SlideShare a Scribd company logo
1 of 14
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
EXPLANATORY NOTE
PROJECT: Development of Regional Waste Management System in Borovo
Region
PART: General
PHASE: Detailed design
General part
Regional facilities for waste treatment will be constructed on the site № 5 Byala-north І
is in the Mid Danube Plain sub-region, with a hilly relief. It is located about 2 km
northeast of the north end of the town of Byala.
In 2005 Consortium Geokompleks Ltd (under the contract concluded with MOEW) has
done preliminary studies on the territory around the geometrical centre of the region
Borovo and preliminary selection of suitable sites for construction of a regional landfill
for the project area. As a result, in the report of the consortium, as the most suitable are
classified following three sites:
 № 5: Byala- North І
 № 5b: Byala- North ІІІ
 № 5a: Byala- North ІІ
Location on the site 5 Byala-north I and asite 5b Biala-north III in the border of
project region
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
1
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
Ranked sites are optimally positioned to municipalities in the project region and are
generally accepted by the mayors of municipalities Borovo, Byala, Dve mogili, Polski
Trambesh and Tzenovo on meeting held on April 26, 2005 to discuss the results of the
studies.
In this regard, since 2005 Geokompleks Ltd. conducted detailed engineering and
geological studies of two sites selected as the main - № 5 Byala- North І and alternative
№ Byala- North 5b-III. In addition, in response to a letter from the Consultant on
28.04.2009 Regional association is confirmed in writing that the Association formally
adopt the proposed building of the regional system for waste management in Region
Borovo sites № 5 Byala- North -I and № 5b Byala- North -III, expressing the opinion
that more preferred should be the site № 5 Byala-North -I, because it is 100% municipal
property, and this would save time and money.
Location on the main site 5 Byala-north I and alternative site 5b Biala-north III in
the border of project region
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
2
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
In physico-geographical terms the site № 5 Byala-north І is in the Mid Danube Plain
sub-region, with a hilly relief. It is located about 2 km northeast of the north end of the
town of Byala. The site incorporates a relatively wide dry gully (150-250 m) and lies on
a relatively oblique slope with north-south direction. There is a hill about 200 m from
the northern border is (176,2 m).
The altitude of the site varies from 110 to 160 m above the sea level. The site gully is
directed to one main gully in the region, right tributary of Yantra River. Gullies are dry
and there are no springs, wells or water sources for drinking and communal water
supply in the region.
The territory of the site is covered mainly by grass, bushes and single trees (natural
meadows). At some places the soil layer is corrupted. Current landfill of Byala is
located at about 1 km from the site.
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
3
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
In hydrogeological terms the conditions of the site are in favor of the landfill
construction. There is no groundwater detected up to 15-17 m depth and the filtration
features of the rocks are low.
The results of analysis of the existing state and suitability of the site № 5 Byala-north І
to take the intended function evaluated on the base of requirements of Regulation №
7/2004, shows that there is no discrepancies in terms of restrictive clauses and
prohibitions on the ground of the site.
The total area of land which includes:
o Landfill for construction and demolition waste
o Landfill for municipal waste
o Waste treatment facility
Cover 100 da
Access to the site is along a black road with a hard coating, with length approximately 2
km, starting from the existing local road. The existing access road is 2000 m long and
the bridge should be repaved to be able to withstand heavy trucks. Road improvement
will be part of the application for Cohesion Fund.
For proper functioning of the regional waste management centre are provided the
following facilities: i) facility for materials separation (FMS), ii) waste water treatment
plants (WWTP), iii) composting area, iv) landfill for municipal waste, v) Landfill for
construction waste, vi) Buildings (for staff, maintenance and daily operations), vii)
Internal roads, viii) Experienced Division, ix) Torch for biogas and x) Temporary
storage of hazardous waste.
Landfilling is the main part of the waste management. Sanitary landfills reduce the
environmental impact (low odor, animals and fire risk), health risks and have better
control than the uncontrolled landfills. The design of the facility requires significant
engineering works to form cells that control emissions and minimize potential harmful
effects on the environment. In the design phase are addressed three stages:
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
4
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
• Construction Stage, when are installed barriers and nets for safe management of
pollutants (membranes, linings, systems for leachate and biogas collect)
• Operation Stage, when daily cover of landfill waste is performed and is monitor
the environmental impacts associated with the landfill waste
• Closure and after-care activities stage, when the top cover is placed to minimize
the environmental impact associated with the landfill waste. Monitoring of
environmental impacts associated with landfill continues several more years,
while carrying out activities for use of the site after its closure (eg, golf courses
and sports facilities)
In this regard, the particular project for the landfill follows the technical requirements of
Directive 99/31/EC for landfills and of the relevant Bulgarian legislation, as will be
described in this chapter to ensure the protection of environment and health.
Description of General layout
The coordinates of the area, where Regional Centre for Waste Management (RCWM)
will build are shown in the table below. Ownership of the land allotted for the site is
approximately 100% municipal.
Coordinates of border points
No Point № X Y
1 125 4715519.16 9464166.48
2 126 4715497.06 9464261.92
3 5782 4715481.88 9464257.50
4 5781 4715382.13 9464241.63
5 5780 4715368.38 9464237.38
6 5779 4715338.44 9464209.97
7 5778 4715298.63 9464183.54
