SlideShare a Scribd company logo
1 of 6
Download to read offline
Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia
Mobile phone: +6281574262863 (Indonesia)
E-mail: chen.surian@gmail.com
1/6
CURRICULUM VITAE
Name : Surian Tanoto
Place, date of birth : Medan – Indonesia, 25th
November 1972
Sex : Male
Nationality : Indonesian
Religion : Buddhism
Marital status : Single
Mobile phone : +6281574262863 (Indonesia)
Home address : Jl. Bandengan Selatan 84A Blok C No. 4
Jakarta – 14450, Indonesia
E-mail address : chen.surian@gmail.com
QUALIFICATIONS
• 19 year experience in structural design of industrial and commercial building
• 15 year experience in project management and construction management.
EDUCATION
1991-1997 Bachelor degree in Civil Engineering, the faculty of engineering, Tarumanagara
University, Jakarta - Indonesia.
AFFILIATION
• Member of the Indonesian Society of Civil and Structural Engineers (HAKI - Himpunan
Ahli Konstruksi Indonesia).
COMPUTER SKILLS
• Microsoft Office: MS-Word, MS-Excel, MS-PowerPoint and MS-Project.
• Computer Structural Analysis and Design: SAP90, SAP2000 and STAAD-III
• Soils and Rock Analysis Program: Plaxis.
• AutoCAD.
LANGUAGES
• English.
• Bahasa Indonesia.
Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia
Mobile phone: +6281574262863 (Indonesia)
E-mail: chen.surian@gmail.com
2/6
WORKING EXPERIENCES
May 2013 – Now Assistant Project Department Head cum Project Manager, PT.
Panen Lestari Internusa – Project Division Jakarta, Indonesia.
Duties and Responsibilities:
- Project Manager for the project management and constructions of
the company’s retail shops with various international brands such
as: Paul Bakery Pacific Place (2013), Paul Bakery Kota
Kasablanka (2016), Genki Sushi Plaza Senayan (2013), Genki
Sushi Sogo Emporium Pluit (2014-2015), Genki Sushi Seibu
Grand Indonesia (2015), Sephora Plaza Indonesia (2014), Sephora
Kota Kasablanka (2014), Sephora Plaza Senayan (2015), Sephora
Kelapa Gading Mall (2015), Sephora Discovery Shopping Mall
Bali (2015-2016), Sephora Central Park (2016), Jurlique Plaza
Indonesia (2014), Jurlique Seibu Grand Indonesia (2015), H2O
Plaza Indonesia (2014), Vero Moda (2014-2015), Lucky Brand
(2014), Camaieu (2013-2015), Penshoppe (2013-2015).
Jan 2012 – Feb 2013 Technical Manager, Phuc Hung Trading - Construction - Design -
Consultant - Project Management Co., Ltd (Công ty TNHH
Thương mại - Xây dựng - Thiết kế - Tư vấn - Quản lý dự án Phúc
Hưng), Hà Nội, Việt Nam.
Duties and Responsibilities:
- Technical Manager for design coordination, structural design
verification, tender assessment and the construction of Five-level-
basement and Nine-storey Phu Gia (Apricot) Hotel Project at 136-
138 Hàng Trống Street, Hoàn Kiếm District, Hà Nội, Việt Nam,
Phu Gia Joint-Stock Company – Công Ty Cổ Phần Phú Gia,
2012-at present.
- Technical Manager for the Renovation Project of Pullman Hanoi
Horison Hotel, at 40 Cat Linh Street, Dong Da, Hanoi, Vietnam,
Global Toserco Ltd – Công Ty TNHH Global Toserco, 2012.
Dec 2007 – Dec 2011 Technical Manager cum Project Manager, Pacific Links Design &
Construction Co., Ltd, Hà Nội, Việt Nam.
Duties and Responsibilities:
- Technical Manager for the Renovation Project of Pullman Hanoi
Horison Hotel, at 40 Cat Linh Street, Dong Da, Hanoi, Vietnam,
Global Toserco Ltd – Công Ty TNHH Global Toserco, 2011.
- Technical Manager for design coordination, structural design
verification, tender assessment and the construction of Five-level-
basement and Nine-storey Phu Gia (Apricot) Hotel Project at 136-
138 Hàng Trống Street, Hoàn Kiếm District, Hà Nội, Việt Nam,
Phu Gia Joint-Stock Company – Công Ty Cổ Phần Phú Gia,
2007-2011.
- Project Manager for the Construction of 2000m2
Sales Office and
Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia
Mobile phone: +6281574262863 (Indonesia)
E-mail: chen.surian@gmail.com
3/6
Mock-Up Rooms of the Premier Project, at Lot D13, Cau Giay
Urban Area, Cau Giay district, Hanoi, Vietnam, Mountain for
Aiding and Development Co., Ltd – Công ty TNHH Thương mại
Hỗ trợ Kiến thiết Miền núi, 2010-2012.
- Technical Manager for setting up the construction management
team and tender assessment of the 90ha Lang Son International
Business and Trade Centre Project (Phase 1), Lạng Sơn, Việt
Nam, Lang Son International Corporation, 2010-2011.
