations.
Fabrication Services
Pipe Fabrication, small and large bore, carbon and alloy welding
Structural Steel, ladders, handrails, supports, stands and platforms
Modular Fabrication, including metering skids, LACT units, CPF’s compressors, generators, launcher
and receivers, sludge catchers, gas dryers skids, charge and transfer pump skids
Vessel Fabrication, Tanks, vessels, hoppers and drums.
Fabrication
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
Repeat Legacy Customer Base
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
Contact Information
Please feel free to contact persons below:
Steve Watkins : 281-731-5768 email: steve.watkins@smwp.net
CEO
Kirk Davis : 713-494-4605 email: kirk.davis@smwp.net
VP of Operations
Chris Griffith : 409-284-7051 email: chris.griffith@smwp.net
VP of Construction
Deborah Fraley : 865-748-6100 email: deborah.fraley@smwp.net
Safety Manager
Steve Scruggs :832-374-9965 email: steve.scruggs@smwp.net
Vice President of I&E
Brandon Watkins : 832-794-1825 email: Brandon.watkins@smwp.net
Office Manager
SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
Resources
SMWP is very comfortable in supplying up to 500 qualified personnel to perform
the various activities listed. Our data base of employees is centered on the follow-
ing geographical areas: Anahuac, Winnie, Mont Belvieu, Baytown, La Porte, Deer
Park, Pasadena, Dayton, Hardin, Liberty, Henderson, Tyler, South Texas, Beaumont,
Port Arthur, Orange and Baton Rouge. We also recruit additional resources from the
following areas; Texas Hill Country, North Texas area, and mid-western Oklahoma.

More Related Content

What's hot (19)

PradeepKombilath
PradeepKombilathPradeepKombilath
PradeepKombilath
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Umar inam karim CV
Umar inam karim  CVUmar inam karim  CV
Umar inam karim CV
 
Patrick O. Madden Resume 2
Patrick O. Madden Resume 2Patrick O. Madden Resume 2
Patrick O. Madden Resume 2
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
Jai Townsend - CV
Jai Townsend - CVJai Townsend - CV
Jai Townsend - CV
 
MSD Rathdrum Role
MSD Rathdrum RoleMSD Rathdrum Role
MSD Rathdrum Role
 
P.M.
P.M.P.M.
P.M.
 
20160620_MG CV
20160620_MG CV20160620_MG CV
20160620_MG CV
 
Bec Corporate Brochure Updated 0710
Bec Corporate Brochure Updated 0710Bec Corporate Brochure Updated 0710
Bec Corporate Brochure Updated 0710
 
Hamza qadeer cv
Hamza qadeer cvHamza qadeer cv
Hamza qadeer cv
 
Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy CV - November 2016
Gary Clancy CV - November 2016
 
CV ABHIJIT 04-03-2015
CV ABHIJIT 04-03-2015CV ABHIJIT 04-03-2015
CV ABHIJIT 04-03-2015
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
 
Pradeep ramakrishnan cv 2018
Pradeep ramakrishnan   cv 2018Pradeep ramakrishnan   cv 2018
Pradeep ramakrishnan cv 2018
 
Genisision – Sales – 012 – Capability Statement Expanded
Genisision – Sales – 012 – Capability Statement ExpandedGenisision – Sales – 012 – Capability Statement Expanded
Genisision – Sales – 012 – Capability Statement Expanded
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
 
2016 07 Henry Campbell
2016 07 Henry Campbell2016 07 Henry Campbell
2016 07 Henry Campbell
 
Benjamin Santos Resume V1
Benjamin Santos Resume V1Benjamin Santos Resume V1
Benjamin Santos Resume V1
 

Similar to SMW Projects Turnaround Management Services

Seguin morris slidedoc general contractor
Seguin morris slidedoc general contractorSeguin morris slidedoc general contractor
Seguin morris slidedoc general contractorLuc Marcoux
 
World-Class Project Controls Program
World-Class Project Controls ProgramWorld-Class Project Controls Program
World-Class Project Controls ProgramBlack & Veatch
 
The Completions Group Overview
The Completions Group OverviewThe Completions Group Overview
The Completions Group OverviewRuss Hrapinski
 
