Practical BIM-
LOD was developed by a construction costing software company (Vicosoftware) and was used to make
the process of estimating possible in BIM. Estimating involves human factor, but LOD makes BIM models
do estimation without the involvement of human.
- They developed the concept of Level of Detail
o LOD 100 – not very definitive, but area/volume rate are accurate enough
o LOD 200 – number of items in the model are correct, but they have to estimated
individually
o LOD 300 – items defined, actual cost can be used
o LOD 400 – has supply data also, so can be used to assess payments for purchases
- AIA redefined the term LOD to mean Level of Development to be used in reference to BIM
- Renamed it so that it is not confused with amount of information, rather than the decisiveness
of information
Level of Development
- It is a measure of how seriously you take the information represented by a BIM element
- Different people perceive the information differently - to be able to work they require a certain
level of details
o To order something, contractor requires only the model number and manufacturer. But
to install it, the carpenter requires the dimensions, material etc. So, for the same
product - different details are required by different players
- Level of Development “LOD” - LOD 100 – describing what it is; LOD 200 – its dimension; LOD 300
– its functions and options; LOD 400 – manufacturer and model; LOD – 500 LOD 400 + delivery
details
- Tells information what a particular person can use
- Also a measure of the completeness of work- LOD 100= 20%; LOD 200= 40%... LOD 500= 100%
Level of Detail
- It is a measure of the amount of information provided – measure of quantity
- Level of Detail “LOD”
o Differently used by various agencies
 CIC (Penn State) called as Information Level of Details aka “Info”– A: size,
location, material, object parameters; B: general size and location, object
parameters; C: schematic size and location
 USACE M3 (Min. Model Matrix) called as Grade – A: 3D + facility data; B: 2D +
facility data; C: 2D + text description
 AEC (UK) BIM Protocol called as Graded Component Creation- G0: Schematic;
G1: Concept; G2: Defined 3D; G3: Rendered 3D
o LOD Tables – tabular representation of LOD data; describes how information in BIM
model will progress; how much information is usable at each stage of project etc
Link between Development and Detail
- Both are quite different but closely related and interdependent
- One cannot have a certain Level of Development if Level of Details does not exist
- Without Details you cannot successfully visualize a product, and without Development you
cannot order the right product.
- Level of Detail – required more in the starting phase and decreases as project proceeds
- Level of Development – required less in the starting phase, but increases as project proceeds
- So, for clarity – LOD: Level of Development; Grade: Level of Details
An LOD table is an attempt to record agreed responsibilities around a BIM Model. It sets the Division of
Responsibility inside the BIM model. There are various LOD concepts which can be used. The author
finds the US AIA E203 document which uses LOD and MEA (Model Element Author) in its Model Element
Table as most appropriate. It allows to use the broad structure and concept, and gives flexibility change
the structure, add new levels etc. and cater it to needs required by the project. It treats LOD not a set
rules, but as a process.
To make the best use of LOD we have to think about how we can make it meaningful to our project and
the project team.
- US AIA E203 gives freedom to create LOD table the way you like
- Keep it simple enough to understand and complex enough to accommodate all the needs
- Create multiple levels
o Create levels even for sub tasks like inspection, QA/QC check etc.
- Make multiple tables for different players containing the details they require
- Treat LOD as a concept, not a rule. Tweak it to your own needs
BIM: Measurement of design progress on large capital projects-
In this chapter, the author delves into techniques that can be used to make implementation of BIM
more effectively by focusing his attention on LOD. One of the key challenge that BIM practitioners face
is the measurement of design progress in a BIM model.
- BIM model tends to evolve unlike 2D drawings that follow linear fashion. So, different method
has to be used for progress measurement in BIM
- Analytical Analysis ability of BIM is useful in this case and author puts forward some analytical
analysis techniques that can be used
Setting up data collection now to enable progress tracking later:-
- It begins with the definition of LOD. Different LOD levels should be defined. LOD 100, LOD 200,
LOD 300, LOD350, LOD 400 and LOD 500