- Planning Manager for the Crowne Plaza Complex Project, Le Đức
Tho, Hà Nội, Việt Nam, Tran Hong Quan Commercial Co., Ltd.,
BON Engineering Consultants Pte. Ltd., BON Vietnam JV, Co.,
Ltd, 2009-2011.
- Project Manager for the Development of the 652,409m2
Park
Height Nam Son Luxury Villas Project, Tiền Phong, Mê Linh, Hà
Nội, Việt Nam, Vinh Son Joint-Stock Company – Công Ty Cổ
Phần Vĩnh Sơn, 2008-2009.
- Technical Manager for setting up the construction management
team and tender preparation and assessment of Interior and
Finishing Work Package for the Completion of Halong Bay Four
Points Sheraton Hotel Project, Ha Long, Quang Ninh, Vietnam,
Royal International Corporation, 2008-2009.
- Project Manager for the Architectural, Structural, Mechanical,
Electrical and Plumbing Design of the Proposed Three-level-
basement and Twenty-five-storey Hiền Đức Luxury Hotel –
Diamond Palace Vietnam cum Convention and Shopping Centre
at D7 – Phú Thượng Ward, Tây Hồ District, Hà Nội, Việt Nam,
Hien Duc Corporation – Công Ty Cổ Phần Hiền Đức, 2007-2008.
Professional experiences:
- Design of temporary supporting structures for the construction of
the basement structures of the Proposed Reconstruction of the
existing Nanyang Kindergarten to a part single/part 2-storey
Building using Plaxis Soils and Rock Analysis program,
Singapore, 2008-2009.
- Design of temporary supporting structures for the construction of
the basement structures of the proposed Guillemard Road using
Plaxis Soils and Rock Analysis program, Singapore, 2008.
Aug 2005 – Dec 2007 Deputy Operational Manager, Mega Mall – Batam Centre, PT.
Federal Property Management, Batam, Indonesia.
Duties and Responsibilities:
- The management of the contracted Maintenance, Security, and
Cleaning service providers, through their site supervisors, to
ensure the delivery of service within the agreed budgets.
- The maintenance and monitoring of procedures and records
relating to the mechanical and electrical maintenance of Mall.
- The maintenance of the ‘Planned Preventative Maintenance’
Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia
Mobile phone: +6281574262863 (Indonesia)
E-mail: chen.surian@gmail.com
4/6
Schedule of Mall.
- To ensure all Health, Safety and Environmental statutory
obligations and industry best practice procedures and systems are
adhered to.
- To assist in the preparation and maintenance of the service charge
budget and expenditure.
- Manage and oversee the day-to-day operational problems.
- Ensure the Standard Operational Procedures for the Mall, security
and housekeeping are monitored and followed.
- To ensure that all plant and machinery are being effectively and
efficiently maintained by engineering and maintenance team or
third party contractors in accordance with the maintenance
schedules and that all records are accurately maintained.
- To assist in the maintenance of the ‘Occupiers Handbook’ of
Mall.
- To maintain the ‘Shop Fitting Guide’ of Mall and to assist
Marketing Department in any Occupier shop fit plan approvals.
- To ensure that utility consumption and costs are effectively and
efficiently managed.
- To prepare and deliver operational reports as required.
- Assist the Centre Manager in overseeing all aspects of Centre’s
health safety and environmental policies and procedures including
the induction of new occupiers and their contractors.
- Ensure that all visitors, contractors and occupiers adhere to site
health, safety and environmental procedures and are compliant
with appropriate regulations.
- With the Centre Manager, periodically review the performance of
contractors to ensure all standards are being met, reporting to the
managing agent’s Procurement Team any short comings
Mar 2002 – Aug 2005 Construction Manager, Mega Mall – Batam Centre Project, PT.
Federal Investindo, Batam, Indonesia.
Duties and Responsibilities:
- Construction Management for the Construction of Mega Mall –
Batam Centre Project (Phase I and Phase II), 2002 - 2005
- Structural design and verification of structural work.
- Quality control for structural and architectural works.
Oct 2001 – Dec 2001 Supervision Engineer, PT. Partono Fondas Engineering
Consultant, Jakarta, Indonesia.
Duties and Responsibilities:
- Supervising the concrete repair work on structural reinforced
