1) Introduction
2) Need of study
3) Aim & Objective
4) Methodology
5) Literature Review
6) Materials used
7) Test and result
8) Conclusion
9) Reference
10) Images
CONTENT OF PRESENTATION
INTRODUCTION
Concrete :-
Concrete is considered world most use construction materials and they
form with homogeneous mixture of cement, fine aggregate, coarse aggregate and water with
proper proportion.
In this experimental work we focus on the coarse aggregate in concrete.
We partially replace coarse aggregate by waste bricks. And we replace waste bricks in various
percentage like 0% ,20%, 30%.
WASTE BRICKS :
Waste bricks are rejected bricks which are either over
burned or not in shaped according to specification and the best way to recycle
these bricks is by using them in making concrete.
Over burn bricks or rejected bricks.
NEED OF STUDY
For this replacement we choose waste bricks because of their
availability. The waste bricks are available from bricks manufacturing area. also
in brick making a large number of bricks are rejected due to non conformity with
the specification one such major nonconformity is the distorted form of brick
produced due to the uneven temperature in kiln. The main constituent of the
concrete is cement ,fine aggregate coarse aggregate, and water replacing some
of these materials makes significant changes in cost as well as performance.
coarse aggregate filled almost 70% of volume in concrete the cost of coarse
aggregate rapidly increasing also the availability of the aggregate is getting
reduced the major cost of the concrete is belonged to the aggregate. These
waste bricks is can also be a potential source of coarse aggregate.
AIM & OBJECTIVE
1) Determine the mechanical strength of concrete by replacing coarse aggregate
with waste bricks.
2) Determine the behavior of fresh concrete after partial replacement of coarse
aggregate with waste bricks.
3) To find out optimum percentage of waste brick for maximum compressive
strength.
METHODOLOGY
Mix proportion :
The batching of all ingredients was performed by weight.
The sand was air dried in the laboratory before mixing. First the surface of
damped with water then all the aggregate ( natural coarse aggregate ,fine
aggregate and waste bricks aggregate ) were spread on the surface area till
the aggregate.
After through mixing of aggregate cement was introduced
on the ground surface and water were added slowly as per W/C ratio. The
concrete was mixed for approximately three minutes after the water was
added.
MIX CASTING :
We use M20 grade of concrete for this replacement. It is
found that the waste bricks base concrete is dark in color and is cohesive.
The amount of water in the mixture plays important role on the behavior of
fresh concrete. When the mixing time is long , mixture with high water
content bled and segregation of aggregate and the past occurred . This
phenomenon is usually followed by low compressive strength of hardened
concrete. From the preliminary work, it was decided to observe the
following standard process of mixing in all further studies.
1) Take the suitable proportion of the ingredients of the concrete.
2) Spread the fine aggregate on ground .
3) After that put the coarse aggregate as well as waste bricks .
4) After that add the water in suitable quantity.
5) And continue the wet mixing for another four minutes.
6) Then the fresh prepared mix was casting in standard cube molds.
Curing :
All the mold were cured by immersing in a curing tank in
the lab the specimen were brought out from water approximately 24
hours before testing and kept at room temperature till testing.
Following test were conducted for this experimental work
a) Workability test
b) compressive strength test
LITERATURE REVIEW
2.1 Mr. G. S patil and Mr. P. B. Autade : have reported effect of replacement of course
aggregate by jhama class brick in concrete and to developed a mixture proportioning
process to manufacture jhama class brick base concrete and to identify study the effect of
silent parameters that affect the properties of jhama class brick based concrete and to study
the short term engineering properties of fresh and Hardened jhama class brick based
concrete.
2.2 Dr. M. N. hirenath and Mr. Sanjay S. J : have reported replacement of course
aggregate by demolished brick waste in concrete and to determine the suitabilty of brick
waste as replacement of course aggregate in concrete production and discuss on investigate
the mechanical and physical property of brick waste concrete and to compare the
performance between concrete with brick waste as course aggregate partially replacement
and conventional concrete This research is focus on some properties and strength behavior
of concrete if demolised waste brick used as aggregate in construction.
2.3 Gopinandan dev and joyanta pal have reported on use of brick aggregate in
standard concrete and its performance in elevated temperature. Crush brick can be used
satisfactorily to produce M-25, M-30 keeping water cement ratt in range of 0.35 to 0.45
2.4 Bidve ganesh shivkant and G. N shete. Discuss about experimental study on effect
of partially replacement of course aggregate by over burn brick backs concrete is chipper
than conventional concrete 3% increment in the Compressive strength is found 20%
replacement of course aggregate by over burnt brick bat waste and strength decrease by
3.3% when the 40% of course aggregate is replace by over burnt brick bat waste, by
using aggregate cement ratio is 4.2 water cement ratio is 0.45 current study concluded
that over brunt brick bat waste can replace course aggregate up to 20 %
2.5 Akshay N kadu and PM kulkarni : discuss about of partial replacement of over
brunt brick. This research is basically study to development, the manufacture and physical
properties of the concrete made by over brunt brick and demolished brick as a course
aggregate from this chapter present the environment which upraise the utilization of some
alternative materials of course aggregate in concrete at the time of brick manufacturing
maximum number of brick are rejected due to non - Comformity with the required
specification this rejected and waste brick can also be a potential source of course
aggregate.