8 5777 4715270.31 9464182.29
9 5776 4715215.63 9464177.06
10 5775 4715159.50 9464170.88
11 5774 4715087.81 9464148.04
12 5773 4715059.81 9464145.84
13 5772 4714965.69 9464126.59
14 5771 4714938.88 9464116.97
15 5770 4714920.50 9464105.72
16 5769 4714862.81 9464063.56
17 5768 4714842.88 9464044.59
18 5767 4714836.44 9464041.72
19 127 4714832.71 9464040.41
20 128 4714854.86 9463944.75
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
5
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
No Point № X Y
21 68463 4715191.50 9464025.31
22 68462 4715467.19 9464083.00
23 68461 4715518.50 9464166.34
The entrance of the facility is located in the south. Therefore, room service, scale and
area of sampling are located a few meters from the entrance. Incoming trucks are
directed to the facility or for materials separation (FMS) in the northwest part or
directly to the cells of the landfill. Access to other facilities is facilitated by internal
road, ie to: i) composting, maturation, storage area for composting, ii) the area of
administrative and business buildings and iii) waste water treatment plant (WWTP),
where all leachate and wastewater is collected and treated. In the central and largest part
of the site will be built i) cells for nonhazardous waste landfill (5 year and 15 year
period) and ii) cells for landfill for construction waste (20 years). Area required for the
construction of various parts is as follows:
BALANCE OF THE TERRITORY:
Total area - 100 000, 00 m2.
Territory of the landfill - 70 607, 00 m2
Cells for the landfill for the non-hazardous wastes - 41 689,95 m2
Including Cell 1 - 16 060,00 m2
Planting - 9 626,65 m2
Roads and parking lots - 19 290,40 m2
URBANISATION INDICATORS
/ according Regulation №7/2004г. for the requirements, which have to be met for
positioning of the equipment for treatment of the wastes/
Coefficient of the usage of the territory - 0,863
Planting percentage - 13,63% of the non-taken from the landfill area
Territory of MRF and composting area –
29 393,00 m2
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
6
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
build-up
- built-up square 2 540,90 m2
- open square 2 582,90 m2
Planting - 12 457,85 m2
Roads and parking lots - 14 364,75 m2
URBANISATION INDICATORS
according Regulation №7/2004г. for the requirements, which have to be met for
positioning of the equipment for treatment of the wastes/
Coefficient of the usage of the territory - 0,58
consistence of build-up - 8,64%
intensity of build-up - 0,0878
Planting percentage - 42,4%
The general plan is represented on the figure below. (without scale),
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
7
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
8
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
The project includes the following sub objects:
1. Checkpoint and security house
2. Weighing bridge
3. Administrative building
4. Water tank (Reservoir)
5. Maintenance building and truck wash
6. WWTP
7. Technical building at the WWTP
8. Technical building - sludge dewatering
9. Leachate collection tank
10. Material Recovery Facility (MRF)
10a. production Shed
11. Tyre Washing Facility
12. Sampling Area
13. * Composting site
C1. Reception area
C2. Intensive composting
C3. Stabilization of compost
C4. Maturation
C5. Storage
14. Biogas Flare
15. Temporary storage of hazardous waste
16. Transformer station
17. Waste cover material
18. Top cover material
For preparing of the project are used:
• Feasibility studies
• Conceptual design
• Geological, Engineering-geological and hydrological studies of the site
• Geodesy surveying
• Technological Assignment
Project is based on the following legislative documents:
Part Architecture
Part Architecture of the project has been based on:
• Spatial planning act
• Ordinance № 7 for the rules and norms for spatial development of different types
of territories and urban development zones
• Ordinance № 2 for the fire safety building and technical norms
• Norms for design of general plans for industrial enterprises/ Approved by Order
№ RD-02-14-25 2.02.1988g. of Committee for territorial and urban
development /
• Standards for design of manufacture buildings at industrial enterprises/ Approved
by Order № RD-02-14-25 2.02.1988g /.
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
9
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
• Standards for design of service buildings and facilities to industrial enterprises /
Approved by Order № RD-14-02-292 5.05.1982g. of IUA /
Part Construction
Part Construction of the project is based on:
• Ordinance № 1 of 1996 for design of flat foundation (SG. 85 of 1996) and regulations
for the design of flat foundation; published in BAS, issue. 10 of 1996
• Ordinance № 3 of 2004 on basic principles for design of structures of buildings and
the impacts on them (promulgated, SG. 92 of 2004, corr. No.. 98, 2004; am. And
suppl. No. 33 of 2005)
• Ordinance № 2 of 2007 on the design of buildings and structures in seismic areas
(promulgated, SG. 68 of 2007, amended. No. 74 of 2007) published in BAS, issue. 10
of 2007
• Norms for design of foundations subjected to dynamic loads of machines (published
BAS No.. 2 and 4 of 1986, amended. No. 7 of 1986)
• Norms for design of concrete and reinforced concrete structures (promulgated, SG. 17
of 1987;. № 2, SG. 17 of 1993, amended. № 3, SG. 3 of 1996, amended. № 4, SG. 49
of 1999), updated version, BAS, issue. 6-8 1999
• Norms for design of concrete and reinforced concrete structures for hydraulic
facilities (published, BAS, vol. 1 of 1989, amended., Vol. 8 of 1991)
• Norms for design of retaining walls (published BAS, issue. 10, 1986, amended. No.. 8
of 1990)
• Norms for design of steel structures (published in brochure of Committee for
territorial and urban development, S., 1987)
• Norms for design of masonry structures (published BAS, vol. 12 of 1985, amended.
SG. 110 of 1998), updated version, BAS, issue. 90-10 1998
• Norms for design of timber structures (published BAS No.. 5-6 1990)
• Ordinance № 3 of 1994 for control and approval of concrete and reinforced concrete
structures (promulgated, SG. 97 of 1994, amended. And supplemented. No.. 53 of
1999) and Rules for control and approval of concrete and reinforced concrete
structures; publication, BAS, issue. 11 of 1999
Part Electricity
Part Electrical of the project is based on:
• Ordinance № 3 of 9 June 2004 for the structure of electrical installations and
power transmission lines - SG. 90 and. 91 of 2004
• Ordinance № 4 of 9 June 2004. for the technical operation of electrical equipment
