2. Ayşe Sarımustafa PageProfessional 2 Ayşe Sarımustafa PageProfessional 3
RUA AL HARAM . MASTERPLAN COMPETITION
MAKKAH - SAUDI ARABIA // 2018
PARTICIPATED IN CONCEPT DESIGN - MODELLING - PRESENTATION
DUBAI CREEK . RESIDENTIAL DESIGN COMPETITION
DUBAI- UAE // 2017-2018
PARTICIPATED IN CONCEPT DESIGN - MODELLING - PRESENTATION
YAS ISLAND RETAIL CENTRE . RETAIL DESIGN COMPETITION
ABU DHABI - UAE // 2017
PARTICIPATED IN CONCEPT DESIGN - MODELLING - PRESENTATION
RMJM ISTANBULMALDIVES COMMUNITY CENTER . PUBLIC USE BUILDING DESIGN
FOAKAIDHOO ISLAND - MALDIVES // 2019
CONCEPT DESIGN - MODELLING - FACADE AND ILANDSCAPE DESIGN - PERMIT DRAWINGS
LONDON 18-20 PARK ST. DEVLP. . RESIDENCE & OFFICE BUILDING DESIGN
SLOUGH / BERKSHIRE - UNITED KINGDOM // 2019
CONCEPT DESIGN - MODELLING - FACADE AND INTERIOR DESIGN - PERMIT DRAWINGS
GENEVA HOUSE AND LANDSCAPE . RESIDENTIAL DESIGN & RENOVATION
COLOGNY / GENEVA - SWITZERLAND // 2019
CONCEPT DESIGN - MODELLING - FACADE RENOVATION- INTERIOR AND LANDSCAPE DESIGN
FREELANCE
(ALL IMAGES ,DESIGNS AND
DRAWINGS ARE PRODUCED
BY ME)
COMPETITION
(ALL IMAGES ,DESIGNS AND
DRAWINGS ARE PRODUCED
BY ME)
MUNICIPALITY BUILDING. CONCEPT DESIGN COMPETITION
MUGLA - TURKEY // 2018
INDIVIDUAL PARTICIPATION - ALL IMAGES AND DRAWINGS PRODUCED BY ME
BAHCESEHIR PARK . MIXED USE PROJECT
ISTANBUL - TURKEY // 2015
PARTICIPATED IN CONCEPT & SCHEMATICS PHASE
DOUBLETREE RESORT . HOSPITALITY
XINGLONG LAKESIDE - CHINA // 2015
PARTICIPATED IN SCHEMATICS & DESIGN DEVELOPMENT PHASE
ANATOLIUM MARMARA . MIXED USE PROJECT
ISTANBUL - TURKEY // 2015
PARTICIPATED IN CONCEPT & SCHEMATICS PHASE
DDG - USA
THERM[NATUR]AL HUB . MIXED USE PROJECT
CANAKKALE - TURKEY // 2016
GRADUATION PROJECT - ALL IMAGES AND DRAWINGS PRODUCED BY ME
GRADUATION
PROJECT
3. Ayşe Sarımustafa PageProfessional 4 Ayşe Sarımustafa PageProfessional 5
PROFESSIONAL.ARCHITECTURE
note : includes only some parts that have personally been worked on & participated in
4. FOAKAIDHOO COMMUNITY
CENTER
PUBLIC USE BUILDING
DESIGN
FOAKAIDHOO ISLAND / MALDIVES
2019
FREELANCE JOB
(ALL IMAGES ,DESIGNS AND DRAWINGS ARE PRODUCED
BY ME)
The project is located in
the middle of an exotic
island , Foakaidhoo Island,
which is belong to Maldives
Republic. The community
center is situated at apprx.
20.000 sqf land and required
build up area was between
8.000 - 10.000 sqf area.
The building is designed in
a way to have iconic look as
much as to be efficient in
plan configuration. The main
circulation within the design
divides the building in two
areas, which are public and
private spaces.The building
has multiple entrances
from landscape, but the site
has only one entrance from
the main side road. The
community center includes
multipurpose conference
hall 55 x 32ft (enough to
accommodate 2 badminton
courts also with a stage),
3 Club Offices 13 x 11ft each,
a meeting room for
30ppl 25 x 14ft,
library with museum 30 x 20ft,
store 12 x 10ft,
a waiting room 12 x 12 ft,
restroom with 3 toilets,
a small team room 11 x 13ft.
9. Ayşe Sarımustafa PageProfessional 16 Ayşe Sarımustafa PageProfessional 17
LAND AREA=
APPRX. 1800 SQM
BUILT UP AREA=
APPRX. 900 SQM
BUILDING
FOOTPRINT
MULTIPURPOSE
HALL
BADMINTON
ENTR.
ENTR.
PUBLICPRIVATE
ENTR.
