1. BABAR_ALI04@YAHOO.COM ….. (00966)507406168 https://sa.linkedin.com/in/babar-
ali-26686b47
Contact:(00966)507406168;
babar_ali04@yahoo.com
Al-Jubail, KSA
OBJECTIVE
To seek a challenging career job
utilizing my academic and practical
experience
EDUCATION
M.S. (MECH) ENGINEERING,
HOWARD UNIVERSITY, U.S.A
B.S. (MECH.) ENGINEERING,
UET, LAHORE, PAKISTAN
SKILLS
PROJECT MANAGEMENT
DESIGN & ENGINEERING
PLANT MAINTENANCE
PLANT RELIABILITY
BOILER DESIGN
COMPUTER SKILLS
Visual Basic, Pascal, FORTRAN; Software:
Oracle8 (dBA), Autocad, Word, Excel,
Windows, M.S. Project, Primavera, etc.
KEY HIGHLIGHTS
Managed the projects excess of
10million man hours.
Managed the Plant Maintenance
with 20 skilled staff
Managed Design Office with 15
plus engineers and skilled staff.
BABAR ALI HAS 29 YEARS (APPROX.) EXPERIENCE IN PETROCHEMICAL,
MANUFACTURING, DESIGN & CONSTRUCTION UNITS
EXPERIENCE
SABIC/Sabtank working as Staff Engineer 2008/to date
Project Coordination/Management: Main projects in progress are
o Petrokemya ABS project (Sabic Project).
o Kemya Coal Tar/Butene I project (Sabic Project).
o Sipchem EA/BA/Ethanol project (Non-Sabic Project).
o Samapco/SAHARA CA/EDC project (Non-Sabic Project).
o Gulf Farabi Benzene project (Non-Sabic Project).
Projects Completed
o Saudi Kayan Project for MEG/DEG/TEG/AT/BNZ/Raw Hexane and N-Butanol
project at King Fahd Industrial Port, Saudi Arabia.
Works include:
o Project Idea initiation/Scope of work (SOW)/pre-feasibility & CDP development.
CDP/BEP/FEED/ITB (bidding)/DEP30%, 60%, 90% & 100% design/ up to PSSR/ and
commissioning & final as-built documentation. Hazop/ PHA/ LOPA/ SIL / SAFER study
sessions on each product lines/nodes and the facility. Ensuring HCIS approval with NFPA
standards.Project schedules, RFIs & reviewing QA/QC documents. Management of change
(MOC) on a project.
Nimir Chemicals worked as Divisional Manager, 1995/2008
Works include:
o Reliability and Maintenance of all the equipment at Plant.
o Planning Scheduling/Predictive/Preventive maintenance
o Equipment/Spare history with CMMS
o Budgeting the Annual expenditures (revenue)/capital costing.
o SPECIAL PROJECT: Engineering/design/erection of Phthalic Anhydride Reactor,
distillation column, associated equipment, piping, pre-commissioning, commissioning.
Celanese worked as Project in-charge (site) 1993/1995
Works include:
o Managing and controlling all the Plant erection matters at Site, Implementing the project
construction strategies, monitoring for best possible available resource management.
Ittefaq Foundry worked as Deputy Manager design 1989/1993
Works include:
o Boiler design/Engineering, Stress calculations, approval of drawings from ABSTECH,
applicable Codes: ASME, Sec. I & VIII. Piping, etc. for 80 t/h, 60 t/h, 50 t/h and 45 t/h
Capacities Boilers for various sugar Mills.
Kohinoor Battery worked as Development Engineer 1988/1989
Works include:
o Plant equipment Lay-outing, Installation, and modification of machines.