concrete walls of taxiway bridges in Soekarno-Hatta Jakarta
International Airport and making the monthly report to the Owner,
PT. (Persero) Angkasa Pura II, Jakarta
- Providing the technical assistance for the Client.
Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia
Mobile phone: +6281574262863 (Indonesia)
E-mail: chen.surian@gmail.com
5/6
Oct 1996 – Jan 2001 Structural Engineer, PT. Partono Fondas Engineering Consultant,
Jakarta, Indonesia.
Duties and Responsibilities:
- Designing, analysing, verifying and supervising civil and
structural work for commercial and industrial buildings, bridges,
and foundations.
- Producing technical proposal, technical specification, tender
document, design calculation report, construction drawing, bill of
quantity and cost estimation.
- Solving and judging structural problems and questions occurred at
the construction site.
- Checking over construction drawings for issuing to constructor.
Professional experiences:
- Verification of the adequacy of structural reinforced concrete
frames for relocation of Escalators in Matahari Department Store
– Mega Mall Pluit, Jakarta, Indonesia, PT. Matahari Putra Prima
Tbk, 2001.
- Preparing and editing fundamental concepts of Indonesian
concrete and steel bridges design codes, Roads and Bridges
Network Development Project, Ministry of Public Work’s Office,
Indonesia, 2000.
- Design for the HFO storage tank’s reinforced concrete foundation
(a storage tank with capacity of 35000 m3
), The Marine Oil
Terminal Project, Poti-Tbilisi, Georgia, PT. Istana Karang Laut,
2000.
- Verification and strengthening design for structural reinforced
concrete walls of taxiway bridges in Soekarno-Hatta Jakarta
International Airport Centre, Tangerang, Indonesia, PT. (Persero)
Angkasa Pura II, 1999-2000.
- Verification and strengthening design for structural reinforced
concrete beams of the Palm Fruit’s Loading Platform, South
Sumatera, Indonesia, PT. Hindoli - Cargill Indonesia, 1999.
- Analysis and design for reinforced concrete foundations of
telecommunication towers, Trans-Sulawesi Expansion and
Extension Project in Luwuk-Ambon, Indonesia, PT. Alcatel
Enkomindo, 1998.
- Design for cement factory’s related facilities, Extension and
Optimization II Project, South Sumatera, Indonesia, PT. Semen
Baturaja (Persero), 1997.
- Structural analysis and design for the coal storage (a 30m-
diameter steel-framed dome structure) of the Baturaja Cement
Factory, Extension and Optimization II Project, South Sumatera,
Indonesia, PT. Semen Baturaja (Persero), 1997.
- Design for the reinforced concrete water channel and analysis for
the soil stability, The Kuranji Hydro Power Plant Project, West
Sumatera, Indonesia, PT. Semen Padang (Persero), 1996-1997.
Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia
Mobile phone: +6281574262863 (Indonesia)
E-mail: chen.surian@gmail.com
6/6
- Structural analysis and design for the Cisadane Cable Stayed
Bridges (Twin reinforced concrete cable stayed bridges with main
spans of 2×100 meters) in Serpong, West Java, Indonesia, PT.
Bumi Serpong Damai, 1996-1997.
Aug 1995 - Aug 1996 Teaching Assistant, Civil Engineering Department, Tarumanagara
University, Jakarta - Indonesia.
- Engineering Mechanics I & II
- Laboratory of Soil Mechanics
REFERENCES
Mr. Mahardjo Lila Santoso, B.Sc., M.Eng., C.Eng., MICE, MIES, PE (Singapore),
MASCE, MHKIE, MAPM
General Director of Pacific Links Design & Construction Co., Ltd
Unit 607, 6th
Floor, Savina Building,
No. 1 Dinh Le Street, Hoan Kiem District,
Mobile phone: +6590030196; +84912749858
Office phone: 84-4 39367063
Hanoi – Vietnam
Mr. Patrick Chan
Previous General Manager of Mega Mall – Batam Centre, PT. Federal Property
Management
Mega Mall – Batam Centre (In front of International Ferry Terminal Batam Centre)
Mobile phone: +6281213388977; +6591228634
Office phone: 62-778 7033683
Batam 29432 – Indonesia
Mr. Tong Lee Yew
Previous Project Manager of Mega Mall – Batam Centre Project, PT. Federal
Investindo.
Mega Mall – Batam Centre (In front of International Ferry Terminal Batam Centre)
Mobile phone: +6592996124
Office phone: 62-778 7033683
Batam 29432 – Indonesia
Dr. F.X. Supartono
Director of PT. Partono Fondas Engineering Consultant
Jl. Petojo V.I.Y - 1 No. 30 A
Mobile phone: +628161856385
Office phone: 62-21 3448520
Jakarta – 10150
Indonesia