2.6 Durga chaitnya and kumar jagarapu. Alternative course aggregate in concrete they
review the various admixture utilize in concrete like cocot shell rubber waste e - waste
and jhama brick concrete made by utilizing jhama block as course total, at first
invigorates the elevated compressive for the substitution 20% and 20 later that it
diminished by 60% and 80%
Cement is a fine, grey powder. It is mixed with water and materials such as
sand, gravel, and crushed stone to make concrete. The cement and water form
a paste that binds the other materials together as the concrete hardens.
Ordinary Portland cement 53 grade was used for preparation of all concrete
cubes.
TEST ON CEMENT :
1. Fineness
2. Standard consistency
3. Initial and final setting time
MATERIALS
CEMENT:
FINE AGGREGATE :
The size of aggregate lesser than 4.75 mm is considered
as fine aggregate. In this experimental programmed coarse sand which is less
than 4.75mm is use the physical properties of fine aggregate like specific
gravity , fineness modulus gradation are tested.
COARSE AGGREGATE:
The size of aggregate bigger than 4.75 mm is
considered as coarse aggregate. There are different types of shape of coarse
aggregate like rounded aggregate ,flaky aggregate and angular or crushed
aggregate. In this experimental programmed 20mm crushed aggregate were
used. The physical properties of coarse like specific gravity , water absorption ,
fineness modulus are tested.
WASTE BRICKS AGGREGATE :
Bricks is a durable building materials and
construction materials with good load bearing properties various research have
been carried out in porosity, permeability and absorption of brick. The
traditional clay bricks are manually produced by pressing clay with certain
amount of sand in the wooden mould. Then the wet bricks are first dried in the
sun and air then transported to brick kiln for subsequent burning process the
brick are burn upto 800 to 900 C the brick kiln. If the temperature in kiln is
uncontrolled then the bricks are over burn.
Test on materials :
Test on cement
1) Fineness of cement
2) Standard consistency
3) Initial setting time
4) Final setting time of cement
Test on fine aggregate
1) Fineness modulus of fine aggregate
2) Specific gravity of fine aggregate
3) Water absorption
Test on coarse aggregate
1) Impact value of coarse aggregate
2) Specific gravity test
3) Water absorption test
4) Fineness modulus
5) Abrasion value
Test on waste brick aggregate
1) Impact value of brick waste
2) Water absorption test
3) Specific gravity test
4) Fineness modulus
5) Abrasion value
Results :
Test on cement :
the cement used was ordinary Portland cement 53 grade the
cement should be fresh and uniform consistency. Where there is evidence of
lumps or any foreign matter in the material
TABLE : I
Sr. no Characteristic value
1. Standard consistency 33 %
2. Initial setting time 48 min
3. Final setting time 240 min
4. fineness 4 %
Test on fine aggregate :
fine aggregate play a major role in concrete as it helps
in packing of concrete that is as a filler in concrete. For making strong concrete
the naturally available strong aggregate with particular size and shapes for
making the concrete.
TABLE : II
SR.NO. Characteristic value
1. Type uncrushed
2. Specific gravity 2.46
3. Fineness modulus 2.30
4. Grading zone III
5. Water absorption 0.7 %
Test on coarse aggregate :
the size of aggregate bigger than 4.75 mm is
considered as coarse aggregate there are different type of coarse aggregate like
rounded, flaky and angular aggregate in this experimental programmed 20mm
crushed aggregate are used.
TABLE : III
SR. NO. Characteristics Value
1. Type Crushed
2. Maximum Size 20 mm
3. Specific Gravity 2.62
4. Water Absorption 0.50%
5. Impact test 10.65%
6. Abrasion value 17.60%
7. Fineness modulus 6.29
8. Flakiness & Elongation Index 13.21 & 14.20 %
Test on brick waste materials:
bricks is a durable building materials
with good quality load bearing properties various research have been
carried out in porosity ,permeability and absorption of brick. The traditional
clay brick are manually produced by pressing clay with certain amount of
sand in the wooden mould.
TABLE : IV
SR. NO. Properties Value
1. Impact Value 21.19 %
2. Specific gravity 2.27
3. Water Absorption 8.11 %
4. Abrasion Value 39.26%
5. Fineness modulus 6.19
6. Flakiness & Elongation Index 11.48 &12.04 %
MIX DESIGN
1) M-15 Grade :
2) M-20 Grade :
Material Cement Fine Aggregate Coarse Aggregate Water
Quantity 286.76 kg/m3 701.10 kg/m3 1218.30 kg/m3 157.72
Proportion 1 2.44 4.24 0.55
Material Cement Fine Aggregate Coarse Aggregate Water
Quantity 315.45 kg/m3 673.54 kg/m3 1221.44 kg/m3 157.72
Proportion 1 2.13 3.87 0.50
Test on Fresh Concrete
1) Slump Cone Test : ( M-15 Grade )
Replacement In ( % ) Without Admixture With Admixture
0% 30 mm 120 mm
20% 34 mm 130 mm
30% 40 mm 135 mm
2) Slump Cone Test : ( M- 20 Grade )
Replacement In ( % ) Without Admixture With Admixture
0% 22 mm 75 mm
20% 32 mm 110 mm
30% 50 mm 180 mm
1) Compaction Factor Test : ( M -15 Grade )
Replacement in ( % ) Without Admixture With Admixture
0 % 0.90 0.92
20 % 0.87 0.88
30% 0.84 0.87
2) Compaction Factor Test : ( M โ€“ 20 Grade )
Replacement In ( % ) Without Admixture With Admixture
0 % 0.84 0.89
20 % 0.82 0.85
30 % 0.81 0.84
Compressive strength test :
Replacement In
(%)
Strength
After 7 Days
Strength
After 14 Days
Strength
After 28 Days
0 % 10.65 N/๐’Ž๐’Ž๐Ÿ
11.79 N/๐’Ž๐’Ž๐Ÿ
16.30 N/๐’Ž๐’Ž๐Ÿ
20 % 7.18 N/๐’Ž๐’Ž๐Ÿ
10.41 N/๐’Ž๐’Ž๐Ÿ
14.24 N/๐’Ž๐’Ž๐Ÿ
30 % 5.20 N/๐’Ž๐’Ž๐Ÿ 7.07 N/๐’Ž๐’Ž๐Ÿ 10.90 N/๐’Ž๐’Ž๐Ÿ
M-15 Grade
0
2
4
6
8
10
12
14
16
18
0% 20% 30%
CompressiveStrength(M15)
7 DAY 14 DAY 28 DAY
M -20 Grade
Replacement In
( % )
Strength
After 7 Days
Strength
After 14 Days
Strength
After 28 Days
0 % 10.40 N/๐‘š๐‘š2 14.19 N/๐‘š๐‘š2 20.22 N/๐‘š๐‘š2
20 % 6.42 N/๐‘š๐‘š2 10.48 N/๐‘š๐‘š2 17.02 N/๐‘š๐‘š2
30 % 5.77 N/๐‘š๐‘š2 8.01 N/๐‘š๐‘š2 12.70 N/๐‘š๐‘š2
Compressive strength test :
CONCLUSION
After the completion of project and final testing of cubes after 28 days And on
the basis of results obtained during the experimental investigation, following.