PLAZA
RECEPTION
AND EVENT
HALL
STAIR
TERRACE
RESTROOMS LIBRARY&MUSEUM
MEETING ROOM
KITCHEN
WAITING
ROOM
TEAM
ROOM
3
OFFICES
STORAGE
BADMINTON
STAGE
Ayşe Sarımustafa PageProfessional 17
10. Ayşe Sarımustafa PageProfessional 18 Ayşe Sarımustafa PageProfessional 19
ENTRANCE
ENTRANCE
ENTRANCE
ENTRANCE
LAND AREA = 2249.00 SQM
BUILD UP AREA = 976.11 SQM
GROUND FLOOR BUA = 792.42 SQM
17500
[57'-5"]
900
[2'-11"]
5250
[17'-3"]
34400
[112'-10"]
13800
[45'-3"]
6100
[20']
2500
[8'-2"]
2000
[6'-7"]
2280
[7'-6"]
1600
[5'-3"]
2220
[7'-3"]
24400
[80'-1"]
2800
[9'-2"]
3700
[12'-2"]
1600
[5'-3"]
2000
[6'-7"]
25500
[83'-8"]
35600
[116'-10"]
1000
[3'-3"]
2000
[6'-7"]
1900
[6'-3"]
2000
[6'-7"]
6100
[20']
2000
[6'-7"]
4500
[14'-9"]
4900
[16'-1"]
24400
[80'-1"]
10750
[35'-3"]
200
[8"]
1600
[5'-3"]
2400
[7'-10"]
4200
[13'-9"]
200
[8"]
200
[8"]
200
[8"]
1400
[4'-7"]
9800
[32'-2"]
200
[8"]
200
[8"]
200
[8"]
200
[8"]
200
[8"]
21000
[68'-11"]200
[8"]
3700
[12'-2"]
70
[3"]1500
[4'-11"]
100
[4"]
4430
[14'-6"]
200
[8"]
7200
[23'-7"]
100
[4"]
1100
[3'-7"]
200
[8"]
4700
[15'-5"]
200
[8"]
6100
[20']200
[8"]
3570
[11'-9"]
200
[8"]
6030
[19'-9"]
200
[8"]
8400
[27'-7"]
200
[8"]
4700
[15'-5"]
200
[8"]
6100
[20']
200
[8"]
3460
[11'-4"]
2390
[7'-10"]
13400
[44']
200
[8"]
6300
[20'-8"]
2100
[6'-11"]
200
[8"]
13400
[44']
200
[8"]
8200
[26'-11"]
200
[8"]2000
[6'-7"]
200
[8"]
13400
[44']
200
[8"]
200
[8"]2000
[6'-7"]
200
[8"]
3925
[12'-11"]
100
[4"]3925
[12'-11"]100
[4"]
3950
[13']
100
[4"]
3600
[11'-10"]
200
[8"]
200
[8"]
2000
[6'-7"]
200
[8"]
3875
[12'-9"]
150
[6"]3875
[12'-9"]
150
[6"]
5100
[16'-9"]
200
[8"]200
[8"]2000
[6'-7"]
200
[8"]
150
[6"]
2650
[8'-8"]
5003
[16'-5"]
3900
[12'-10"]
150
[6"]
4400
[14'-5"]
200
[8"]
1300
[4'-3"]
8200
[26'-11"]
200
[8"]
3446
[11'-4"]
310
[1']
2506
[8'-3"]
1750
[5'-9"]
25x16.80/25
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
8
7
6
5
4
3
2
1
25
150
[6"]
CLOAKROOM
3.28 SQM
MULTIPURPOSE
HALL
282.02 SQM
BADMINTON
COURT
BADMINTON
COURT
STAGE
STORAGE
2.60 SQMLIBRARY
38.70 SQM
RECEPTION &
EVENT HALL
72.90 SQM
STORAGE
13.08 SQM
WC
WOMEN
14.09 SQM
WC
MEN
12.22 SQM
HANDCP. WC
2.88 SQM
HALL &
COMMON
AREA
73.23 SQM
OFFICE
14.67 SQM
OFFICE
14.58 SQM
OFFICE
14.58 SQM
VIP WAITING
LOUNGE
17.12 SQM
KITCHEN&
TEA ROOM
17.22 SQM
HALL
41.74 SQM
BACKSTAGE
STORAGE
35.99 SQM
PRAYER
ROOM
17.11 SQM
MUSEUM&
GALLERY
50.18 SQM
1
1
2
2
N
4
1
2
3
±0.00
±0.00
±0.00
±0.00
DWG NO - P-01
Copyrighted -All rights reserved. No
part of this design to be altered or
reproduced without written permission
from TRUSTENG.
PROJECT
PROPOSED
COMMUNITY CENTER
SH.FOAKAIDHOO
CLIENT
SH.FOAKAIDHOO
COUNCIL
AyseArchitect
July 2019Date
Zuhal&HaadyStructure
SP14512018
CONTACT: 7902490
1. STRUCTURAL ELEMENTS TO BE
CONSTRUCTED TO C&S' DESIGN,DETAILS AND
SECTIONS.
2. ALL WET AND SEMI WET AREAS TO HAVE
DRAINAGE OUTLETS. MAIN CONTRACTOR AND
C&S TO PROPOSE ON THE WATER SUPPLY
AND DISCHARGE TO THE SEWER.
3. MAIN CONTRACTOR AND THE
WATERPROOFING SPECIALIST TO INSPECT
ALL SURFACES TO RECEIVE WATERPROOFING
AND TO INFORM CONSULTANTS IF THERE IS
ANY CONDITION, WHICH PREVENTS THE
PROPER APPLICATION OF THE
WATERPROOFING MATERIALS.
4. MAIN CONTRACTOR TO ENSURE ALL AREAS
EXPOSED TO CONDENSATION OR IMMERSED
IN WATER TO BE WATERPROOFED. MAIN
CONTRACTOR TO RAISE TO CONSULTANTS IF
THERE ARE DEVIATION OR DISCREPANCIES.