More Related Content

What's hot

Project management (1)
Project management (1)Project management (1)
Project management (1)aarenneoone
 
Project Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang JayaProject Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang JayaJoe Onn Lim
 
Electl Engr_Updated CV_Jesnar Odjinar
Electl Engr_Updated CV_Jesnar OdjinarElectl Engr_Updated CV_Jesnar Odjinar
Electl Engr_Updated CV_Jesnar OdjinarJesnar Odjinar
 
Industrial training @ sierra amjedh
Industrial training @ sierra amjedhIndustrial training @ sierra amjedh
Industrial training @ sierra amjedhAmjedh Haleel
 
Project Management - Recreation Blocks
Project Management - Recreation BlocksProject Management - Recreation Blocks
Project Management - Recreation BlocksYen Min Khor
 
Company Profile
Company ProfileCompany Profile
Company Profiledeadmk
 
001cnd-Marjune O. Provido Resume 2015
001cnd-Marjune O. Provido Resume 2015001cnd-Marjune O. Provido Resume 2015
001cnd-Marjune O. Provido Resume 2015Marjune O. Provido
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineerhamdyhussien
 
Bibin resume 12.08.2015
Bibin resume 12.08.2015Bibin resume 12.08.2015
Bibin resume 12.08.2015Bibin Pathrose
 
Bibin resume 12.08.2015
Bibin resume 12.08.2015Bibin resume 12.08.2015
Bibin resume 12.08.2015Bibin Pathrose
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALjolynnTJL
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)AwZhiXuan
 

What's hot (19)

Pari Resume 2015 India
Pari Resume 2015 IndiaPari Resume 2015 India
Pari Resume 2015 India
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
Project Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang JayaProject Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang Jaya
 
Electl Engr_Updated CV_Jesnar Odjinar
Electl Engr_Updated CV_Jesnar OdjinarElectl Engr_Updated CV_Jesnar Odjinar
Electl Engr_Updated CV_Jesnar Odjinar
 
MAAN SINGH
MAAN SINGHMAAN SINGH
MAAN SINGH
 
Industrial training @ sierra amjedh
Industrial training @ sierra amjedhIndustrial training @ sierra amjedh
Industrial training @ sierra amjedh
 
Project Management - Recreation Blocks
Project Management - Recreation BlocksProject Management - Recreation Blocks
Project Management - Recreation Blocks
 
Compiled report
Compiled reportCompiled report
Compiled report
 
Company Profile
Company ProfileCompany Profile
Company Profile
 
001cnd-Marjune O. Provido Resume 2015
001cnd-Marjune O. Provido Resume 2015001cnd-Marjune O. Provido Resume 2015
001cnd-Marjune O. Provido Resume 2015
 
Che Abdul Roni Bin Mustafa
Che Abdul Roni Bin MustafaChe Abdul Roni Bin Mustafa
Che Abdul Roni Bin Mustafa
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineer
 
SULU TOLANI cv
SULU TOLANI cvSULU TOLANI cv
SULU TOLANI cv
 
Rimon C.V
Rimon C.VRimon C.V
Rimon C.V
 
Bibin resume 12.08.2015
Bibin resume 12.08.2015Bibin resume 12.08.2015
Bibin resume 12.08.2015
 
Bibin resume 12.08.2015
Bibin resume 12.08.2015Bibin resume 12.08.2015
Bibin resume 12.08.2015
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
 
Aromal_CV.PDF
Aromal_CV.PDFAromal_CV.PDF
Aromal_CV.PDF
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
 

Viewers also liked

Astrit Sahiti CV 2016
Astrit Sahiti CV 2016Astrit Sahiti CV 2016
Astrit Sahiti CV 2016Astrit Sahiti
 