- SG issue 99 and issue. 101 of 2004
• Ordinance № 9 for the technical operation of power stations and networks - SG.
72 18.08.2004
• BS EN 12464 "Lighting of enclosed workplaces";
• Ordinance № 8 / 28.12.2004g. Lightning protection for buildings, outdoor
facilities and open spaces
• Fire-building and technical standards by 1986, Am. and supplemented. SG 33 of
1994
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
10
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
Part water supply and sewerage system
Part water supply and sewerage system is based on
• Ordinance № 2 for the design, construction and operation of water systems by
2005.
• Standards for design of sewer systems
• Ordinance № 4 for the design, construction and operation of building water
supply and sewerage systems by 2005.
• Ordinance № 2 for the fire building and technical standards by 1987.
• Ordinance № 8 for rules and regulations for the placement of ducts and technical
facilities in settlements since 1999.
Part heating supply, ventilation and air conditioning
The projects relating part “Heating supply, ventilation and air conditioning is developed
on the basis of:
• Ordinance № 15 of 28 July 2005 - "on technical rules and norms for the design,
construction and operation of the objects and equipments for generation,
transmission and distribution of thermal energy"
• Ordinance № 7 - Heat conservation and energy saving "- 2005.
• Ordinance № 7, on the minimum requirements for safe and healthy occupational
conditions in workplaces - 23.09.1999
Part “Landscaping and development “
The projects relating part “Landscaping and development “is developed on the basis of:
• Environmental Protection Act, State Gazette. 91/25.09.2002g, Amended, SG.
98/18.10.2002., Amended SG. 86/30.09.2003, Supplemented, SG.
70/10.08.2004g, in force since 1.01.2005, SG. 74/13.09.2005, in force since
1.01.2006, amended, SG. 77/27.09.2005, Amended SG. 88/4.11.2005, SG.
95/29.11.2005, in force since 1.03.2006, amended, SG. 105/29.12.2005, in force
since 1.01.2006, Amended SG. 30/11.04.2006 (in force since 12.07.2006)
• Spatial Planning Act (promulgated, SG. 1 of 2001; Am. No.. 41 and 111 of 2001.
No.. 43 2002., Am. and supplemented. No.. 20 of 2003. No.. 65 and br.107/2003,
am. SG. 36 and pc. 65/2004, am. SG. 28/2005.)
• Protection of Agricultural Land Act (SG. 35/24.04.1996) and its Implementing
Rules (SG. 84/04.10.1996)
• Forest Act (State Gazette. 125/29.12.1997.) and its Implementing Rules;
• • Ordinance № 7 / 2003 on rules and regulations for development of different
types of territories and development zones (Official SG. 3 of 2004.; Am. No.. 10,
11 and 51 in 2005.)
Part geodesy
The design of the vertical planning is developed on the basis of “Instruction for
development, implementation and supporting of plans for vertical planning
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
11
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
Part Technology
Some technology projects are developed on the basis of:
• Ordinance № 7 of 24 August 2004 on the requirements that must be met for
setting up of waste treatment facilities issued by the Minister of Environment and
Water, Minister of Regional Development, Minister of Agriculture and Forestry
and the Minister of Health, promulgated. SG. 81 of 17.09.2004.
• Ordinance № 8 of 24 August 2004 on the conditions and requirements for
construction and operation of landfills and other facilities and installations for
recovery and disposal , by the Minister of Environment and Water, published. SG.
83 24.09.2004
• Ordinance № 26 for recultivation of damaged terrains, improvement of low
productivity lands, removal and recovery of the humus layer-Prom. SG. No. 89
dated 22 October 1996., am. SG. issue 30 of 22 March 2002.
• Landfill Directive 1999/31/EC (26.04.1999.)
Part “Safety and Health Plan“(SHP) - it is being developed in the next phase of
design
Part SHP is being developed as an independent part of the project.
The project consists of drawings, explanatory notes and the time schedule of
construction.
Project is being developed on the base of:
• Ordinance № 2 of 22 March 2004 on the minimum requirements for occupational
health and safety in carrying out construction works (SG issue 37 from
04.05.2004.; corr. issue 98/05.11.2004.; am. SG, issue 102 19.12. 2006.) and the
internal instructions of the Contractor’s executive staff based on it.
• Ordinance № 3 on the establishment of certificates and protocols during
construction (promulgated, SG. 72 of 2003.; Am. and supplemented. Issue 37
2004. and issue 29 of 2006).
• Ordinance № 7 minimum requirements for occupational health and safety at
workplaces using the work equipment, including its amendments (promulgated,
SG. 88 of 1999.; Am. issue. 48 of 2000. And issue 52 of 2001.; corr. issue 54 of
2001. amended and supplemented. issue. 43 2003., am. issue. 37 2004., am. and
supplemented. issue 88 of 2004.)
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
12
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
List of folders contained in each copy of each part and sub objects are:
List of folders – Part : GENERAL
List of folders – Part : ARCHITECTURE
List of folders – Part : CONSTRUCTION
List of folders – Part :ELECTRICAL
List of folders – Part : Water Supply and Sewerage
List of folders – Part: heating supply, ventilation and air conditioning
List of folders – Part: ENERGY EFFICIENCY
List of folders – Part: AUTOMATISATION
List of folders – Part: FIRE ALARM
List of folders – Part: CCTV
List of folders – Part: VERTICAL PLANNING
List of folders – Part: Landscaping and DEVELOPMENT
List of folders – Part: LANDFILL FOR NON-HAZARDOUS WASTE. GROUND
BASE
List of folders – Part: TECHNOLOGY FOR CONSTRUCTION OF
EMBANKMENTS. ASSESMENT OF THE STABILITY OF SLOPES
List of folders – Part: TECHNOLOGICAL
List of folders – Part :FIRE SAFETY
List of folders – Part :FIRE PROTECTION OF THE STEEL BEARING
STRUCTURES
List of folders – Part : Fire safety
List of folders – Part : OPERATION AND MONITORING
List of folders – Part : ACCOUNTING RECORDS
Subobject: Fence
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
13
BULGARIAN GOVERNMENT
MINISTRY OF ENVIRONMENT AND WATER
Project financed by
EUROPEAN UNION
Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria
In Annex 1 to the note: "Requirements for the completion and approval of works „are given.
A bill of quantities has been compiled.
Prepared by:
/eng. G. Petkov/
CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH
BT – ENGINEERING Ltd
14

