SlideShare a Scribd company logo
1 of 17
BEDIFFERENT                                ACE   GERMANY




Copyright © 2012 Aras. All Rights Reserved.                   aras.com
ACE
                                              Germany


 Supplier Management.
 Integration der Lieferanten und Partner

 Jens Rollenmüller
 Aras Partner Manager
 T-Systems




Copyright © 2012 Aras. All Rights Reserved.        aras.com
Agenda / Overview.

 1        OEM & supplier ecosphere

 2        Overview of challenges

 2        IT challenges

 3        Process challenges

 4        IT solutions

 5        Process solutions

 6        Example for an OEM supplier environment bases on Aras Innovator

 7        Discussion & Questions



Copyright © 2012 Aras. All Rights Reserved.   Slide 3                       aras.com
OEM & Supplier Ecosphere.
  OEM Supplier for …

   Moduls                                                                        Production
                                                                                               Retail
    (front of car, gearbox, airplane kitchen)
   Parts                                                    Supplier

    (standard parts)
   Engineering only                                                                                                  Recycling
    (engineering center)
                                                                        Development
   Engineering and production                OEMs                      partner                                  Production planning

    responsible for components
                                                                                                IT
   Complete product
    outsourcing of a complete product
                                                                            OEM                         Prototyping
                                                 Design center




Copyright © 2012 Aras. All Rights Reserved.             Slide 4                                                          aras.com
Challenges.
  Complexity top down view…
   Multi level supplier structure
   M:N relations
             OEM  OEM                                              OEM
             Supplier  supplier
             OEM  supplier
   Multi cultural ecosphere
             Asia (China, India, …)
             America (US, Mexico, Brasil, …)
                                                             Supplier Tier[1]
             Europe (Germany, France, Italy, …)
   Measurements and standards
   Infrastructure
             IT Hardware                                    Supplier Tier[2]

             IT Software (PLM)
             Bandwidth and latency
                                                             Supplier Tier[3 - n]


Copyright © 2012 Aras. All Rights Reserved.        Slide 5             aras.com
Challenges.
                                                             OEM [B]
  Complexity bottom up view…
   Multi level supplier & OEM structure                                          OEM [A]
   M:N relations
             OEM  OEM
             Supplier  supplier
             OEM  supplier                                       Supplier
   Multi cultural ecosphere
             Asia (China, India, …)
             America (US, Mexico, Brasil, …)
             Europe (Germany, France, Italy, …)
   Measurements and standards
   Infrastructure
             IT Hardware                                                              Supplier
             IT Software (PLM)
             Bandwidth and latency

                                                                       Supplier
Copyright © 2012 Aras. All Rights Reserved.        Slide 6                                        aras.com
IT Challenges.
  Options for collaboration Environment…

   Online connection within supplier ecosphere (unfortunately does not work)
             Same PLM platform and identical data model and processes
   Online with different copies of database
             Definite need for a synchronization
             Identical data model is a prerequisite
   Offline
             Data exchange – immense amount of data has to be managed every day
             Synchronization between sites.
             IP Protection is possible (exchange only what OEM, supplier needs)
                                                  Experiences:
                    Depending on your need you normally need all types of collaboration types
                                          (Online, online copy, offline)
                                                                                           D
              Within an environment there is always a need to exchange data with offline capabilities.



Copyright © 2012 Aras. All Rights Reserved.          Slide 7                                             aras.com
IT Challenges.
  Global view…




                                                T




Copyright © 2012 Aras. All Rights Reserved.   Slide 8   aras.com
IT Challenges.
  Germany …




                                                T




Copyright © 2012 Aras. All Rights Reserved.   Slide 9   aras.com
IT Challenges.
  Europe …




                                                T




Copyright © 2012 Aras. All Rights Reserved.   Slide 10   aras.com
IT Challenges.
  North America …




                                                T




Copyright © 2012 Aras. All Rights Reserved.   Slide 11   aras.com
IT Challenges.
  Global view…