The Completions Group Overview
The Completions Group OverviewThe Completions Group Overview
The Completions Group OverviewSterling McLeod
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume Rebecca Selinger
 
CMS Intro Brochure Feb 2016
CMS Intro Brochure Feb 2016CMS Intro Brochure Feb 2016
CMS Intro Brochure Feb 2016Aaron Buntrock
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docxFairFASST
 
Resume-DanTruaxWeston
Resume-DanTruaxWestonResume-DanTruaxWeston
Resume-DanTruaxWestondajomatruax
 
SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14Andrew Milota
 
Prekaro Projects - Statement of capabilities
Prekaro Projects - Statement of capabilitiesPrekaro Projects - Statement of capabilities
Prekaro Projects - Statement of capabilitiesPrekaro Projects
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 
Seatec Brochure 2011
Seatec Brochure 2011Seatec Brochure 2011
Seatec Brochure 2011smb007
 
Beard Resume May 2015v2
Beard Resume May 2015v2Beard Resume May 2015v2
Beard Resume May 2015v2Wade Beard
 

Similar to SMW Projects Turnaround Management Services (20)

Seguin morris slidedoc general contractor
Seguin morris slidedoc general contractorSeguin morris slidedoc general contractor
Seguin morris slidedoc general contractor
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
World-Class Project Controls Program
World-Class Project Controls ProgramWorld-Class Project Controls Program
World-Class Project Controls Program
 
The Completions Group Overview
The Completions Group OverviewThe Completions Group Overview
The Completions Group Overview
 
The Completions Group Overview
The Completions Group OverviewThe Completions Group Overview
The Completions Group Overview
 
SPEC Process Engineering&Construction
SPEC Process Engineering&ConstructionSPEC Process Engineering&Construction
SPEC Process Engineering&Construction
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume
 
CMS Intro Brochure Feb 2016
CMS Intro Brochure Feb 2016CMS Intro Brochure Feb 2016
CMS Intro Brochure Feb 2016
 
CMS Inc.
CMS Inc.CMS Inc.
CMS Inc.
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docx
 
Resume-DanTruaxWeston
Resume-DanTruaxWestonResume-DanTruaxWeston
Resume-DanTruaxWeston
 
SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14
 
Prekaro Projects - Statement of capabilities
Prekaro Projects - Statement of capabilitiesPrekaro Projects - Statement of capabilities
Prekaro Projects - Statement of capabilities
 
MPM Corporate Brochure 2014
MPM Corporate Brochure 2014MPM Corporate Brochure 2014
MPM Corporate Brochure 2014
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Seatec Brochure 2011
Seatec Brochure 2011Seatec Brochure 2011
Seatec Brochure 2011
 
Cms solution 08072010
Cms solution 08072010Cms solution 08072010
Cms solution 08072010
 
Beard Resume May 2015v2
Beard Resume May 2015v2Beard Resume May 2015v2
Beard Resume May 2015v2
 