The compaction factor decreased as the percentage of waste bricks increased.
The unit weight also decreased as the percentage of waste bricks increases in
comparison with conventional concrete.
Concrete made by using waste bricks as a coarse aggregate, it gives better strength
for replacement of 20 % in M 15 grade of concrete.
Compressive strength was decreases after adding 30 % of waste bricks aggregate by
the replacement of stone aggregate in M 15 grade.
In M15 grade of concrete it gives high strength as compared to M20 grade of
concrete and it is suitable up to 20% replacement.
Use of such waste materials not only cuts down the cost of construction, but also
contributes in safe disposal of waste materials.
REFERENCES:
1.Mr.G..S.Patil Mr.P.B.Autade international Journal of Engineering Research and General
Science Volume 3, Issue 4, Part-2, July-( August, 2015.) Effect of partial replacement of
coarse Aggregate by jhama class brick in concrete.
2. Dr.M.N Hirenath , Mr . SJ international journal of science Technology And engineering
|volume 4 | Issue 2 |( Augest 2017) Replacement of coarse aggregate by demolished brick
waste in Concrete
3. Akshay N kadu , PM kulkarni International journal of innovative Research in science
Engineering and technology | Volume 9 | | Issue 7 | (July 2020 .) Used of partial replacement
of over Burnt brick.
4. Bidve ganesh shivkant , G.N. shete international journal of Research in engineering
science and management | volume | | Issue 4 | (April 2019.) Experimental study on effect of
partial Replacement of coarse aggregate by over burnt brick.
5. Vikash Kumar Gautam , Mr. Devesh jayasawal international Journal for research in
engineering application and management | Volume 4 | | issue 2 | (May 2018. ) Use of over
burnt crushed Brick as coarse aggregate in concrete mix.
6. kumar nilesh , saxena anil kumar ,Sonu gourav international Journal of advance research ,
idea innovation in technology | Volume 3 |. | Issue 6 | ( 2017 ) Analysis of concrete made From
over burned bricks.
7. Durga Chaitanya kumar international journal of emerging Technology in engineering
research | volume 8 | | issue 12 | ( December 2020 ) Alternative coarse aggregate in concrete.
8. Gopinandan Dey and jayant pal international journal of Engineering and technology |
volume 5 | No 4 (August 2013) Use Of brick aggregate in standard concrete and it's
performance in Elevated temperature
IMAGES
THANK YOU

More Related Content

What's hot

Balanced Cantilever Bridge
Balanced Cantilever BridgeBalanced Cantilever Bridge
Balanced Cantilever BridgeJeelkumar Patel
ย 
Introduction to Geotechnical Engineering SU - Fall 2015
Introduction to Geotechnical Engineering   SU - Fall 2015Introduction to Geotechnical Engineering   SU - Fall 2015
Introduction to Geotechnical Engineering SU - Fall 2015bhaladog
ย 
building material Minor project for final year .
building material Minor project for final year .building material Minor project for final year .
building material Minor project for final year .Sachin gupta
ย 
MODULE 1.pptx
MODULE 1.pptxMODULE 1.pptx
MODULE 1.pptxSEKHARJ3
ย 
Presentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionPresentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionTEJASWI SHARMA
ย 
Constructability of ug stations
Constructability of ug stationsConstructability of ug stations
Constructability of ug stationsPALLA NARASIMHUDU
ย 
Concrete technology
Concrete technologyConcrete technology
Concrete technologypreethi raja
ย 
Cement stabilization of soils ppt
Cement stabilization of soils pptCement stabilization of soils ppt
Cement stabilization of soils pptVeluppillai Mohan
ย 
Project report on pervious concrete
Project report on pervious concreteProject report on pervious concrete
Project report on pervious concreteMDZAFARHASIB
ย 
Engineering fundamentals of construction equipments
Engineering fundamentals of construction equipmentsEngineering fundamentals of construction equipments
Engineering fundamentals of construction equipmentsNayana 54321
ย 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and PracticeSenthamizhan M
ย 
Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignRiaz Zalil
ย 
Soil exploration by abhishek sharma
Soil exploration by abhishek sharmaSoil exploration by abhishek sharma
Soil exploration by abhishek sharmaABHISHEK SHARMA
ย 
Self Compacting Concrete - 2018
Self Compacting Concrete - 2018Self Compacting Concrete - 2018
Self Compacting Concrete - 2018Garima Lodha
ย 
cement industry
cement industrycement industry
cement industrydijo2014
ย 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009 Avinash Kumar Gupta
ย 
Break off test
Break off testBreak off test
Break off testAyaz khan
ย 

What's hot (20)

Balanced Cantilever Bridge
Balanced Cantilever BridgeBalanced Cantilever Bridge
Balanced Cantilever Bridge
ย 
Introduction to Geotechnical Engineering SU - Fall 2015
Introduction to Geotechnical Engineering   SU - Fall 2015Introduction to Geotechnical Engineering   SU - Fall 2015
Introduction to Geotechnical Engineering SU - Fall 2015
ย 
building material Minor project for final year .
