1. SCAFFOLDPLANNING PROCESS
Safe system of work
Site location
Periodof timethe scaffoldis requiredtobe in place
Intendeduse
Height& length & any criticaldimensionswhichmayaffectthe scaffold
Numberof boardedlifts
Maximumworkingloadtobe imposed&maximumnumberofpeopleusingthescaffoldat anyone time
Typeof accessontothe scaffold
whetherthere is a requirementforsheeting,netting or brickguards
any specific requirementsorprovisionse.g. pedestrianwalkway,restrictionon tie locations,
inclusion/provisionformechanicalhandlingplante.g.hoist)
natureof the groundconditionsorsupportingstructure
informationonthe structure/buildingthescaffoldwillbeerectedagainsttogetherwithany relevant
dimensionsanddrawings
any restrictionsthat mayaffect the erection,alterationordismantlingprocess
Prior to installation,the scaffoldcontractororscaffolddesignercanthenproviderelevant informationaboutthe
scaffold. Thisshouldinclude:
type of scaffoldrequired(tube & fitting or system)
maximumbaylengths
maximumliftheights
platform boardingarrangement(i.e.5 + 2) and the numberofboardedlifts that canbeused at any onetime
safe workingload/ loadclass
maximumlegloads
maximumtiespacingbothhorizontalandvertical andtie duty
detailsof additionalelementssuchasbeamedbridges,fans,loadingbays etc., whichmaybe a standard
configurationorspecificallydesigned
informationcanbeincludedinrelevantdrawingsif appropriate
any other informationrelevantto the design,installationoruse of the scaffold
referencenumber,dateetc.to enablerecording,referencingandchecking
All scaffoldingmustbeerected,dismantled andalteredinasafe manner.Thisisachievedbyfollowingtheguidance
provided by the NASC in documentSG4‘Preventingfallsin scaffolding’fortubeand fitting scaffoldsor by following
similarguidanceprovidedbythe manufacturersofsystem scaffolding.
Forscaffoldsthat falloutside the scopeofa generallyrecognizedstandardconfigurationthedesignmustbesuch
that safe erectionanddismantlingtechniquescanalsobeemployedthroughoutthedurationof the works. Toensure
stabilityfor morecomplexscaffolds,drawingsshouldbeproducedand,wherenecessary,these mayneedto be
supplementedwithspecificinstructions.
Any proposedmodificationoralterationthattakes a scaffoldoutsidethe scopeof a generallyrecognizedstandard
configurationshouldbedesignedbya competentpersonandprovenby calculation.
2. SCAFFOLDPLANNING PROCESS
Managingworkatheightfollows a hierarchyof controls;
Avoid, Prevent, Minimize –whichbeginswiththe question canthework be donesafely from the ground?
Fallrestraints andsafety netting shouldonlybe consideredasalast resort if other safety equipmentcannotbeused.
Assessing work at height- Assess the risks, take precautions,andissueclearmethodstatementsforeveryone who
willwork at height.
Fragilesurfaces-Thehierarchyof controlsfor workingon or nearfragile surfacesisavoid, control,communicate,co-
operate.
Ladders- When it’s appropriateto useladders – and the threekey safety issues– position,conditionandsafeuse.
Towerscaffolds-Selectthe right towerfor the job; erect,use, move anddismantlethetower safely; ensurethat it is
stable; inspectit regularly;prevent falls.
ErectionSequence;
Obtainvalid work permit
Barricadethework area
Put warningsign
Risk assessment/TBT
Selectionofscaffoldmaterials
Apply proper manualhandlingtechnique
Propermeasurement/layouton the specific areathatthe structure needed toerect as perdesign/drawing
Levelingthe base foundation
Soft groundconditionneedsoleboards(1soleboardin 2 standardsis better than 1)
Lay out the standard,ledger, transom for kickerlift (allend cornermustbeat 900 angle)
Continueto the next lift measurementofminimum1.8m heightfirst lift
All connectionofstandards,ledgers,transom are fix by right anglecoupler
Levelingvertical post by installingledger/swaybracingonallsidesof the structure
Makea temporaryplatform in the middleofkickerlift & first list to obtainthe advanceguardrailsystem
Makesure all fall protectionequipmentareanchoredproperlyabove your height
Avoid throwingof anyscaffoldmaterialsuserope, fitting bags& pulley(ginwheel)
Properleveling of allhorizontal ledgers& transom & makesure allconnectionsaresecurelytights
Samesequenceoferectionuntilyou reachthe finalheightof the platform neededasper request
Internalaccessmustbein the maximum openingat450mm x600mm &shouldbeput cageonthe top
platform to prevent workersdirectlyfalldownnear the gapopening
Externalaccessmustbein maximum widthopeningof1m onthe workingplatform
Accessladdermustin a 750 angleandsecurelytied on top, middle,bottom
Ladderprojectionfrom theplatform heightat least 1m
Housekeepingallunusedscaffoldmaterials
Removebarricadeandwarningsign
Scaffoldstructurereadyfor inspection
Suspend/closethe permit