NOTES:
GROUND FLOOR LEVEL PLAN
SCALE:1/200
1
LAND AREA = 2249.00 SQM
BUILD UP AREA = 976.11 SQM
FIRST FLOOR BUA = 183.69 SQM
(INCLUDING TERRACES)
25x16.80/25
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
OPEN
BELOW
OPEN
BELOW
LOUNGE
25.26 SQM
MEETING
ROOM
39.59 SQM
TERRACE&
EVENTS
113.10 SQM
13450
[44'-2"]
10200
[33'-6"]
34400
[112'-10"]
13800
[45'-3"]
6100
[20']
2500
[8'-2"]
2000
[6'-7"]
25500
[83'-8"]
35600
[116'-10"]
4900
[16'-1"]
24400
[80'-1"]
4200
[13'-9"]
10750
[35'-3"]
19500
[64']
13710
[45']
4680
[15'-4"]
1510
[4'-11"]
2300
[7'-7"]
2200
[7'-3"]
1400
[4'-7"]
100
[4"]
400
[1'-4"]10000
[32'-10"]
500
[1'-8"]
0
[0"]
400
[1'-4"]
9000
[29'-6"]
400
[1'-4"]
2200
[7'-3"]
10100
[33'-2"]
2520
[8'-3"] 4680
[15'-4"]
1250
[4'-1"]
1600
[5'-3"] 9950
[32'-8"] 4200
[13'-9"]
200
[8"]
7200
[23'-7"]
1200
[3'-11"]
4000
[13'-1"]
200
[8"]
6800
[22'-4"]
400
[1'-4"]
1200
[3'-11"]
100
[4"]
400
[1'-4"]
8100
[26'-7"]
400
[1'-4"]
200
[8"]23800
[78'-1"]
200
[8"]
400
[1'-4"]
6400
[21']
400
[1'-4"]
100
[4"]
2900
[9'-6"]
200
[8"]
13400
[44']
200
[8"]
5900
[19'-4"]
200
[8"]2300
[7'-7"]
2200
[7'-3"]
200
[8"]
13400
[44']
200
[8"]
5700
[18'-8"]
400
[1'-4"]
2300
[7'-7"]
2200
[7'-3"]
2400
[7'-10"]
24400
[80'-1"]
+4.20
+5.40
+4.50
+4.50
+4.50
+4.20
+4.20
+4.20 ±0.00
±0.00
±0.00
+4.50
1
1
2
2
N
4
1
2
3
DWG NO -
Copyrighted -
part of this
reproduced w
fro
PR
PR
COMMUN
SH.FO
C
SH.FO
CO
Architect
Date
Structure
SP1451
CONTAC
1. STRUCTURAL EL
CONSTRUCTED
SECTIONS.
2. ALL WET AND SE
DRAINAGE OUTL
C&S TO PROPOS
AND DISCHARGE
3. MAIN CONTRACT
WATERPROOFIN
ALL SURFACES T
AND TO INFORM
ANY CONDITION
PROPER APPLIC
WATERPROOFIN
4. MAIN CONTRACT
EXPOSED TO CO
IN WATER TO BE
CONTRACTOR T
THERE ARE DEV
FIRST FLOOR LEVEL PLAN
SCALE:1/200
2
11. Ayşe Sarımustafa PageProfessional 20 Ayşe Sarımustafa PageProfessional 21
SLOPE
STRUCTURAL STEEL LINTEL
WELDED TO STEEL BEAM
(MATCHING COLOR)
6 INCH MASONRY WALL
PARAPHET FRAMING
PLASTER&PAINT
WATERPROOF
MEMBRANE
ALUMINUM WINDOW FRAMES
WITH DOUBLE GLAZING
12 INCH MASONRY WALL
PLASTER&PAINT
6 INCH MASONRY WALL
PLASTER&PAINT
BACKSTAGE
STORAGE
35.99 SQM
OFFICE
14.58 SQM
PRAYER
ROOM
17.48 SQM
2 INCH CUT BLOCK
FOR BEAM FACING
TIMBER SKIRTING
FOR PLASTER&PAINT
SLIP JOINT ANCHOR
FASTEN TO STEEL BEAM
6 INCH MASONRY WALL
PLASTER&PAINT
PARAPHET TO
END ROOF LAYERING
STAGE
BADMINTON
COURTS
MULTIPURPOSE
HALL
282.02 SQM
GLASS OFFICE
SEPERATION
SPANDREL PANEL
CURTAIN WALL
DRIPPING EDGE FINISH PROFILE
(MATCHING COLOR
NATURAL STONE PROFILE
TO END STUCCO
ALUMINUM SILL
(MATCHING COLOR)
LEVELING CONCRETE
CRUSHED AGGREGATE
8800
[28'-10"]
GROUND FLOOR LEVEL
FFL ±0000
FIRST FLOOR LEVEL
FFL +4200
9450
[31']
4200
[13'-9"]
ROOF LEVEL
FFL +13650
FILTER LAYER
(GEOTEXTILE)
THERMAL INSULATION
2X WATERPROOFING
MEMBRANE
GYPSUM BASED
CEILING BOARD
REINFORCED SCREED
80mm
STEEL FLOOR
STRUCTURE
PRECAST CONCRETE
PLANKS 150mm
SUPPORT FRAMING
ALUMINUM ROOF
CLADDING
METAL TOP RAIL
DOUBLE LAYER
LAMINATED GLASS
STEEL PROFILE
FL150 FILTER LAYER
WATER RESERVOIR&
DRAINAGE LAYER
PL300 PROTECTION LAYER
(GEOTEXTILE)
PRECAST CONCRETE
ROOF PLANKS
ROOT RESISTANT WATERPROOFING
INSULATION PANEL
REINFORCED SCREED
80mm
VAPOUR CONTROL LAYER
EXTENTIVE SUBSTRATE
VEGETATION
STRUCTURAL FRAMING
(WORKS LIKE CANOPY)
WHITE ALUMINUM CLADDING
AL2
ANTHRACITE ALUMINUM CLADDING
AL3
STANDING SEAM
ALUMINUM SHEET
BREATHER MEMBRANE
THERMAL INSULATION
VAPOUR CONTROL
MEMBRANE
STEEL DECK BEARING
STRUCTURE
STEEL ROOF STRUCTURE
GYPSUM BASED
CEILING BOARD
NATURAL STONE
CLADDING 20mm
MORTAR 10mm
WATERPROOF OR
FILTER (GEOTEXTILE)
SCREED
LEAN CONCRETE
COMPACTED GROUND
GYPSUM BASED
CEILING BOARD
STEEL FLOOR
STRUCTURE
FLOOR FINISH
SCREED 50 mm
WATERPROOF OR FILTER
(GEOTEXTILE)
THERMAL INSULATION
2 X WATERPROOF
MEMBRANE
REINFORCED CONCRETE
FLOOR
CRUSHED AGGREGATE
SOIL
LEVELING CONCRETE
CRUSHED AGGREGATE
DRAINAGE
DRAINAGE PLATE
THERMAL ISOLATION
WATERPROOFING
FLOOR FINISH
SCREED 50 mm
WATERPROOF OR
FILTER (GEOTEXTILE)
THERMAL INSULATION
2 X WATERPROOF
MEMBRANE
REINFORCED
CONCRETE FLOOR
CRUSHED AGGREGATE
SOIL
ROOF&TERRACES
1. ALL STRUCTURAL ELEMENTS TO BE CONSTRUCTED TO C&S'
DESIGN,DETAILS AND SECTIONS.