SMW Projects Turnaround Management Services

  • 1. SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252 Statement of Professional Services Commitment to Safety and Quality SMWP does not subscribe to the “Police Action” approach to Safety and Quality. We realize that Safety and Quality are a culture. Through leadership and mentoring we implement a Behavior Based Safety and Quality program. Through vigilant observation, analysis, and modification of behaviors at all levels of our organization, we are able to continually achieve Ex- cellence in Safety and Quality.
  • 2. Introduction Welcome to SMW Projects, Inc. (SMWP). We are a full service EPC firm with specialized, unique proprietary systems and processes. We achieve World Class performance in Safety, Quality and Productivity; specializing in Engineering, Procurement, Construction, Project Controls, Turnaround and Asset Management, Commissioning and Start-up, Instrumentation and Electrical, Heat Trace, Fabrication and Inspection Services. Our top executives have an average of 40+ years of major pro- ject experience. With three offices located in the Gulf Coast region, two offices in Texas (Baytown & Beaumont) and one office in Louisiana, we service the entire United States, coast to coast. We define project completion as “On-time Startup” with systems and processes oriented towards providing the Owner with control of the project. Our management teams’ extensive owner/ operator experience and culture ensures a smooth, team integrated approach. We provide ser- vices for the Refining, Petrochemical, Specialty Chemicals, Power Generation, Mid-Stream, Paper, and other heavy industrial related fields. SMWP, formerly Watco, Inc., was established in 1987 at the request of several clients who needed Project Management and Construction expertise. From those early days, SMWP has grown into a specialized management and EPC company with owner oriented goals. SMWP was affiliated with two larger EPC companies during the years 2006 through July, 2013 and successfully completed numerous EPC, Capital and Turnaround projects all over the US; totaling well in excess of $1.5B, ranging from $50K - $350M. In July of 2013, SMWP emerged as a separate entity poised to ser- vice our Owners/Clients with a more customer oriented approach. SMWP specializes in the following business services:  Project Controls  Turnaround Management and Execution  EPC Projects  Direct Hire Construction  Commissioning and Startup  Asset Management  Construction Management  Project Management Consulting and Staffing  Instrumentation and Electrical  Thermal Energy Management  Fabrication SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 3. The SMW Projects’ Services Offered Project Controls SMWP provides Project Controls Systems and Project Controls Specialist for Capital Projects and Turnarounds. We pride ourselves on being able to supply real time costs and progress. Our system will provide the Owner with enough reaction time to cor- rect deficiencies in cost and schedule. The hub of our process is our proprietary Pro- ject Control Book. More specifically the book consists of: Budget/Estimate; Cost Sum- mary Report; Quantity and Man hour Report, (Q&M); Productivity profiles, (by major activity); Progress charts; Rules of credit; and Dash Board Indicators. Our scheduling tool of choice is Primavera. We can supply a complete Control Team or individual per- sonnel. Samples of our Control Book can be supplied upon request. (We can also supply a contract strategy that will interface with our Control Process.) SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 4. EPC Projects SMWP offers a unique approach to EPC Projects. We use unconventional Engineering and Construction methods when executing EPC Projects. Our goal is to minimize your facility installed costs while maintaining safety and quality and reduce the overall project duration. Our extreme systems and processes will enable you to complete your project ahead of traditional execution methods; therefore saving 12% to 18% of TIC and reduce schedule duration by months. We break projects into 6 silos versus the conventional 3 silos of Engineering, Procurement, and Construction. This allows us to perform perpetual activities at the same time and fill all six silos: (Engineering, Procurement, Construction, Maintenance, Startup/Commissioning, and Operations). We strive for economical design standards and realize that Construction must have sufficient reaction time in order to achieve optimal cost and schedule reductions. Engineering and Procurement activities are orga- nized around the needs of Construction. We also utilize a backward integration process which is driven by Owner’s start up criteria. We combine mechanical completion and commissioning activities in order to re- duce redundant resources, improve schedule, and reduce costs. We excel on fast track projects. By getting us involved early in the project life, we are able to have a greater influence on lowering the facility installed cost and reducing project schedules. Constructability impact on Engineering and Procurement has its greatest effect early in the project life cycle. We strive on understand- ing each Owner’s design, maintenance, and operations philosophies, and we build this execution methodol- ogy into the project. Give us the opportunity to present this unique approach on your next EPC Project. SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 5. Turnaround Management Services SMWP provides Turnaround Management professionals and proprietary processes for the Petro- chemical, Refining, Specialty Chemicals, Paper, and Power industries. More specifically, we provide prov- en processes and