Cost Savings/ IncreasingProfitability:
 By bundlinganFMC Tree order(SEA ProductionVXTw/control equipment,ProductionBPTw/control equip,&SEA WaterHXT w/control
equipment) resultedina$4.2M savings(approx.$71,600 per monthsynergydiscount) in2009.
 During2011 a savingsof $316K was generatedbybiddingoutprojectstoobtainthe bestrates& schedules. Tofurtherdetail abidevent
for an ROV UnderwaterInspectionof anexistingplatformtoverifydamage &identifyanynewdamage. Fourbidderswere solicitedfor
the bidevent. The endresultwasa $132K savings. A separate bideventwasheldtomanufacture & replace the DeEthanizerReflux
Boot fora StretfordAbsorber&SulfinolStripper. Six bidderswere solicitedforthe bideventwhichresultedina$184K savings.
 During2012 a Reverse Auctioneventwasheldforthe abandonmentof aplatform& gas plant. Three bidderswere solicitedforthis
eventwhichresulted inacost savingsof $1.045M.
 During2015 a Reverse Auctioneventwasheldforthe abandonmentof aplatform. Five biddersweresolicitedforthiseventwhich
resultedinacost savingsof $900K forNon-ReefingOptionand$600K for Reefingoption.
IncreasingEfficiency:
 Initiallythe projectmanagers/engineerswouldbypassprocurement&tryto negotiate pricingorterms& conditions. Byintegrating
myself, uponassignmenttothe projectsgroup,efficiencyhasincreased. The amountof reworkor catch-up/afterthe factworkhas
significantlydiminished. The projectmanagers&projectengineersare more aptto ask questions&seekguidance frommyself than
before. The projectsgrouphaslearnedthatI have a vast knowledge of materials&Iam familiarwiththe internal processes.
Project Completion/Development:
Didvariousprojects forExxonMobil inthe followinglocations:
Labarage,WY the largestsingle source heliumplantinthe world.
2009 2011 2012 2014
Labarge NOx Reduction
- Selective Catalytic
Reduction (SCR)
Installation
Labarge CO2 Vent
Heater
Labarge AGI Egress
- Installation of
stairwell
River Water Intake
- Installation of new
infiltration gallery river
water intakestructure
Labarge Sour Water
Disposal Well 4-31
LabarageHeRU
- Turbine
Installation
Labarge AGI 427
- Pipeline
Installation
Santa YnezUnit,CA consistingof three platforms&anonshore oil & natural gas processingfacilityinLasFloresCanyon.
2011 2012 2013 2014
Hondo FlareTip
Removal
POPCO Vessel
Replacement
- V204 Sulfinol Stripper
- VA504 Stretford
Absorber
Induced Gas
Floatation Skid
Compression Project
Heritage Platform
- ICCP Installation
Harmony Rig
-Derrick Replacement
Harmony Rig
- Winch System
HA Acoustic Monitoring
- Installation of underwater & in-
air ambientsound
- Acoustic monitoringduring
installation of 5 conductors
Harmony Rig
- ICCP Installation
Hondo Conduit Replacement
- Replacement of Cable& Cable
trays
Underwater Inspection
- Regulatory driven inspection of
platform(s) & seabed
KingRanch Gas Plant,ExxonMobil’slargestleasefacilityconsistingbothoil &gas, wellheads,gatheringsystemstotransportoil &gas collection
centers,& a treatment& processingplant.
2012 2013 2014
W191 Longitudinal
Turbine Exchange
Effluent Discharge RADU Recovery Project
- Replacement of Piping&
Structural Steel Pipe Racks,Vessel
Ladders & PipeRacks
- Rebuild filter housingfor MARs
Turbine
Flareupgrade
FloatingRoof Tank
OverpressureMitigation
Demolitionof the HawkinsGasPlantinEast Texas
Variousprojectsinthe Gulf of Mexico
2009 2010 2011 2012 2013 2014 2015
Eugene Island 314 (EI314)
- PipelineJumper
Installation
Grand Island 18A
(GA18A)
- Abandonment
MC 354 Zinc
- Platform
Abandonment
MB 822G
-Platform
Abandonment
MB OPF Sweetening
- H2S Scavenger
Skids
76D
- Subsea Tie-In &
Pipeline
Abandonment
MB867BB
- Abandonment
of Platform
Hoover Diana
- Chain Jack
Maintenance
- Pony Structure
Underwater
Inspection Program
- Inspection of 7
platforms
Diana Scarlet
- EVDT Tree
MB Mary Ann
- Removal of all
surface
equipment
MB 76D & 822F
- Heavy Lift
- Removal of
platforms,
conductors and
transporting
material to
shore for
disposal
Diana Decommissioning
- Abandonment
of Subsea
Facilities
DCS Upgrade
- Upgrade of
control
Panal
Mississippi Canyon 211
(MC211)
- MICA EHXT (subsea
tree & controls)
- Subsea Jumper
West Delta 99A
(WD99A)
- Debris Removal
MB 115
- Flowline&
Cable
Installation
- Jacket Deck
Installation
823 Gas Plant
- Abandonment
PipelineRepair
- Repair of 2.5
miles of
damaged pipe
West Delta 117A (WD117)
- Conductor, Debris
Removal & Covering
Exposed Pipeline
Offshore Platform
Decommissioning
Program
(decommissioningof 6
platforms)
- Heavy Lift