- As we move from LOD 100 to LOD 350 more and more details should be added to make the
object more defined and certain
- LOD should definitions can be customized
- Intermediate LOD levels like LOD 350 should be created to enable better understanding and
coordination between various disciplines.
- Higher level of LOD like LOD 400 and LOD 500 have more details and can be used for
prefabrication and field verification rather than design coordination.
o LOD 400 and LOD 500 can be added later on, they are not necessarily required during
design process
o This will save time during design phase
Model Progression Table (MPT)
- Accompanies customized LOD definitions
- Unit Measurement per element per LOD should be added
o Helps in keeping track of progress at different LOD levels
o As it uses Measurement Units – it becomes easier – it is like integrating old and new i.e.
2D measurement for quantity to BIM
- Grouping and layering of model elements
o Layers and objects should be named to help designing and coordination
o In addition, elements should be separated with their respective LOD layers
 LOD 100 level details in one layer, and then LOD 200, LOD 300 etc. level details
are added in separate layer. All these combine to for the complete element
- Schedule, categorize and link activities to model elements
o Various phases like design/engineering, modelling, coordination, revision, re-
coordination etc. should be categorized in the BIM model
o Attach each of these phases with a WBS code
o This helps track how much time and resources are spent in each phase
 Lack of sufficient effort during design/engineering phase causes revisions in the
design, and then it has to be re-coordinated – loss of time and resources
 If revision and re-coordination for a particular activity is more, it means there
was faults in its design, and thus, more time can be allocated to these activities
in future to avoid it
- Track inputs of productivity
o People involved in BIM modelling should keep a time-log for keeping track of time they
spent on different activities, WBS, LOD level etc.
o This will help in knowing how much time was spent on a particular element – area of
time wastages can be avoided to increase productivity
Using data collected to analyze and measure progress by leveraging data analytics
- Input hours tracked in time sheets
- Model output tracked in LOD layers connected via WBS
- Combining both (input hours and model output) creates a living dataset
- Applying Data Analytics – different analysis can be done to track and measure BIM progress
o Hours spent per LOD %age completion
 Gives visibility to effort spent in LOD per progress %age points gained
o Hours spent per category per LOD %age completion
 Know if efforts spent were proportional or disproportionate to %age completion
by LOD
 If disproportionality is there, then time spent can either be increased or
decreased to enhance productivity
 If downstream activities (revision) takes more time, then time spent on
upstream activities (design/engineering) can be increased which will
result in less revisions downstream
o Vertical Analysis – the BIM “efficiency ratio”
 Hours spent redesigning, remodeling and re-coordinating are waste in system
 Lesser or no time should be spent here
 Greater time spent in initial design, modelling and coordination lead to less
waste in system
 BIM efficiency ratio: Ratio of (time spent in initial design, modelling and
coordination) to (time spent in redesigning, remodeling and re-coordination)
o Horizontal analysis – the BIM “weighted average efficiency ratio
 Different phases were created in MPT by blending model elements with
schedule activities through WBS
 By using this we are able to find time spent in each phase of the LOD
o Initial design – more time spent on LOD 100s
o Later phase – more time spent on LOD 350s
 Calculate BIM efficiency ratio per LOD
 This can be further used to create weighted average efficiency ratio
 This provides information regarding efficiency over particular time period of
design as well as a trending measure over various phases of project
o Using RACI (Responsible, Accountable, Consulted and Informed) matrix to allocate tasks
to individuals
 RACI analysis of each individual across each activity done to spot overlaps and
gaps
 Enhances clarity of individual responsibilities
o Regression analysis and bench marking
 The data obtained from one project can be used to make improvements in
future projects
 Data can also be used for selection of individuals like architect, engineer etc.
o Linking element/activity to schedule of values
 Making progress payments like monthly payments to contractors
 Will require more effort in initial stages but very useful in later stages of project

