With reference to the above I would like to apply my candidature for the above
subjected post.I am a civil engineer having more than 31 years of experience in
maintenance work,building constructions and project management in
construction industries in the territory of India with civilconstruction &
maintenance work engaged in Hotel Industry,Building Construction&maximum
numbers of Maintenance of HotelBuilding (PSU) in Kolkata,Assam,Orissa &
Bihar.
I am enclosing here with my resume for your kind perusal and sympathetic
consideration. Hope you will be kind enough to offer me an opportunity in your
esteemed organization. I shallbring your adequate per excellence.
Thanking you in anticipation with best regards,
Yoursfaithfully
NirmalChatterjee
2. RESUME
NIRMAL CHATTERJEE
E-mail:-
nirmalchatterjee.60@rediffmail.com
chatterjeenirmal.60@gmail.com
Mobile. No:-+919433467265
KEY SKILLS: -Project Construction and Management
includingFinishing Work and Maintenance Work.
KEY QUALIFICATION:-
More than 31 years of professional experience in various fields of civil engineering
Particularly inbuilding constructions& its maintenance works.
Undergone Quality Control & Quality Assurance Works.
Undergone Supervisory Development Programme from 21.11.1990 to 23.11.1990.
Undergone Integrated Hotel Management Programme from Indian Tourism
Development Corporation from 01.03.1991 to 06.03.1991.
Undergone Basic Course in Interior Designing from April 1991 to July 1991
.
Undergone Training Programme on Maintenance from 01.09.1992 to 12.09.0992.from
National Productivity Council,Calcutta
Undergone Training for Lay-out of Handling Materials from National Productivity
Council,Calcutta from 19.04.1993 to 24.04.1993.
Undergone Training Programme for Employee Development from HRD,IVRCL
Infrastructures & Projects Ltd. On 26.11.2010.
Expertise in structure,foundations & retaining walls.
Having 21 years exposure & expertise in the maintenance of the Hotel Building.
Flexible attitude, always willing to acquire and learn new skill and good team work.
EDUCATION:-
MadhyamikParikshapassed from Dr.Shyamaprasad Mukherjee
Institution,Kolkata-54 in the year 1976.
H.S.(10+2) passed from Dr.Shyamaprasad Mukherjee Institution, Kolkata-54 in
the year 1978.
TECHNICAL QUALIFICATION:-
3. Licentiate in civil Engineering (LCE) Passed in 1984fromState Council for Engineering &
Technical Education,Govtof West Bengal.
Basic Course in Interior Designing from Indo American Society, Kolkata in 1991.
Proposed Position : - Dy.ProjectManager (CIVIL)
Name of Applicant : - NIRMAL CHATTERJEE
Profession : - Civil Engineer.
Date of Birth : - 31.12.1960
Marital Status : - Married.
Nationality : - Indian.
Permanent Address: - NirmalChatterjeeBG-165/1,
Hanapara, Jorakhana, Kestopur,
Kolkata-700102, WestBengal,India
Mob: -+919433467265/9681358833
Professional Experiences:-
PROFESSIONAL EXPERIENCE :-
From : May 2013 totill this date
Position : Dy.Project Manager.
Employer :Paul Builders Pvt. Ltd.
Client : Indian Statistical Institution, Kolkata
Project : Construction of one 6-storied Building.
Project Cost : 20crores.
Responsibility:-
Look after RCC frame structure,driven & bore piles,brick work,plaster,various types of
floorings,interior works including false flooring & false ceilings, various types of paving etc.
Worked for Quality Control & Quality Assurance Worksviz.cement-testing, brick-
testing,reinforcement-testing, cube-testing etc.
Preparation ofBar Bending Schedule(BBS) & sub contractors bill.
Coordinate with supervisory personnel, contractors and consultants to discuss and resolve
matter such as complaints and construction problems.
Supervision,quality control,checking of contractors’ bill for various type of structures.
Safety practices & quality implemented from starting of construction and achieved 29 million
zero Hour loss.
Coordinating project review meeting at site on weekly & monthly basis.
Coordinating monthly safety meeting at site.
PROFESSIONAL EXPERIENCE:
From : Jan.2013to April 2013
Position : Dy.ProjectManager
Employer : SSP Associates Pvt.Ltd.
Client : Indian Steel Plant (ISP).
Projects : Construction of a Bridge & Road
4. Project Cost : 12 chores.
Location : Assansol (Burn-pur), West-Bengal
Responsibility:-
Close co-ordination with design team,Architect for release the drawings as per priority for construction.
Follow up contractors for material supply at site in time.
Worked for Quality Control & Quality Assurance Works viz.cement-testing,brick-testing,
reinforcement-testing, cube-testing etc.
Checking of civil drawings with electrical drawings so as to avoid any mismatch and thereby reducing Re-
work at site.
Safety measure & quality implemented from the beginning of the project.
Checking of contractors’ bill in time so that to release the payment in time.
Coordinating with management,staffs,contractors,sub-contractors.
Involving planning of manpower’s& resources.
Involving Monthly meeting with management regarding work progress,contractor’s payment,timely
completion of project.
Checking of materials and quality control during executions.
Liasioning with Architect and Govt. approved test laboratory for testing and approval of materials.