2. MAIN CONTRACTOR TO ENSURE ALL AREAS EXPOSED TO
CONDENSATION OR IMMERSED IN WATER TO BE
WATERPROOFED. MAIN CONTRACTOR TO RAISE TO
CONSULTANTS IF THERE ARE DEVIATION OR
DISCREPANCIES.
ALUMINUM ROOF TO BE SUPPLIED
AND INSTALLED BY OTHERS, ALL
ROOF STRUCTURAL ELEMENTS
TO BE CONSTRUCTED TO C&S'
DESIGN,DETAILS AND SECTIONS.
PA1
AL2
CR2CR2 CR2VN1
CR1CR1
AL3
AL2
AL6
CW-AL1 CW-SPCW-SPCW-SP CW-AL1
CW-AL1CW-GL CW-GL CW-AL1 CW-AL1
CW-AL1CW-GL CW-GL CW-GLCW-AL1
CW-AL1CW-GLCW-GLCW-AL1
PA1
ALUMINUM AND GLAZED CURTAIN
WALL TO BE SUPPLIED AND
INSTALLED BY OTHERS,
ACCORDING TO FACADE
CONSULTANTS' AND C&S'
DESIGN,DETAILS AND SECTIONS
1. ALL STRUCTURAL ELEMENTS TO BE CONSTRUCTED TO C&S'
DESIGN,DETAILS AND SECTIONS.
2. MAIN CONTRACTOR TO ENSURE ALL AREAS EXPOSED TO
CONDENSATION OR IMMERSED IN WATER TO BE
WATERPROOFED. MAIN CONTRACTOR TO RAISE TO
CONSULTANTS IF THERE ARE DEVIATION OR
DISCREPANCIES.
FOUNDATION&GROUND FLOOR
+4500
+2500
+3100
+5450
+7800
DWG NO - P-01
Copyrighted -All rights reserved. No
part of this design to be altered or
reproduced without written permission
from TRUSTENG.
PROJECT
PROPOSED
COMMUNITY CENTER
SH.FOAKAIDHOO
CLIENT
SH.FOAKAIDHOO
COUNCIL
AyseArchitect
July 2019Date
Zuhal&HaadyStructure
SP14512018
CONTACT: 7902490
VINYL FINISH FOR
BADMINTON COURT
MATERIAL KEY-FINISHES
CURTAIN WALL- DOUBLE GLAZING
RAL 7016
CURTAIN WALL- ALUMINUM PANEL
RAL 9010
CW-SP
CURTAIN WALL- SPANDREL PANEL
RAL 7016
CW-GL
ALUMINUM CLADDING
RAL 9010
CW-AL1
AL2
AL3
ALUMINUM CLADDING
RAL 7016
PLASTER&EXTERIOR GRADE PAINT
FINISH
RAL 9010
PA1
SELECTED STONE VENEER FINISH
(BEIGE COLOR)
ST1
SELECTED WOOD
VENEERED ALUMINUM
PROFILE
(TEAK WOOD)
AL4
PAINTED STEEL STRUCTURE
RAL 9010
PAINTED ALUMINUM
PROFILE
RAL 7016
(ALL GLAZING&WINDOW
PROFILES)
AL5
SS
VN1
CR1
CR2
CR3
CERAMIC TYPE 1
CERAMIC TYPE 2
CERAMIC TYPE 3
STANDING SEAM
ALUMINUM SHEET
RAL 9010
AL6
NOTES:
1. STRUCTURAL ELEMENTS TO BE CONSTRUCTED
TO C&S' DESIGN,DETAILS AND SECTIONS.
2. ALL WET AND SEMI WET AREAS TO HAVE
DRAINAGE OUTLETS. MAIN CONTRACTOR AND
C&S TO PROPOSE ON THE WATER SUPPLY AND
DISCHARGE TO THE SEWER.
3. MAIN CONTRACTOR AND THE WATERPROOFING
SPECIALIST TO INSPECT ALL SURFACES TO
RECEIVE WATERPROOFING AND TO INFORM
CONSULTANTS IF THERE IS ANY CONDITION,
WHICH PREVENTS THE PROPER APPLICATION OF
THE WATERPROOFING MATERIALS.