More Related Content

What's hot

Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)metalalp
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentationrsalbin
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)Franco Bontempi Org Didattica
 
International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5Saad Al Jabri
 
The Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowThe Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowUnited-BIM
 
BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...bimservicesindia1
 
ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)Be2camp Admin
 
2011.05.04 BIM Presentation - Next Level
2011.05.04   BIM Presentation - Next Level2011.05.04   BIM Presentation - Next Level
2011.05.04 BIM Presentation - Next LevelAntman1963
 
BIM project execution
BIM project executionBIM project execution
BIM project executionStephen Au
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentationryanabarton
 
BIM Contract International Conference 2017
BIM Contract International Conference 2017BIM Contract International Conference 2017
BIM Contract International Conference 2017Chun Keung Ng
 

What's hot (18)

The Bim Process Explained
The Bim Process ExplainedThe Bim Process Explained
The Bim Process Explained
 
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)
 
International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5
 
The Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowThe Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should Know
 
BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 
bim+ Presentation BIM Manager
bim+ Presentation BIM Managerbim+ Presentation BIM Manager
bim+ Presentation BIM Manager
 
Building Information Modeling
Building Information ModelingBuilding Information Modeling
Building Information Modeling
 
ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
2011.05.04 BIM Presentation - Next Level
2011.05.04   BIM Presentation - Next Level2011.05.04   BIM Presentation - Next Level
2011.05.04 BIM Presentation - Next Level
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 
what is BIM
what is BIMwhat is BIM
what is BIM
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
BIM Contract International Conference 2017
BIM Contract International Conference 2017BIM Contract International Conference 2017
BIM Contract International Conference 2017
 

Viewers also liked

BIM LOD (Level of Definition)
BIM LOD (Level of Definition) BIM LOD (Level of Definition)
BIM LOD (Level of Definition) Scott Berry
 
The Level of Development (LOD) Specification 2016
The Level of Development (LOD) Specification 2016The Level of Development (LOD) Specification 2016
The Level of Development (LOD) Specification 2016Huytraining
 
The Level of Development (LOD) Specification 2015 (LOD 2015)
The Level of Development (LOD) Specification 2015 (LOD 2015)The Level of Development (LOD) Specification 2015 (LOD 2015)
The Level of Development (LOD) Specification 2015 (LOD 2015)Huytraining
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 

Viewers also liked (8)

BIM LOD (Level of Definition)
BIM LOD (Level of Definition) BIM LOD (Level of Definition)
BIM LOD (Level of Definition)
 
The Level of Development (LOD) Specification 2016
The Level of Development (LOD) Specification 2016The Level of Development (LOD) Specification 2016
The Level of Development (LOD) Specification 2016
 
The Level of Development (LOD) Specification 2015 (LOD 2015)
The Level of Development (LOD) Specification 2015 (LOD 2015)The Level of Development (LOD) Specification 2015 (LOD 2015)
The Level of Development (LOD) Specification 2015 (LOD 2015)
 
Bim overview
Bim overviewBim overview
Bim overview
 
Revit And BIM
Revit And BIMRevit And BIM
Revit And BIM
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
BIM LOD (Level of Definition)
BIM LOD (Level of Definition) BIM LOD (Level of Definition)
BIM LOD (Level of Definition)
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 

Similar to Level of development - BIM

BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500United-BIM
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for constructionCesare Caoduro
 
Standard of bim and cad
Standard of bim and cadStandard of bim and cad
Standard of bim and cadOmar Selim
 
Standard of bim and cad
Standard of bim and cadStandard of bim and cad
Standard of bim and cadOmar Selim
 
A brief account on detailing levels based on which BIM models are developed
A brief account on detailing levels based on which BIM models are developedA brief account on detailing levels based on which BIM models are developed
A brief account on detailing levels based on which BIM models are developedbimservicesindia1
 
Software app slides
Software app slidesSoftware app slides
Software app slidesahmong4
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfVincentPoon15
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1Timun Loh
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesShze Hwa Lee
 
