As Sr Facility Executive Work Experience in the day Facility Operation, Utility & Electro Mechanical Equipments Maintenance LIFT,WTP,STP, RO, FIRE, DG, BMS HVAC system,HT With Vendor Management, Billing & Costing.
1. Page 1 of 2
Anirban Roy
Choudhury
Electrical Engineer (Property
Management)
rrc9851638714@gmail.com
91-9851638714 / 7003889829
Vill+Post-Charkalgram, Dist- Birbhum; P.S - Nanoor
State- West Bengal; Pin-731301, , , Nationality - India,
Passport No___ P8471873 , Expires 03-15-2027
April 20, 1995
linkedin.com/in/anirban-roy-choudhury-407b46132
anirban.roychoudhury4
outside clients and vendors.Keeps abreast of new technologies supporting efficient energy utilization through reading, meeting with
suppliers and attending seminars.Provide solutions to a wide range of difficult problems.
EDUCATION
06/2015 – 06/2018
B.Tech
Mallabhum Institute of Technology
Bankura,West Bengal
(DGPA 7.08 % )
06/2012 – 06/2015
Executive Shift Engineer
CBRE South Asia Pvt.Ltd
Godrej Genesis ,Kolkata
Property Management and Facilities Services
Description Detail Manage all service contracts and procurement
relating to the property management and facilities services
Review technical reports, engineering calculations and cost
estimates for energy eciency projects for small commercial
customers
Working to ensure all deliveries are made on time
Manages project electrical engineering
design,installation,maintenance,operations and construction
management for Industrial,Commercial,and Institutional
facilities,motor controls, process control ,material
handling,HVAC ,fire protection,life safety,and facility
management
Working collaboratively with many cross-functioning
departments regularly
Assist in the maintenance and repair of equipment and any
general maintenance tasks as directed by the assistant facility
manager.
SKILLS
Develop energy and ancillary (operation &
maintenance) savings
Health and Safety at the Workplace
Ability to produce clear and concise reports
suitable for senior management
Ability to work under pressure and to tight
deadlines
PERSONAL PROJECTS
Star Delta panel wiring, water level controller and
with heating element & conveyors belt (with
programing and SCADA) (03/2018 – 10/2018)
INDUSTRIAL AUTOMATION & TECHNOLOG : SCADA : WinCC
& winCC exable for HMI (SIEMENS) RS view-32 (ROCKWELL)
Automation Software : Rockwell Software & PLC – Flex
logix/control logix with (RS Logix 500) Siemens Software
&PLC: – S7-200, S7-300, S7-400 with (simatic manager)
PERSONAL INTEREST &
STRENGTH
I am always involved in the depth of any job’s to
fulll my responsibility
I am always guiding others while working with in a
group.
Internet Browsing
CERTIFICATES
Auto CAD , Live Wires (http://livewiresgroup.in)
(2015)
(15 Days 2D and 3D Modeling using Auto CAD
Computer Application , Domestic Softech
1 year Diploma in Computer Application (Opearting Systems
Windows XP,7,8,10), Business Productivity Software: Microsoft
Excel,power point,word,out look
Electrical Engineer
Description Detail/Tasks
07/2019–01/2022
6.04 years’ experience working in Property Management. SoftandHard Services,ability towork withall levels of internal staff, as wellas
Diploma
Santiniketan Institute of Polytechnic
WORK EXPERIENCE
Senior ShiftEngineer
MANIGroup
02/2022-TillNow
Mani Casadona,Kolkata
- As Sr FacilityExecutive Work Experience In the dayFacilityOperation,Utility&
ElectroMechanical Equipments MaintenanceLIFT,WTP,STP,RO,FIRE,DG,BMS
HVAC system,HT With Vendor ManagEment,Billing & Costing.
- Minimization of Operational Cost,Overall Plant Utility Cost by Energy saving activities.
2. Page 2 of 2
WORK EXPERIENCE
01/2018 – 06/2019
Engineer
Transtech of Voltas Ltd
Kolkata,India
TCS Gitanjali Park (SEZ)
Working with other members of the team to execute and
complete work requests in a timely manner and to the
satisfaction of the customer
General Maintenance: painting, plumbing, light electrical work,
move furniture, trouble shoot machinery problems, general
repairs for overall facility
Managing all security issues at the allocated premises including
finding the right security companies, CCTV specialists and guards
to protect the premises.Residential and commercial wiring and
maintenance, Documentation of daily reports and analysis on
quality of the plant maintenance work
Creates and modifies Standard Operating Procedures (Sops) and
(preventative) maintenance requirements
Develop and maintain corporate standards, guidelines, common
systems, and best practices to support continuous improvement
of the facility electrical and controls systems through innovation,
life cycle cost, and value engineering analysis
Demonstrated working knowledge and programming experience
with Programmable Logic Controllers (PLCs) and for process
contract and (SCADA) (SIEMENS) (ROCKWELL) (RS Logix 500)&
(simatic manager)
01/2016 – 12/2017
Title/Position
IRIS Stang Solution Pvt.Ltd C/o of Schneider Electric
Kolkata, West Bengal
UPS Engineer
Holding regular team meetings to ensure everyone is up-to-date
with the latest developments in the organisation and addressing
any issues or concern
Operation and maintenance of 33 KV/ 11 KV substation, 2 no’s
17.5 MVA power transformer, 12 nos dry type 2500 KVA
transformer, Electrical switch-gears, HT & LT panel ,AHU control
panel, HRW panel,Fire ventilation panel, LT substation, ACB &
VCB,DG operation, PLC,HVAC system
APC & MGE 3phase UPS system maintenance with battery bank,
Isolation Transformer
Electrical Maintenance weekly preparing the format of
Preventive Maintenance, Daily maintain the power consumption
report
Maintenance of Transformer (11/0.4 KV), CTs, PTs, & Battery etc.
Operation and of H.T and L.T breaker. Preventive Maintenance of
Electrical LT Panels Such as Blowering,contact tightness
checking.
LANGUAGES
Hindi
Full Professional Proficiency
Bengali
Native or Bilingual Proficiency
English
Full Professional Proficiency
INNOVATION & FAST
IMPLEMENTATION
Solar water heating (SWH) is the conversion of
sunlight into heat for water heating using a solar ...
Equipment components must be insulated to
achieve full system benefits. The installation of
efficient insulation ... Cooking. Solar cooker.
Disinfection. Solar water use to cafeteria.Solar still
...
Food waste into cooking fuel daily. As food and
yard waste decompose, methane and carbon
dioxide are created, inflating the rubber bladder to
create the pressure necessary to supply a gas
burner.
Motion Sensor energy saving power saver infrared
ir pir body movement automatic on off lamp lamps
light fan and i use to Astronomical timer improving
energy efficiency, cost effective and saving energy
Automatic Tube Cleaning System with balls In the
on-line process, the improves chiller efficiency and
process cooling efficiency by preventing fouling in
condensers and shell and tube heat exchangers.
Achievements/Tasks
Achievements/Tasks
I, Anirban Roy Choudhury, hereby declare that the information contained herein is true and correct to the best of my knowledge and belief.
Statement
Statement
Anirban Roy Choudhury Kolkata,West Bengal