building material Minor project for final year .building material Minor project for final year .
building material Minor project for final year .
ย 
Ppt ggbs
Ppt ggbsPpt ggbs
Ppt ggbs
ย 
MODULE 1.pptx
MODULE 1.pptxMODULE 1.pptx
MODULE 1.pptx
ย 
Presentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionPresentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road Construction
ย 
Constructability of ug stations
Constructability of ug stationsConstructability of ug stations
Constructability of ug stations
ย 
He final ppt
He final pptHe final ppt
He final ppt
ย 
Concrete technology
Concrete technologyConcrete technology
Concrete technology
ย 
Cement stabilization of soils ppt
Cement stabilization of soils pptCement stabilization of soils ppt
Cement stabilization of soils ppt
ย 
Project report on pervious concrete
Project report on pervious concreteProject report on pervious concrete
Project report on pervious concrete
ย 
Engineering fundamentals of construction equipments
Engineering fundamentals of construction equipmentsEngineering fundamentals of construction equipments
Engineering fundamentals of construction equipments
ย 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
ย 
Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement Design
ย 
Soil exploration by abhishek sharma
Soil exploration by abhishek sharmaSoil exploration by abhishek sharma
Soil exploration by abhishek sharma
ย 
Self Compacting Concrete - 2018
Self Compacting Concrete - 2018Self Compacting Concrete - 2018
Self Compacting Concrete - 2018
ย 
LIGHT WEIGHT AGGREGATE CONCRETE BY USING COCONUT SHELL
LIGHT WEIGHT AGGREGATE CONCRETE BY USING COCONUT SHELLLIGHT WEIGHT AGGREGATE CONCRETE BY USING COCONUT SHELL
LIGHT WEIGHT AGGREGATE CONCRETE BY USING COCONUT SHELL
ย 
cement industry
cement industrycement industry
cement industry
ย 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009
ย 
Break off test
Break off testBreak off test
Break off test
ย 

Similar to GROUP NO 18 PPT.pptx

M45017276
M45017276M45017276
M45017276IJERA Editor
ย 
Study on Partial replacement of CAnewFA.pptx
Study on Partial replacement of CAnewFA.pptxStudy on Partial replacement of CAnewFA.pptx
Study on Partial replacement of CAnewFA.pptxGokulS229289
ย 
Investigation on fine aggregate by broken tiles in concrete
Investigation on fine aggregate by broken tiles in concreteInvestigation on fine aggregate by broken tiles in concrete
Investigation on fine aggregate by broken tiles in concreteIJARIIT
ย 
2 review
2 review2 review
2 reviewEr Kumaran
ย 
Replacement of cement by glass powder and sand quarry dust
Replacement of cement by glass powder and sand quarry dustReplacement of cement by glass powder and sand quarry dust
Replacement of cement by glass powder and sand quarry dustRakshith Suvarna
ย 
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksComparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksBhagyashreeNagpure2
ย 
Study on Partial replacement of CAnewFA.pptx
Study on Partial replacement of CAnewFA.pptxStudy on Partial replacement of CAnewFA.pptx
Study on Partial replacement of CAnewFA.pptxharishg6783
ย 
An Experimental Investigation on Strengths Characteristics of Concrete with t...
An Experimental Investigation on Strengths Characteristics of Concrete with t...An Experimental Investigation on Strengths Characteristics of Concrete with t...
An Experimental Investigation on Strengths Characteristics of Concrete with t...ijsrd.com
ย 
The Use Of Permeable Concrete For Ground Water Recharge
The Use Of Permeable Concrete For Ground Water RechargeThe Use Of Permeable Concrete For Ground Water Recharge
The Use Of Permeable Concrete For Ground Water RechargeIJERA Editor
ย 
BAMBOO AS PARTIALLY REPLACEMENT FOR COARSE AGGREGATE
 BAMBOO AS PARTIALLY REPLACEMENT FOR COARSE AGGREGATE BAMBOO AS PARTIALLY REPLACEMENT FOR COARSE AGGREGATE
BAMBOO AS PARTIALLY REPLACEMENT FOR COARSE AGGREGATENischith Nizee
ย 
J1304026874
J1304026874J1304026874
J1304026874IOSR Journals
ย 
THE MECHANICAL PROPERTIES OF STEEL FIBER REINFORCED CONCRETE WITH QUARRY DUST...
THE MECHANICAL PROPERTIES OF STEEL FIBER REINFORCED CONCRETE WITH QUARRY DUST...THE MECHANICAL PROPERTIES OF STEEL FIBER REINFORCED CONCRETE WITH QUARRY DUST...