experienced specialists that work as part of the Owner’s integrated team. Our proprie- tary processes and systems will be managed and installed by our professionals and will remain with the Owners for future use. Very seldom can you succeed in developing a tool, which can be utilized by all levels of management, from the Turnaround Management team in the office, to the supervision, foreman and craftsmen in the field. Development of such a tool and system would en- sure success, and improve communication and productivity of Turnarounds. Truly, this would be a “cradle to the grave” approach. We have accomplished this feat with our Turnaround Management Process. Our system is based upon Turnaround Planning Documents (TPDs) that contain detailed work steps simi- lar to MAXIMO Work Order Tasks and SAP Maintenance Order Operations. This makes it possible for SMWP to record asset history, and Turnaround labor activities and material costs on the asset level. In- formation from the TPDs can then be extracted into flat formats acceptable for upload into either sys- tem using the Client’s existing update software; therefore adding the TPDs to the Client’s existing Relia- bility/Maintenance Work Library for timely scheduling, activity and cost tracing, and maintaining infor- mation for all future Turnarounds. Our Turnaround Management processes have been developed over the past 22 years and are continu- ously updated. Our processes are easily integrated with the Owner’s systems and processes; or they may be utilized as a stand-alone system. Through the use of our “copyright pending” Turnaround Plan- ning Documents (TPD’s) and Capital Project Planning Documents (CPPD’s), data can be entered into any planning or scheduling system and if preferred uploaded into the Owner’s Computerized Mainte- nance Management System (CMMS). With this powerful capability the data is stored forever and can be utilized by the Owner for future Turnarounds. SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 6. Turnaround Management Services Integration of Capital Projects When planning a Capital Project with Maintenance and Reliability work, it is very important to inte- grate the two. Lack of successful integration will result in failure. It is also paramount to increase the amount of pre tar Capital work. In other words, design to maximize pre tar work and remove it from the Turnaround window. Our CPPDs (Capital Project Planning Documents) and our experienced per- sonnel ensure that this process is successful. Turnaround Planning for new Projects On new Capital projects, why not have your turnaround planning complete, (except for work orders that hit your system between cycles), when you achieve mechanical completion? SMWP can accomplish this by integrating their processes and experienced personnel with the Owner and Engineer during the exe- cution phases of the project. At this phase of the project information is easily accessible and the plan- ning process is more productive. We estimate that we can lower planning costs by 40% to 50%. Once completed you will only need to check the items to be executed during the respective turnaround from the Global Turnaround list and your turnaround is ready to continue to the next gate. SMWP’s Turnaround Management process will save the Owners up to 70% of the planning cost for all future Turnarounds. Our process has proven to improve contractor efficiency, equipment management, material management, cost control, reduce bid package preparation time and costs, and force complete integration between Capital and Turnaround tasks while shortening Turnaround durations and reducing cost by as much as 15% to 20%. The end result is a well-managed on schedule and within budget Turna- round that produces a smooth, uneventful start up. Execution Options With SMWP you have several options for your next Turnaround. We can develop and install a global turnaround system for you. We develop and install the system and manage your turnaround or turnarounds. We can develop and install the system and execute the complete turnaround. We can develop and install the system, execute the mechanical portion of your turna- round, and manage the remainder of the turnaround. SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 7. Direct Hire Construction When executing a construction project, SMWP utilizes an approach that includes a checklist to assure that lessons learned, best practices and new construction technology is always considered. The Con- struction Execution Plan (CEP) is detailed strategy describing Home Office and Field Construction ac- tivities, as well as interfaces necessary to plan and execute the project. Elements included in the CEP are as follows: Staffing, Constructability, Construction Project Controls, Infrastructure, Subcontracting, Material Control, Quality Control, Safety/ Security, Logistics, Rigging and Lifting. We also emphasize pre assembly and modularization in order to reduce on site man hours. We can offer select point to point fabrication. In other words we ship our products in complete packages to ensure optimal productivity. Piping spools are packaged from starting point to ending point thus elimi- nating stops and starts, temporary supports, number 9 wire, lost materials, etc. We offer turnkey completion to include documentation, testing, x-ray and stress relieving if required. Some offsite pre- assembly items are: SMWP provides direct hire construction professionals and proprietary processes for the Refining, Petro- chemical, Special Chemicals, Midstream, Paper, and Power industries. More specifically, we provide prov- en processes and experienced crafts personnel that work to ensure the safety, quality control and