1- C.V WORLD FINAL2
1- C.V WORLD FINAL21- C.V WORLD FINAL2
1- C.V WORLD FINAL2Reda Sheta
 
CV Thierry BEKAERT TP DAO
CV Thierry BEKAERT TP DAOCV Thierry BEKAERT TP DAO
CV Thierry BEKAERT TP DAOBEKAERT Thierry
 
Curriculum vitae Pediatric Cardiac Intensivist
Curriculum vitae Pediatric Cardiac IntensivistCurriculum vitae Pediatric Cardiac Intensivist
Curriculum vitae Pediatric Cardiac IntensivistHussain Mahmoud
 
1 Engr. Mohammad Faizal CV (1) - Copy
1 Engr. Mohammad Faizal CV (1) - Copy1 Engr. Mohammad Faizal CV (1) - Copy
1 Engr. Mohammad Faizal CV (1) - CopyMohammad Faizal Molok
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016Mohamed Fawzy
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016Mohamed Fawzy
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMohammed ali
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.vali ibrahim
 

Viewers also liked (16)

Astrit Sahiti CV 2016
Astrit Sahiti CV 2016Astrit Sahiti CV 2016
Astrit Sahiti CV 2016
 
1- C.V WORLD FINAL2
1- C.V WORLD FINAL21- C.V WORLD FINAL2
1- C.V WORLD FINAL2
 
CV Thierry BEKAERT TP DAO
CV Thierry BEKAERT TP DAOCV Thierry BEKAERT TP DAO
CV Thierry BEKAERT TP DAO
 
Curriculum vitae Pediatric Cardiac Intensivist
Curriculum vitae Pediatric Cardiac IntensivistCurriculum vitae Pediatric Cardiac Intensivist
Curriculum vitae Pediatric Cardiac Intensivist
 
1 Engr. Mohammad Faizal CV (1) - Copy
1 Engr. Mohammad Faizal CV (1) - Copy1 Engr. Mohammad Faizal CV (1) - Copy
1 Engr. Mohammad Faizal CV (1) - Copy
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Emad Mohammed CV
Emad Mohammed CVEmad Mohammed CV
Emad Mohammed CV
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
 

Similar to CV 2016 Surian Tanoto (20)

Ajaree_PM_CV
Ajaree_PM_CVAjaree_PM_CV
Ajaree_PM_CV
 
Nguyen_Ngoc_Thao CVs-E
Nguyen_Ngoc_Thao CVs-ENguyen_Ngoc_Thao CVs-E
Nguyen_Ngoc_Thao CVs-E
 
Gusyahri hidayat (cm)
Gusyahri hidayat (cm)Gusyahri hidayat (cm)
Gusyahri hidayat (cm)
 
CV_Dhan_A4_size
CV_Dhan_A4_sizeCV_Dhan_A4_size
CV_Dhan_A4_size
 
CV EDDY CHANDRA
CV  EDDY CHANDRACV  EDDY CHANDRA
CV EDDY CHANDRA
 
CV_ Adhy_rev-Oct2016
CV_ Adhy_rev-Oct2016CV_ Adhy_rev-Oct2016
CV_ Adhy_rev-Oct2016
 
CV Ronald G.P.
CV Ronald G.P.CV Ronald G.P.
CV Ronald G.P.
 
Steven Hartanto - Resume
Steven Hartanto - ResumeSteven Hartanto - Resume
Steven Hartanto - Resume
 
CV
CVCV
CV
 
CV
CVCV
CV
 
CV
CVCV
CV
 
CV
CVCV
CV
 
CV
CVCV
CV
 
Magazine 02
Magazine 02Magazine 02
Magazine 02
 
Magazine 02
Magazine 02Magazine 02
Magazine 02
 
CV
CVCV
CV
 
ICI PROJECT 2 Magazine
ICI PROJECT 2 MagazineICI PROJECT 2 Magazine
ICI PROJECT 2 Magazine
 
Magazine 02
Magazine 02Magazine 02
Magazine 02
 
ICI Magazine ( ICI ) FNBE March 2015
ICI Magazine ( ICI ) FNBE March 2015ICI Magazine ( ICI ) FNBE March 2015
ICI Magazine ( ICI ) FNBE March 2015
 
ICI MAGAZINE ( ICI PROJECT )- FNBE 2015
ICI MAGAZINE ( ICI PROJECT )- FNBE 2015ICI MAGAZINE ( ICI PROJECT )- FNBE 2015
ICI MAGAZINE ( ICI PROJECT )- FNBE 2015
 