More Related Content

Viewers also liked

Prosedur kompleks
Prosedur kompleks Prosedur kompleks
Prosedur kompleks akbarferdi
 
Експресионизъм и група Мост / Expressionism and "Die Brücke"
Експресионизъм и група Мост / Expressionism and "Die Brücke"Експресионизъм и група Мост / Expressionism and "Die Brücke"
Експресионизъм и група Мост / Expressionism and "Die Brücke"Denitza Tchakarova
 
Zap-Obchta-Borovo-2003
Zap-Obchta-Borovo-2003Zap-Obchta-Borovo-2003
Zap-Obchta-Borovo-2003Anatol Dukanov
 
Bab 1. anekdot power point
Bab 1. anekdot   power pointBab 1. anekdot   power point
Bab 1. anekdot power pointsarsarah
 
Introducing small basic
Introducing small basicIntroducing small basic
Introducing small basicAn I
 
Compilation of Learning Modules GRADE 7
Compilation of Learning Modules GRADE 7Compilation of Learning Modules GRADE 7
Compilation of Learning Modules GRADE 7Angel Avecilla
 
Kelompok 4 Teks Negosiasi
Kelompok 4 Teks NegosiasiKelompok 4 Teks Negosiasi
Kelompok 4 Teks Negosiasiakbarferdi
 
7science q1to4-140709132409-phpapp01
7science q1to4-140709132409-phpapp017science q1to4-140709132409-phpapp01
7science q1to4-140709132409-phpapp01Angel Avecilla
 
Philippines presentation!
Philippines presentation!Philippines presentation!
Philippines presentation!Krystal-Key
 
Creating your personal life plan
Creating your personal life planCreating your personal life plan
Creating your personal life plansheinikainen
 

Viewers also liked (13)

Prosedur kompleks
Prosedur kompleks Prosedur kompleks
Prosedur kompleks
 
Експресионизъм и група Мост / Expressionism and "Die Brücke"
Експресионизъм и група Мост / Expressionism and "Die Brücke"Експресионизъм и група Мост / Expressionism and "Die Brücke"
Експресионизъм и група Мост / Expressionism and "Die Brücke"
 
Zap-Obchta-Borovo-2003
Zap-Obchta-Borovo-2003Zap-Obchta-Borovo-2003
Zap-Obchta-Borovo-2003
 
Cv ad-gb-97
Cv ad-gb-97Cv ad-gb-97
Cv ad-gb-97
 
Dm circular
Dm  circularDm  circular
Dm circular
 
Bab 1. anekdot power point
Bab 1. anekdot   power pointBab 1. anekdot   power point
Bab 1. anekdot power point
 
Introducing small basic
Introducing small basicIntroducing small basic
Introducing small basic
 
Ppt b.indo
Ppt b.indoPpt b.indo
Ppt b.indo
 
Compilation of Learning Modules GRADE 7
Compilation of Learning Modules GRADE 7Compilation of Learning Modules GRADE 7
Compilation of Learning Modules GRADE 7
 
Kelompok 4 Teks Negosiasi
Kelompok 4 Teks NegosiasiKelompok 4 Teks Negosiasi
Kelompok 4 Teks Negosiasi
 
7science q1to4-140709132409-phpapp01
7science q1to4-140709132409-phpapp017science q1to4-140709132409-phpapp01
7science q1to4-140709132409-phpapp01
 
Philippines presentation!
Philippines presentation!Philippines presentation!
Philippines presentation!
 
Creating your personal life plan
Creating your personal life planCreating your personal life plan
Creating your personal life plan
 

Similar to Zap obchta-borovo-2003

Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshLokesh Saini
 
Eng leonid shimarek eco_russia
Eng leonid shimarek eco_russiaEng leonid shimarek eco_russia
Eng leonid shimarek eco_russiaBusiness Finland
 
St. Petersburg Waste Management
St. Petersburg Waste Management St. Petersburg Waste Management
St. Petersburg Waste Management Business Finland
 
Azerbaijan NbS workshop 2023 Mihaela Dragan Lebovics IUCN ENG.pdf
Azerbaijan NbS workshop 2023 Mihaela Dragan Lebovics IUCN ENG.pdfAzerbaijan NbS workshop 2023 Mihaela Dragan Lebovics IUCN ENG.pdf
Azerbaijan NbS workshop 2023 Mihaela Dragan Lebovics IUCN ENG.pdfOECD Environment
 
EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVERvikas rahangdale
 
Road development projects.
Road development projects.Road development projects.
Road development projects.Abhishek Rajput
 
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...OECD Environment
 
A CASE STUDY ON MINING PROJECT EIA PLAN.pptx
A CASE STUDY ON MINING PROJECT EIA PLAN.pptxA CASE STUDY ON MINING PROJECT EIA PLAN.pptx
A CASE STUDY ON MINING PROJECT EIA PLAN.pptxDarpanChaudhary7
 
Supertram - Tram Train Pilot - Sheffield - Rotherham
Supertram - Tram Train Pilot - Sheffield - RotherhamSupertram - Tram Train Pilot - Sheffield - Rotherham
Supertram - Tram Train Pilot - Sheffield - RotherhamSepehr Aghamehdi
 
Romania Agricultural Pollution Control Project Presentation
Romania Agricultural Pollution Control Project PresentationRomania Agricultural Pollution Control Project Presentation
Romania Agricultural Pollution Control Project PresentationIwl Pcu
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongWater, Land and Ecosystems (WLE)
 
Nereus atene-rven - presentation 3 - 2014
Nereus   atene-rven - presentation 3 - 2014Nereus   atene-rven - presentation 3 - 2014
Nereus atene-rven - presentation 3 - 2014Silvano De Zorzi
 

Similar to Zap obchta-borovo-2003 (20)

Petrovskyy en
Petrovskyy enPetrovskyy en
Petrovskyy en
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakesh
 
Eng leonid shimarek eco_russia
Eng leonid shimarek eco_russiaEng leonid shimarek eco_russia
Eng leonid shimarek eco_russia
 
St. Petersburg Waste Management
St. Petersburg Waste Management St. Petersburg Waste Management
St. Petersburg Waste Management
 
Azerbaijan NbS workshop 2023 Mihaela Dragan Lebovics IUCN ENG.pdf
Azerbaijan NbS workshop 2023 Mihaela Dragan Lebovics IUCN ENG.pdfAzerbaijan NbS workshop 2023 Mihaela Dragan Lebovics IUCN ENG.pdf
Azerbaijan NbS workshop 2023 Mihaela Dragan Lebovics IUCN ENG.pdf
 
EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVER
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
 
A CASE STUDY ON MINING PROJECT EIA PLAN.pptx
A CASE STUDY ON MINING PROJECT EIA PLAN.pptxA CASE STUDY ON MINING PROJECT EIA PLAN.pptx
A CASE STUDY ON MINING PROJECT EIA PLAN.pptx
 
Pressures, impacts and risk on surface water. Concept and examples
Pressures, impacts and risk on surface water. Concept and examplesPressures, impacts and risk on surface water. Concept and examples
Pressures, impacts and risk on surface water. Concept and examples
 
Supertram - Tram Train Pilot - Sheffield - Rotherham
Supertram - Tram Train Pilot - Sheffield - RotherhamSupertram - Tram Train Pilot - Sheffield - Rotherham
Supertram - Tram Train Pilot - Sheffield - Rotherham
 
Romania Agricultural Pollution Control Project Presentation
Romania Agricultural Pollution Control Project PresentationRomania Agricultural Pollution Control Project Presentation
Romania Agricultural Pollution Control Project Presentation
 
"Local sustainability initiatives in cooperation with research. The case of B...
"Local sustainability initiatives in cooperation with research. The case of B..."Local sustainability initiatives in cooperation with research. The case of B...
"Local sustainability initiatives in cooperation with research. The case of B...
 
Prezentatsiia 2021 19.05._--_buklet_eng
Prezentatsiia 2021 19.05._--_buklet_engPrezentatsiia 2021 19.05._--_buklet_eng
Prezentatsiia 2021 19.05._--_buklet_eng
 
Prezentatsiia 2021 19.05._--_buklet_eng
Prezentatsiia 2021 19.05._--_buklet_engPrezentatsiia 2021 19.05._--_buklet_eng
Prezentatsiia 2021 19.05._--_buklet_eng
 
Slides ESPP Italy P Platform 12_12_23.pdf
Slides ESPP Italy P Platform 12_12_23.pdfSlides ESPP Italy P Platform 12_12_23.pdf
Slides ESPP Italy P Platform 12_12_23.pdf
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience Mekong
 
Nereus atene-rven - presentation 3 - 2014
Nereus   atene-rven - presentation 3 - 2014Nereus   atene-rven - presentation 3 - 2014
Nereus atene-rven - presentation 3 - 2014
 
basic civil unit 1.pptx
basic civil  unit 1.pptxbasic civil  unit 1.pptx
basic civil unit 1.pptx
 

Recently uploaded

High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Recently uploaded (20)