Bim implementation
Bim implementationBim implementation
Bim implementationOmar Selim
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
What does bim mean to you
What does bim mean to youWhat does bim mean to you
What does bim mean to youOnyema Udeze
 

Similar to Level of development - BIM (20)

BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500
 
BIM Modeling in Detailed with Different Levels of Details.pdf
BIM Modeling in Detailed with Different Levels of Details.pdfBIM Modeling in Detailed with Different Levels of Details.pdf
BIM Modeling in Detailed with Different Levels of Details.pdf
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
Standard of bim and cad
Standard of bim and cadStandard of bim and cad
Standard of bim and cad
 
Standard of bim and cad
Standard of bim and cadStandard of bim and cad
Standard of bim and cad
 
A brief account on detailing levels based on which BIM models are developed
A brief account on detailing levels based on which BIM models are developedA brief account on detailing levels based on which BIM models are developed
A brief account on detailing levels based on which BIM models are developed
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
CH-2.pptx
CH-2.pptxCH-2.pptx
CH-2.pptx
 
BIM Modeling In Detailed With Different Levels Of Details (LOD)
BIM Modeling In Detailed With  Different Levels Of Details (LOD)BIM Modeling In Detailed With  Different Levels Of Details (LOD)
BIM Modeling In Detailed With Different Levels Of Details (LOD)
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 
BIM for Project Managers
BIM for Project ManagersBIM for Project Managers
BIM for Project Managers
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software
Software Software
Software
 
Bim implementation
Bim implementationBim implementation
Bim implementation
 
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
Mechanical, Electrical and Plumbing (MEP) Course.pdf
Mechanical, Electrical and Plumbing (MEP) Course.pdfMechanical, Electrical and Plumbing (MEP) Course.pdf
Mechanical, Electrical and Plumbing (MEP) Course.pdf
 
What does bim mean to you
What does bim mean to youWhat does bim mean to you
What does bim mean to you
 

More from Ankit Singhai

THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONTHE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONAnkit Singhai
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction FormworkAnkit Singhai
 
Role of Prefabrication in the Construction Industry to improve sustainability...
Role of Prefabrication in the Construction Industry to improve sustainability...Role of Prefabrication in the Construction Industry to improve sustainability...
Role of Prefabrication in the Construction Industry to improve sustainability...Ankit Singhai
 
BIMplement INC Presentation
BIMplement INC PresentationBIMplement INC Presentation
BIMplement INC PresentationAnkit Singhai
 
BIMplement inc_proposal
BIMplement inc_proposalBIMplement inc_proposal
BIMplement inc_proposalAnkit Singhai
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated designAnkit Singhai
 
3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction3 d and 4d modeling for design and construction
3 d and 4d modeling for design and constructionAnkit Singhai
 
Virtual design and construction
Virtual design and constructionVirtual design and construction
Virtual design and constructionAnkit Singhai
 
BIM for Infrastructure
BIM for InfrastructureBIM for Infrastructure
BIM for InfrastructureAnkit Singhai
 
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Ankit Singhai
 

More from Ankit Singhai (13)

THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONTHE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
Role of Prefabrication in the Construction Industry to improve sustainability...
Role of Prefabrication in the Construction Industry to improve sustainability...Role of Prefabrication in the Construction Industry to improve sustainability...
Role of Prefabrication in the Construction Industry to improve sustainability...
 
