NAME: RAGHAVENDRA.L
E-Mail
rippuraghu22@gmail.com
Mobile
+91 8123201009
Personal Data
Date of Birth : 25-7-1987
Sex : Male
Nationality : Indian
Marital Status : Single
Languages Known
1. English
2. kannada
3. Hindi
OBJECTIVE
Seeking an entry-level assignment in an organization of repute,
which provides me avenues for learning and encourages individual
growth and contribute to an organization of repute both for
professional as well as organizational goals
EDUCATIONAL QUALIFICATION:
 Bachelor of Engineering in CIVIL (VTU)-(2008-2011) from
Bangalore College of Engineering & Technology with 61%.
 Diploma in CIVIL – (2006-2008) from Sanjay Memorial
Polytechnic, Sagara with 64%
 P.U.C in Commerce – (2005) from Government PU College
with 58%
 S.S.L.C – (2003) from Mary Matha High School, Rippenpet
with 65.6%
PARTICULARS OF WORK EXPERIENCE:
Approximately Five years of experience Planning and
designing , Quantity Surveying ,Execution of work as per
drawing..
TECHNICAL SKILLS:
Package : Auto CADD 2D & 3D, Sketch up 3D drawings, MS
office, Basic Computers & with Basics of Rivets & MS Projects.
Operating systems : Windows XP series, Vista
Work experience in Company:
1. Sweett Group of India
2. Water pepper pool LLP
3. New Consolidated
Construction company
LTD
EXPERIENCE INFO:
International Projects:
 Project: Kuwait international airport – Terminal-II
Responsibility: BOQ Validation for Pre-tender estimate.
Details: 2 Basement, Ground + 5 upper floors. Build up area is
around 6, 00,000 Sqm.
 Al Bayt Stadium – Al Khor city, Qutar.
Responsibility: BOQ Validation for Pre-tender estimation.
Quantification of structural details
Indian Projects:
 MANTRI DEVELOPERS Pvt Ltd
 Mantri agara Residential blocks and commercial block:
Details: Residential block , commercial block and Retail block with
landscaping works.
Total quantification work. Pretender estimation and post tender
estimate, and post-tender billing and checking site execution work.
There handle model flat complete structural and interior work
execution as per drawing and billing.
 Mantri Swastick commercial building:
Responsibility: BOQ Validation for Pre-tender estimate.
Details: Commercial block with multi story car parking.
 Mantri pinacle commercial building:Bannergatta road.
Responsibility: BOQ Validation for Pre-tender estimate.
Details: Commercial building.
 Purvankara projects Pvt. Ltd
Project Details: Purva Sun flower Residential building. It
having A,B,C and D wings in Magadi Road.
 Suchithra Cinimas, Bannergatta Road:
Responsibility: BOQ Validation for Pre-tender estimate.
Hobbies
1. Surfing internet
2. Making friends
3. Listening Music
Temprory address
C/O Mendegar , near mango
sutes,No.20/536/4,
4th block kormangala, Bangalore
Address
S/o G Lingappa Baruve(vlg),
Rippenpet(pst), Hosanagar(Tq)
Shivamoga(D), Karnataka ,
Pin:577426
 Worked for New Consolidated Construction Company Pvt. Ltd
Job Description: Having one Year experienced as Planning & BBS
Engineer with the knowledge of Software’s like AUTOCAD, MS
Excel & a basics of MS project.
Project Detail: Patel Neomall, at Electronic City, Bangalore, is the
one of upcoming Commercial mall
 Water Pepper Pools LLP.
 Job Description: Designer & Architect of Swimming pools &
Buildings all over Karnataka, Tamil Nadu & Kerala. Major
Projects
 Indian Institute of Science, Bangalore:
Her renovate the old swimming pool and designed with
new technology
 Sree Dharmasthala Manjunath trust:
In Ujire Designed Olymic size swimming pool and for same
trust in Dharwad designed single lap swimming pool.
Job responsibilities:
 Studying tender document and understanding the scope of work.
 Bill of material preparation in co-ordination with Client to get the
details.
 Preparation & Verification of Bill of Quantities.
 Analyse the documents before working out the basis rates.
 Preparation of Cost plan.
 Preparation and validation of BOQ.
 Preparation of pre tender estimate along with rate analysis and
backup.
 Checking and compilation of Measurements.
 Measurement and BOQ done for different standard, like IS 1200,
POMI, SMM7.
 Client coordination in the terms of deliverable.
 Preparing the package split with respect to Contractors
requirement.
STRENGTHS
 Self confident and Smart Working.
 Quick Learning and Creative.
 Positive attitude and commitment towards work and
environment.
 Flexible and adaptable to different situations.
 Can be a team as well as individual player.
DECLARATION
 I hereby declare that statements made in the true complete
and correct to the best of my knowledge and belief.