High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Zap obchta-borovo-2003

  • 1. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria EXPLANATORY NOTE PROJECT: Development of Regional Waste Management System in Borovo Region PART: General PHASE: Detailed design General part Regional facilities for waste treatment will be constructed on the site № 5 Byala-north І is in the Mid Danube Plain sub-region, with a hilly relief. It is located about 2 km northeast of the north end of the town of Byala. In 2005 Consortium Geokompleks Ltd (under the contract concluded with MOEW) has done preliminary studies on the territory around the geometrical centre of the region Borovo and preliminary selection of suitable sites for construction of a regional landfill for the project area. As a result, in the report of the consortium, as the most suitable are classified following three sites:  № 5: Byala- North І  № 5b: Byala- North ІІІ  № 5a: Byala- North ІІ Location on the site 5 Byala-north I and asite 5b Biala-north III in the border of project region CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 1
  • 2. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria Ranked sites are optimally positioned to municipalities in the project region and are generally accepted by the mayors of municipalities Borovo, Byala, Dve mogili, Polski Trambesh and Tzenovo on meeting held on April 26, 2005 to discuss the results of the studies. In this regard, since 2005 Geokompleks Ltd. conducted detailed engineering and geological studies of two sites selected as the main - № 5 Byala- North І and alternative № Byala- North 5b-III. In addition, in response to a letter from the Consultant on 28.04.2009 Regional association is confirmed in writing that the Association formally adopt the proposed building of the regional system for waste management in Region Borovo sites № 5 Byala- North -I and № 5b Byala- North -III, expressing the opinion that more preferred should be the site № 5 Byala-North -I, because it is 100% municipal property, and this would save time and money. Location on the main site 5 Byala-north I and alternative site 5b Biala-north III in the border of project region CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 2
  • 3. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria In physico-geographical terms the site № 5 Byala-north І is in the Mid Danube Plain sub-region, with a hilly relief. It is located about 2 km northeast of the north end of the town of Byala. The site incorporates a relatively wide dry gully (150-250 m) and lies on a relatively oblique slope with north-south direction. There is a hill about 200 m from the northern border is (176,2 m). The altitude of the site varies from 110 to 160 m above the sea level. The site gully is directed to one main gully in the region, right tributary of Yantra River. Gullies are dry and there are no springs, wells or water sources for drinking and communal water supply in the region. The territory of the site is covered mainly by grass, bushes and single trees (natural meadows). At some places the soil layer is corrupted. Current landfill of Byala is located at about 1 km from the site. CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 3
  • 4. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria In hydrogeological terms the conditions of the site are in favor of the landfill construction. There is no groundwater detected up to 15-17 m depth and the filtration features of the rocks are low. The results of analysis of the existing state and suitability of the site № 5 Byala-north І to take the intended function evaluated on the base of requirements of Regulation № 7/2004, shows that there is no discrepancies in terms of restrictive clauses and prohibitions on the ground of the site. The total area of land which includes: o Landfill for construction and demolition waste o Landfill for municipal waste o Waste treatment facility Cover 100 da Access to the site is along a black road with a hard coating, with length approximately 2 km, starting from the existing local road. The existing access road is 2000 m long and the bridge should be repaved to be able to withstand heavy trucks. Road improvement will be part of the application for Cohesion Fund. For proper functioning of the regional waste management centre are provided the following facilities: i) facility for materials separation (FMS), ii) waste water treatment plants (WWTP), iii) composting area, iv) landfill for municipal waste, v) Landfill for construction waste, vi) Buildings (for staff, maintenance and daily operations), vii) Internal roads, viii) Experienced Division, ix) Torch for biogas and x) Temporary storage of hazardous waste. Landfilling is the main part of the waste management. Sanitary landfills reduce the environmental impact (low odor, animals and fire risk), health risks and have better control than the uncontrolled landfills. The design of the facility requires significant engineering works to form cells that control emissions and minimize potential harmful effects on the environment. In the design phase are addressed three stages: CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 4
  • 5. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria • Construction Stage, when are installed barriers and nets for safe management of pollutants (membranes, linings, systems for leachate and biogas collect) • Operation Stage, when daily cover of landfill waste is performed and is monitor the environmental impacts associated with the landfill waste • Closure and after-care activities stage, when the top cover is placed to minimize the environmental impact associated with the landfill waste. Monitoring of environmental impacts associated with landfill continues several more years, while carrying out activities for use of the site after its closure (eg, golf courses and sports facilities) In this regard, the particular project for the landfill follows the technical requirements of Directive 99/31/EC for landfills and of the relevant Bulgarian legislation, as will be described in this chapter to ensure the protection of environment and health. Description of General layout The coordinates of the area, where Regional Centre for Waste Management (RCWM) will build are shown in the table below. Ownership of the land allotted for the site is approximately 100% municipal. Coordinates of border points No Point № X Y 1 125 4715519.16 9464166.48 2 126 4715497.06 9464261.92 3 5782 4715481.88 9464257.50 4 5781 4715382.13 9464241.63 5 5780 4715368.38 9464237.38 6 5779 4715338.44 9464209.97 7 5778 4715298.63 9464183.54 8 5777 4715270.31 9464182.29 9 5776 4715215.63 9464177.06 10 5775 4715159.50 9464170.88 11 5774 4715087.81 9464148.04 12 5773 4715059.81 9464145.84 13 5772 4714965.69 9464126.59 14 5771 4714938.88 9464116.97 15 5770 4714920.50 9464105.72 16 5769 4714862.81 9464063.56 17 5768 4714842.88 9464044.59 18 5767 4714836.44 9464041.72 19 127 4714832.71 9464040.41 20 128 4714854.86 9463944.75 CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 5
