Antar Mohamed Mustafa Salama
Mechanical Piping Engineer
Country KSA
Mob. +966 507183171
E-mail : antar.mustafa@gmail.com
Profile
Mechanical engineer having 18 years' experience in piping design, layout
arrangement, stress analysis and so having experience in piping construction
including fabrication and erection,
Fields: Oil& Gas, Power station and Petrochemical industry projects.
Having awareness of human and project safety especially live gas works.
Work well under pressure and achieve required jobs in the optimum time.
An organization that empowers its employees with knowledge encourages
teamwork, have flexibility in communication between team-group and have enough
space to fully employ my experience & skills.
I am equally eager to acquire the necessary experience.
Summary of
Personal
Data and
Experience
Name : Antar Mohamed
Date of Birth: November 16th, 1973
Place of Birth: Egypt
Nationality: Egyptian
Marital Status: Married
Military Status: Exempted
Education: B.Sc. Mechanical Power Engineering
Present position: Piping Engineer
Linguistic Abilities: Arabic (mother tongue)& English (good)
Experience :
• Familiar with standards and codes like ASME / ANSI, AISC
• Development Plot Plan & Equipment Layout
• Piping design and stress analysis against P&ID line designation table.
• Generating piping general arrangement.
• Piping bill of materials.
• Pipe support design.
• Pipe supports bill of Materials
Career history :
1. ABB (Client Khalada) Sep. 2007 till March. 2009
2. Evermac April.2009 to March.2010
3. Initec Energia April.2010 to June 2011
4. Uhde Engineering Egypt (UEE) June.2011 to Aug 2012
5. Power System Projects–PSP Aug. 2012 till Oct. 2014
6. GS E&C Nov.2014 Till now
CV
Education
B.Sc. Power Mechanical Engineering:
Shoubra Faculty of Engineering, Benha University;
Last Year Grade: Very good
Graduation Project Grade: Excellent
Cumulative Grade of the Five years: (74.98%)
Graduation Project:
Its name: Piping system analysis
The project topic was about “The Analysis of piping system (Hydraulic Transient)
in Pipelines using the method of characteristics”
• With the aid of programming language (Matlab), a program is developed for
modeling
pressure and volume flow rate in pipelines due to pump failure and different valve
closures and for modeling of control devices and comparing the results with Aft
Fathom product modeling in piping systems.
High School Certificate:
Anshas Secondary School; Math Section.
Sharkia, Bilbeis Administration
Language & IT
skills
Language:
1. Arabic: Mother Tongue
2. English: Fluently speaking, writing & reading
IT:
1. Windows and Networks.
2. Internet Applications
Training courses
& Piping
Knowledge
Elementary Course for Piping System entails the following;
1. Hardy Cross technique to analyze the pipeline systems
2. The phenomenon of water hammer and protection
3. Pipe drafting and design
4. ASME B31-1-2004 Power piping
5. P&ID ” Piping &Instrument Drawing”
6. GA Drawing” General Arrangement”
7. Pipe Hangers& Supports
8. PDMS piping &Equipment design, Draft and Isodraft.
9. Caepipe piping stress analysis
10. Design Criteria
Engineering
programs
1. Power Point (Excellent presentation skills)
2. Excel (powerful knowledge of excel)
3. Microsoft office Word
4. Microsoft office Outlook
5. Microsoft office Access
6. AutoCAD
7. Matlab Programming
8. Aft Fathom product modeling in piping systems
9. PDMS piping design, Equipment ,Isodraft and Draft
10. Caepipe piping stress analysis
2
CV
Career History 1. GS E&C (TO)
PDMS spooling & check design
Project Egyptian Refinery in Mostorod
Duration
From: Oct 2014
To: till now
2. PSP Power System Projects Co.
Pipe Support Design Engineer(mainly)
Piping Design Engineer (as built)
Duration
From: August 2012
To: till 6/2014
Project 1 : El Ain El Sokhna supercritical thermal power plant 2x650MW
PSP – Power System Projects - is subcontracted by ΘVEOLIA
Contract no: CP111(Water treatment and desalination systems)
Consultant : PGESCo Cleint: East Delta Electricity Production Company EDEPC
Job Description:
1. Determination locations of pipe supports on ISOS designed by Veolia
