1. Cost Savings/ IncreasingProfitability:
By bundlinganFMC Tree order(SEA ProductionVXTw/control equipment,ProductionBPTw/control equip,&SEA WaterHXT w/control
equipment) resultedina$4.2M savings(approx.$71,600 per monthsynergydiscount) in2009.
During2011 a savingsof $316K was generatedbybiddingoutprojectstoobtainthe bestrates& schedules. Tofurtherdetail abidevent
for an ROV UnderwaterInspectionof anexistingplatformtoverifydamage &identifyanynewdamage. Fourbidderswere solicitedfor
the bidevent. The endresultwasa $132K savings. A separate bideventwasheldtomanufacture & replace the DeEthanizerReflux
Boot fora StretfordAbsorber&SulfinolStripper. Six bidderswere solicitedforthe bideventwhichresultedina$184K savings.
During2012 a Reverse Auctioneventwasheldforthe abandonmentof aplatform& gas plant. Three bidderswere solicitedforthis
eventwhichresulted inacost savingsof $1.045M.
During2015 a Reverse Auctioneventwasheldforthe abandonmentof aplatform. Five biddersweresolicitedforthiseventwhich
resultedinacost savingsof $900K forNon-ReefingOptionand$600K for Reefingoption.
IncreasingEfficiency:
Initiallythe projectmanagers/engineerswouldbypassprocurement&tryto negotiate pricingorterms& conditions. Byintegrating
myself, uponassignmenttothe projectsgroup,efficiencyhasincreased. The amountof reworkor catch-up/afterthe factworkhas
significantlydiminished. The projectmanagers&projectengineersare more aptto ask questions&seekguidance frommyself than
before. The projectsgrouphaslearnedthatI have a vast knowledge of materials&Iam familiarwiththe internal processes.
2. Project Completion/Development:
Didvariousprojects forExxonMobil inthe followinglocations:
Labarage,WY the largestsingle source heliumplantinthe world.
2009 2011 2012 2014
Labarge NOx Reduction
- Selective Catalytic
Reduction (SCR)
Installation
Labarge CO2 Vent
Heater
Labarge AGI Egress
- Installation of
stairwell
River Water Intake
- Installation of new
infiltration gallery river
water intakestructure
Labarge Sour Water
Disposal Well 4-31
LabarageHeRU
- Turbine
Installation
Labarge AGI 427
- Pipeline
Installation
3. Santa YnezUnit,CA consistingof three platforms&anonshore oil & natural gas processingfacilityinLasFloresCanyon.
2011 2012 2013 2014
Hondo FlareTip
Removal
POPCO Vessel
Replacement
- V204 Sulfinol Stripper
- VA504 Stretford
Absorber
Induced Gas
Floatation Skid
Compression Project
Heritage Platform
- ICCP Installation
Harmony Rig
-Derrick Replacement
Harmony Rig
- Winch System
HA Acoustic Monitoring
- Installation of underwater & in-
air ambientsound
- Acoustic monitoringduring
installation of 5 conductors
Harmony Rig
- ICCP Installation
Hondo Conduit Replacement
- Replacement of Cable& Cable
trays
Underwater Inspection
- Regulatory driven inspection of
platform(s) & seabed
4. KingRanch Gas Plant,ExxonMobil’slargestleasefacilityconsistingbothoil &gas, wellheads,gatheringsystemstotransportoil &gas collection
centers,& a treatment& processingplant.
2012 2013 2014
W191 Longitudinal
Turbine Exchange
Effluent Discharge RADU Recovery Project
- Replacement of Piping&
Structural Steel Pipe Racks,Vessel
Ladders & PipeRacks
- Rebuild filter housingfor MARs
Turbine
Flareupgrade
FloatingRoof Tank
OverpressureMitigation
Demolitionof the HawkinsGasPlantinEast Texas
5. Variousprojectsinthe Gulf of Mexico
2009 2010 2011 2012 2013 2014 2015
Eugene Island 314 (EI314)
- PipelineJumper
Installation
Grand Island 18A
(GA18A)
- Abandonment
MC 354 Zinc
- Platform
Abandonment
MB 822G
-Platform
Abandonment
MB OPF Sweetening
- H2S Scavenger
Skids
76D
- Subsea Tie-In &
Pipeline
Abandonment
MB867BB
- Abandonment
of Platform
Hoover Diana
- Chain Jack
Maintenance
- Pony Structure
Underwater
Inspection Program
- Inspection of 7
platforms
Diana Scarlet
- EVDT Tree
MB Mary Ann
- Removal of all
surface
equipment
MB 76D & 822F
- Heavy Lift
- Removal of
platforms,
conductors and
transporting
material to
shore for
disposal
Diana Decommissioning
- Abandonment
of Subsea
Facilities
DCS Upgrade
- Upgrade of
control
Panal
Mississippi Canyon 211
(MC211)
- MICA EHXT (subsea
tree & controls)
- Subsea Jumper
West Delta 99A
(WD99A)
- Debris Removal
MB 115
- Flowline&
Cable
Installation
- Jacket Deck
Installation
823 Gas Plant
- Abandonment
PipelineRepair
- Repair of 2.5
miles of
damaged pipe
West Delta 117A (WD117)
- Conductor, Debris
Removal & Covering
Exposed Pipeline
Offshore Platform
Decommissioning
Program
(decommissioningof 6
platforms)
- Heavy Lift