PROFESSIONAL EXPERIENCE:
From : September 2010 to Dec. 2012
Position : Deputy ProjectManager.
Employer : IVRCL Infrastructures&Projects Ltd.
Client : IOCL & Irrigation Department,Govt. ofBihar
Location : Para deep,Orissa& North-Bihar (Birpur).
Project : Township Project – 28 Nos. Block &
Irrigation to Cosi –BarriageSystem (BECKS- Projects)
Project Cost : 400Chores&360Chores.
Responsibility:-
Co-coordinating with designer & Architect for issuing drawings, approval of materials as per
contract Specifications.
Co-ordination with management, supervisory staffs & contractors.
Interaction with contractors,Govt.Authority and Architect ensuring the civil work is doing as per
Construction schedule with due adherence to quality & safety norms.
Worked for Quality Control & Quality Assurance Works viz.cement-testing,brick-
testing,reinforcement-testing,cube-testing etc.
Checking of contractor’s bills as per work done.
Checking of construction drawings before execution.
Supervision of all civil activities from starting to hand over of the project.
PROFESSIONAL EXPERIENCE:-
From : December2009 toAugust 2010
Position : Project Consultant Engineer.
5. Employer : TechcreteConstructionPvt. Ltd, Kolkata
Client : CCAP
Project : Construction of one Shopping Mall,4-storied bldg.
Location : Guwahati, Assam
Responsibility:-
Responsible for all civil & mechanical works.
Co-ordination with client,Architect & contractors.
Preparation ofbar bending schedule(BBS),Monthly bill.
Checking of centering & shuttering,steel binding as per drawing,
Checking of sub-contractors bill.
Planning & scheduling of materials,manpower & site executions.
Checking of quality & safety measures.
Checking of civil & mechanical so as to avoid mismatch & wastage of men&materials.
PROFESSIONAL EXPERIENCE:
From : April 2009 to November 2009
Position : Project Engineer.
Employer : M/SAPS Michigan Pvt. Ltd.
Client : Kolkata Municipal Corporation
Location : Kolkata
Project : Renovation & Reconstruction of the underground sewer line (a jnnurm-project)
Project Cost : 5 chores.
Responsibility:-
Preparation of BBS & Monthly bill.
Checking of shuttering¢ering,reinforcement & RCC.
Checking & monitoring of quality of work.
Planning & scheduling of materials &manpower’s.
Coordination with client & Architect.
Preparation of DPR, Checking ofcontractors’ bill for various types of work like RCC
Structures,brickwork,plaster& all internal finishing works.
PROFESSIONAL EXPERIENCE:
From : January 2008 toMarch 2009
Position : SeniorProject Engineer.
Employer : Ganapati Projects
Client : Bengal Chemical Private Ltd.
Location : Kankurgachi, Kolkata, West Bengal
Project : Two Nos. (G+2) Building including bore-piling
6. Project cost : 21 Chores.
Responsibility:-
Responsible for all constructional activities like centering &shuttering,RCC work,brick
work,inter & External plaster,water proofing &flooring works.
Planning & scheduling of materials &manpower.
Preparation of sub-contractors bills,BBS,DPR,
Preparation and submission of all documents regarding execution to client & consultant.
Co-ordination with client & consultants.
Involving weekly meeting with client & consultants regarding progress,quality,target schedule.
Worked for Quality Control & Quality Assurance Works viz.cement-testing,brick-
testing,reinforcement-testing,cube-testing etc.
PROFESSIONAL EXPERIENCES:
From : December 2005 to December 2007.
Position : Project Engineer.
Employer : M/S Simplex Projects Pvt. Ltd.
Client :West Bengal Housing Board (ABASAN)
Location : Rajarhat, New Town, West Bengal Projects : Driven Piling
6300 Nos. including Pile Cap for SankalpoProject (G+14)
Project Cost : 17 Chores
Responsibility:-
Preparation &submission of all documents of civil activities like pore card,RFI,DPR& DLR.
Preparation of Bar Bending Schedule(BBS),Sub-contractors bill,estimating of materials &
BOQ.
Co-ordination with client & consultants.
Checking and maintaining of quality & safety precautions during constructions.
Worked for Quality Control & Quality Assurance Works viz.cement-testing, brick-testing,
reinforcement-testing, cube-testing etc.
Planning and scheduling of materials and manpower’s.
PROFESSIONNAL EXPERIENCE :-
From : January 1984toNovember2005
Position : S.A.E. (Civil).
Employer : Great Eastern Hotel,(PSU) Govt.of West Bengal.
Client : 1, 2&3, Old Court House Street, Kolkata - 700069
Projects : Maintenance ofthe Hotel Building
Responsibility:-
Supervision of all Maintenance activities& manpower.
Monitoring of the total Preventive & Routine Maintenance works
Maintaining of all paper work like pore cards,RFI,DLR & DPR.
Checking of sub-contractors bills.
Checking & maintaining of quality & safety precautions. Excellent outputs.
7. LANGUAGES KNOWN:-
SPEAK READ WRITE
Bengali Excellent Excellent
Hindi Excellent Excellent
English Excellent Excellent
Current CTC : Rs 6, 50,000 P.A.
Expected CTC : Negotiable.
Notice Period : One Month.
Declarations :One Month.
I,the undersigned certify that the data as furnished above is correct& the best of my knowledge &