quality assurance of your facility assets. Our Quality Program will document and validate that plant assets have been engineered properly; constructed and installed per design standards and regulatory requirements; commissioned correctly; and started up properly, without incident. ● Small bore piping fabrication ● Spool pre-assembly ● Weld in and bolt on valve assembly to pipe ● ● Pump trim complete packages ● Vessel trim complete packages ● Control valve stations ● ● Safety shower pre-assembly ● Precast manholes / catch basins ● Hangers / supports / shoes ● ● Precast spread footing complete with pier ● Precast structural supports and racks ● ● Precast underground electrical ducts ● Complete Procurement & Expediting ● SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 8. Commissioning and Startup Systems Completion is a key element of successful project execution where early planning and prepa- ration in the project cycle is essential. This process will provide the Owner with full control of the pro- ject for all project phases, from Engineering and Construction through Commissioning and Start-Up. A well-managed and documented Systems Completion process will result in a smooth transition of the Facility to Operations, and is founded on the development and execution of a well-defined Systems Completion Planning Process. Commissioning and Startup provides a full array of plant completion services, starting in FEED and completing with operations stabilization. We have “electronic scope documents for every category of tagged items installed. Our philosophy is as follows: (the driver to System Completion Process)  Maintain a laser focus on Commissioning & Start-up Activities  Provide credible commissioning management and execution team that bring technology, work processes, subject matter experts, best practices, lessons learned and procedures as part of our “toolkit.”  Commitment to deliver a safe, incident free & successful start-up. Support Owner in the development of the System Completion Process Industry recognized Commissioning & Start-Up specialists to furnish “Cold Eyes Review” input in support of major capital projects Field service teams including P&ID walk down, inspection teams, CSS’s, electrical technicians, mechanical specialists. Direct hire commissioning teams to perform flushing drying, motor run ins, loop sell off and all other commissioning activities. RFS (Ready for Startup teams and personnel) Hand over packages and system packages and punch list management. Project tracking software. Equipment certification and Factory Acceptance Testing (FAT) Industry recognized “best practice” Commissioning Planning Applications (SYSTEMS COMPLETION APPROACH) HAZOPS, PSR’s and PSSR’s Operator training and procedure writing Commissioning guidelines and procedures Training programs, job specific Services Include: SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 9. In addition to the above our Backward Integration Process will ensures a reliable Commissioning schedule designed to meet the needs of Startup. This process works as follows:  When executing a capital project, we focus on the concept to completion philosophy. A project is not complete until it is validated and the unit is started up. We schedule the project by working backwards from Startup Dates obtained from the Client. This information produces dates that are used to develop target mechanical completion dates.  As we prepare our execution plan, the project is broken down into Operating Systems. All activities are assigned an operation system code. The Operating System Time Line established by this Backward Integration combined with our OWL (Outstanding Work List) process ensures we achieve our turnover milestones accurately. Commissioning and Startup (cont.) SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 10. At SMWP we have a senior management team that is experienced in asset management. We can support the Owner’s team in preparing asset records for all required assets. We have proprietary templates for every asset class in your facility. We can assist in all phases of Asset Management in- cluding Reliability in Design, Asset Inspection & Testing Plans (ITP), Asset Database Cataloging and approved Spare Parts Lists, Reliability Based Preventive/Predictive Maintenance Programs, and Maintenance Strategic Documents addressing the Life Cycle of the Asset. The focus of all elements of the Asset Management process is to enhance Equipment Availability thereby providing increased Facility profitability. Asset management deliverables are as follows: Asset Management  Asset records  Asset inspection and testing plans (ITPs)  Asset spare parts  Asset life cycle preventative maintenance plan  Asset bills of material requirements  Asset visual inspection program  Initial asset PM (Preventative maintenance) work orders  Maintenance strategy framing documents SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 11. SMWP can offer complete Construction Management services. More specifically experienced Con- struction Managers, Coordinators, Planners, Schedulers, Cost Engineers, Safety Professionals, Quali- ty managers and inspectors, and craft discipline subject matter experts. We can work with the pro- ject team on Constructability issues to include: designing for economical construction; organizing engineering and procurement around the needs of construction; interactive scheduling sessions; and pre assembly and modularization planning. Our goal is to reduce installed costs by a target range of 12% to 18%. The end result of a good Constructability Program is reduced costs through productivity improvement, reducing redundant resources and activities, reduced design rework, scope changes and schedules. We can work as part of the IMPT (Integrated Management Project Team) or as a stand-alone Project Management team. With our experience in Commissioning and Startup, we can offer a team that will manage the project from mechanical completion, through pre-commissioning, commissioning, and start up. Using this approach will guarantee a reduction in cost and schedule. We can supply a complete management team or pieces of a team. More specifically we can supply managers, administrators, cost and schedule control personnel, safety and quality professionals. Our extensive QA/QC program can be easily attached as a separate entity to any project. Construction Management