THE MECHANICAL PROPERTIES OF STEEL FIBER REINFORCED CONCRETE WITH QUARRY DUST...S.N. Veeresh Kumar
ย 
Recycle and reuse of Demolished concrete
Recycle and reuse of Demolished concreteRecycle and reuse of Demolished concrete
Recycle and reuse of Demolished concretePrasad Thota
ย 
An Experimental Investigation on Strengths Characteristics of Concrete with t...
An Experimental Investigation on Strengths Characteristics of Concrete with t...An Experimental Investigation on Strengths Characteristics of Concrete with t...
An Experimental Investigation on Strengths Characteristics of Concrete with t...IJERA Editor
ย 
C41011521
C41011521C41011521
C41011521IJERA Editor
ย 
IRJET- Partial Replacement of Cement with Marble Dust Powder and Addition of ...
IRJET- Partial Replacement of Cement with Marble Dust Powder and Addition of ...IRJET- Partial Replacement of Cement with Marble Dust Powder and Addition of ...
IRJET- Partial Replacement of Cement with Marble Dust Powder and Addition of ...IRJET Journal
ย 
Partial Replacement of Cement to Concrete by Marble Dust Powder
Partial Replacement of Cement to Concrete by Marble Dust PowderPartial Replacement of Cement to Concrete by Marble Dust Powder
Partial Replacement of Cement to Concrete by Marble Dust PowderIJMTST Journal
ย 
COMPRESSIVE STRENGTH OF CONCRETE BY USING WASTE MATERIALS
COMPRESSIVE STRENGTH OF CONCRETE BY USING WASTE MATERIALSCOMPRESSIVE STRENGTH OF CONCRETE BY USING WASTE MATERIALS
COMPRESSIVE STRENGTH OF CONCRETE BY USING WASTE MATERIALSila vamsi krishna
ย 
PPT ON Glass powder and GGBS Mix concrete
PPT ON Glass powder and GGBS Mix concretePPT ON Glass powder and GGBS Mix concrete
PPT ON Glass powder and GGBS Mix concreteamity university
ย 

Similar to GROUP NO 18 PPT.pptx (20)

M45017276
M45017276M45017276
M45017276
ย 
Study on Partial replacement of CAnewFA.pptx
Study on Partial replacement of CAnewFA.pptxStudy on Partial replacement of CAnewFA.pptx
Study on Partial replacement of CAnewFA.pptx
ย 
Investigation on fine aggregate by broken tiles in concrete
Investigation on fine aggregate by broken tiles in concreteInvestigation on fine aggregate by broken tiles in concrete
Investigation on fine aggregate by broken tiles in concrete
ย 
2 review
2 review2 review
2 review
ย 
Replacement of cement by glass powder and sand quarry dust
Replacement of cement by glass powder and sand quarry dustReplacement of cement by glass powder and sand quarry dust
Replacement of cement by glass powder and sand quarry dust
ย 
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksComparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
ย 
Study on Partial replacement of CAnewFA.pptx
Study on Partial replacement of CAnewFA.pptxStudy on Partial replacement of CAnewFA.pptx
Study on Partial replacement of CAnewFA.pptx
ย 
An Experimental Investigation on Strengths Characteristics of Concrete with t...
An Experimental Investigation on Strengths Characteristics of Concrete with t...An Experimental Investigation on Strengths Characteristics of Concrete with t...
An Experimental Investigation on Strengths Characteristics of Concrete with t...
ย 
The Use Of Permeable Concrete For Ground Water Recharge
The Use Of Permeable Concrete For Ground Water RechargeThe Use Of Permeable Concrete For Ground Water Recharge
The Use Of Permeable Concrete For Ground Water Recharge
ย 
BAMBOO AS PARTIALLY REPLACEMENT FOR COARSE AGGREGATE
 BAMBOO AS PARTIALLY REPLACEMENT FOR COARSE AGGREGATE BAMBOO AS PARTIALLY REPLACEMENT FOR COARSE AGGREGATE
BAMBOO AS PARTIALLY REPLACEMENT FOR COARSE AGGREGATE
ย 
J1304026874
J1304026874J1304026874
J1304026874
ย 
THE MECHANICAL PROPERTIES OF STEEL FIBER REINFORCED CONCRETE WITH QUARRY DUST...
THE MECHANICAL PROPERTIES OF STEEL FIBER REINFORCED CONCRETE WITH QUARRY DUST...THE MECHANICAL PROPERTIES OF STEEL FIBER REINFORCED CONCRETE WITH QUARRY DUST...
THE MECHANICAL PROPERTIES OF STEEL FIBER REINFORCED CONCRETE WITH QUARRY DUST...
ย 
Recycle and reuse of Demolished concrete
Recycle and reuse of Demolished concreteRecycle and reuse of Demolished concrete
Recycle and reuse of Demolished concrete
ย 
An Experimental Investigation on Strengths Characteristics of Concrete with t...
An Experimental Investigation on Strengths Characteristics of Concrete with t...An Experimental Investigation on Strengths Characteristics of Concrete with t...
An Experimental Investigation on Strengths Characteristics of Concrete with t...
ย 
C41011521
C41011521C41011521
C41011521
ย 
IRJET- Partial Replacement of Cement with Marble Dust Powder and Addition of ...
IRJET- Partial Replacement of Cement with Marble Dust Powder and Addition of ...IRJET- Partial Replacement of Cement with Marble Dust Powder and Addition of ...
