SlideShare a Scribd company logo
1 of 2
Download to read offline
BABAR_ALI04@YAHOO.COM ….. (00966)507406168 https://sa.linkedin.com/in/babar-
ali-26686b47
Contact:(00966)507406168;
babar_ali04@yahoo.com
Al-Jubail, KSA
OBJECTIVE
To seek a challenging career job
utilizing my academic and practical
experience
EDUCATION
M.S. (MECH) ENGINEERING,
HOWARD UNIVERSITY, U.S.A
B.S. (MECH.) ENGINEERING,
UET, LAHORE, PAKISTAN
SKILLS
 PROJECT MANAGEMENT
 DESIGN & ENGINEERING
 PLANT MAINTENANCE
 PLANT RELIABILITY
 BOILER DESIGN
 COMPUTER SKILLS
Visual Basic, Pascal, FORTRAN; Software:
Oracle8 (dBA), Autocad, Word, Excel,
Windows, M.S. Project, Primavera, etc.
KEY HIGHLIGHTS
 Managed the projects excess of
10million man hours.
 Managed the Plant Maintenance
with 20 skilled staff
 Managed Design Office with 15
plus engineers and skilled staff.
BABAR ALI HAS 29 YEARS (APPROX.) EXPERIENCE IN PETROCHEMICAL,
MANUFACTURING, DESIGN & CONSTRUCTION UNITS
EXPERIENCE
SABIC/Sabtank working as Staff Engineer 2008/to date
Project Coordination/Management: Main projects in progress are
o Petrokemya ABS project (Sabic Project).
o Kemya Coal Tar/Butene I project (Sabic Project).
o Sipchem EA/BA/Ethanol project (Non-Sabic Project).
o Samapco/SAHARA CA/EDC project (Non-Sabic Project).
o Gulf Farabi Benzene project (Non-Sabic Project).
Projects Completed
o Saudi Kayan Project for MEG/DEG/TEG/AT/BNZ/Raw Hexane and N-Butanol
project at King Fahd Industrial Port, Saudi Arabia.
Works include:
o Project Idea initiation/Scope of work (SOW)/pre-feasibility & CDP development.
CDP/BEP/FEED/ITB (bidding)/DEP30%, 60%, 90% & 100% design/ up to PSSR/ and
commissioning & final as-built documentation. Hazop/ PHA/ LOPA/ SIL / SAFER study
sessions on each product lines/nodes and the facility. Ensuring HCIS approval with NFPA
standards.Project schedules, RFIs & reviewing QA/QC documents. Management of change
(MOC) on a project.
Nimir Chemicals worked as Divisional Manager, 1995/2008
Works include:
o Reliability and Maintenance of all the equipment at Plant.
o Planning Scheduling/Predictive/Preventive maintenance
o Equipment/Spare history with CMMS
o Budgeting the Annual expenditures (revenue)/capital costing.
o SPECIAL PROJECT: Engineering/design/erection of Phthalic Anhydride Reactor,
distillation column, associated equipment, piping, pre-commissioning, commissioning.
Celanese worked as Project in-charge (site) 1993/1995
Works include:
o Managing and controlling all the Plant erection matters at Site, Implementing the project
construction strategies, monitoring for best possible available resource management.
Ittefaq Foundry worked as Deputy Manager design 1989/1993
Works include:
o Boiler design/Engineering, Stress calculations, approval of drawings from ABSTECH,
applicable Codes: ASME, Sec. I & VIII. Piping, etc. for 80 t/h, 60 t/h, 50 t/h and 45 t/h
Capacities Boilers for various sugar Mills.
Kohinoor Battery worked as Development Engineer 1988/1989
Works include:
o Plant equipment Lay-outing, Installation, and modification of machines.
EMAIL ….. (00966)507406168 HTTPS://SA.LINKEDIN.COM
/IN/BABAR-ALI-26686B47
2

More Related Content

What's hot (20)

Job role desired
Job role desiredJob role desired
Job role desired
 
Resume
ResumeResume
Resume
 
inventum-brochure
inventum-brochureinventum-brochure
inventum-brochure
 
Resume - LALSON DAVIS-2015 (1)
Resume - LALSON DAVIS-2015 (1)Resume - LALSON DAVIS-2015 (1)
Resume - LALSON DAVIS-2015 (1)
 
Amr El-Metwally CV
Amr El-Metwally CVAmr El-Metwally CV
Amr El-Metwally CV
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
MA CV
MA CVMA CV
MA CV
 
Duties at Emineo Ltd
Duties at Emineo LtdDuties at Emineo Ltd
Duties at Emineo Ltd
 
Javier Dominguez
Javier DominguezJavier Dominguez
Javier Dominguez
 
Rinell-Pico_CV
Rinell-Pico_CVRinell-Pico_CV
Rinell-Pico_CV
 
Updated CV Azimuddin
Updated CV AzimuddinUpdated CV Azimuddin
Updated CV Azimuddin
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 
William T Lipinski 2012
William T Lipinski   2012William T Lipinski   2012
William T Lipinski 2012
 
renjith piping engineer
renjith piping engineerrenjith piping engineer
renjith piping engineer
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
David Walle Resume 12 1 10
David Walle Resume 12 1 10David Walle Resume 12 1 10
David Walle Resume 12 1 10
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cv
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 

Similar to CV-Executive Summary

Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_ResumeJit Roy
 
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -M.K NARAYANA
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016Frank Burton
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resumeBrent Strahan
 
Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E.
 