4. MAIN CONTRACTOR TO ENSURE ALL AREAS
EXPOSED TO CONDENSATION OR IMMERSED IN
WATER TO BE WATERPROOFED. MAIN
CONTRACTOR TO RAISE TO CONSULTANTS IF
THERE ARE DEVIATION OR DISCREPANCIES.
SECTION
SCALE:1/100
1
SLOPE
STRUCTURAL STEEL LINTEL
WELDED TO STEEL BEAM
(MATCHING COLOR)
6 INCH MASONRY WALL
PARAPHET FRAMING
PLASTER&PAINT
WATERPROOF
MEMBRANE
ALUMINUM WINDOW FRAMES
WITH DOUBLE GLAZING
12 INCH MASONRY WALL
PLASTER&PAINT
6 INCH MASONRY WALL
PLASTER&PAINT
BACKSTAGE
STORAGE
35.99 SQM
OFFICE
14.58 SQM
PRAYER
ROOM
17.48 SQM
2 INCH CUT BLOCK
FOR BEAM FACING
TIMBER SKIRTING
FOR PLASTER&PAINT
SLIP JOINT ANCHOR
FASTEN TO STEEL BEAM
6 INCH MASONRY WALL
PLASTER&PAINT
PARAPHET TO
END ROOF LAYERING
STAGE
BADMINTON
COURTS
MULTIPURPOSE
HALL
282.02 SQM
GLASS OFFICE
SEPERATION
SPANDREL PANEL
CURTAIN WALL
DRIPPING EDGE FINISH PROFILE
(MATCHING COLOR
NATURAL STONE PROFILE
TO END STUCCO
ALUMINUM SILL
(MATCHING COLOR)
LEVELING CONCRETE
CRUSHED AGGREGATE
8800
[28'-10"]
GROUND FLOOR LEVEL
FFL ±0000
FIRST FLOOR LEVEL
FFL +4200
9450
[31']
4200
[13'-9"]
ROOF LEVEL
FFL +13650
FILTER LAYER
(GEOTEXTILE)
THERMAL INSULATION
2X WATERPROOFING
MEMBRANE
GYPSUM BASED
CEILING BOARD
REINFORCED SCREED
80mm
STEEL FLOOR
STRUCTURE
PRECAST CONCRETE
PLANKS 150mm
SUPPORT FRAMING
ALUMINUM ROOF
CLADDING
METAL TOP RAIL
DOUBLE LAYER
LAMINATED GLASS
STEEL PROFILE
FL150 FILTER LAYER
WATER RESERVOIR&
DRAINAGE LAYER
PL300 PROTECTION LAYER
(GEOTEXTILE)
PRECAST CONCRETE
ROOF PLANKS
ROOT RESISTANT WATERPROOFING
INSULATION PANEL
REINFORCED SCREED
80mm
VAPOUR CONTROL LAYER
EXTENTIVE SUBSTRATE
VEGETATION
STRUCTURAL FRAMING
(WORKS LIKE CANOPY)
WHITE ALUMINUM CLADDING
AL2
ANTHRACITE ALUMINUM CLADDING
AL3
STANDING SEAM
ALUMINUM SHEET
BREATHER MEMBRANE
THERMAL INSULATION
VAPOUR CONTROL
MEMBRANE
STEEL DECK BEARING
STRUCTURE
STEEL ROOF STRUCTURE
GYPSUM BASED
CEILING BOARD
NATURAL STONE
CLADDING 20mm
MORTAR 10mm
WATERPROOF OR
FILTER (GEOTEXTILE)
SCREED
LEAN CONCRETE
COMPACTED GROUND
GYPSUM BASED
CEILING BOARD
STEEL FLOOR
STRUCTURE
FLOOR FINISH
SCREED 50 mm
WATERPROOF OR FILTER
(GEOTEXTILE)
THERMAL INSULATION
2 X WATERPROOF
MEMBRANE
REINFORCED CONCRETE
FLOOR
CRUSHED AGGREGATE
SOIL
LEVELING CONCRETE
CRUSHED AGGREGATE
DRAINAGE
DRAINAGE PLATE
THERMAL ISOLATION
WATERPROOFING
FLOOR FINISH
SCREED 50 mm
WATERPROOF OR
FILTER (GEOTEXTILE)
THERMAL INSULATION
2 X WATERPROOF
MEMBRANE
REINFORCED
CONCRETE FLOOR
CRUSHED AGGREGATE
SOIL
ROOF&TERRACES
1. ALL STRUCTURAL ELEMENTS TO BE CONSTRUCTED TO C&S'
DESIGN,DETAILS AND SECTIONS.
2. MAIN CONTRACTOR TO ENSURE ALL AREAS EXPOSED TO
CONDENSATION OR IMMERSED IN WATER TO BE
WATERPROOFED. MAIN CONTRACTOR TO RAISE TO
CONSULTANTS IF THERE ARE DEVIATION OR
DISCREPANCIES.
ALUMINUM ROOF TO BE SUPPLIED
AND INSTALLED BY OTHERS, ALL
ROOF STRUCTURAL ELEMENTS
TO BE CONSTRUCTED TO C&S'
DESIGN,DETAILS AND SECTIONS.
PA1
AL2
CR2CR2 CR2VN1
CR1CR1
AL3
AL2
AL6
CW-AL1 CW-SPCW-SPCW-SP CW-AL1
CW-AL1CW-GL CW-GL CW-AL1 CW-AL1
CW-AL1CW-GL CW-GL CW-GLCW-AL1
CW-AL1CW-GLCW-GLCW-AL1
PA1
ALUMINUM AND GLAZED CURTAIN
WALL TO BE SUPPLIED AND
INSTALLED BY OTHERS,
ACCORDING TO FACADE
CONSULTANTS' AND C&S'
DESIGN,DETAILS AND SECTIONS
1. ALL STRUCTURAL ELEMENTS TO BE CONSTRUCTED TO C&S'
DESIGN,DETAILS AND SECTIONS.