More Related Content

What's hot

SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...John Downs
 
Institute’s Americas office launches The Global Status of CCS: 2016 at the Cl...
Institute’s Americas office launches The Global Status of CCS: 2016 at the Cl...Institute’s Americas office launches The Global Status of CCS: 2016 at the Cl...
Institute’s Americas office launches The Global Status of CCS: 2016 at the Cl...Global CCS Institute
 
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringAlnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringStatoil
 
Jourdan Completes Drilling Program On The Preissac-Lacorne Lithium Portfolio
Jourdan Completes Drilling Program On The Preissac-Lacorne Lithium PortfolioJourdan Completes Drilling Program On The Preissac-Lacorne Lithium Portfolio
Jourdan Completes Drilling Program On The Preissac-Lacorne Lithium PortfolioMichael Dehn
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processGlobal CCS Institute
 
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of NutechIdentifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of NutechDaniel Matranga
 
News Release: Commerce Resources Corp. Updates Pilot & Metalurgical Program
News Release:  Commerce Resources Corp. Updates Pilot & Metalurgical ProgramNews Release:  Commerce Resources Corp. Updates Pilot & Metalurgical Program
News Release: Commerce Resources Corp. Updates Pilot & Metalurgical ProgramCommerce Resources Corp. (TSXv:CCE)
 
CSC Benchmarking Resource Plays
CSC Benchmarking Resource PlaysCSC Benchmarking Resource Plays
CSC Benchmarking Resource Playsseifertm
 
Petroleum Site 14 Update
Petroleum Site 14 UpdatePetroleum Site 14 Update
Petroleum Site 14 UpdateSteve Williams
 
Lng regasification asit
Lng regasification asitLng regasification asit
Lng regasification asitAsit Meher
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13freshtrackscommunications
 
Regional Fuel Operations
Regional Fuel OperationsRegional Fuel Operations
Regional Fuel Operationsroddyt001
 
Gaurav Sharma - Petroleum Engineer LATEST 2017
Gaurav Sharma - Petroleum Engineer LATEST 2017Gaurav Sharma - Petroleum Engineer LATEST 2017
Gaurav Sharma - Petroleum Engineer LATEST 2017GAURAV SHARMA
 
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...Global CCS Institute
 
Fabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconiFabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconiFabio Brambilla
 
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...IRJET Journal
 
DiagnosticsOverview_CP_CDR_Rev0
DiagnosticsOverview_CP_CDR_Rev0DiagnosticsOverview_CP_CDR_Rev0
DiagnosticsOverview_CP_CDR_Rev0Kuishon Brown
 

What's hot (20)

SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
 
Institute’s Americas office launches The Global Status of CCS: 2016 at the Cl...
Institute’s Americas office launches The Global Status of CCS: 2016 at the Cl...Institute’s Americas office launches The Global Status of CCS: 2016 at the Cl...
Institute’s Americas office launches The Global Status of CCS: 2016 at the Cl...
 