                                                                  Online PLM access:
                                                                   Easy to connect.
                                                                                   D
                      Online PLM access:
                                                                      T
                          Works, but
                      dependent on env.
                                              D                                                    Online PLM access:
                                                                                                 Could work, very limited
                                                                                                                     D




                                                                 Experiences:
                                                            Green: connect online
                                                  Yellow and Red: Better use own installation.                   D



Copyright © 2012 Aras. All Rights Reserved.                        Slide 12                                                 aras.com
Process challenges.
    Typical scenario…                                                 3
                                                                          Each OEM delivers different data
                                                                                exchange package



                                         OEM
1
               PLM Backbone from different
                   IT service providers,
                and with different versions


                                                                                           2
                                                                                               Own PLM strategy with flexible toolset with
                                                                                                       best value for supplier
 General conditions:                           4
  Large amount of data.                            Content of data
  Content dependent on project phase.             exchange package                            Supplier
  Content has to be checked (quality).               is defined.




Copyright © 2012 Aras. All Rights Reserved.         Slide 13                                                                   aras.com
Process challenges.
                                              A1             A1                   A1
                                                   B1   E1           B2      E1         B2     E1

                                                        F1                   F2                F2

                                                   C1   G1           C1      G1         C1     G1
  OEM
                                                   D1   G1           D1      G1         D2     G1

                                                        H1                   H1                H2


                                                                                          Additional complexities:
                                                                                           Configuration management
                                                                                   A1       (aerospace).
                                                                                           Different responsibilities at OEM
                                                   B1   E1           B2      E1         D2 (engine, body).
                                                                                                G1
                                                                                           2D/3D documents.
 Supplier                                               F1                   F2                 H2
                                                                                           IP Protection.




Copyright © 2012 Aras. All Rights Reserved.                       Slide 14                                              aras.com
Conclusion.
  IT Challenges
   Worldwide challenges (build your own ecosphere).
   Handle with different OEMs and toolsets.
   Changes within IT Toolset of OEM.
  Process Challenges
   Multi OEM handling.
   Different content of data exchange packages.
   Documentation of data exchange (what is new, changes within toolset, …)
  Supplier needs a simple and flexible solution to fulfill the requirements of all OEM’s and
  be able to keep own processes.




Copyright © 2012 Aras. All Rights Reserved.   Slide 15                                  aras.com
Example environment.
  T-Systems “Aerospace Supplier Package ” powered by Aras Innovator


                                              Four Software Components within one package.
                                               Basic Aras Innovator.
                                               Engineering configuration management.
                                               Data exchange toolset.
                                               CAD Integration.
                                              Every component is pre-customized and optimized
                                              for aerospace suppliers.




Copyright © 2012 Aras. All Rights Reserved.            Slide 16                                 aras.com
ACE Germany




 Questions                                    ?
 Jens Rollenmüller
 Aras Partner Manager
 T-Systems
 jens.rollenmueller@t-systems.com



Copyright © 2012 Aras. All Rights Reserved.               aras.com

More Related Content

What's hot

SolidWorks: Overview, 2012
SolidWorks: Overview, 2012SolidWorks: Overview, 2012
SolidWorks: Overview, 2012Paul Schneider
 
Making Scrum Stick Inside Heavy Regulated Industries (2012)
Making Scrum Stick Inside Heavy Regulated Industries (2012) Making Scrum Stick Inside Heavy Regulated Industries (2012)
Making Scrum Stick Inside Heavy Regulated Industries (2012) Laszlo Szalvay
 
HintTech WCM and DAM integration
HintTech WCM and DAM integrationHintTech WCM and DAM integration
HintTech WCM and DAM integrationBart Omlo
 
Social Business Practices shared by IBM Vice President Sandy Carter
Social Business Practices shared by IBM Vice President Sandy CarterSocial Business Practices shared by IBM Vice President Sandy Carter
Social Business Practices shared by IBM Vice President Sandy Carteribmvietnam
 
Future of BuildingCycle organisation English
Future of BuildingCycle organisation EnglishFuture of BuildingCycle organisation English
Future of BuildingCycle organisation Englishzuidema
 
Organizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements ComposerOrganizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements ComposerKurt Solarte
 
Enterprise modernization: improving the economics of mainframe and multi-plat...
Enterprise modernization: improving the economics of mainframe and multi-plat...Enterprise modernization: improving the economics of mainframe and multi-plat...
Enterprise modernization: improving the economics of mainframe and multi-plat...IBM Rational software
 
Warsaw Seminar Diem Ho 2
Warsaw Seminar Diem Ho 2Warsaw Seminar Diem Ho 2
Warsaw Seminar Diem Ho 2Youth Agora
 

What's hot (20)

IPM_E_8.2.2012
IPM_E_8.2.2012IPM_E_8.2.2012
IPM_E_8.2.2012
 
IPM_E_17.3.12
IPM_E_17.3.12IPM_E_17.3.12
IPM_E_17.3.12
 
IPM_E_19.3.12
IPM_E_19.3.12IPM_E_19.3.12
IPM_E_19.3.12
 
SolidWorks: Overview, 2012
SolidWorks: Overview, 2012SolidWorks: Overview, 2012
SolidWorks: Overview, 2012
 
Making Scrum Stick Inside Heavy Regulated Industries (2012)
Making Scrum Stick Inside Heavy Regulated Industries (2012) Making Scrum Stick Inside Heavy Regulated Industries (2012)
Making Scrum Stick Inside Heavy Regulated Industries (2012)
 
IPM_E_17.3.12
IPM_E_17.3.12IPM_E_17.3.12
IPM_E_17.3.12
 
IEM_E_13.2.12
IEM_E_13.2.12IEM_E_13.2.12
IEM_E_13.2.12
 
HSM_E_17.3.12
HSM_E_17.3.12HSM_E_17.3.12
HSM_E_17.3.12
 
HintTech WCM and DAM integration
HintTech WCM and DAM integrationHintTech WCM and DAM integration
HintTech WCM and DAM integration
 
Social Business Practices shared by IBM Vice President Sandy Carter
Social Business Practices shared by IBM Vice President Sandy CarterSocial Business Practices shared by IBM Vice President Sandy Carter
Social Business Practices shared by IBM Vice President Sandy Carter
 
IPM_E_7.4.12
IPM_E_7.4.12IPM_E_7.4.12
IPM_E_7.4.12
 
IPM_E_23.4.12
IPM_E_23.4.12IPM_E_23.4.12
IPM_E_23.4.12
 
IPM_E_17.3.12
IPM_E_17.3.12IPM_E_17.3.12
IPM_E_17.3.12
 
Future of BuildingCycle organisation English
Future of BuildingCycle organisation EnglishFuture of BuildingCycle organisation English
Future of BuildingCycle organisation English
 
Organizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements ComposerOrganizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements Composer
 
Enterprise modernization: improving the economics of mainframe and multi-plat...
Enterprise modernization: improving the economics of mainframe and multi-plat...Enterprise modernization: improving the economics of mainframe and multi-plat...
Enterprise modernization: improving the economics of mainframe and multi-plat...
 
Warsaw Seminar Diem Ho 2
Warsaw Seminar Diem Ho 2Warsaw Seminar Diem Ho 2
Warsaw Seminar Diem Ho 2
 
Edc Engineering Solutions Profile
Edc Engineering Solutions ProfileEdc Engineering Solutions Profile
Edc Engineering Solutions Profile
 
IRM_E_12.03.12
IRM_E_12.03.12IRM_E_12.03.12
IRM_E_12.03.12
 
CMS_01.03.12
CMS_01.03.12CMS_01.03.12
CMS_01.03.12
 

Similar to Aras and T-Systems: Supplier Management

Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...
Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...
Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...Strongback Consulting
 
Aras PLM Software Update
Aras PLM Software UpdateAras PLM Software Update
Aras PLM Software UpdateAras
 
Oop2012 keynote Design Driven Development
Oop2012 keynote Design Driven DevelopmentOop2012 keynote Design Driven Development
Oop2012 keynote Design Driven DevelopmentMichael Chaize
 