BIMplement INC Presentation
BIMplement INC PresentationBIMplement INC Presentation
BIMplement INC Presentation
 
BIMplement inc_proposal
BIMplement inc_proposalBIMplement inc_proposal
BIMplement inc_proposal
 
Bim execution plan
Bim execution planBim execution plan
Bim execution plan
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated design
 
4D bim
4D bim4D bim
4D bim
 
3 d laser scanning
3 d laser scanning3 d laser scanning
3 d laser scanning
 
3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction
 
Virtual design and construction
Virtual design and constructionVirtual design and construction
Virtual design and construction
 
BIM for Infrastructure
BIM for InfrastructureBIM for Infrastructure
BIM for Infrastructure
 
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
 

Recently uploaded

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 

Recently uploaded (20)

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 

Level of development - BIM

  • 1. Practical BIM- LOD was developed by a construction costing software company (Vicosoftware) and was used to make the process of estimating possible in BIM. Estimating involves human factor, but LOD makes BIM models do estimation without the involvement of human. - They developed the concept of Level of Detail o LOD 100 – not very definitive, but area/volume rate are accurate enough o LOD 200 – number of items in the model are correct, but they have to estimated individually o LOD 300 – items defined, actual cost can be used o LOD 400 – has supply data also, so can be used to assess payments for purchases - AIA redefined the term LOD to mean Level of Development to be used in reference to BIM - Renamed it so that it is not confused with amount of information, rather than the decisiveness of information Level of Development - It is a measure of how seriously you take the information represented by a BIM element - Different people perceive the information differently - to be able to work they require a certain level of details o To order something, contractor requires only the model number and manufacturer. But to install it, the carpenter requires the dimensions, material etc. So, for the same product - different details are required by different players - Level of Development “LOD” - LOD 100 – describing what it is; LOD 200 – its dimension; LOD 300 – its functions and options; LOD 400 – manufacturer and model; LOD – 500 LOD 400 + delivery details - Tells information what a particular person can use - Also a measure of the completeness of work- LOD 100= 20%; LOD 200= 40%... LOD 500= 100% Level of Detail - It is a measure of the amount of information provided – measure of quantity - Level of Detail “LOD” o Differently used by various agencies  CIC (Penn State) called as Information Level of Details aka “Info”– A: size, location, material, object parameters; B: general size and location, object parameters; C: schematic size and location  USACE M3 (Min. Model Matrix) called as Grade – A: 3D + facility data; B: 2D + facility data; C: 2D + text description  AEC (UK) BIM Protocol called as Graded Component Creation- G0: Schematic; G1: Concept; G2: Defined 3D; G3: Rendered 3D o LOD Tables – tabular representation of LOD data; describes how information in BIM model will progress; how much information is usable at each stage of project etc Link between Development and Detail - Both are quite different but closely related and interdependent
  • 2. - One cannot have a certain Level of Development if Level of Details does not exist - Without Details you cannot successfully visualize a product, and without Development you cannot order the right product. - Level of Detail – required more in the starting phase and decreases as project proceeds - Level of Development – required less in the starting phase, but increases as project proceeds - So, for clarity – LOD: Level of Development; Grade: Level of Details An LOD table is an attempt to record agreed responsibilities around a BIM Model. It sets the Division of Responsibility inside the BIM model. There are various LOD concepts which can be used. The author finds the US AIA E203 document which uses LOD and MEA (Model Element Author) in its Model Element Table as most appropriate. It allows to use the broad structure and concept, and gives flexibility change the structure, add new levels etc. and cater it to needs required by the project. It treats LOD not a set rules, but as a process. To make the best use of LOD we have to think about how we can make it meaningful to our project and the project team. - US AIA E203 gives freedom to create LOD table the way you like - Keep it simple enough to understand and complex enough to accommodate all the needs - Create multiple levels o Create levels even for sub tasks like inspection, QA/QC check etc. - Make multiple tables for different players containing the details they require - Treat LOD as a concept, not a rule. Tweak it to your own needs BIM: Measurement of design progress on large capital projects- In this chapter, the author delves into techniques that can be used to make implementation of BIM more effectively by focusing his attention on LOD. One of the key challenge that BIM practitioners face is the measurement of design