IRJET- Partial Replacement of Cement with Marble Dust Powder and Addition of ...
ย 
Partial Replacement of Cement to Concrete by Marble Dust Powder
Partial Replacement of Cement to Concrete by Marble Dust PowderPartial Replacement of Cement to Concrete by Marble Dust Powder
Partial Replacement of Cement to Concrete by Marble Dust Powder
ย 
REVIEW.pptx
REVIEW.pptxREVIEW.pptx
REVIEW.pptx
ย 
COMPRESSIVE STRENGTH OF CONCRETE BY USING WASTE MATERIALS
COMPRESSIVE STRENGTH OF CONCRETE BY USING WASTE MATERIALSCOMPRESSIVE STRENGTH OF CONCRETE BY USING WASTE MATERIALS
COMPRESSIVE STRENGTH OF CONCRETE BY USING WASTE MATERIALS
ย 
PPT ON Glass powder and GGBS Mix concrete
PPT ON Glass powder and GGBS Mix concretePPT ON Glass powder and GGBS Mix concrete
PPT ON Glass powder and GGBS Mix concrete
ย 

Recently uploaded

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .DerechoLaboralIndivi
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 

GROUP NO 18 PPT.pptx

  • 1. METROPOLITAN INSTITUTE OF TECHNOLOGY & MANAGEMENT, OROS SINDHUDURG (MH) A PRESENTATION ON EXPERIMENTAL STUDY ON EFFECT OF PARTIAL REPLACEMENT OF COARSE AGGREGATE BY WASTE BRICKS. Presented by :- MR. RANE HARSHAD ARUN MR. BUTE SANTOSH JANU MR. GAWDE AKSHAY PRAMOD MR. KADAM VAIBHAV VASUDEV UNDER THE GUIDANCE OF PROF. R.R.NAIK DEPARTMENT OF CIVIL ENGINEERING Academic year 2021-2022
  • 2. 1) Introduction 2) Need of study 3) Aim & Objective 4) Methodology 5) Literature Review 6) Materials used 7) Test and result 8) Conclusion 9) Reference 10) Images CONTENT OF PRESENTATION
  • 3. INTRODUCTION Concrete :- Concrete is considered world most use construction materials and they form with homogeneous mixture of cement, fine aggregate, coarse aggregate and water with proper proportion. In this experimental work we focus on the coarse aggregate in concrete. We partially replace coarse aggregate by waste bricks. And we replace waste bricks in various percentage like 0% ,20%, 30%.
  • 4. WASTE BRICKS : Waste bricks are rejected bricks which are either over burned or not in shaped according to specification and the best way to recycle these bricks is by using them in making concrete. Over burn bricks or rejected bricks.
  • 5. NEED OF STUDY For this replacement we choose waste bricks because of their availability. The waste bricks are available from bricks manufacturing area. also in brick making a large number of bricks are rejected due to non conformity with the specification one such major nonconformity is the distorted form of brick produced due to the uneven temperature in kiln. The main constituent of the concrete is cement ,fine aggregate coarse aggregate, and water replacing some of these materials makes significant changes in cost as well as performance. coarse aggregate filled almost 70% of volume in concrete the cost of coarse aggregate rapidly increasing also the availability of the aggregate is getting reduced the major cost of the concrete is belonged to the aggregate. These waste bricks is can also be a potential source of coarse aggregate.
  • 6. AIM & OBJECTIVE 1) Determine the mechanical strength of concrete by replacing coarse aggregate with waste bricks. 2) Determine the behavior of fresh concrete after partial replacement of coarse aggregate with waste bricks. 3) To find out optimum percentage of waste brick for maximum compressive strength.
  • 7. METHODOLOGY Mix proportion : The batching of all ingredients was performed by weight. The sand was air dried in the laboratory before mixing. First the surface of damped with water then all the aggregate ( natural coarse aggregate ,fine aggregate and waste bricks aggregate ) were spread on the surface area till the aggregate. After through mixing of aggregate cement was introduced on the ground surface and water were added slowly as per W/C ratio. The concrete was mixed for approximately three minutes after the water was added.
  • 8. MIX CASTING : We use M20 grade of concrete for this replacement. It is found that the waste bricks base concrete is dark in color and is cohesive. The amount of water in the mixture plays important role on the behavior of fresh concrete. When the mixing time is long , mixture with high water content bled and segregation of aggregate and the past occurred . This phenomenon is usually followed by low compressive strength of hardened concrete. From the preliminary work, it was decided to observe the following standard process of mixing in all further studies. 1) Take the suitable proportion of the ingredients of the concrete. 2) Spread the fine aggregate on ground . 3) After that put the coarse aggregate as well as waste bricks . 4) After that add the water in suitable quantity. 5) And continue the wet mixing for another four minutes. 6) Then the fresh prepared mix was casting in standard cube molds.
  • 9. Curing : All the mold were cured by immersing in a curing tank in the lab the specimen were brought out from water approximately 24 hours before testing and kept at room temperature till testing. Following test were conducted for this experimental work a) Workability test b) compressive strength test
  • 10. LITERATURE REVIEW 2.1 Mr. G. S patil and Mr. P. B. Autade : have reported effect of replacement of course aggregate by jhama class brick in concrete and to developed a mixture proportioning process to manufacture jhama class brick base concrete and to identify study the effect of silent parameters that affect the properties of jhama class brick based concrete and to study the short term engineering properties of fresh and Hardened jhama class brick based concrete. 2.2 Dr. M. N. hirenath and Mr. Sanjay S. J : have reported replacement of course aggregate by demolished brick waste in concrete and to determine the suitabilty of brick waste as replacement of course aggregate in concrete production and discuss on investigate the mechanical and physical property of brick waste concrete and to compare the performance between concrete with brick waste as course aggregate partially replacement and conventional concrete This research is focus on some properties and strength behavior of concrete if demolised waste brick used as aggregate in construction.