2. MAIN CONTRACTOR TO ENSURE ALL AREAS EXPOSED TO
CONDENSATION OR IMMERSED IN WATER TO BE
WATERPROOFED. MAIN CONTRACTOR TO RAISE TO
CONSULTANTS IF THERE ARE DEVIATION OR
DISCREPANCIES.
FOUNDATION&GROUND FLOOR
+4500
+2500
+3100
+5450
+7800
DWG NO - P-01
Copyrighted -All rights reserved. No
part of this design to be altered or
reproduced without written permission
from TRUSTENG.
PROJECT
PROPOSED
COMMUNITY CENTER
SH.FOAKAIDHOO
CLIENT
SH.FOAKAIDHOO
COUNCIL
AyseArchitect
July 2019Date
Zuhal&HaadyStructure
SP14512018
CONTACT: 7902490
VINYL FINISH FOR
BADMINTON COURT
MATERIAL KEY-FINISHES
CURTAIN WALL- DOUBLE GLAZING
RAL 7016
CURTAIN WALL- ALUMINUM PANEL
RAL 9010
CW-SP
CURTAIN WALL- SPANDREL PANEL
RAL 7016
CW-GL
ALUMINUM CLADDING
RAL 9010
CW-AL1
AL2
AL3
ALUMINUM CLADDING
RAL 7016
PLASTER&EXTERIOR GRADE PAINT
FINISH
RAL 9010
PA1
SELECTED STONE VENEER FINISH
(BEIGE COLOR)
ST1
SELECTED WOOD
VENEERED ALUMINUM
PROFILE
(TEAK WOOD)
AL4
PAINTED STEEL STRUCTURE
RAL 9010
PAINTED ALUMINUM
PROFILE
RAL 7016
(ALL GLAZING&WINDOW
PROFILES)
AL5
SS
VN1
CR1
CR2
CR3
CERAMIC TYPE 1
CERAMIC TYPE 2
CERAMIC TYPE 3
STANDING SEAM
ALUMINUM SHEET
RAL 9010
AL6
NOTES:
1. STRUCTURAL ELEMENTS TO BE CONSTRUCTED
TO C&S' DESIGN,DETAILS AND SECTIONS.
2. ALL WET AND SEMI WET AREAS TO HAVE
DRAINAGE OUTLETS. MAIN CONTRACTOR AND
C&S TO PROPOSE ON THE WATER SUPPLY AND
DISCHARGE TO THE SEWER.
3. MAIN CONTRACTOR AND THE WATERPROOFING
SPECIALIST TO INSPECT ALL SURFACES TO
RECEIVE WATERPROOFING AND TO INFORM
CONSULTANTS IF THERE IS ANY CONDITION,
WHICH PREVENTS THE PROPER APPLICATION OF
THE WATERPROOFING MATERIALS.
4. MAIN CONTRACTOR TO ENSURE ALL AREAS
EXPOSED TO CONDENSATION OR IMMERSED IN
WATER TO BE WATERPROOFED. MAIN
CONTRACTOR TO RAISE TO CONSULTANTS IF
THERE ARE DEVIATION OR DISCREPANCIES.
SECTION
SCALE:1/100
1
12. 18-20 PARK ST. DEVELOPMENT
RESIDENCE & OFFICE BUILDING
DESIGN
SLOUGH - BERKSHIRE / UNITED KINGDOM
2019
FREELANCE JOB
(ALL IMAGES ,DESIGNS AND DRAWINGS ARE PRODUCED
BY ME)
I was commissioned
in February 2019 by a
wealthy business man to
design 3 floors addition to
his existing commercial
building in Slough which is in
the outskirts of London - UK.
The ground level is currently
occupied by a bookshop
and a restaurant. Also, the
first floor is occupied as
office. The client requires
to keep the first and the
second floor as it is, and
add 2 level with attic to use
for residences. The facade
was aimed to preserve its
features as it is, and design
the facade of additional
floors to be compatible with
existing facade features.
In addition to these, UK
residential standards are
considered for flats to
achieve to obtain permit
from municipality. The
flats were designed with
maximum efficiency
and ergonomics. The
entrances for 7 flats were
seperated and provided
from Herschel St. with an
additional stair and lift.
14. Ayşe Sarımustafa PageProfessional 26 Ayşe Sarımustafa PageProfessional 27
GROUND FLOOR
PROPOSED PLAN
GROUND FLOOR
EXISTING PLAN
UNITED KINGDOM
SLOUGH/BERKSHIRE
SLOUGH
PROJECT
LOCATION
BUCKINGHAMSHIRE
WINDSOR
AND
MAIDENHEAD
SURREY
GREATER LONDON
HIGH STREET
ONLY PEDESTRIAN
MOSTLY
COMMERCIAL
AND RETAIL
WELLINGTON ST.
HTC
ROUNDABOUT
MOSTLY
COMMERCIAL
AND RETAIL
MOSTLY
COMMERCIAL
AND RETAIL
OFFICES AND
BOOKSHOP
ENTRANCE
RESTAURANT
ENTRANCE
OFFICES & BOOKSHOP
ENTRANCE
OFFICES & BOOKSHOP
ENTRANCE
BOOKSHOP
ENTRANCE
BOOKSHOP
ENTRANCE
RESTAURANT
ENTRANCE
RESTAURANT
ENTRANCE
RESIDENCES
ENTRANCE
RESTAURANT
ENTRANCE
CARPARK,STORAGE
AND RESTAURANT
ENTRANCE
MOSTLY
RESIDENTIAL,
OFFICES AND
RESTAURANTS
MOSTLY
RESIDENTIAL,
OFFICES AND
RESTAURANTS
WINDSOR RD.