  • 6. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria No Point № X Y 21 68463 4715191.50 9464025.31 22 68462 4715467.19 9464083.00 23 68461 4715518.50 9464166.34 The entrance of the facility is located in the south. Therefore, room service, scale and area of sampling are located a few meters from the entrance. Incoming trucks are directed to the facility or for materials separation (FMS) in the northwest part or directly to the cells of the landfill. Access to other facilities is facilitated by internal road, ie to: i) composting, maturation, storage area for composting, ii) the area of administrative and business buildings and iii) waste water treatment plant (WWTP), where all leachate and wastewater is collected and treated. In the central and largest part of the site will be built i) cells for nonhazardous waste landfill (5 year and 15 year period) and ii) cells for landfill for construction waste (20 years). Area required for the construction of various parts is as follows: BALANCE OF THE TERRITORY: Total area - 100 000, 00 m2. Territory of the landfill - 70 607, 00 m2 Cells for the landfill for the non-hazardous wastes - 41 689,95 m2 Including Cell 1 - 16 060,00 m2 Planting - 9 626,65 m2 Roads and parking lots - 19 290,40 m2 URBANISATION INDICATORS / according Regulation №7/2004г. for the requirements, which have to be met for positioning of the equipment for treatment of the wastes/ Coefficient of the usage of the territory - 0,863 Planting percentage - 13,63% of the non-taken from the landfill area Territory of MRF and composting area – 29 393,00 m2 CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 6
  • 7. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria build-up - built-up square 2 540,90 m2 - open square 2 582,90 m2 Planting - 12 457,85 m2 Roads and parking lots - 14 364,75 m2 URBANISATION INDICATORS according Regulation №7/2004г. for the requirements, which have to be met for positioning of the equipment for treatment of the wastes/ Coefficient of the usage of the territory - 0,58 consistence of build-up - 8,64% intensity of build-up - 0,0878 Planting percentage - 42,4% The general plan is represented on the figure below. (without scale), CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 7
  • 8. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 8
  • 9. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria The project includes the following sub objects: 1. Checkpoint and security house 2. Weighing bridge 3. Administrative building 4. Water tank (Reservoir) 5. Maintenance building and truck wash 6. WWTP 7. Technical building at the WWTP 8. Technical building - sludge dewatering 9. Leachate collection tank 10. Material Recovery Facility (MRF) 10a. production Shed 11. Tyre Washing Facility 12. Sampling Area 13. * Composting site C1. Reception area C2. Intensive composting C3. Stabilization of compost C4. Maturation C5. Storage 14. Biogas Flare 15. Temporary storage of hazardous waste 16. Transformer station 17. Waste cover material 18. Top cover material For preparing of the project are used: • Feasibility studies • Conceptual design • Geological, Engineering-geological and hydrological studies of the site • Geodesy surveying • Technological Assignment Project is based on the following legislative documents: Part Architecture Part Architecture of the project has been based on: • Spatial planning act • Ordinance № 7 for the rules and norms for spatial development of different types of territories and urban development zones • Ordinance № 2 for the fire safety building and technical norms • Norms for design of general plans for industrial enterprises/ Approved by Order № RD-02-14-25 2.02.1988g. of Committee for territorial and urban development / • Standards for design of manufacture buildings at industrial enterprises/ Approved by Order № RD-02-14-25 2.02.1988g /. CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 9
  • 10. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria • Standards for design of service buildings and facilities to industrial enterprises / Approved by Order № RD-14-02-292 5.05.1982g. of IUA / Part Construction Part Construction of the project is based on: • Ordinance № 1 of 1996 for design of flat foundation (SG. 85 of 1996) and regulations for the design of flat foundation; published in BAS, issue. 10 of 1996 • Ordinance № 3 of 2004 on basic principles for design of structures of buildings and the impacts on them (promulgated, SG. 92 of 2004, corr. No.. 98, 2004; am. And suppl. No. 33 of 2005) • Ordinance № 2 of 2007 on the design of buildings and structures in seismic areas (promulgated, SG. 68 of 2007, amended. No. 74 of 2007) published in BAS, issue. 10 of 2007 • Norms for design of foundations subjected to dynamic loads of machines (published BAS No.. 2 and 4 of 1986, amended. No. 7 of 1986) • Norms for design of concrete and reinforced concrete structures (promulgated, SG. 17 of 1987;. № 2, SG. 17 of 1993, amended. № 3, SG. 3 of 1996, amended. № 4, SG. 49 of 1999), updated version, BAS, issue. 6-8 1999 • Norms for design of concrete and reinforced concrete structures for hydraulic facilities (published, BAS, vol. 1 of 1989, amended., Vol. 8 of 1991) • Norms for design of retaining walls (published BAS, issue. 10, 1986, amended. No.. 8 of 1990) • Norms for design of steel structures (published in brochure of Committee for territorial and urban development, S., 1987) • Norms for design of masonry structures (published BAS, vol. 12 of 1985, amended. SG. 110 of 1998), updated version, BAS, issue. 90-10 1998 • Norms for design of timber structures (published BAS No.. 5-6 1990) • Ordinance № 3 of 1994 for control and approval of concrete and reinforced concrete structures (promulgated, SG. 97 of 1994, amended. And supplemented. No.. 53 of 1999) and Rules for control and approval of concrete and reinforced concrete structures; publication, BAS, issue. 11 of 1999 Part Electricity Part Electrical of the project is based on: • Ordinance № 3 of 9 June 2004 for the structure of electrical installations and power transmission lines - SG. 90 and. 91 of 2004 • Ordinance № 4 of 9 June 2004. for the technical operation of electrical equipment - SG issue 99 and issue. 101 of 2004 • Ordinance № 9 for the technical operation of power stations and networks - SG. 72 18.08.2004 • BS EN 12464 "Lighting of enclosed workplaces"; • Ordinance № 8 / 28.12.2004g. Lightning protection for buildings, outdoor facilities and open spaces • Fire-building and technical standards by 1986, Am. and supplemented. SG 33 of 1994 CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 10