progress in a BIM model. - BIM model tends to evolve unlike 2D drawings that follow linear fashion. So, different method has to be used for progress measurement in BIM - Analytical Analysis ability of BIM is useful in this case and author puts forward some analytical analysis techniques that can be used Setting up data collection now to enable progress tracking later:- - It begins with the definition of LOD. Different LOD levels should be defined. LOD 100, LOD 200, LOD 300, LOD350, LOD 400 and LOD 500 - As we move from LOD 100 to LOD 350 more and more details should be added to make the object more defined and certain - LOD should definitions can be customized - Intermediate LOD levels like LOD 350 should be created to enable better understanding and coordination between various disciplines. - Higher level of LOD like LOD 400 and LOD 500 have more details and can be used for prefabrication and field verification rather than design coordination. o LOD 400 and LOD 500 can be added later on, they are not necessarily required during design process
  • 3. o This will save time during design phase Model Progression Table (MPT) - Accompanies customized LOD definitions - Unit Measurement per element per LOD should be added o Helps in keeping track of progress at different LOD levels o As it uses Measurement Units – it becomes easier – it is like integrating old and new i.e. 2D measurement for quantity to BIM - Grouping and layering of model elements o Layers and objects should be named to help designing and coordination o In addition, elements should be separated with their respective LOD layers  LOD 100 level details in one layer, and then LOD 200, LOD 300 etc. level details are added in separate layer. All these combine to for the complete element - Schedule, categorize and link activities to model elements o Various phases like design/engineering, modelling, coordination, revision, re- coordination etc. should be categorized in the BIM model o Attach each of these phases with a WBS code o This helps track how much time and resources are spent in each phase  Lack of sufficient effort during design/engineering phase causes revisions in the design, and then it has to be re-coordinated – loss of time and resources  If revision and re-coordination for a particular activity is more, it means there was faults in its design, and thus, more time can be allocated to these activities in future to avoid it - Track inputs of productivity o People involved in BIM modelling should keep a time-log for keeping track of time they spent on different activities, WBS, LOD level etc. o This will help in knowing how much time was spent on a particular element – area of time wastages can be avoided to increase productivity Using data collected to analyze and measure progress by leveraging data analytics - Input hours tracked in time sheets - Model output tracked in LOD layers connected via WBS - Combining both (input hours and model output) creates a living dataset - Applying Data Analytics – different analysis can be done to track and measure BIM progress o Hours spent per LOD %age completion  Gives visibility to effort spent in LOD per progress %age points gained o Hours spent per category per LOD %age completion  Know if efforts spent were proportional or disproportionate to %age completion by LOD  If disproportionality is there, then time spent can either be increased or decreased to enhance productivity  If downstream activities (revision) takes more time, then time spent on upstream activities (design/engineering) can be increased which will result in less revisions downstream
  • 4. o Vertical Analysis – the BIM “efficiency ratio”  Hours spent redesigning, remodeling and re-coordinating are waste in system  Lesser or no time should be spent here  Greater time spent in initial design, modelling and coordination lead to less waste in system  BIM efficiency ratio: Ratio of (time spent in initial design, modelling and coordination) to (time spent in redesigning, remodeling and re-coordination) o Horizontal analysis – the BIM “weighted average efficiency ratio  Different phases were created in MPT by blending model elements with schedule activities through WBS  By using this we are able to find time spent in each phase of the LOD o Initial design – more time spent on LOD 100s o Later phase – more time spent on LOD 350s  Calculate BIM efficiency ratio per LOD  This can be further used to create weighted average efficiency ratio  This provides information regarding efficiency over particular time period of design as well as a trending measure over various phases of project o Using RACI (Responsible, Accountable, Consulted and Informed) matrix to allocate tasks to individuals  RACI analysis of each individual across each activity done to spot overlaps and gaps  Enhances clarity of individual responsibilities o Regression analysis and bench marking  The data obtained from one project can be used to make improvements in future projects  Data can also be used for selection of individuals like architect, engineer etc. o Linking element/activity to schedule of values  Making progress payments like monthly payments to contractors  Will require more effort in initial stages but very useful in later stages of project