Similar to CV-Executive Summary (20)

Mep manager surendra yadav 26112016
Mep manager surendra  yadav 26112016Mep manager surendra  yadav 26112016
Mep manager surendra yadav 26112016
 
Mohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CVMohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CV
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
lutfor@CV.
lutfor@CV.lutfor@CV.
lutfor@CV.
 
Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-Manufacturing
 
Resume RVM 2015
Resume RVM 2015Resume RVM 2015
Resume RVM 2015
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18
 
New CV (Medical )
New CV  (Medical )New CV  (Medical )
New CV (Medical )
 

CV-Executive Summary

  • 1. BABAR_ALI04@YAHOO.COM ….. (00966)507406168 https://sa.linkedin.com/in/babar- ali-26686b47 Contact:(00966)507406168; babar_ali04@yahoo.com Al-Jubail, KSA OBJECTIVE To seek a challenging career job utilizing my academic and practical experience EDUCATION M.S. (MECH) ENGINEERING, HOWARD UNIVERSITY, U.S.A B.S. (MECH.) ENGINEERING, UET, LAHORE, PAKISTAN SKILLS  PROJECT MANAGEMENT  DESIGN & ENGINEERING  PLANT MAINTENANCE  PLANT RELIABILITY  BOILER DESIGN  COMPUTER SKILLS Visual Basic, Pascal, FORTRAN; Software: Oracle8 (dBA), Autocad, Word, Excel, Windows, M.S. Project, Primavera, etc. KEY HIGHLIGHTS  Managed the projects excess of 10million man hours.  Managed the Plant Maintenance with 20 skilled staff  Managed Design Office with 15 plus engineers and skilled staff. BABAR ALI HAS 29 YEARS (APPROX.) EXPERIENCE IN PETROCHEMICAL, MANUFACTURING, DESIGN & CONSTRUCTION UNITS EXPERIENCE SABIC/Sabtank working as Staff Engineer 2008/to date Project Coordination/Management: Main projects in progress are o Petrokemya ABS project (Sabic Project). o Kemya Coal Tar/Butene I project (Sabic Project). o Sipchem EA/BA/Ethanol project (Non-Sabic Project). o Samapco/SAHARA CA/EDC project (Non-Sabic Project). o Gulf Farabi Benzene project (Non-Sabic Project). Projects Completed o Saudi Kayan Project for MEG/DEG/TEG/AT/BNZ/Raw Hexane and N-Butanol project at King Fahd Industrial Port, Saudi Arabia. Works include: o Project Idea initiation/Scope of work (SOW)/pre-feasibility & CDP development. CDP/BEP/FEED/ITB (bidding)/DEP30%, 60%, 90% & 100% design/ up to PSSR/ and commissioning & final as-built documentation. Hazop/ PHA/ LOPA/ SIL / SAFER study sessions on each product lines/nodes and the facility. Ensuring HCIS approval with NFPA standards.Project schedules, RFIs & reviewing QA/QC documents. Management of change (MOC) on a project. Nimir Chemicals worked as Divisional Manager, 1995/2008 Works include: o Reliability and Maintenance of all the equipment at Plant. o Planning Scheduling/Predictive/Preventive maintenance o Equipment/Spare history with CMMS o Budgeting the Annual expenditures (revenue)/capital costing. o SPECIAL PROJECT: Engineering/design/erection of Phthalic Anhydride Reactor, distillation column, associated equipment, piping, pre-commissioning, commissioning. Celanese worked as Project in-charge (site) 1993/1995 Works include: o Managing and controlling all the Plant erection matters at Site, Implementing the project construction strategies, monitoring for best possible available resource management. Ittefaq Foundry worked as Deputy Manager design 1989/1993 Works include: o Boiler design/Engineering, Stress calculations, approval of drawings from ABSTECH, applicable Codes: ASME, Sec. I & VIII. Piping, etc. for 80 t/h, 60 t/h, 50 t/h and 45 t/h Capacities Boilers for various sugar Mills. Kohinoor Battery worked as Development Engineer 1988/1989 Works include: o Plant equipment Lay-outing, Installation, and modification of machines.
  • 2. EMAIL ….. (00966)507406168 HTTPS://SA.LINKEDIN.COM /IN/BABAR-ALI-26686B47 2