HERSCHEL ST.
18-20 PARK
STREET
DEVELOPMENT
PARK
STREET
HERSCHEL
STREET
EXISTING
BUILDING
Ayşe Sarımustafa PageProfessional 27
15. Ayşe Sarımustafa PageProfessional 28 Ayşe Sarımustafa PageProfessional 29
FIRST FLOOR
EXISTING PLAN
FIRST FLOOR
PROPOSED PLAN
SECOND FLOOR
PROPOSED PLAN
THIRD FLOOR
PROPOSED PLAN
ATTIC FLOOR
PROPOSED PLAN
20. GENEVA HOUSE & LANDSCAPE
RENOVATION
DUPLEX HOUSE RENOVATION
DESIGN
COLOGNY - GENEVA / SWITZERLAND
2019
FREELANCE JOB
The villa is located in
beautiful town called
Cologny in Switzerland and
the project has a precious
view of Geneva Lake.The
site has a great slope
that causes the 6m level
difference between upper
and lower entrances. The
client commisioned me as
an architect to design the
renovation for the villa. The
mission was to modernise
the villa by keeping all the
facade features as it is for
not to be obligated to obtain
permit from municipality.
Stone frames are added
and corten frame is used
as cladding for central
double height window to
equalize the height with
other window frames on
first floor. In addition to
these, pergola, balustrade,
kitchen entrance and upper
entrance is redesigned to
have more modern look.
The landscape is redesigned
to have infinity pool with a
pool house and access from
lower entrance is renewed.
The house and the landscape
is considered togerther
to have integrated look.
21. Ayşe Sarımustafa PageProfessional 40 Ayşe Sarımustafa PageProfessional 41
GENEVA LAKE
SWITZERLAND
GENEVA
COLOGNY
NANT
D’ARGENT
ROAD
20A
LOWER STREET
ENTRANCE
UPPER STREET
ENTRANCE
PROJECT
LOCATION
COLOGNY
WHARF ROAD
NANT-D’ARGENT
ROADNANT
D’ARGENT
ROAD
20A
PROJECT
AREA
MOSTLY COMMERCIAL,
RETAIL AND LEISURE
RHONE
RIVER
MOSTLY RESIDENTIAL
GENEVA LAKE
PORT
AREA
GENEVA
CENTER
PORT
AREA
26. RUA AL HARAM
CONCEPT MASTERPLAN
COMPETITION
MAKKAH / SAUDI ARABIA
2018
RMJM ISTANBUL & RMJM DUBAI
PARTICIPATED IN :
CONCEPT & MASTERPLANNING
DESIGN AND MODELLING
PREPARING PRESENTATIONS , ANALYSIS AND DIAGRAMS
The site is located in Makkah
and is spiritually privileged
due to it’s proximity to the
Kaa’ba. It is at a walking
distance from Al Masjid
Al Haram, adjacent to the
extension of Al-Haram,
between first and second
ring road. The site includes
the Qaiqa’an mountain, part
of Wadi Ibrahim and Abu
Qubeis mountain, all of
which has great historical
and spiritual value. The
development of the site
is a key part of the Public
Investmen Fund’s Vision
for 2030 which will be
developed by the Ru’a
Al Haram Company. The
topography of the area is
mostly mountainous with
high elevation differences
but partly flat around
Wadi Ibrahim. It is set to
become one of the main
pilgrim’s gateways to Al-
-Haram through Extension.
In our vision, Makkah begun
from its landscape and
the future city of Makkah
will be reborn from it.
32. MUNICIPALITY BUILDING
CONCEPT DESIGN
COMPETITION
MUGLA / TURKEY
2018
INDIVIDUAL PARTICIPANT
Muğla City, which is
dominated by local features,
also hosts tourists from other
provinces and countries
in the summer period
due to being a residential
area, while in winter it
shows a city structure
dominated by the local
population and students.
Muğla province with its
permeable and outward-
-opening demographic
structure clings to local
features at one end,
while the other end
touches the metropolis.
In this context, the project
is designed in a structure
that takes local values into
consideration and adapts
to current life habits by
adopting a sustainability
approach, which can be
integrated into the city and
can adapt its functions
according to need.
Therefore, the general
approach allows the
project to establish a
close connection with its
environment and to re-
-produce the potentials
of its environment.
33. Ayşe Sarımustafa PageProfessional 64 Ayşe Sarımustafa PageProfessional 65
connection with
urban system
municipality
public area
development
public square
development
B1 level
functions around
public square
B1 level
municipality building
development
lower level
development
40. Competition Project is
situated at the heart of
Creek Harbour in Dubai
and surrounded by a
beautiful Gulf Sea. The
design approach to the
project is to create such
and environment which is
in collaboration with the
existing nature and culture
throughan integrated
development. The overall
project aims to take
maximum advantage of the
views and includes Creek
Tower. Residential project
with private courtyards
and social areas provide
residents to share common
life as much as possible.