  • 11. 2.3 Gopinandan dev and joyanta pal have reported on use of brick aggregate in standard concrete and its performance in elevated temperature. Crush brick can be used satisfactorily to produce M-25, M-30 keeping water cement ratt in range of 0.35 to 0.45 2.4 Bidve ganesh shivkant and G. N shete. Discuss about experimental study on effect of partially replacement of course aggregate by over burn brick backs concrete is chipper than conventional concrete 3% increment in the Compressive strength is found 20% replacement of course aggregate by over burnt brick bat waste and strength decrease by 3.3% when the 40% of course aggregate is replace by over burnt brick bat waste, by using aggregate cement ratio is 4.2 water cement ratio is 0.45 current study concluded that over brunt brick bat waste can replace course aggregate up to 20 %
  • 12. 2.5 Akshay N kadu and PM kulkarni : discuss about of partial replacement of over brunt brick. This research is basically study to development, the manufacture and physical properties of the concrete made by over brunt brick and demolished brick as a course aggregate from this chapter present the environment which upraise the utilization of some alternative materials of course aggregate in concrete at the time of brick manufacturing maximum number of brick are rejected due to non - Comformity with the required specification this rejected and waste brick can also be a potential source of course aggregate. 2.6 Durga chaitnya and kumar jagarapu. Alternative course aggregate in concrete they review the various admixture utilize in concrete like cocot shell rubber waste e - waste and jhama brick concrete made by utilizing jhama block as course total, at first invigorates the elevated compressive for the substitution 20% and 20 later that it diminished by 60% and 80%
  • 13. Cement is a fine, grey powder. It is mixed with water and materials such as sand, gravel, and crushed stone to make concrete. The cement and water form a paste that binds the other materials together as the concrete hardens. Ordinary Portland cement 53 grade was used for preparation of all concrete cubes. TEST ON CEMENT : 1. Fineness 2. Standard consistency 3. Initial and final setting time MATERIALS CEMENT:
  • 14. FINE AGGREGATE : The size of aggregate lesser than 4.75 mm is considered as fine aggregate. In this experimental programmed coarse sand which is less than 4.75mm is use the physical properties of fine aggregate like specific gravity , fineness modulus gradation are tested. COARSE AGGREGATE: The size of aggregate bigger than 4.75 mm is considered as coarse aggregate. There are different types of shape of coarse aggregate like rounded aggregate ,flaky aggregate and angular or crushed aggregate. In this experimental programmed 20mm crushed aggregate were used. The physical properties of coarse like specific gravity , water absorption , fineness modulus are tested.
  • 15. WASTE BRICKS AGGREGATE : Bricks is a durable building materials and construction materials with good load bearing properties various research have been carried out in porosity, permeability and absorption of brick. The traditional clay bricks are manually produced by pressing clay with certain amount of sand in the wooden mould. Then the wet bricks are first dried in the sun and air then transported to brick kiln for subsequent burning process the brick are burn upto 800 to 900 C the brick kiln. If the temperature in kiln is uncontrolled then the bricks are over burn.
  • 16.
  • 17. Test on materials : Test on cement 1) Fineness of cement 2) Standard consistency 3) Initial setting time 4) Final setting time of cement Test on fine aggregate 1) Fineness modulus of fine aggregate 2) Specific gravity of fine aggregate 3) Water absorption Test on coarse aggregate 1) Impact value of coarse aggregate 2) Specific gravity test 3) Water absorption test 4) Fineness modulus 5) Abrasion value Test on waste brick aggregate 1) Impact value of brick waste 2) Water absorption test 3) Specific gravity test 4) Fineness modulus 5) Abrasion value
  • 18. Results : Test on cement : the cement used was ordinary Portland cement 53 grade the cement should be fresh and uniform consistency. Where there is evidence of lumps or any foreign matter in the material TABLE : I Sr. no Characteristic value 1. Standard consistency 33 % 2. Initial setting time 48 min 3. Final setting time 240 min 4. fineness 4 %
  • 19. Test on fine aggregate : fine aggregate play a major role in concrete as it helps in packing of concrete that is as a filler in concrete. For making strong concrete the naturally available strong aggregate with particular size and shapes for making the concrete. TABLE : II SR.NO. Characteristic value 1. Type uncrushed 2. Specific gravity 2.46 3. Fineness modulus 2.30 4. Grading zone III 5. Water absorption 0.7 %