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringAlnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoring
 
Jourdan Completes Drilling Program On The Preissac-Lacorne Lithium Portfolio
Jourdan Completes Drilling Program On The Preissac-Lacorne Lithium PortfolioJourdan Completes Drilling Program On The Preissac-Lacorne Lithium Portfolio
Jourdan Completes Drilling Program On The Preissac-Lacorne Lithium Portfolio
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
 
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of NutechIdentifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
 
News Release: Commerce Resources Corp. Updates Pilot & Metalurgical Program
News Release:  Commerce Resources Corp. Updates Pilot & Metalurgical ProgramNews Release:  Commerce Resources Corp. Updates Pilot & Metalurgical Program
News Release: Commerce Resources Corp. Updates Pilot & Metalurgical Program
 
CSC Benchmarking Resource Plays
CSC Benchmarking Resource PlaysCSC Benchmarking Resource Plays
CSC Benchmarking Resource Plays
 
Petroleum Site 14 Update
Petroleum Site 14 UpdatePetroleum Site 14 Update
Petroleum Site 14 Update
 
Shark Bay Upgrade
Shark Bay UpgradeShark Bay Upgrade
Shark Bay Upgrade
 
Lng regasification asit
Lng regasification asitLng regasification asit
Lng regasification asit
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
 
Regional Fuel Operations
Regional Fuel OperationsRegional Fuel Operations
Regional Fuel Operations
 
Gaurav Sharma - Petroleum Engineer LATEST 2017
Gaurav Sharma - Petroleum Engineer LATEST 2017Gaurav Sharma - Petroleum Engineer LATEST 2017
Gaurav Sharma - Petroleum Engineer LATEST 2017
 
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
 
Fabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconiFabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconi
 
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
 
DiagnosticsOverview_CP_CDR_Rev0
DiagnosticsOverview_CP_CDR_Rev0DiagnosticsOverview_CP_CDR_Rev0
DiagnosticsOverview_CP_CDR_Rev0
 
Jim Galford
Jim GalfordJim Galford
Jim Galford
 

Viewers also liked

Dear NSA, let me take care of your slides.
Dear NSA, let me take care of your slides.Dear NSA, let me take care of your slides.
Dear NSA, let me take care of your slides.Emiland
 
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemensSirris
 
Renewable resources
Renewable resourcesRenewable resources
Renewable resourcesSlenaCyrus
 
Sales Presentation Show
Sales Presentation ShowSales Presentation Show
Sales Presentation ShowRobinDavis
 
Wind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsWind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsTorben Haagh
 
FYP Report - Eoin Lees
FYP Report - Eoin LeesFYP Report - Eoin Lees
FYP Report - Eoin LeesEoin Lees
 
letter of rec from Christian
letter of rec from Christianletter of rec from Christian
letter of rec from ChristianSean Fowler
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...John Downs
 
NewNuclear? Global Trends in Renewable and Nuclear Power
NewNuclear? Global Trends in Renewable and Nuclear PowerNewNuclear? Global Trends in Renewable and Nuclear Power
NewNuclear? Global Trends in Renewable and Nuclear PowerWorldwatch Institute
 
Experimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
Experimental Study of Gas Turbine Combustion with Elevated Fuel TemperaturesExperimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
Experimental Study of Gas Turbine Combustion with Elevated Fuel TemperaturesSociety of Women Engineers
 
Design small scale wind turbine for home electricity generation
Design small scale wind turbine for home electricity generationDesign small scale wind turbine for home electricity generation
Design small scale wind turbine for home electricity generationMaheemal Thilakarathna
 
Latest Research On Gears and Bearings
Latest Research On Gears and BearingsLatest Research On Gears and Bearings
Latest Research On Gears and BearingsNavneet Roy
 

Viewers also liked (19)

Water Quality Control and Treatment Water Treatment
Water Quality Control and Treatment Water Treatment Water Quality Control and Treatment Water Treatment
Water Quality Control and Treatment Water Treatment
 
Dear NSA, let me take care of your slides.
Dear NSA, let me take care of your slides.Dear NSA, let me take care of your slides.
Dear NSA, let me take care of your slides.
 