engineering department according to ASME B31.1 criteria and select
suitable steel frames according to PGESCo CPS (Contract Package
Specification) or design frames of pipe supports if no std according to
AISC (American Institute of Steel Construction) to release new issues
revisions of isometrics for construction.
2. Design piping isometrics for some lines missing designed by Veolia as
Air Heater area.
3. Issuing As Built of all piping isometrics in site.
4. Acting as the site T.O engineer for the remains works after T.O resign.
5. Acting as the site material engineer for the remains works.
6. Acting as the site planner for the remains works.
Project 2 : ABOQIR power plant 2x650MW units 6&7
PSP – Power System Projects - is contractor join venture ZTPC
Contract no: CP118(Water treatment and desalination systems)
Consultant : PGESCo Cleint: East Delta Electricity Production Company
WDEPC
Job Description:
1. Determination locations of pipe supports on ISOS designed by FPI
engineering department according to ASME B31.1 criteria and select
suitable steel frames according to PGESCo CPS (Contract Package
Specification) or design frames of pipe supports if no std according to
AISC (American Institute of Steel Construction) to release new issues
revisions of isometrics for construction.
3. UHDE ENGINEERING EGYPT (UEE) Co.
Piping Design Engineer
Piping and Layout Department
Duration
From: December 2011
To: July 2012
UHDE focuses its activity on the Engineering & consultants of petrochemical
plants and its facilities, its web site www.thyssenkrupp.com
Projects:
3
CV
1-AMMONIUM SULPHATE ALEXFERT
Location: Egypt (Alexandria)
Job Description: I’m working by using PDMS and AutoCAD to do of :
1. General Arrangement drawings (GA).
2. Steel structure layout,
3. Equipment arrangement.
4. Civil Design Drawing.
5. Pumps Foundations, Formwork and Reinforcement Drawings
6. Ducts and shoots dimensioning for isometrics.
7. Equipment Fixing Drawings.
8. Special Supports (Design)
9. Nozzle Orientation
10. Fabrication and installation drawings of transition pieces(Ducts and
shoots) between equipments.
4. PIPING DESIGN ENGINEER using software PDMS
at INITEC Energía SA Co. (Egypt Branch).
Duration
From: May 2010
To : July 2011
INITEC Energía focuses its activity on the Engineering & construction of electricity
generation facilities, its web site www.initec-energia.com
I'm joined in INITEC Energía (Cairo office) in April 2010 Worked in position piping
design engineer in power station projects implemented by the INITEC Energía
company inside and outside Egypt using software PDMS.
Projects:
1- MANCHASOL-1,2(planta termosolar 2X50MW)
Location: Spain.
Consultant: § Cobra.
Job Description: 1- I worked by using PDMS(Draft module) to release updating of
Piping Arrangement drawings ( putting the labels of piping and its components
valves ,instruments and supports) and so putting dimensions and coordinates all of
this.
2- Cairo West Power Plant ( 2 X 350 MW Thermal p.p.).
Owner: Egyptian Electricity Authority.
Consultant: Power Generation Engineering and Services Company (PGESCo).
Location: Egypt
Job Description:
Design (Create small bore AS_BUILT) of all piping systems in Cairo West power
station to release isometric As built issue Material Take Off (MTO).
5. Co. Name: EVRMaC
PDMS piping designer and Caepipe Stress analyst.
Duration: 04/2009 to 04/2010
Subcontracted by Initec Energia SA for plant piping design, critical piping stress
analysis, special supports designs, MTO, ISOS, and as built.
Projects:
1-Nuberia Power Plant III (750MW combined cycle project).
2-Tebbin Power Plant ( 2 X 350 MW Thermal power plant).
3-Cairo West Power Plant ( 2 X 350 MW Thermal p.p.).
Owner: Egyptian Electricity Authority.
Consultant: (PGESCo).
Location: Egypt
Contractor: Initec Energia SA
.Job Description:
4
CV
1- Design of all piping systems in power plants “simple cycles or combined
“buildings per standard code (ASME B31.1_2004), to release isometric issue for
approval contains (BOM) and if design ok then release issue for construction.