  • 12. Because of our years in the business and our project experience, we can offer a select group of individuals experienced in the construction of large and small projects. Areas of expertise include: Project Management and Construction Staffing  Constructability  Reliability in design  Infrastructure  Cost controls  Scheduling  Project management  Procurement and expediting  Safety  Piping  Civil / Structural  Rigging  Mechanical  Electrical  Instrumentation  Towers / Vessels  Insulation / Paint  QA/QC and Inspection  Commissioning and startup  Turnaround management SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 13. The goal of SMWP was to develop highly specialized industrial electrical and instrumentation services. We feel that we have set ourselves apart from the rest. We recently completed supplying over 130 I&E Technicians and over 35 Commissioning and Startup specialist performing RFS (Ready for Startup) ser- vices for Shell / Motiva in Port Arthur. SMWP I & E services include, but not limited to: Instrumentation and Electrical  Power Supply  Lighting  Underground Electrical Work  Electrical Instrumentation  Mechanical Instrumentation  Calibration, Loop Check, and Start-up Assistance  Panel Boards and Instrument Rack Fabrication  Fiber Optic Installation and Testing  Electrical and Steam Heat Tracing SMW Projects, Inc.’s technicians provide conduit installations & calibrations and testing ser- vices to ensure all equipment is fully operational and accurate prior to system start-up. Plus, we can provide complete system maintenance to keep the systems reliable & operational. SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 14. SMWP is an EPC full service provider for all of your industrial thermal needs. SMWP can design, pro- cure, construct, install and maintain: Thermal Energy Management Services Thermal Insulation Systems (Personnel Protection, Heat Conservation and Cryogenic) Electric Heat Trace Systems (Freeze Protection, Process Temperature Maintenance, Thermal Heat up) Steam Tracing Systems SMWP will work with you to provide your facility’s thermal systems with the highest reliability at the lowest cost of ownership. A Valuable Partner SMW Projects, Inc.’s T.E.M.P. Division keeps its focus on “VALUE ADDED” solutions for our clients’ thermal energy needs. From Heat Tracing and insulation systems to operating facility optimization, we are committed to system reliability and the LOWEST TOTAL COST OF OWNERSHIP. Global Approach As a Division of SMW Projects, Inc., we maintain the resources to support your facility’s needs anywhere, anytime. Whether you need design and engineering assistance or turnkey services, SMW Projects, Inc. is the solution. Flexibility– Competence At Every Level SMW Projects, Inc. understands that every customer is unique, with different needs and arrangements. We are prepared to provide whatever level of service our customers request. Our competence in the individual components of the industry guar- antees our clients professional service and WORLD CLASS RESULTS! Thermal Energy Management SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 15. SMWP provides project focused fabrication services for clients across the United States. With a world class safety and quality record and certified craftsmen, SMWP delivers fabrication solutions that meet and exceed our clients’ expectations. Fabrication Services Pipe Fabrication, small and large bore, carbon and alloy welding Structural Steel, ladders, handrails, supports, stands and platforms Modular Fabrication, including metering skids, LACT units, CPF’s compressors, generators, launcher and receivers, sludge catchers, gas dryers skids, charge and transfer pump skids Vessel Fabrication, Tanks, vessels, hoppers and drums. Fabrication SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 16. Repeat Legacy Customer Base SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252
  • 17. Contact Information Please feel free to contact persons below: Steve Watkins : 281-731-5768 email: steve.watkins@smwp.net CEO Kirk Davis : 713-494-4605 email: kirk.davis@smwp.net VP of Operations Chris Griffith : 409-284-7051 email: chris.griffith@smwp.net VP of Construction Deborah Fraley : 865-748-6100 email: deborah.fraley@smwp.net Safety Manager Steve Scruggs :832-374-9965 email: steve.scruggs@smwp.net Vice President of I&E Brandon Watkins : 832-794-1825 email: Brandon.watkins@smwp.net Office Manager SMW PROJECTS, INC - 207 W. Archer Rd.— Baytown, Texas 77521 - 832-932-9252 Resources SMWP is very comfortable in supplying up to 500 qualified personnel to perform the various activities listed. Our data base of employees is centered on the follow- ing geographical areas: Anahuac, Winnie, Mont Belvieu, Baytown, La Porte, Deer Park, Pasadena, Dayton, Hardin, Liberty, Henderson, Tyler, South Texas, Beaumont, Port Arthur, Orange and Baton Rouge. We also recruit additional resources from the following areas; Texas Hill Country, North Texas area, and mid-western Oklahoma.