Bme
BmeBme
Bme
 
5208 chap 09
5208 chap 095208 chap 09
5208 chap 09
 
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
 
wind power
 wind power wind power
wind power
 
Renewable resources
Renewable resourcesRenewable resources
Renewable resources
 
Abradable coatings paper
Abradable coatings paperAbradable coatings paper
Abradable coatings paper
 
Sales Presentation Show
Sales Presentation ShowSales Presentation Show
Sales Presentation Show
 
Wind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsWind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of Drivetrains
 
FYP Report - Eoin Lees
FYP Report - Eoin LeesFYP Report - Eoin Lees
FYP Report - Eoin Lees
 
letter of rec from Christian
letter of rec from Christianletter of rec from Christian
letter of rec from Christian
 
JAM_RESUME
JAM_RESUMEJAM_RESUME
JAM_RESUME
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
 
NewNuclear? Global Trends in Renewable and Nuclear Power
NewNuclear? Global Trends in Renewable and Nuclear PowerNewNuclear? Global Trends in Renewable and Nuclear Power
NewNuclear? Global Trends in Renewable and Nuclear Power
 
Experimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
Experimental Study of Gas Turbine Combustion with Elevated Fuel TemperaturesExperimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
Experimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
 
Drilling engineering zaidi
Drilling engineering zaidiDrilling engineering zaidi
Drilling engineering zaidi
 
Design small scale wind turbine for home electricity generation
Design small scale wind turbine for home electricity generationDesign small scale wind turbine for home electricity generation
Design small scale wind turbine for home electricity generation
 
Latest Research On Gears and Bearings
Latest Research On Gears and BearingsLatest Research On Gears and Bearings
Latest Research On Gears and Bearings
 

Similar to PClayton_accomplishments

Dr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyDr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyGlobal CCS Institute
 
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSiQHub
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...Global CCS Institute
 
Trican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationTrican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationSistema FIEB
 
Regional Fuel Operations
Regional Fuel OperationsRegional Fuel Operations
Regional Fuel OperationsDavid Roddy
 
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...Global CCS Institute
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012Mike Vernon
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...Juan Diego Suarez Fromm
 
New Developments in the Natural Gas Industry
New Developments in the Natural Gas IndustryNew Developments in the Natural Gas Industry
New Developments in the Natural Gas Industryenergypipeline
 
Greenairport Cdg Peer Review
Greenairport Cdg Peer ReviewGreenairport Cdg Peer Review
Greenairport Cdg Peer Reviewstevewareham
 
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Cairn India Limited
 

Similar to PClayton_accomplishments (20)

Mg flng welcome 2010 mar
Mg flng welcome 2010 marMg flng welcome 2010 mar
Mg flng welcome 2010 mar
 
ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
PQ_SEC _2014
PQ_SEC _2014PQ_SEC _2014
PQ_SEC _2014
 
Dr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyDr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technology
 
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
 
EGCR 2015 Secondary Containment
EGCR 2015 Secondary ContainmentEGCR 2015 Secondary Containment
EGCR 2015 Secondary Containment
 
Csu venture pitch_tong
Csu venture pitch_tongCsu venture pitch_tong
Csu venture pitch_tong
 
Trican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationTrican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources Presentation
 
Regional Fuel Operations
Regional Fuel OperationsRegional Fuel Operations
Regional Fuel Operations
 
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Mg Innovation Flng Cn 2010 R1
Mg Innovation Flng Cn 2010 R1Mg Innovation Flng Cn 2010 R1
Mg Innovation Flng Cn 2010 R1
 
Atlantic Council - Randall Rush
Atlantic Council - Randall RushAtlantic Council - Randall Rush
Atlantic Council - Randall Rush
 
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...
 
New Developments in the Natural Gas Industry
New Developments in the Natural Gas IndustryNew Developments in the Natural Gas Industry
New Developments in the Natural Gas Industry
 
Greenairport Cdg Peer Review
Greenairport Cdg Peer ReviewGreenairport Cdg Peer Review
Greenairport Cdg Peer Review
 