2-Stress analysis of pipeline if temperature of flow during operating more than
204ºC, taking accounts movement of wind and seismic.
Site visit:
I made several visits to the Nubaria Power Plant III for:
1-study the site
2-modify some of the designs for non-completion model
3-attend meetings with owner to discuss the reports and designs.
6. Co. Name: ABB
SITE: Khalda Projects Maintenance (Egypt)
Client: Khalda Petroleum Company (KPC)
Responsibilities: Piping Engineer
Duration: 09/2007 to 02/2009
Job Details:
Construction “oil, gas and water” pipelines from wells to manifolds and at facilities
“Khalada, Kahraman, Khepri, Umbaraka and Tarek”facilites
Installation valves, pumps, tanks and all of equipments.
Extend a lot of flow lines at fields of khalada and sumpetco
“Piping” fabrication workshops monitoring Carbon steel materials.
Monitoring all activities starting with material inspection and insure
That is identical with the drawings and continuously makes Fit‐up
Inspection on “Dimensions, Materials, Sizes, Rotation angles,
Clearance gap, misalignment, numbering & Tagging,
Welding Visual inspection and finally hydrostatic test.
Prepare daily Fit‐up and Welding Reports including inch dia.
Completed and balance to be fabricated as per planned target
And available materials Monitoring all Safety activities inside the workshop.
& Available & issued materials Maintenance of existing piping system.
7. Co. Name: ECCO SPI
Position: Piping Supervisor
Duration: 02/1996 to 08/2007
Job Details:
"Pressure Vessels" fabrication workshops monitoring Carbon steel and follow all
the steps mentioned above but in the construction of pressure piping& vessels.
This a period has advised me to understand the Equipment Drawings
And its connections so these vessels is an important parts of piping systems
(This experience gained through my work at Sites informed me greatly
benefit in my Career "Piping Design")
5
CV
1- Design of all piping systems in power plants “simple cycles or combined
“buildings per standard code (ASME B31.1_2004), to release isometric issue for
approval contains (BOM) and if design ok then release issue for construction.
2-Stress analysis of pipeline if temperature of flow during operating more than
204ºC, taking accounts movement of wind and seismic.
Site visit:
I made several visits to the Nubaria Power Plant III for:
1-study the site
2-modify some of the designs for non-completion model
3-attend meetings with owner to discuss the reports and designs.
6. Co. Name: ABB
SITE: Khalda Projects Maintenance (Egypt)
Client: Khalda Petroleum Company (KPC)
Responsibilities: Piping Engineer
Duration: 09/2007 to 02/2009
Job Details:
Construction “oil, gas and water” pipelines from wells to manifolds and at facilities
“Khalada, Kahraman, Khepri, Umbaraka and Tarek”facilites
Installation valves, pumps, tanks and all of equipments.
Extend a lot of flow lines at fields of khalada and sumpetco
“Piping” fabrication workshops monitoring Carbon steel materials.
Monitoring all activities starting with material inspection and insure
That is identical with the drawings and continuously makes Fit‐up
Inspection on “Dimensions, Materials, Sizes, Rotation angles,
Clearance gap, misalignment, numbering & Tagging,
Welding Visual inspection and finally hydrostatic test.
Prepare daily Fit‐up and Welding Reports including inch dia.
Completed and balance to be fabricated as per planned target
And available materials Monitoring all Safety activities inside the workshop.
& Available & issued materials Maintenance of existing piping system.
7. Co. Name: ECCO SPI
Position: Piping Supervisor
Duration: 02/1996 to 08/2007
Job Details:
"Pressure Vessels" fabrication workshops monitoring Carbon steel and follow all
the steps mentioned above but in the construction of pressure piping& vessels.
This a period has advised me to understand the Equipment Drawings
And its connections so these vessels is an important parts of piping systems
(This experience gained through my work at Sites informed me greatly
benefit in my Career "Piping Design")
5