DUBAI CREEK
CONCEPT RESIDENTIAL DESIGN
COMPETITION
DUBAI / UAE
2017-2018
RMJM ISTANBUL & RMJM DUBAI
PARTICIPATED IN :
CONCEPT
DESIGN AND MODELLING
PREPARING PRESENTATIONS , ANALYSIS AND DIAGRAMS
45. YAS ISLAND RETAIL CENTRE
CONCEPT RETAIL DESIGN
COMPETITION
ABU DHABI / UAE
2017
RMJM ISTANBUL & RMJM DUBAI
PARTICIPATED IN :
CONCEPT
DESIGNING AND MODELING THE ENTIRE FACADE
PREPARING PRESENTATIONS , ANALYSIS AND DIAGRAMS
The retail centre project
is located on the Yas Island
and dsigned as mixed-use
project which is consisted
of offices, retail, dining and
lifestyle with easy access
to the main transportation
lines. The design approach
to the project is to focus
on sustainability and to
respect to its culture
and location with its
approximity to human scale.
50. BAHCESEHIR PARK
MIXED USE PROJECT
ISTANBUL / TURKEY
2015
DDG USA
PARTICIPATED IN :
CONCEPT & SCHEMATICS
ASSISTING TO CONCEPT DESIGN
DESIGNING PLAN AND RELATED DRAWIGNS
PREPARING PRESENTATIONS
Bahçeşehir Park - Atmaca
is redolent of a beautiful
lifestyle center and
designed as a residential
mixed - use project
consisting of multifamily
r e s i d e n c e s , c o m m u n i t y
facilities and convenient
retail stores in collaboration
with the principles of
sustainability, walkability,
ease of regional access,
efficiency and recreational
amenities. The overall
project contains five distinct
zones and experiences such
as, the “Central Plaza” with
shopping environment and
restaurants and “Shopping
Street” connecting to
the Central Plaza via
outdoor promenade,
“Outdoor Dining Terraces”
with dramatic views of
Bahçeşehir Park garden
and the “Covered Mall”
which is located below
the street level.
55. DOUBLETREE RESORT
HOSPITALITY
HAINAN-XINGLONG LAKESIDE / CHINA
2015
DDG USA
PARTICIPATED IN :
SCHEMATICS & DESIGN DEVELOPMENT
PREPARING DESIGN DRAWINGS
REVISIONS ON FACADE AND PLANS
The Hilton - Doubletree
Resort is situated at the
end of the Hainan Xinglong
Shimei Peninsula and
surrounded by a beautiful
lake and green hills which
generates a romantic
ambiance for a wonderfuland
relaxing resort destination.
The design approach to the
projectis to create such
and environment which is
in collaboration with the
fantastic existing nature
through an integrated
development. The overall
project aims to take maxi-
-mum advantage of the lake
views and includes lakefront
coves, riding centers,
“Lanscaped Pathways”with
wide range of different the
med small gardens for Thai
Chi and meditation along
with the lake for visitors.
58. ANATOLIUM MARMARA
MIXED USE PROJECT
ISTANBUL / TURKEY
2015
DDG USA
PARTICIPATED IN :
CONCEPT & SCHEMATICS
ASSISTING TO CONCEPT DESIGN
DESIGNING PLAN AND RELATED DRAWIGNS
Anatolium Marmara is
located on the Asian Side
of İstanbul of Turkey and
designed a mixed-use
project which is consisted
of offices, retail, dining
and lifestylewith easy
access to the new
subway line. The project
contains 4 storey
IKEA as an Anchor and
aims to create presence
as Kar tal District’s tallest
corporate tower with 47
floors above the horizon.
The design approach to
the project is to focus
on sustainability and to
respect to its hillside
location with green roofs
that connects to the sky
gardens, rooftop solar
arrays and thermally
upgraded interiors.
61. THERM[NATUR]AL
HOTEL & SPA PROJECT
ÇANAKKALE / TURKEY
2016
GRADUATION PROJECT
The design,where the thermal
water is the main theme,
build relationship with
adjacent centers and joins
the urban network while
tends to prevent foreseen
problems mentioned
above, so acts as a piece
of nature emphasizing
the importance of natural
diffusion. Definitions help
to categorize, but creates
some kind of boundary
perception. An architectural
element without a volume
to experience does not
define any inner or outer
spaces, interior-exterior-
-landscape. Stripes goes
along the determined axis
helps the spaces define
their own spatial features.
Volume or transparency
can be adjusted. In this
way natural diffusion
can be accomplished,
boundaries between
the definitions can be
blurred,the feature of
presenting different
vistas of topography can
be sustained, circulation
- s t r u c t u r e - l a n d s c a p e -
-interior-exterior can
be embraced together.
62. Ayşe Sarımustafa PageAcademic 122 Ayşe Sarımustafa PageAcademic 123
“Man and nature interact dialectically in such a way that, as society develops, man
tends to become less dependent on nature directly, while indirectly his dependence
grows. This is understandable. While he is getting to know more and more about
nature, and on this basis transforming it, man’s power over nature progressively increases,
but in the same process, man comes into more and more extensive and profound
contact with nature, bringing into the sphere of his activity growing quantities of matter, energy
and information.”
- Engels, Man in the Realm of Nature
Project site, walking distance from Küçükçetmi village/Çanakkale, is in the middle of nature, surrounded by trees and villages further which have remained since
Antiquity and the main characteristic of the site is to have natural thermal water source present. Nowadays, as a result of rapid urbanisation, tendency to head for
what is in the nature increased as the stress and pollution of the cities become too much for people. That kind of tendency impact the nature in such a negative way
that the economic and physical parameters comes superior than the nature itself, therefore the phase of transition starts with damaging and dominating the nature,
building - demolishing cycle affecting the surrounding and place itself negatively in terms of culture, economy, environment. Yet, architecture should not be a war
between nature and itself with boundaries, but should be in collaboration by being flexible enough to allow the diffusion of nature, be a whole instead of seperate
sides. In this context, .therm[natur]alhub. aims to coexist, revitalize the healing function of water while transforming itself as a piece of nature.