Packaged Integration Connectors
Packaged Integration ConnectorsPackaged Integration Connectors
Packaged Integration ConnectorsAras
 
Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13gaborvodics
 
Cast Iron Overview Webinar 6.13.12 Final(Jb)
Cast Iron Overview Webinar 6.13.12 Final(Jb)Cast Iron Overview Webinar 6.13.12 Final(Jb)
Cast Iron Overview Webinar 6.13.12 Final(Jb)Carolyn Crowe
 
What's New in Aras Innovator PLM Software
What's New in Aras Innovator PLM SoftwareWhat's New in Aras Innovator PLM Software
What's New in Aras Innovator PLM SoftwareAras
 
Dom introduction-website-v1.0
Dom introduction-website-v1.0Dom introduction-website-v1.0
Dom introduction-website-v1.0Cogility
 
Apptio up cloud conference 2012 [final].pptx
Apptio up cloud conference 2012 [final].pptxApptio up cloud conference 2012 [final].pptx
Apptio up cloud conference 2012 [final].pptxKhazret Sapenov
 
Lotus domino consolidation to linux on system z
Lotus domino consolidation to linux on system zLotus domino consolidation to linux on system z
Lotus domino consolidation to linux on system zsystemz
 
Aras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras ACE Conference 2013 PLM Keynote by Peter SchroerAras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras ACE Conference 2013 PLM Keynote by Peter SchroerAras
 
Discovering Computers: Chapter 15
Discovering Computers: Chapter 15Discovering Computers: Chapter 15
Discovering Computers: Chapter 15Anna Stirling
 
Sunrise Presentation, Company Overview 2012
Sunrise Presentation, Company Overview 2012Sunrise Presentation, Company Overview 2012
Sunrise Presentation, Company Overview 2012jvangombos
 
Ibm at sae2012 highlights
Ibm at sae2012 highlightsIbm at sae2012 highlights
Ibm at sae2012 highlightsibmsae
 
News to Development Environments and for RDz for z/VSE
News to Development Environments and for RDz for z/VSENews to Development Environments and for RDz for z/VSE
News to Development Environments and for RDz for z/VSEIBM
 

Similar to Aras and T-Systems: Supplier Management (20)

Ceedo Sales training
Ceedo Sales trainingCeedo Sales training
Ceedo Sales training
 
Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...
Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...
Build Smarter User Interfaces for Legacy Applications with IBM Rational Host ...
 
Aras PLM Software Update
Aras PLM Software UpdateAras PLM Software Update
Aras PLM Software Update
 
Oop2012 keynote Design Driven Development
Oop2012 keynote Design Driven DevelopmentOop2012 keynote Design Driven Development
Oop2012 keynote Design Driven Development
 
Packaged Integration Connectors
Packaged Integration ConnectorsPackaged Integration Connectors
Packaged Integration Connectors
 
Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13Cast Iron Overview Webinar 6.13
Cast Iron Overview Webinar 6.13
 
Cast Iron Overview Webinar 6.13.12 Final(Jb)
Cast Iron Overview Webinar 6.13.12 Final(Jb)Cast Iron Overview Webinar 6.13.12 Final(Jb)
Cast Iron Overview Webinar 6.13.12 Final(Jb)
 
What's New in Aras Innovator PLM Software
What's New in Aras Innovator PLM SoftwareWhat's New in Aras Innovator PLM Software
What's New in Aras Innovator PLM Software
 
Dom introduction-website-v1.0
Dom introduction-website-v1.0Dom introduction-website-v1.0
Dom introduction-website-v1.0
 
Apptio up cloud conference 2012 [final].pptx
Apptio up cloud conference 2012 [final].pptxApptio up cloud conference 2012 [final].pptx
Apptio up cloud conference 2012 [final].pptx
 
Intro To Starling Framework for ActionScript 3.0
Intro To Starling Framework for ActionScript 3.0Intro To Starling Framework for ActionScript 3.0
Intro To Starling Framework for ActionScript 3.0
 