More Related Content

What's hot

CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
CV of Dr Eng Mahmoud Allam 2016
CV of Dr  Eng  Mahmoud Allam 2016CV of Dr  Eng  Mahmoud Allam 2016
CV of Dr Eng Mahmoud Allam 2016mahmoudal25
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerWan Sazali
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJSiva Kumar
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 

What's hot (20)

JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
CV of Dr Eng Mahmoud Allam 2016
CV of Dr  Eng  Mahmoud Allam 2016CV of Dr  Eng  Mahmoud Allam 2016
CV of Dr Eng Mahmoud Allam 2016
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
Salah Salem CV
Salah Salem CVSalah Salem CV
Salah Salem CV
 
CFF.CV_10.07.2016
CFF.CV_10.07.2016CFF.CV_10.07.2016
CFF.CV_10.07.2016
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
saad cv
saad cvsaad cv
saad cv
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
MY CV2
MY CV2MY CV2
MY CV2
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 

Similar to Antar Mustafa CV

Similar to Antar Mustafa CV (20)

CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
Mohamed Khaled 2
Mohamed Khaled 2Mohamed Khaled 2
Mohamed Khaled 2
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Mohamed Ezzat - curriculum vitae
Mohamed Ezzat - curriculum vitaeMohamed Ezzat - curriculum vitae
Mohamed Ezzat - curriculum vitae
 
Mohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical EngineerMohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical Engineer
 
CV-NKN-09.05.16
CV-NKN-09.05.16CV-NKN-09.05.16
CV-NKN-09.05.16
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.update
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.update
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 

