Water Industry Process Automation & Control Monthly - April 2024
Bibin resume 12.08.2015
1. Personal Details
Date of Birth : 25th
May 1984.
Sex : Male
Nationality : Indian
Marital Status : Married
Passport No : M 8149549
Passport Expiry : 19th
April 2025.
Contact No : +971 502605912
Email :
bibinppathrose05@gmail.com
Languages Known : English, Malayalam
& Hindi
Address For Communication:
Bibin . P. Pathrose.
ALEC, Al - Jaber Eng. Cont.L.L.C
Dubai Marina Plaza, 36th
Floor
Near Marina Mall, Dubai Marina
P .O Box 27639
Dubaï – UAE
Permanent Address:
Pandicherry House, Kuttamangalam
P.O
Kainakary,Alappuzha,Kerala,Pin-688501
Phone +91 9446389896
BIBIN.P.PATHROSE
Career Objective
To work in challenging and professional environment, that would allow for
the effectively utilization of my wealth of knowledge, to pursue a career in
Civil engineering industry, to demonstrate my skills and abilities in an
organization that offers security and professional growth, while being
resourceful, innovative and flexible. To strive for a challenging job in a
progressive organization, where I can contribute and build my professional
career along with the growth of organization.
Profile
Above TEN year over experience in the Civil Engineering Industry as a
Draughtsman with the capability to provide high quality drawings on time
and the ability to work on own initiative, as part of a team and motivating
team to achieve the objectives. Good analytical, Managerial and problem
solving skills to maintain quality standards.
Summary
In Depth Knowledge in AutoCAD.
Knowledge in Revit.
Good knowledge in MS Office.
Familiar with Adobe Photoshop.
Knowledge of Adobe Acrobat.
Work Experience
Al Jaber L.E.G.T Engineering & Contracting (ALEC) LLC.
(One of the leading contracting company in Dubai, UAE) From
August 2008 to till date
Designation:
Civil Draughtsman/BIM Modeler.
Responsibilities:
Study/Review of IFC drawings, Contract document related
drawings and numbering systems that issued by the consultant to
find out for any discrepancy in the dimensions, levels and
coordination for both sub and super structure in coordination
with Architectural and MEP details.
Preparation of Shop Drawings to get consultant Approval.
To receive and act on design changes and to update drawings with
design changes and as per specification.
Preparation of Architectural detail drawings, sketches and
finishing schedules.
2. Strengths & Attributes
Strengths: Honest and Hardworking,
Friendly, Quick learner and Solving
problems, Self Confidence,
Interpersonal Skills.
Attributes: Communication Skills, Time
Management, and Leadership, Good
Listener, Team Player and Self
Motivated.
Educational Qualification
ITC Draughtsman (Civil) from
N.C.V.T Govt. of India.
Qualification Highlights
Certificate in MS-Office.
Certificate of Autodesk Cad Center
Other Skills
Communicates well at all levels.
Manages their time to the best
possible advantage.
Show’s they can be trusted and
information is kept in confidence.
Preparing sketches and summary statement of discrepancies
found out during drawing study for the submission of RFI. And
to support the design team on RFI response.
Verify and update existing drawings in co-operation of comments
and RFI responses which received from the consultant.
To collect the information for As Built drawings and to create As
Built drawings.
To manage the creation and amendments of all plans for the site,
ensuring the drawings are updated on AutoCAD and distributed
appropriately.
Interactions with Site Engineers and Sub-Contractors to support
construction team at site.
Comparing the contract drawing with supplied schedule like beam
columns and finishes
Projects:
NOW WORKING IN ALEC CENTRAL DESIGN WITH
VARIOUS TYPE OF ALL RUNNING LIVE PROJECTS
(From Sept.2013 till to date)
DUBAI FESTIVAL CITY PHASE 2 CONSTRUCTION WORKS
The project will deliver an enlarged Festival Square connecting with the
unique waterfront dining locations. The first phase of this two-phase
refurbishment program began in January. It included repainting work,
removal of certain kiosks and the addition of shopping space for retailers
like Landmark group to setup in the mall. "Dubai Festival City Mall
provides families, residents and tourists with the most appealing
shopping, leisure and dining options.
Responding to the wants and needs of our guests and retailers underpins
all that we do," said Murray Bell, Managing Director, Retail, Al-Futtaim
Group Real Estate. Designed to capture the ground breaking 21st
Century spirit of Dubai, Dubai Festival City was the first fully integrated
mega project to be progressively delivered in the UAE.
BVLGARI RESORT HOTEL & MARINA VILLAGE
Bvlgari Resort Hotel & Marina Village is located off the coast of Jumeirah
Beach Road and will feature a distinguished 5 star mixed-use
development, sculpted in the shape of a titanic seahorse featuring retail,
residential, hospitality and entertainment zones.
By its name itself holding a prestigious entity, a hotel and varied luxurious
residential options such as villas and mansions will swarm the
ambiance. And with the backdrop of the gleaming Jumeirah Beach
coastline, a Yacht Club will be located at the head of the seahorse shaped
structure, which will be the haven for those fascinating yachts.