CV 2016 Surian Tanoto

  • 1. Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia Mobile phone: +6281574262863 (Indonesia) E-mail: chen.surian@gmail.com 1/6 CURRICULUM VITAE Name : Surian Tanoto Place, date of birth : Medan – Indonesia, 25th November 1972 Sex : Male Nationality : Indonesian Religion : Buddhism Marital status : Single Mobile phone : +6281574262863 (Indonesia) Home address : Jl. Bandengan Selatan 84A Blok C No. 4 Jakarta – 14450, Indonesia E-mail address : chen.surian@gmail.com QUALIFICATIONS • 19 year experience in structural design of industrial and commercial building • 15 year experience in project management and construction management. EDUCATION 1991-1997 Bachelor degree in Civil Engineering, the faculty of engineering, Tarumanagara University, Jakarta - Indonesia. AFFILIATION • Member of the Indonesian Society of Civil and Structural Engineers (HAKI - Himpunan Ahli Konstruksi Indonesia). COMPUTER SKILLS • Microsoft Office: MS-Word, MS-Excel, MS-PowerPoint and MS-Project. • Computer Structural Analysis and Design: SAP90, SAP2000 and STAAD-III • Soils and Rock Analysis Program: Plaxis. • AutoCAD. LANGUAGES • English. • Bahasa Indonesia.
  • 2. Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia Mobile phone: +6281574262863 (Indonesia) E-mail: chen.surian@gmail.com 2/6 WORKING EXPERIENCES May 2013 – Now Assistant Project Department Head cum Project Manager, PT. Panen Lestari Internusa – Project Division Jakarta, Indonesia. Duties and Responsibilities: - Project Manager for the project management and constructions of the company’s retail shops with various international brands such as: Paul Bakery Pacific Place (2013), Paul Bakery Kota Kasablanka (2016), Genki Sushi Plaza Senayan (2013), Genki Sushi Sogo Emporium Pluit (2014-2015), Genki Sushi Seibu Grand Indonesia (2015), Sephora Plaza Indonesia (2014), Sephora Kota Kasablanka (2014), Sephora Plaza Senayan (2015), Sephora Kelapa Gading Mall (2015), Sephora Discovery Shopping Mall Bali (2015-2016), Sephora Central Park (2016), Jurlique Plaza Indonesia (2014), Jurlique Seibu Grand Indonesia (2015), H2O Plaza Indonesia (2014), Vero Moda (2014-2015), Lucky Brand (2014), Camaieu (2013-2015), Penshoppe (2013-2015). Jan 2012 – Feb 2013 Technical Manager, Phuc Hung Trading - Construction - Design - Consultant - Project Management Co., Ltd (Công ty TNHH Thương mại - Xây dựng - Thiết kế - Tư vấn - Quản lý dự án Phúc Hưng), Hà Nội, Việt Nam. Duties and Responsibilities: - Technical Manager for design coordination, structural design verification, tender assessment and the construction of Five-level- basement and Nine-storey Phu Gia (Apricot) Hotel Project at 136- 138 Hàng Trống Street, Hoàn Kiếm District, Hà Nội, Việt Nam, Phu Gia Joint-Stock Company – Công Ty Cổ Phần Phú Gia, 2012-at present. - Technical Manager for the Renovation Project of Pullman Hanoi Horison Hotel, at 40 Cat Linh Street, Dong Da, Hanoi, Vietnam, Global Toserco Ltd – Công Ty TNHH Global Toserco, 2012. Dec 2007 – Dec 2011 Technical Manager cum Project Manager, Pacific Links Design & Construction Co., Ltd, Hà Nội, Việt Nam. Duties and Responsibilities: - Technical Manager for the Renovation Project of Pullman Hanoi Horison Hotel, at 40 Cat Linh Street, Dong Da, Hanoi, Vietnam, Global Toserco Ltd – Công Ty TNHH Global Toserco, 2011. - Technical Manager for design coordination, structural design verification, tender assessment and the construction of Five-level- basement and Nine-storey Phu Gia (Apricot) Hotel Project at 136- 138 Hàng Trống Street, Hoàn Kiếm District, Hà Nội, Việt Nam, Phu Gia Joint-Stock Company – Công Ty Cổ Phần Phú Gia, 2007-2011. - Project Manager for the Construction of 2000m2 Sales Office and