Antar Mustafa CV

  • 1. [Pickthe date] 1 Professional Resume Antar Mohamed Mustafa Salama Mechanical Piping Engineer Country KSA Mob. +966 507183171 E-mail : antar.mustafa@gmail.com Profile Mechanical engineer having 18 years' experience in piping design, layout arrangement, stress analysis and so having experience in piping construction including fabrication and erection, Fields: Oil& Gas, Power station and Petrochemical industry projects. Having awareness of human and project safety especially live gas works. Work well under pressure and achieve required jobs in the optimum time. An organization that empowers its employees with knowledge encourages teamwork, have flexibility in communication between team-group and have enough space to fully employ my experience & skills. I am equally eager to acquire the necessary experience. Summary of Personal Data and Experience Name : Antar Mohamed Date of Birth: November 16th, 1973 Place of Birth: Egypt Nationality: Egyptian Marital Status: Married Military Status: Exempted Education: B.Sc. Mechanical Power Engineering Present position: Piping Engineer Linguistic Abilities: Arabic (mother tongue)& English (good) Experience : • Familiar with standards and codes like ASME / ANSI, AISC • Development Plot Plan & Equipment Layout • Piping design and stress analysis against P&ID line designation table. • Generating piping general arrangement. • Piping bill of materials. • Pipe support design. • Pipe supports bill of Materials Career history : 1. ABB (Client Khalada) Sep. 2007 till March. 2009 2. Evermac April.2009 to March.2010 3. Initec Energia April.2010 to June 2011 4. Uhde Engineering Egypt (UEE) June.2011 to Aug 2012 5. Power System Projects–PSP Aug. 2012 till Oct. 2014 6. GS E&C Nov.2014 Till now
  • 2. CV Education B.Sc. Power Mechanical Engineering: Shoubra Faculty of Engineering, Benha University; Last Year Grade: Very good Graduation Project Grade: Excellent Cumulative Grade of the Five years: (74.98%) Graduation Project: Its name: Piping system analysis The project topic was about “The Analysis of piping system (Hydraulic Transient) in Pipelines using the method of characteristics” • With the aid of programming language (Matlab), a program is developed for modeling pressure and volume flow rate in pipelines due to pump failure and different valve closures and for modeling of control devices and comparing the results with Aft Fathom product modeling in piping systems. High School Certificate: Anshas Secondary School; Math Section. Sharkia, Bilbeis Administration Language & IT skills Language: 1. Arabic: Mother Tongue 2. English: Fluently speaking, writing & reading IT: 1. Windows and Networks. 2. Internet Applications Training courses & Piping Knowledge Elementary Course for Piping System entails the following; 1. Hardy Cross technique to analyze the pipeline systems 2. The phenomenon of water hammer and protection 3. Pipe drafting and design 4. ASME B31-1-2004 Power piping 5. P&ID ” Piping &Instrument Drawing” 6. GA Drawing” General Arrangement” 7. Pipe Hangers& Supports 8. PDMS piping &Equipment design, Draft and Isodraft. 9. Caepipe piping stress analysis 10. Design Criteria Engineering programs 1. Power Point (Excellent presentation skills) 2. Excel (powerful knowledge of excel) 3. Microsoft office Word 4. Microsoft office Outlook 5. Microsoft office Access 6. AutoCAD 7. Matlab Programming 8. Aft Fathom product modeling in piping systems 9. PDMS piping design, Equipment ,Isodraft and Draft 10. Caepipe piping stress analysis 2
  • 3. CV Career History 1. GS E&C (TO) PDMS spooling & check design Project Egyptian Refinery in Mostorod Duration From: Oct 2014 To: till now 2. PSP Power System Projects Co. Pipe Support Design Engineer(mainly) Piping Design Engineer (as built) Duration From: August 2012 To: till 6/2014 Project 1 : El Ain El Sokhna supercritical thermal power plant 2x650MW PSP – Power System Projects - is subcontracted by ΘVEOLIA Contract no: CP111(Water treatment and desalination systems) Consultant : PGESCo Cleint: East Delta Electricity Production Company EDEPC Job Description: 1. Determination locations of pipe supports on ISOS designed by Veolia engineering department according to ASME B31.1 criteria and select suitable steel frames according to PGESCo CPS (Contract Package Specification) or design frames of pipe supports if no std according to AISC (American Institute of Steel Construction) to release new issues revisions of isometrics for construction. 2. Design piping isometrics for some lines missing designed by Veolia as Air Heater area. 3. Issuing As Built of all piping isometrics in site. 4. Acting as the site T.O engineer for the remains works after T.O resign. 5. Acting as the site material engineer for the remains works. 6. Acting as the site planner for the remains works. Project 2 : ABOQIR power plant 2x650MW units 6&7 PSP – Power System Projects - is contractor join venture ZTPC Contract no: CP118(Water treatment and desalination systems) Consultant : PGESCo Cleint: East Delta Electricity Production Company WDEPC Job Description: 1. Determination locations of pipe supports on ISOS designed by FPI engineering department according to ASME B31.1 criteria and select suitable steel frames according to PGESCo CPS (Contract Package Specification) or design frames of pipe supports if no std according to AISC (American Institute of Steel Construction) to release new issues revisions of isometrics for construction. 3. UHDE ENGINEERING EGYPT (UEE) Co. Piping Design Engineer Piping and Layout Department Duration From: December 2011 To: July 2012 UHDE focuses its activity on the Engineering & consultants of petrochemical plants and its facilities, its web site www.thyssenkrupp.com Projects: 3
