SlideShare a Scribd company logo
1 of 3
Betty Shearer 
213 Jason Way Youngsville , N.C. 27596 (919) 426-4827 
Objective 
Looking to join a winning team that will utilize my technical, problem solving, 
organizational and leadership skills 
MECHANIAL/ELECTRONIC ASSEMBLY 
Employment 
 MTS Sensors: 04/14 ~ 05/14 
o Assembled sensors 
 Read Operator Instructions 
 Solder components on pc boards 
 Hot pot and hand tools 
 Sirchie Fingerprint Lab: 12/12 ~ 08/12 
o Assembled Gas Chambers for fingerprint readers and special lights 
 Maysteel through Aerotek: 04/12 ~ 12/12 
o Mechanical assembly of Sheet Metal Enclosures and related components 
 Read Operator Instructions 
 Assemble components 
 Install and tighten fasteners using torque limited drivers 
 Vishay Micro Measurement: 07/08 ~ 07/11 
o Assembled Strain Gauge Control Modules 
 Installed and Soldered wiring 
 Mechanical Assembly of circuit board into control module 
o Assembled Circuit Boards 
 Select components using visual circuit diagrams
 Manually pick and place up to 100 components per board 
 Solder components in circuit board 
o Circuit Board Repair 
 De-solder components and remove from board 
 Manually pick and place replacement component 
 Solder component 
o In process strain gauge inspection 
 Utilized digital oscilloscope to measure pass / fail performance 
 C-Tron: 1/15/07 -7/1/08 
o Inspection of surface mount PCBs 
 Using blue-prints and a microscope visually inspected surface mount 
PCBs for correct orientation, solder joint condition and component 
selection (resistors, diodes, capacitors, LEDs, etc) 
 De-soldered defective / incorrect components 
 Selected, installed and soldered correct components 
 Aramark: years employed 3/27/06 - 8/10/06 
o Caterer 
 The Body Shop: 7/20/04-3/7/05 
o Pick/packer 
 Utilized pick sheet to pick orders and packed items be shipped 
 Devonshire apartments: years employed 5/27/02-11/29/02 
o Maintenance Technician 
 Maintenance inside and outside of apartments, consisted of refrigerators, 
air conditioners, garbage disposals, and turning apartments 
 Acroprint Time Recorder: 12/01/93-4/01/02 
President’s Award 2000-2001 
o Mechanical assembly 
 Assembly line operator 
 Sub-Assembly Group leader
 Warehousing 
 PCB Assembly 
 Manually Pick and Place up to 20 components per board 
 Solder components in PCB 
Education 
High school Diploma (graduate June 1978) North Side High School Ft. Wayne Ind.

More Related Content

Viewers also liked

Viewers also liked (14)

Essay Help
Essay HelpEssay Help
Essay Help
 
17df32f434ee1636dd15a8f0b5399392
17df32f434ee1636dd15a8f0b539939217df32f434ee1636dd15a8f0b5399392
17df32f434ee1636dd15a8f0b5399392
 
Electronic Newsletter (mobile friendly)
Electronic Newsletter (mobile friendly)Electronic Newsletter (mobile friendly)
Electronic Newsletter (mobile friendly)
 
Final project
Final projectFinal project
Final project
 
LauraBradway_resume
LauraBradway_resumeLauraBradway_resume
LauraBradway_resume
 
Brain cancer
Brain cancerBrain cancer
Brain cancer
 
Implementing Global Business Services
Implementing Global Business ServicesImplementing Global Business Services
Implementing Global Business Services
 
Final project
Final projectFinal project
Final project
 
American Indian Quarterly
American Indian QuarterlyAmerican Indian Quarterly
American Indian Quarterly
 
I. A. P
I. A. PI. A. P
I. A. P
 
Subway
SubwaySubway
Subway
 
Brochure Services-AFTER
Brochure Services-AFTERBrochure Services-AFTER
Brochure Services-AFTER
 
PH RESUMEOK (U)
PH RESUMEOK (U)PH RESUMEOK (U)
PH RESUMEOK (U)
 
SSOFT2014 brochure-PDFW10
SSOFT2014 brochure-PDFW10SSOFT2014 brochure-PDFW10
SSOFT2014 brochure-PDFW10
 

Similar to BettyShearerResume

Predictive Maintenance Best Practices Presented by Fluke.pptx
Predictive Maintenance Best Practices Presented by Fluke.pptxPredictive Maintenance Best Practices Presented by Fluke.pptx
Predictive Maintenance Best Practices Presented by Fluke.pptxTranscat
 
Project Report on SMT and through-hole technology
Project Report on SMT and through-hole technologyProject Report on SMT and through-hole technology
Project Report on SMT and through-hole technologylakshya bhardwaj
 
In Plant training(Internship) at Schneider Electric,Bangalore
In Plant training(Internship) at Schneider Electric,BangaloreIn Plant training(Internship) at Schneider Electric,Bangalore
In Plant training(Internship) at Schneider Electric,BangaloreSujith Js
 
In Plant training (internship) at Schneider Electric
In Plant training (internship) at Schneider ElectricIn Plant training (internship) at Schneider Electric
In Plant training (internship) at Schneider ElectricSujith Js
 
Manufacturing of PCB
Manufacturing of PCBManufacturing of PCB
Manufacturing of PCBSujith J S
 
Phalla P Luy Resume
Phalla P Luy ResumePhalla P Luy Resume
Phalla P Luy ResumePhalla Luy
 