  • 3. Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia Mobile phone: +6281574262863 (Indonesia) E-mail: chen.surian@gmail.com 3/6 Mock-Up Rooms of the Premier Project, at Lot D13, Cau Giay Urban Area, Cau Giay district, Hanoi, Vietnam, Mountain for Aiding and Development Co., Ltd – Công ty TNHH Thương mại Hỗ trợ Kiến thiết Miền núi, 2010-2012. - Technical Manager for setting up the construction management team and tender assessment of the 90ha Lang Son International Business and Trade Centre Project (Phase 1), Lạng Sơn, Việt Nam, Lang Son International Corporation, 2010-2011. - Planning Manager for the Crowne Plaza Complex Project, Le Đức Tho, Hà Nội, Việt Nam, Tran Hong Quan Commercial Co., Ltd., BON Engineering Consultants Pte. Ltd., BON Vietnam JV, Co., Ltd, 2009-2011. - Project Manager for the Development of the 652,409m2 Park Height Nam Son Luxury Villas Project, Tiền Phong, Mê Linh, Hà Nội, Việt Nam, Vinh Son Joint-Stock Company – Công Ty Cổ Phần Vĩnh Sơn, 2008-2009. - Technical Manager for setting up the construction management team and tender preparation and assessment of Interior and Finishing Work Package for the Completion of Halong Bay Four Points Sheraton Hotel Project, Ha Long, Quang Ninh, Vietnam, Royal International Corporation, 2008-2009. - Project Manager for the Architectural, Structural, Mechanical, Electrical and Plumbing Design of the Proposed Three-level- basement and Twenty-five-storey Hiền Đức Luxury Hotel – Diamond Palace Vietnam cum Convention and Shopping Centre at D7 – Phú Thượng Ward, Tây Hồ District, Hà Nội, Việt Nam, Hien Duc Corporation – Công Ty Cổ Phần Hiền Đức, 2007-2008. Professional experiences: - Design of temporary supporting structures for the construction of the basement structures of the Proposed Reconstruction of the existing Nanyang Kindergarten to a part single/part 2-storey Building using Plaxis Soils and Rock Analysis program, Singapore, 2008-2009. - Design of temporary supporting structures for the construction of the basement structures of the proposed Guillemard Road using Plaxis Soils and Rock Analysis program, Singapore, 2008. Aug 2005 – Dec 2007 Deputy Operational Manager, Mega Mall – Batam Centre, PT. Federal Property Management, Batam, Indonesia. Duties and Responsibilities: - The management of the contracted Maintenance, Security, and Cleaning service providers, through their site supervisors, to ensure the delivery of service within the agreed budgets. - The maintenance and monitoring of procedures and records relating to the mechanical and electrical maintenance of Mall. - The maintenance of the ‘Planned Preventative Maintenance’
  • 4. Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia Mobile phone: +6281574262863 (Indonesia) E-mail: chen.surian@gmail.com 4/6 Schedule of Mall. - To ensure all Health, Safety and Environmental statutory obligations and industry best practice procedures and systems are adhered to. - To assist in the preparation and maintenance of the service charge budget and expenditure. - Manage and oversee the day-to-day operational problems. - Ensure the Standard Operational Procedures for the Mall, security and housekeeping are monitored and followed. - To ensure that all plant and machinery are being effectively and efficiently maintained by engineering and maintenance team or third party contractors in accordance with the maintenance schedules and that all records are accurately maintained. - To assist in the maintenance of the ‘Occupiers Handbook’ of Mall. - To maintain the ‘Shop Fitting Guide’ of Mall and to assist Marketing Department in any Occupier shop fit plan approvals. - To ensure that utility consumption and costs are effectively and efficiently managed. - To prepare and deliver operational reports as required. - Assist the Centre Manager in overseeing all aspects of Centre’s health safety and environmental policies and procedures including the induction of new occupiers and their contractors. - Ensure that all visitors, contractors and occupiers adhere to site health, safety and environmental procedures and are compliant with appropriate regulations. - With the Centre Manager, periodically review the performance of contractors to ensure all standards are being met, reporting to the managing agent’s Procurement Team any short comings Mar 2002 – Aug 2005 Construction Manager, Mega Mall – Batam Centre Project, PT. Federal Investindo, Batam, Indonesia. Duties and Responsibilities: - Construction Management for the Construction of Mega Mall – Batam Centre Project (Phase I and Phase II), 2002 - 2005 - Structural design and verification of structural work. - Quality control for structural and architectural works. Oct 2001 – Dec 2001 Supervision Engineer, PT. Partono Fondas Engineering Consultant, Jakarta, Indonesia. Duties and Responsibilities: - Supervising the concrete repair work on structural reinforced concrete walls of taxiway bridges in Soekarno-Hatta Jakarta International Airport and making the monthly report to the Owner, PT. (Persero) Angkasa Pura II, Jakarta - Providing the technical assistance for the Client.