  • 4. CV 1-AMMONIUM SULPHATE ALEXFERT Location: Egypt (Alexandria) Job Description: I’m working by using PDMS and AutoCAD to do of : 1. General Arrangement drawings (GA). 2. Steel structure layout, 3. Equipment arrangement. 4. Civil Design Drawing. 5. Pumps Foundations, Formwork and Reinforcement Drawings 6. Ducts and shoots dimensioning for isometrics. 7. Equipment Fixing Drawings. 8. Special Supports (Design) 9. Nozzle Orientation 10. Fabrication and installation drawings of transition pieces(Ducts and shoots) between equipments. 4. PIPING DESIGN ENGINEER using software PDMS at INITEC Energía SA Co. (Egypt Branch). Duration From: May 2010 To : July 2011 INITEC Energía focuses its activity on the Engineering & construction of electricity generation facilities, its web site www.initec-energia.com I'm joined in INITEC Energía (Cairo office) in April 2010 Worked in position piping design engineer in power station projects implemented by the INITEC Energía company inside and outside Egypt using software PDMS. Projects: 1- MANCHASOL-1,2(planta termosolar 2X50MW) Location: Spain. Consultant: § Cobra. Job Description: 1- I worked by using PDMS(Draft module) to release updating of Piping Arrangement drawings ( putting the labels of piping and its components valves ,instruments and supports) and so putting dimensions and coordinates all of this. 2- Cairo West Power Plant ( 2 X 350 MW Thermal p.p.). Owner: Egyptian Electricity Authority. Consultant: Power Generation Engineering and Services Company (PGESCo). Location: Egypt Job Description: Design (Create small bore AS_BUILT) of all piping systems in Cairo West power station to release isometric As built issue Material Take Off (MTO). 5. Co. Name: EVRMaC PDMS piping designer and Caepipe Stress analyst. Duration: 04/2009 to 04/2010 Subcontracted by Initec Energia SA for plant piping design, critical piping stress analysis, special supports designs, MTO, ISOS, and as built. Projects: 1-Nuberia Power Plant III (750MW combined cycle project). 2-Tebbin Power Plant ( 2 X 350 MW Thermal power plant). 3-Cairo West Power Plant ( 2 X 350 MW Thermal p.p.). Owner: Egyptian Electricity Authority. Consultant: (PGESCo). Location: Egypt Contractor: Initec Energia SA .Job Description: 4
  • 5. CV 1- Design of all piping systems in power plants “simple cycles or combined “buildings per standard code (ASME B31.1_2004), to release isometric issue for approval contains (BOM) and if design ok then release issue for construction. 2-Stress analysis of pipeline if temperature of flow during operating more than 204ºC, taking accounts movement of wind and seismic. Site visit: I made several visits to the Nubaria Power Plant III for: 1-study the site 2-modify some of the designs for non-completion model 3-attend meetings with owner to discuss the reports and designs. 6. Co. Name: ABB SITE: Khalda Projects Maintenance (Egypt) Client: Khalda Petroleum Company (KPC) Responsibilities: Piping Engineer Duration: 09/2007 to 02/2009 Job Details: Construction “oil, gas and water” pipelines from wells to manifolds and at facilities “Khalada, Kahraman, Khepri, Umbaraka and Tarek”facilites Installation valves, pumps, tanks and all of equipments. Extend a lot of flow lines at fields of khalada and sumpetco “Piping” fabrication workshops monitoring Carbon steel materials. Monitoring all activities starting with material inspection and insure That is identical with the drawings and continuously makes Fit‐up Inspection on “Dimensions, Materials, Sizes, Rotation angles, Clearance gap, misalignment, numbering & Tagging, Welding Visual inspection and finally hydrostatic test. Prepare daily Fit‐up and Welding Reports including inch dia. Completed and balance to be fabricated as per planned target And available materials Monitoring all Safety activities inside the workshop. & Available & issued materials Maintenance of existing piping system. 7. Co. Name: ECCO SPI Position: Piping Supervisor Duration: 02/1996 to 08/2007 Job Details: "Pressure Vessels" fabrication workshops monitoring Carbon steel and follow all the steps mentioned above but in the construction of pressure piping& vessels. This a period has advised me to understand the Equipment Drawings And its connections so these vessels is an important parts of piping systems (This experience gained through my work at Sites informed me greatly benefit in my Career "Piping Design") 5
  • 6. CV 1- Design of all piping systems in power plants “simple cycles or combined “buildings per standard code (ASME B31.1_2004), to release isometric issue for approval contains (BOM) and if design ok then release issue for construction. 2-Stress analysis of pipeline if temperature of flow during operating more than 204ºC, taking accounts movement of wind and seismic. Site visit: I made several visits to the Nubaria Power Plant III for: 1-study the site 2-modify some of the designs for non-completion model 3-attend meetings with owner to discuss the reports and designs. 6. Co. Name: ABB SITE: Khalda Projects Maintenance (Egypt) Client: Khalda Petroleum Company (KPC) Responsibilities: Piping Engineer Duration: 09/2007 to 02/2009 Job Details: Construction “oil, gas and water” pipelines from wells to manifolds and at facilities “Khalada, Kahraman, Khepri, Umbaraka and Tarek”facilites Installation valves, pumps, tanks and all of equipments. Extend a lot of flow lines at fields of khalada and sumpetco “Piping” fabrication workshops monitoring Carbon steel materials. Monitoring all activities starting with material inspection and insure That is identical with the drawings and continuously makes Fit‐up Inspection on “Dimensions, Materials, Sizes, Rotation angles, Clearance gap, misalignment, numbering & Tagging, Welding Visual inspection and finally hydrostatic test. Prepare daily Fit‐up and Welding Reports including inch dia. Completed and balance to be fabricated as per planned target And available materials Monitoring all Safety activities inside the workshop. & Available & issued materials Maintenance of existing piping system. 7. Co. Name: ECCO SPI Position: Piping Supervisor Duration: 02/1996 to 08/2007 Job Details: "Pressure Vessels" fabrication workshops monitoring Carbon steel and follow all the steps mentioned above but in the construction of pressure piping& vessels. This a period has advised me to understand the Equipment Drawings And its connections so these vessels is an important parts of piping systems (This experience gained through my work at Sites informed me greatly benefit in my Career "Piping Design") 5