Lotus domino consolidation to linux on system z
Lotus domino consolidation to linux on system zLotus domino consolidation to linux on system z
Lotus domino consolidation to linux on system z
 
05 architectural design
05 architectural design05 architectural design
05 architectural design
 
Aras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras ACE Conference 2013 PLM Keynote by Peter SchroerAras ACE Conference 2013 PLM Keynote by Peter Schroer
Aras ACE Conference 2013 PLM Keynote by Peter Schroer
 
OSS Business models
OSS Business modelsOSS Business models
OSS Business models
 
Discovering Computers: Chapter 15
Discovering Computers: Chapter 15Discovering Computers: Chapter 15
Discovering Computers: Chapter 15
 
Sunrise Presentation, Company Overview 2012
Sunrise Presentation, Company Overview 2012Sunrise Presentation, Company Overview 2012
Sunrise Presentation, Company Overview 2012
 
Sunrise presentation
Sunrise presentationSunrise presentation
Sunrise presentation
 
Ibm at sae2012 highlights
Ibm at sae2012 highlightsIbm at sae2012 highlights
Ibm at sae2012 highlights
 
News to Development Environments and for RDz for z/VSE
News to Development Environments and for RDz for z/VSENews to Development Environments and for RDz for z/VSE
News to Development Environments and for RDz for z/VSE
 

More from Aras

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryAras
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM ManagementAras
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology DirectionsAras
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016Aras
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of EngineeringAras
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD ConnectorsAras
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionAras
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product DesignAras
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile DeploymentAras
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelAras
 
Quality Systems
Quality SystemsQuality Systems
Quality SystemsAras
 
Variant Management
Variant ManagementVariant Management
Variant ManagementAras
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service ReportingAras
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchAras
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkAras
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical PublicationsAras
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange PortalAras
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk ManagementAras
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech DocsAras
 

More from Aras (20)

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM Management
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology Directions
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of Engineering
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD Connectors
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic Vision
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product Design
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile Deployment
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next Level
 
Quality Systems
Quality SystemsQuality Systems
Quality Systems
 
Variant Management
Variant ManagementVariant Management
Variant Management
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service Reporting
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise Search
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling Framework
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical Publications
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange Portal
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk Management
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech Docs
 

Recently uploaded

Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 

Recently uploaded (20)

Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 

Aras and T-Systems: Supplier Management

  • 1. BEDIFFERENT ACE GERMANY Copyright © 2012 Aras. All Rights Reserved. aras.com
  • 2. ACE Germany Supplier Management. Integration der Lieferanten und Partner Jens Rollenmüller Aras Partner Manager T-Systems Copyright © 2012 Aras. All Rights Reserved. aras.com
  • 3. Agenda / Overview. 1 OEM & supplier ecosphere 2 Overview of challenges 2 IT challenges 3 Process challenges 4 IT solutions 5 Process solutions 6 Example for an OEM supplier environment bases on Aras Innovator 7 Discussion & Questions Copyright © 2012 Aras. All Rights Reserved. Slide 3 aras.com
  • 4. OEM & Supplier Ecosphere. OEM Supplier for …  Moduls Production Retail (front of car, gearbox, airplane kitchen)  Parts Supplier (standard parts)  Engineering only Recycling (engineering center) Development  Engineering and production OEMs partner Production planning responsible for components IT  Complete product outsourcing of a complete product OEM Prototyping Design center Copyright © 2012 Aras. All Rights Reserved. Slide 4 aras.com
  • 5. Challenges. Complexity top down view…  Multi level supplier structure  M:N relations  OEM  OEM OEM  Supplier  supplier  OEM  supplier  Multi cultural ecosphere  Asia (China, India, …)  America (US, Mexico, Brasil, …) Supplier Tier[1]  Europe (Germany, France, Italy, …)  Measurements and standards  Infrastructure  IT Hardware Supplier Tier[2]  IT Software (PLM)  Bandwidth and latency Supplier Tier[3 - n] Copyright © 2012 Aras. All Rights Reserved. Slide 5 aras.com
  • 6. Challenges. OEM [B] Complexity bottom up view…  Multi level supplier & OEM structure OEM [A]  M:N relations  OEM  OEM  Supplier  supplier  OEM  supplier Supplier  Multi cultural ecosphere  Asia (China, India, …)  America (US, Mexico, Brasil, …)  Europe (Germany, France, Italy, …)  Measurements and standards  Infrastructure  IT Hardware Supplier  IT Software (PLM)  Bandwidth and latency Supplier Copyright © 2012 Aras. All Rights Reserved. Slide 6 aras.com
  • 7. IT Challenges. Options for collaboration Environment…  Online connection within supplier ecosphere (unfortunately does not work)  Same PLM platform and identical data model and processes  Online with different copies of database  Definite need for a synchronization  Identical data model is a prerequisite  Offline  Data exchange – immense amount of data has to be managed every day  Synchronization between sites.  IP Protection is possible (exchange only what OEM, supplier needs) Experiences: Depending on your need you normally need all types of collaboration types (Online, online copy, offline) D Within an environment there is always a need to exchange data with offline capabilities. Copyright © 2012 Aras. All Rights Reserved. Slide 7 aras.com
  • 8. IT Challenges. Global view… T Copyright © 2012 Aras. All Rights Reserved. Slide 8 aras.com
  • 9. IT Challenges. Germany … T Copyright © 2012 Aras. All Rights Reserved. Slide 9 aras.com
  • 10. IT Challenges. Europe … T Copyright © 2012 Aras. All Rights Reserved. Slide 10 aras.com
  • 11. IT Challenges. North America … T Copyright © 2012 Aras. All Rights Reserved. Slide 11 aras.com
  • 12. IT Challenges. Global view… Online PLM access: Easy to connect. D Online PLM access: T Works, but dependent on env. D Online PLM access: Could work, very limited D Experiences: Green: connect online Yellow and Red: Better use own installation. D Copyright © 2012 Aras. All Rights Reserved. Slide 12 aras.com
  • 13. Process challenges. Typical scenario… 3 Each OEM delivers different data exchange package OEM 1 PLM Backbone from different IT service providers, and with different versions 2 Own PLM strategy with flexible toolset with best value for supplier General conditions: 4  Large amount of data. Content of data  Content dependent on project phase. exchange package Supplier  Content has to be checked (quality). is defined. Copyright © 2012 Aras. All Rights Reserved. Slide 13 aras.com
  • 14. Process challenges. A1 A1 A1 B1 E1 B2 E1 B2 E1 F1 F2 F2 C1 G1 C1 G1 C1 G1 OEM D1 G1 D1 G1 D2 G1 H1 H1 H2 Additional complexities:  Configuration management A1 (aerospace).  Different responsibilities at OEM B1 E1 B2 E1 D2 (engine, body). G1  2D/3D documents. Supplier F1 F2 H2  IP Protection. Copyright © 2012 Aras. All Rights Reserved. Slide 14 aras.com
  • 15. Conclusion. IT Challenges  Worldwide challenges (build your own ecosphere).  Handle with different OEMs and toolsets.  Changes within IT Toolset of OEM. Process Challenges  Multi OEM handling.  Different content of data exchange packages.  Documentation of data exchange (what is new, changes within toolset, …) Supplier needs a simple and flexible solution to fulfill the requirements of all OEM’s and be able to keep own processes. Copyright © 2012 Aras. All Rights Reserved. Slide 15 aras.com
  • 16. Example environment. T-Systems “Aerospace Supplier Package ” powered by Aras Innovator Four Software Components within one package.  Basic Aras Innovator.  Engineering configuration management.  Data exchange toolset.  CAD Integration. Every component is pre-customized and optimized for aerospace suppliers. Copyright © 2012 Aras. All Rights Reserved. Slide 16 aras.com
  • 17. ACE Germany Questions ? Jens Rollenmüller Aras Partner Manager T-Systems jens.rollenmueller@t-systems.com Copyright © 2012 Aras. All Rights Reserved. aras.com