The scope of works consists of Hotel approx. 27,000m2, Villas approx.
7,000m2, Beach Residence 73,000m2, Retail approx. 11,000m2, Yacht
Club approx. 5,500m2, Centralized Plant approx. 4,400m2, 15 Mansions
(3 to 6 bedrooms) approx. 9,500 and 133,700m2 of landscaping
3. Personal Overview
Equally effective working
independently or in a team.
Ability to takes a proactive
approaches to work.
Completes a quality job – right first
time.
Applies courage at work.
Pleasant disposition & good at
human relations.
Consistency in quality work with
dedication and professionalism.
Driving License Details.
License No : 1829906
Place of Issue : Dubai
Date of Issue : 30.09.2012
Date of Expiry : 30.09.2022
DOHA FESTIVAL CITY – 3100 MALL MAIN CONTRACT
ALEC Qatar originally formed a JV with Gulf Contracting Company
(GCC) to execute the 3250 Enabling Works package which covers all
sub-grade earthworks; piling (day 1 variation); pad footings; basement
slab and ground floor suspended slab, including all waterproofing and
MEP buried services. This fast track project has been very successful to
date and is currently running ahead of schedule.
The next phase in the project, the 3100 Mall Main Contact, consists of
the construction of the retail mall, multi storey car park facility as well as a
state of the art entertainment facility
RELOCATION OF DUBAI AIRSHOW EXPO HALL &
RELATED FACILITIES TO DWC
(From June.2012 to Sept.2013)
The new facility in Dubai World Central is the home of The New
Dubai Airshow 2013. The scope of works included for the dismantling,
transportation and rebuilding of the loadmaster, royal pavilion and
expo hall buildings. Comprising of all structural elements, architectural
finishes and MEP systems
DUBAI INTERNATIONAL AIRPORT - CONCOURSE A
(From June.2011 to June.2012)
The third concourse will have 20 contact gates, of which 18 will be for
the A380. It is a fully airside structure and is connected to Terminal 3
via an automated people mover in addition to vehicular and baggage
handling systems utility tunnels. Encased in its elliptical shape are 2
rectangular volumes that hold both 4 and 5 star hotels. The first and
business class lounges are located on 2 separate levels below the hotel,
including arrival and departure floors and a duty free area. ALEC's
scope includes the overall co-ordination of the project, managing
various subcontract packages and associated package
PARK HYATT, SAADIYAT ISLAND
(From April.2010 to June 2011)
A 309 key six-storey Hotel on Saadiyat Island including all FF&E, a
single basement for MEP and parking for 430 vehicles, a health club,
four F&B outlets, ballroom & conference facilities; a presidential villa,
three 2-bedroom villas; six single storey ryads; one double storey ryad;
a kids club; a beach house; all landscaping, external works and services.
MIRDIF CITY CENTRE
(From Aug.2008 to April.2010)
One of the UAE’s largest super regional centers focused on lifestyle
and community facilities, Midriff City Centre features 440 outlets in a
two-level mall, with associated parking and energy center.
4. DECLARATION:
I am happy to take responsibilities however hard it may be. I am a man of values and having faith in god. I am
also confident of my ability to work in a team.
I hereby declare that the above mentioned information is true to my knowledge and I bear the responsibility for
the correctness of the above mentioned particulars.
Place: Bibin.P.Pathrose
Date:
References
.
Arun Kumar
Senior Design Manager
Al Jabber L.E.G.T Eng. &
Contracting LLC
Mob: +971 50 8110548
E-mail: akumar@alec.ae
Sandeep MB.
Architect - Snr, Design
Al Jabber L.E.G.T Eng. &
Contracting LLC
Mob: +971 56 9926345
E-mail: sandeepmb@alec.ae
https://ae.linkedin.com/pub/bibin-
pathrose/30/32a/14a
EXPERIENCE IN INDIA (03 YEARS & 10 MONTHS)
CIVIL DRAUGHTSMAN.
Sep.2005 to July 2008 : Space Tech Pvt. Ltd.
Group of Fabtech (Abu Dhabi)
Bangalore, India.
Project Executed : Akshaya Home Chennai
Bangalore, India
Client : Kammbhavi Group
Responsibilities:
Concept & Detailed designs of various types of
projects which includes
Coordination with planning in the preparation of
schedule of shop drawings like for preparing,
submission and re-submission. Guiding overall
drafting team
Study/Review of contract drawing and contract
document related to the drawing presentation and
numbering system that issued by the client/consultant
to find out for any discrepancy in the dimensions,
level and Co-ordination for both sub and super
structure in coordination with architectural details.
Comparing the contract drawing with supplied
schedule like beam columns and finishes.
Preparation of shop drawing in coordination with
MEP works and incorporation of RFI’s received from
Client/consultant in coordination with architectural
finishes.
Submissions of final shop drawing to the
consultant/Client for their review/approval.
Preparation of column schedule at different floor level
at different areas.
Maintaining the data for the purpose of preparing as
built drawing upon completion of the project in
coordination with technical Manager, Zone Engineer,
and site Engineers in coordination.