  • 11. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria Part water supply and sewerage system Part water supply and sewerage system is based on • Ordinance № 2 for the design, construction and operation of water systems by 2005. • Standards for design of sewer systems • Ordinance № 4 for the design, construction and operation of building water supply and sewerage systems by 2005. • Ordinance № 2 for the fire building and technical standards by 1987. • Ordinance № 8 for rules and regulations for the placement of ducts and technical facilities in settlements since 1999. Part heating supply, ventilation and air conditioning The projects relating part “Heating supply, ventilation and air conditioning is developed on the basis of: • Ordinance № 15 of 28 July 2005 - "on technical rules and norms for the design, construction and operation of the objects and equipments for generation, transmission and distribution of thermal energy" • Ordinance № 7 - Heat conservation and energy saving "- 2005. • Ordinance № 7, on the minimum requirements for safe and healthy occupational conditions in workplaces - 23.09.1999 Part “Landscaping and development “ The projects relating part “Landscaping and development “is developed on the basis of: • Environmental Protection Act, State Gazette. 91/25.09.2002g, Amended, SG. 98/18.10.2002., Amended SG. 86/30.09.2003, Supplemented, SG. 70/10.08.2004g, in force since 1.01.2005, SG. 74/13.09.2005, in force since 1.01.2006, amended, SG. 77/27.09.2005, Amended SG. 88/4.11.2005, SG. 95/29.11.2005, in force since 1.03.2006, amended, SG. 105/29.12.2005, in force since 1.01.2006, Amended SG. 30/11.04.2006 (in force since 12.07.2006) • Spatial Planning Act (promulgated, SG. 1 of 2001; Am. No.. 41 and 111 of 2001. No.. 43 2002., Am. and supplemented. No.. 20 of 2003. No.. 65 and br.107/2003, am. SG. 36 and pc. 65/2004, am. SG. 28/2005.) • Protection of Agricultural Land Act (SG. 35/24.04.1996) and its Implementing Rules (SG. 84/04.10.1996) • Forest Act (State Gazette. 125/29.12.1997.) and its Implementing Rules; • • Ordinance № 7 / 2003 on rules and regulations for development of different types of territories and development zones (Official SG. 3 of 2004.; Am. No.. 10, 11 and 51 in 2005.) Part geodesy The design of the vertical planning is developed on the basis of “Instruction for development, implementation and supporting of plans for vertical planning CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 11
  • 12. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria Part Technology Some technology projects are developed on the basis of: • Ordinance № 7 of 24 August 2004 on the requirements that must be met for setting up of waste treatment facilities issued by the Minister of Environment and Water, Minister of Regional Development, Minister of Agriculture and Forestry and the Minister of Health, promulgated. SG. 81 of 17.09.2004. • Ordinance № 8 of 24 August 2004 on the conditions and requirements for construction and operation of landfills and other facilities and installations for recovery and disposal , by the Minister of Environment and Water, published. SG. 83 24.09.2004 • Ordinance № 26 for recultivation of damaged terrains, improvement of low productivity lands, removal and recovery of the humus layer-Prom. SG. No. 89 dated 22 October 1996., am. SG. issue 30 of 22 March 2002. • Landfill Directive 1999/31/EC (26.04.1999.) Part “Safety and Health Plan“(SHP) - it is being developed in the next phase of design Part SHP is being developed as an independent part of the project. The project consists of drawings, explanatory notes and the time schedule of construction. Project is being developed on the base of: • Ordinance № 2 of 22 March 2004 on the minimum requirements for occupational health and safety in carrying out construction works (SG issue 37 from 04.05.2004.; corr. issue 98/05.11.2004.; am. SG, issue 102 19.12. 2006.) and the internal instructions of the Contractor’s executive staff based on it. • Ordinance № 3 on the establishment of certificates and protocols during construction (promulgated, SG. 72 of 2003.; Am. and supplemented. Issue 37 2004. and issue 29 of 2006). • Ordinance № 7 minimum requirements for occupational health and safety at workplaces using the work equipment, including its amendments (promulgated, SG. 88 of 1999.; Am. issue. 48 of 2000. And issue 52 of 2001.; corr. issue 54 of 2001. amended and supplemented. issue. 43 2003., am. issue. 37 2004., am. and supplemented. issue 88 of 2004.) CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 12
  • 13. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria List of folders contained in each copy of each part and sub objects are: List of folders – Part : GENERAL List of folders – Part : ARCHITECTURE List of folders – Part : CONSTRUCTION List of folders – Part :ELECTRICAL List of folders – Part : Water Supply and Sewerage List of folders – Part: heating supply, ventilation and air conditioning List of folders – Part: ENERGY EFFICIENCY List of folders – Part: AUTOMATISATION List of folders – Part: FIRE ALARM List of folders – Part: CCTV List of folders – Part: VERTICAL PLANNING List of folders – Part: Landscaping and DEVELOPMENT List of folders – Part: LANDFILL FOR NON-HAZARDOUS WASTE. GROUND BASE List of folders – Part: TECHNOLOGY FOR CONSTRUCTION OF EMBANKMENTS. ASSESMENT OF THE STABILITY OF SLOPES List of folders – Part: TECHNOLOGICAL List of folders – Part :FIRE SAFETY List of folders – Part :FIRE PROTECTION OF THE STEEL BEARING STRUCTURES List of folders – Part : Fire safety List of folders – Part : OPERATION AND MONITORING List of folders – Part : ACCOUNTING RECORDS Subobject: Fence CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 13
  • 14. BULGARIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND WATER Project financed by EUROPEAN UNION Preparation of waste management measures in the regions of Levski, Borovo, Veliko Tarnovo and Varna – Bulgaria In Annex 1 to the note: "Requirements for the completion and approval of works „are given. A bill of quantities has been compiled. Prepared by: /eng. G. Petkov/ CONSORTIUM ENVIROPLAN S.A. – N.T.U.A. – KOCKS CONSULT GmbH BT – ENGINEERING Ltd 14