  • 20. Test on coarse aggregate : the size of aggregate bigger than 4.75 mm is considered as coarse aggregate there are different type of coarse aggregate like rounded, flaky and angular aggregate in this experimental programmed 20mm crushed aggregate are used. TABLE : III SR. NO. Characteristics Value 1. Type Crushed 2. Maximum Size 20 mm 3. Specific Gravity 2.62 4. Water Absorption 0.50% 5. Impact test 10.65% 6. Abrasion value 17.60% 7. Fineness modulus 6.29 8. Flakiness & Elongation Index 13.21 & 14.20 %
  • 21. Test on brick waste materials: bricks is a durable building materials with good quality load bearing properties various research have been carried out in porosity ,permeability and absorption of brick. The traditional clay brick are manually produced by pressing clay with certain amount of sand in the wooden mould. TABLE : IV SR. NO. Properties Value 1. Impact Value 21.19 % 2. Specific gravity 2.27 3. Water Absorption 8.11 % 4. Abrasion Value 39.26% 5. Fineness modulus 6.19 6. Flakiness & Elongation Index 11.48 &12.04 %
  • 22. MIX DESIGN 1) M-15 Grade : 2) M-20 Grade : Material Cement Fine Aggregate Coarse Aggregate Water Quantity 286.76 kg/m3 701.10 kg/m3 1218.30 kg/m3 157.72 Proportion 1 2.44 4.24 0.55 Material Cement Fine Aggregate Coarse Aggregate Water Quantity 315.45 kg/m3 673.54 kg/m3 1221.44 kg/m3 157.72 Proportion 1 2.13 3.87 0.50
  • 23. Test on Fresh Concrete 1) Slump Cone Test : ( M-15 Grade ) Replacement In ( % ) Without Admixture With Admixture 0% 30 mm 120 mm 20% 34 mm 130 mm 30% 40 mm 135 mm 2) Slump Cone Test : ( M- 20 Grade ) Replacement In ( % ) Without Admixture With Admixture 0% 22 mm 75 mm 20% 32 mm 110 mm 30% 50 mm 180 mm
  • 24. 1) Compaction Factor Test : ( M -15 Grade ) Replacement in ( % ) Without Admixture With Admixture 0 % 0.90 0.92 20 % 0.87 0.88 30% 0.84 0.87 2) Compaction Factor Test : ( M โ€“ 20 Grade ) Replacement In ( % ) Without Admixture With Admixture 0 % 0.84 0.89 20 % 0.82 0.85 30 % 0.81 0.84
  • 25.
  • 26.
  • 27. Compressive strength test : Replacement In (%) Strength After 7 Days Strength After 14 Days Strength After 28 Days 0 % 10.65 N/๐’Ž๐’Ž๐Ÿ 11.79 N/๐’Ž๐’Ž๐Ÿ 16.30 N/๐’Ž๐’Ž๐Ÿ 20 % 7.18 N/๐’Ž๐’Ž๐Ÿ 10.41 N/๐’Ž๐’Ž๐Ÿ 14.24 N/๐’Ž๐’Ž๐Ÿ 30 % 5.20 N/๐’Ž๐’Ž๐Ÿ 7.07 N/๐’Ž๐’Ž๐Ÿ 10.90 N/๐’Ž๐’Ž๐Ÿ M-15 Grade
  • 29. M -20 Grade Replacement In ( % ) Strength After 7 Days Strength After 14 Days Strength After 28 Days 0 % 10.40 N/๐‘š๐‘š2 14.19 N/๐‘š๐‘š2 20.22 N/๐‘š๐‘š2 20 % 6.42 N/๐‘š๐‘š2 10.48 N/๐‘š๐‘š2 17.02 N/๐‘š๐‘š2 30 % 5.77 N/๐‘š๐‘š2 8.01 N/๐‘š๐‘š2 12.70 N/๐‘š๐‘š2 Compressive strength test :
  • 30.
  • 31. CONCLUSION After the completion of project and final testing of cubes after 28 days And on the basis of results obtained during the experimental investigation, following. The compaction factor decreased as the percentage of waste bricks increased. The unit weight also decreased as the percentage of waste bricks increases in comparison with conventional concrete. Concrete made by using waste bricks as a coarse aggregate, it gives better strength for replacement of 20 % in M 15 grade of concrete. Compressive strength was decreases after adding 30 % of waste bricks aggregate by the replacement of stone aggregate in M 15 grade. In M15 grade of concrete it gives high strength as compared to M20 grade of concrete and it is suitable up to 20% replacement. Use of such waste materials not only cuts down the cost of construction, but also contributes in safe disposal of waste materials.
  • 32. REFERENCES: 1.Mr.G..S.Patil Mr.P.B.Autade international Journal of Engineering Research and General Science Volume 3, Issue 4, Part-2, July-( August, 2015.) Effect of partial replacement of coarse Aggregate by jhama class brick in concrete. 2. Dr.M.N Hirenath , Mr . SJ international journal of science Technology And engineering |volume 4 | Issue 2 |( Augest 2017) Replacement of coarse aggregate by demolished brick waste in Concrete 3. Akshay N kadu , PM kulkarni International journal of innovative Research in science Engineering and technology | Volume 9 | | Issue 7 | (July 2020 .) Used of partial replacement of over Burnt brick. 4. Bidve ganesh shivkant , G.N. shete international journal of Research in engineering science and management | volume | | Issue 4 | (April 2019.) Experimental study on effect of partial Replacement of coarse aggregate by over burnt brick.
  • 33. 5. Vikash Kumar Gautam , Mr. Devesh jayasawal international Journal for research in engineering application and management | Volume 4 | | issue 2 | (May 2018. ) Use of over burnt crushed Brick as coarse aggregate in concrete mix. 6. kumar nilesh , saxena anil kumar ,Sonu gourav international Journal of advance research , idea innovation in technology | Volume 3 |. | Issue 6 | ( 2017 ) Analysis of concrete made From over burned bricks. 7. Durga Chaitanya kumar international journal of emerging Technology in engineering research | volume 8 | | issue 12 | ( December 2020 ) Alternative coarse aggregate in concrete. 8. Gopinandan Dey and jayant pal international journal of Engineering and technology | volume 5 | No 4 (August 2013) Use Of brick aggregate in standard concrete and it's performance in Elevated temperature