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
 

PClayton_accomplishments

  • 1. Cost Savings/ IncreasingProfitability:  By bundlinganFMC Tree order(SEA ProductionVXTw/control equipment,ProductionBPTw/control equip,&SEA WaterHXT w/control equipment) resultedina$4.2M savings(approx.$71,600 per monthsynergydiscount) in2009.  During2011 a savingsof $316K was generatedbybiddingoutprojectstoobtainthe bestrates& schedules. Tofurtherdetail abidevent for an ROV UnderwaterInspectionof anexistingplatformtoverifydamage &identifyanynewdamage. Fourbidderswere solicitedfor the bidevent. The endresultwasa $132K savings. A separate bideventwasheldtomanufacture & replace the DeEthanizerReflux Boot fora StretfordAbsorber&SulfinolStripper. Six bidderswere solicitedforthe bideventwhichresultedina$184K savings.  During2012 a Reverse Auctioneventwasheldforthe abandonmentof aplatform& gas plant. Three bidderswere solicitedforthis eventwhichresulted inacost savingsof $1.045M.  During2015 a Reverse Auctioneventwasheldforthe abandonmentof aplatform. Five biddersweresolicitedforthiseventwhich resultedinacost savingsof $900K forNon-ReefingOptionand$600K for Reefingoption. IncreasingEfficiency:  Initiallythe projectmanagers/engineerswouldbypassprocurement&tryto negotiate pricingorterms& conditions. Byintegrating myself, uponassignmenttothe projectsgroup,efficiencyhasincreased. The amountof reworkor catch-up/afterthe factworkhas significantlydiminished. The projectmanagers&projectengineersare more aptto ask questions&seekguidance frommyself than before. The projectsgrouphaslearnedthatI have a vast knowledge of materials&Iam familiarwiththe internal processes.
  • 2. Project Completion/Development: Didvariousprojects forExxonMobil inthe followinglocations: Labarage,WY the largestsingle source heliumplantinthe world. 2009 2011 2012 2014 Labarge NOx Reduction - Selective Catalytic Reduction (SCR) Installation Labarge CO2 Vent Heater Labarge AGI Egress - Installation of stairwell River Water Intake - Installation of new infiltration gallery river water intakestructure Labarge Sour Water Disposal Well 4-31 LabarageHeRU - Turbine Installation Labarge AGI 427 - Pipeline Installation
  • 3. Santa YnezUnit,CA consistingof three platforms&anonshore oil & natural gas processingfacilityinLasFloresCanyon. 2011 2012 2013 2014 Hondo FlareTip Removal POPCO Vessel Replacement - V204 Sulfinol Stripper - VA504 Stretford Absorber Induced Gas Floatation Skid Compression Project Heritage Platform - ICCP Installation Harmony Rig -Derrick Replacement Harmony Rig - Winch System HA Acoustic Monitoring - Installation of underwater & in- air ambientsound - Acoustic monitoringduring installation of 5 conductors Harmony Rig - ICCP Installation Hondo Conduit Replacement - Replacement of Cable& Cable trays Underwater Inspection - Regulatory driven inspection of platform(s) & seabed
  • 4. KingRanch Gas Plant,ExxonMobil’slargestleasefacilityconsistingbothoil &gas, wellheads,gatheringsystemstotransportoil &gas collection centers,& a treatment& processingplant. 2012 2013 2014 W191 Longitudinal Turbine Exchange Effluent Discharge RADU Recovery Project - Replacement of Piping& Structural Steel Pipe Racks,Vessel Ladders & PipeRacks - Rebuild filter housingfor MARs Turbine Flareupgrade FloatingRoof Tank OverpressureMitigation Demolitionof the HawkinsGasPlantinEast Texas
  • 5. Variousprojectsinthe Gulf of Mexico 2009 2010 2011 2012 2013 2014 2015 Eugene Island 314 (EI314) - PipelineJumper Installation Grand Island 18A (GA18A) - Abandonment MC 354 Zinc - Platform Abandonment MB 822G -Platform Abandonment MB OPF Sweetening - H2S Scavenger Skids 76D - Subsea Tie-In & Pipeline Abandonment MB867BB - Abandonment of Platform Hoover Diana - Chain Jack Maintenance - Pony Structure Underwater Inspection Program - Inspection of 7 platforms Diana Scarlet - EVDT Tree MB Mary Ann - Removal of all surface equipment MB 76D & 822F - Heavy Lift - Removal of platforms, conductors and transporting material to shore for disposal Diana Decommissioning - Abandonment of Subsea Facilities DCS Upgrade - Upgrade of control Panal Mississippi Canyon 211 (MC211) - MICA EHXT (subsea tree & controls) - Subsea Jumper West Delta 99A (WD99A) - Debris Removal MB 115 - Flowline& Cable Installation - Jacket Deck Installation 823 Gas Plant - Abandonment PipelineRepair - Repair of 2.5 miles of damaged pipe West Delta 117A (WD117) - Conductor, Debris Removal & Covering Exposed Pipeline Offshore Platform Decommissioning Program (decommissioningof 6 platforms) - Heavy Lift