Chery orinoco m11-service manual
Chery orinoco m11-service manualChery orinoco m11-service manual
Chery orinoco m11-service manualtallerdomingo
 
ie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptBasemAbdo4
 
Matsuba_Andrew_Makwela_CV1
Matsuba_Andrew_Makwela_CV1Matsuba_Andrew_Makwela_CV1
Matsuba_Andrew_Makwela_CV1Andrew Makwela
 
final year project report on EDM Machine BS tech mechanical
final year project report on EDM Machine BS tech mechanicalfinal year project report on EDM Machine BS tech mechanical
final year project report on EDM Machine BS tech mechanicalTariqJamil19
 
presentation1-131031235854-phpapp02.pptx
presentation1-131031235854-phpapp02.pptxpresentation1-131031235854-phpapp02.pptx
presentation1-131031235854-phpapp02.pptxSirachartChuto
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years expParthsarathy vijayan
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 

Similar to BettyShearerResume (20)

Predictive Maintenance Best Practices Presented by Fluke.pptx
Predictive Maintenance Best Practices Presented by Fluke.pptxPredictive Maintenance Best Practices Presented by Fluke.pptx
Predictive Maintenance Best Practices Presented by Fluke.pptx
 
Project Report on SMT and through-hole technology
Project Report on SMT and through-hole technologyProject Report on SMT and through-hole technology
Project Report on SMT and through-hole technology
 
In Plant training(Internship) at Schneider Electric,Bangalore
In Plant training(Internship) at Schneider Electric,BangaloreIn Plant training(Internship) at Schneider Electric,Bangalore
In Plant training(Internship) at Schneider Electric,Bangalore
 
In Plant training (internship) at Schneider Electric
In Plant training (internship) at Schneider ElectricIn Plant training (internship) at Schneider Electric
In Plant training (internship) at Schneider Electric
 
Manufacturing of PCB
Manufacturing of PCBManufacturing of PCB
Manufacturing of PCB
 
Phalla P Luy Resume
Phalla P Luy ResumePhalla P Luy Resume
Phalla P Luy Resume
 
Chery orinoco m11-service manual
Chery orinoco m11-service manualChery orinoco m11-service manual
Chery orinoco m11-service manual
 
Instrument Technician CV
Instrument Technician CVInstrument Technician CV
Instrument Technician CV
 
ie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.ppt
 
my report
my reportmy report
my report
 
Matsuba_Andrew_Makwela_CV1
Matsuba_Andrew_Makwela_CV1Matsuba_Andrew_Makwela_CV1
Matsuba_Andrew_Makwela_CV1
 
Whitted v 2015 (1) (1)
Whitted v 2015 (1) (1)Whitted v 2015 (1) (1)
Whitted v 2015 (1) (1)
 
final year project report on EDM Machine BS tech mechanical
final year project report on EDM Machine BS tech mechanicalfinal year project report on EDM Machine BS tech mechanical
final year project report on EDM Machine BS tech mechanical
 
presentation1-131031235854-phpapp02.pptx
presentation1-131031235854-phpapp02.pptxpresentation1-131031235854-phpapp02.pptx
presentation1-131031235854-phpapp02.pptx
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Vou_Thitakham
Vou_ThitakhamVou_Thitakham
Vou_Thitakham
 
MANUAL.pdf
MANUAL.pdfMANUAL.pdf
MANUAL.pdf
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Day 2
Day 2Day 2
Day 2
 

BettyShearerResume

  • 1. Betty Shearer 213 Jason Way Youngsville , N.C. 27596 (919) 426-4827 Objective Looking to join a winning team that will utilize my technical, problem solving, organizational and leadership skills MECHANIAL/ELECTRONIC ASSEMBLY Employment  MTS Sensors: 04/14 ~ 05/14 o Assembled sensors  Read Operator Instructions  Solder components on pc boards  Hot pot and hand tools  Sirchie Fingerprint Lab: 12/12 ~ 08/12 o Assembled Gas Chambers for fingerprint readers and special lights  Maysteel through Aerotek: 04/12 ~ 12/12 o Mechanical assembly of Sheet Metal Enclosures and related components  Read Operator Instructions  Assemble components  Install and tighten fasteners using torque limited drivers  Vishay Micro Measurement: 07/08 ~ 07/11 o Assembled Strain Gauge Control Modules  Installed and Soldered wiring  Mechanical Assembly of circuit board into control module o Assembled Circuit Boards  Select components using visual circuit diagrams
  • 2.  Manually pick and place up to 100 components per board  Solder components in circuit board o Circuit Board Repair  De-solder components and remove from board  Manually pick and place replacement component  Solder component o In process strain gauge inspection  Utilized digital oscilloscope to measure pass / fail performance  C-Tron: 1/15/07 -7/1/08 o Inspection of surface mount PCBs  Using blue-prints and a microscope visually inspected surface mount PCBs for correct orientation, solder joint condition and component selection (resistors, diodes, capacitors, LEDs, etc)  De-soldered defective / incorrect components  Selected, installed and soldered correct components  Aramark: years employed 3/27/06 - 8/10/06 o Caterer  The Body Shop: 7/20/04-3/7/05 o Pick/packer  Utilized pick sheet to pick orders and packed items be shipped  Devonshire apartments: years employed 5/27/02-11/29/02 o Maintenance Technician  Maintenance inside and outside of apartments, consisted of refrigerators, air conditioners, garbage disposals, and turning apartments  Acroprint Time Recorder: 12/01/93-4/01/02 President’s Award 2000-2001 o Mechanical assembly  Assembly line operator  Sub-Assembly Group leader
  • 3.  Warehousing  PCB Assembly  Manually Pick and Place up to 20 components per board  Solder components in PCB Education High school Diploma (graduate June 1978) North Side High School Ft. Wayne Ind.