PLACE : Bangalore
DATE :
RAGHAVENDRA L
Raghavendra
Raghavendra
Raghavendra
Raghavendra

Raghavendra

  • 1.
    NAME: RAGHAVENDRA.L E-Mail rippuraghu22@gmail.com Mobile +91 8123201009 PersonalData Date of Birth : 25-7-1987 Sex : Male Nationality : Indian Marital Status : Single Languages Known 1. English 2. kannada 3. Hindi OBJECTIVE Seeking an entry-level assignment in an organization of repute, which provides me avenues for learning and encourages individual growth and contribute to an organization of repute both for professional as well as organizational goals EDUCATIONAL QUALIFICATION:  Bachelor of Engineering in CIVIL (VTU)-(2008-2011) from Bangalore College of Engineering & Technology with 61%.  Diploma in CIVIL – (2006-2008) from Sanjay Memorial Polytechnic, Sagara with 64%  P.U.C in Commerce – (2005) from Government PU College with 58%  S.S.L.C – (2003) from Mary Matha High School, Rippenpet with 65.6% PARTICULARS OF WORK EXPERIENCE: Approximately Five years of experience Planning and designing , Quantity Surveying ,Execution of work as per drawing.. TECHNICAL SKILLS: Package : Auto CADD 2D & 3D, Sketch up 3D drawings, MS office, Basic Computers & with Basics of Rivets & MS Projects. Operating systems : Windows XP series, Vista
  • 2.
    Work experience inCompany: 1. Sweett Group of India 2. Water pepper pool LLP 3. New Consolidated Construction company LTD EXPERIENCE INFO: International Projects:  Project: Kuwait international airport – Terminal-II Responsibility: BOQ Validation for Pre-tender estimate. Details: 2 Basement, Ground + 5 upper floors. Build up area is around 6, 00,000 Sqm.  Al Bayt Stadium – Al Khor city, Qutar. Responsibility: BOQ Validation for Pre-tender estimation. Quantification of structural details Indian Projects:  MANTRI DEVELOPERS Pvt Ltd  Mantri agara Residential blocks and commercial block: Details: Residential block , commercial block and Retail block with landscaping works. Total quantification work. Pretender estimation and post tender estimate, and post-tender billing and checking site execution work. There handle model flat complete structural and interior work execution as per drawing and billing.  Mantri Swastick commercial building: Responsibility: BOQ Validation for Pre-tender estimate. Details: Commercial block with multi story car parking.  Mantri pinacle commercial building:Bannergatta road. Responsibility: BOQ Validation for Pre-tender estimate. Details: Commercial building.  Purvankara projects Pvt. Ltd Project Details: Purva Sun flower Residential building. It having A,B,C and D wings in Magadi Road.  Suchithra Cinimas, Bannergatta Road: Responsibility: BOQ Validation for Pre-tender estimate.
  • 3.
    Hobbies 1. Surfing internet 2.Making friends 3. Listening Music Temprory address C/O Mendegar , near mango sutes,No.20/536/4, 4th block kormangala, Bangalore Address S/o G Lingappa Baruve(vlg), Rippenpet(pst), Hosanagar(Tq) Shivamoga(D), Karnataka , Pin:577426  Worked for New Consolidated Construction Company Pvt. Ltd Job Description: Having one Year experienced as Planning & BBS Engineer with the knowledge of Software’s like AUTOCAD, MS Excel & a basics of MS project. Project Detail: Patel Neomall, at Electronic City, Bangalore, is the one of upcoming Commercial mall  Water Pepper Pools LLP.  Job Description: Designer & Architect of Swimming pools & Buildings all over Karnataka, Tamil Nadu & Kerala. Major Projects  Indian Institute of Science, Bangalore: Her renovate the old swimming pool and designed with new technology  Sree Dharmasthala Manjunath trust: In Ujire Designed Olymic size swimming pool and for same trust in Dharwad designed single lap swimming pool. Job responsibilities:  Studying tender document and understanding the scope of work.  Bill of material preparation in co-ordination with Client to get the details.  Preparation & Verification of Bill of Quantities.  Analyse the documents before working out the basis rates.  Preparation of Cost plan.  Preparation and validation of BOQ.  Preparation of pre tender estimate along with rate analysis and backup.  Checking and compilation of Measurements.  Measurement and BOQ done for different standard, like IS 1200, POMI, SMM7.  Client coordination in the terms of deliverable.  Preparing the package split with respect to Contractors requirement.
  • 4.
    STRENGTHS  Self confidentand Smart Working.  Quick Learning and Creative.  Positive attitude and commitment towards work and environment.  Flexible and adaptable to different situations.  Can be a team as well as individual player. DECLARATION  I hereby declare that statements made in the true complete and correct to the best of my knowledge and belief. PLACE : Bangalore DATE : RAGHAVENDRA L