  • 5. Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia Mobile phone: +6281574262863 (Indonesia) E-mail: chen.surian@gmail.com 5/6 Oct 1996 – Jan 2001 Structural Engineer, PT. Partono Fondas Engineering Consultant, Jakarta, Indonesia. Duties and Responsibilities: - Designing, analysing, verifying and supervising civil and structural work for commercial and industrial buildings, bridges, and foundations. - Producing technical proposal, technical specification, tender document, design calculation report, construction drawing, bill of quantity and cost estimation. - Solving and judging structural problems and questions occurred at the construction site. - Checking over construction drawings for issuing to constructor. Professional experiences: - Verification of the adequacy of structural reinforced concrete frames for relocation of Escalators in Matahari Department Store – Mega Mall Pluit, Jakarta, Indonesia, PT. Matahari Putra Prima Tbk, 2001. - Preparing and editing fundamental concepts of Indonesian concrete and steel bridges design codes, Roads and Bridges Network Development Project, Ministry of Public Work’s Office, Indonesia, 2000. - Design for the HFO storage tank’s reinforced concrete foundation (a storage tank with capacity of 35000 m3 ), The Marine Oil Terminal Project, Poti-Tbilisi, Georgia, PT. Istana Karang Laut, 2000. - Verification and strengthening design for structural reinforced concrete walls of taxiway bridges in Soekarno-Hatta Jakarta International Airport Centre, Tangerang, Indonesia, PT. (Persero) Angkasa Pura II, 1999-2000. - Verification and strengthening design for structural reinforced concrete beams of the Palm Fruit’s Loading Platform, South Sumatera, Indonesia, PT. Hindoli - Cargill Indonesia, 1999. - Analysis and design for reinforced concrete foundations of telecommunication towers, Trans-Sulawesi Expansion and Extension Project in Luwuk-Ambon, Indonesia, PT. Alcatel Enkomindo, 1998. - Design for cement factory’s related facilities, Extension and Optimization II Project, South Sumatera, Indonesia, PT. Semen Baturaja (Persero), 1997. - Structural analysis and design for the coal storage (a 30m- diameter steel-framed dome structure) of the Baturaja Cement Factory, Extension and Optimization II Project, South Sumatera, Indonesia, PT. Semen Baturaja (Persero), 1997. - Design for the reinforced concrete water channel and analysis for the soil stability, The Kuranji Hydro Power Plant Project, West Sumatera, Indonesia, PT. Semen Padang (Persero), 1996-1997.
  • 6. Jl. Bandengan Selatan 84A Blok C No. 4, Jakarta – Indonesia Mobile phone: +6281574262863 (Indonesia) E-mail: chen.surian@gmail.com 6/6 - Structural analysis and design for the Cisadane Cable Stayed Bridges (Twin reinforced concrete cable stayed bridges with main spans of 2×100 meters) in Serpong, West Java, Indonesia, PT. Bumi Serpong Damai, 1996-1997. Aug 1995 - Aug 1996 Teaching Assistant, Civil Engineering Department, Tarumanagara University, Jakarta - Indonesia. - Engineering Mechanics I & II - Laboratory of Soil Mechanics REFERENCES Mr. Mahardjo Lila Santoso, B.Sc., M.Eng., C.Eng., MICE, MIES, PE (Singapore), MASCE, MHKIE, MAPM General Director of Pacific Links Design & Construction Co., Ltd Unit 607, 6th Floor, Savina Building, No. 1 Dinh Le Street, Hoan Kiem District, Mobile phone: +6590030196; +84912749858 Office phone: 84-4 39367063 Hanoi – Vietnam Mr. Patrick Chan Previous General Manager of Mega Mall – Batam Centre, PT. Federal Property Management Mega Mall – Batam Centre (In front of International Ferry Terminal Batam Centre) Mobile phone: +6281213388977; +6591228634 Office phone: 62-778 7033683 Batam 29432 – Indonesia Mr. Tong Lee Yew Previous Project Manager of Mega Mall – Batam Centre Project, PT. Federal Investindo. Mega Mall – Batam Centre (In front of International Ferry Terminal Batam Centre) Mobile phone: +6592996124 Office phone: 62-778 7033683 Batam 29432 – Indonesia Dr. F.X. Supartono Director of PT. Partono Fondas Engineering Consultant Jl. Petojo V.I.Y - 1 No. 30 A Mobile phone: +628161856385 Office phone: 62-21 3448520 Jakarta – 10150 Indonesia