1. PID
DCS Yokogawa
Thermodynamic
Process engineer who has
high motivation to learn /
work wonderfully and good
analysis skills
WHY ME?
SUHERI
ADE HERI
Mass Transfer Phenomena
SKILLS
Energy Transfer Phenomena
Continous Improvement
5R/5S
Mic. Office
SAP
Hysys
LANGUAGES
English
Japanese
Process
Control
Improvement
Process
CONTACTS
Suherifauzan@gmail.com
085788712479
linkedin.com/adeherisuheri
EDUCATION
2005 - 2008
Major : Science
SENIOR HIGH SCHOOL
At SMA Negeri 3 Tangerang
Tangerang
2007 - 2008
Predicate: Good
DIPLOMA 2 ENGLISH
At Practical Education Center
Tangerang
2008 - 2013
2005 - 2008
Grade : 3.00
Consentration : Polimer & Catalitic Process
Essay : Pre-design factory manufacture polyethylene
terephthalate by direct esterification with capacity 180.000
ton/year
Toefl : 453, certified by English Institution of Sriwijaya University
CHEMICAL ENGINEERING (BACHELOR)
At Sriwijaya University
Palembang
Tangerang
EXPERIENCE
LABORATORY ASSISTANT
Process Unit Lab (Sriwijaya University) Palembang
2011 - 2012
Together with lecturer of process unit and laboratory analyst
guide student to do practice for some subject, such as :
Fluid Mixing, Heat Conduction & Cooling tower (OTK 1)
Corrosion & Safonifikasi (OTK 2)
PT Mitsubishi Chemical Indonesia Cilegon
ON JOB TRAINING2012
Special task : Evaluation Efficiency Heat Exchanger
E-1831 A/B/C/D2/D3 in Plant PTA 1
IPI – LEPINDO Palembang
TRAINING INSTRUCTOR2012 - 2013
Give some HYSYS training for student of university
LABORATORY ASSISTANT COORDINATOR
Organic Chemistry Lab (Sriwijaya University) Palembang
2010 - 2011
Together analyst make practice schedule
Coordinate daily practice
Give some evaluation for student in the end of semester
Palembang
LABORATORY ASSISTANT
Organic Chemistry Lab (Sriwijaya University)
2009 - 2010
Together with lecturer of organic chemistry and laboratory
analyst guide student to do practice for some subject, such as :
Distillation
Alkyl Halida (synthesis n butyl bromide)
Asetilasi (synthesis asetanilida)
Esterification (synthesis metyl salisilat)
2. TRAINING
2010 – 2011
Vice Governor of BEM FT Unsri
ORGANIZATION EXPERIENCE
2010
Head of Secretarial of BEM FT
Unsri
2008 - 2009
Staff Syiar of KALAM (Keluarga
Mahasiswa Islam) FT Unsri
2008 - 2009
Staff Humas & Alumni of
IMATEK (Ikatan Mahasiswa
Teknik Kimia) FT Unsri
- Building Team Work
- SAP Overview
- Communication Change
- Change Management
- Skill Development Activities (SDA)
- Effective Presentation
- Introduction Management by
Olimpic System
- Overview ISO 9001 & 14001
- Overview 5R/5S
APP SCHOOL PROGRAM (2013)
2009 - 2013
Active Member of IRMA (Ikatan
Remaja Masjid) Ghuzail al Adzmi
MIC BENTLEY v8I (2010)
BPPT Serpong
ASPEN HYSYS (2011)
LPP Master Computer Palembang
FLARE RADIATION ANALYSIS
USING FLARESIM (2009)
Sriwijaya University
ECHIEVEMENT IN APP
Pre-Olympic SDA Competition
SECOND WINNER
FIRST WINNER
I-Suggest Competition for PMB Division
PT. Indah Kiat Pulp & Paper Serang Mill
PT. Indah Kiat Pulp & Paper Serang Mill
Collect abnormal machine & follow up to supporting section
( mechanic, instrument, electric etc)
Control daily report & checklist for machine
Answer abnormal quality product from quality control
report (action taken & preventif)
Support daily production process, especially for roll
handling after rewinding process
Support 5R/5S activity, follow up finding & solve it
Project admin (I-Suggest, JDI, SDA, SGA & SPC)
Support implementation ISO 9001, ISO 14001 & OHSAS,
especially for internal audit or external audit
Admin for monthly performance evaluation for operator
Make SOP (Standard Operation), WI (Work Instruction) &
OPL (One Point Lesson)
Work in different section to gain perspective (production,
stock preparation, colour kitchen, calcium carbonate &
deinking process)
PT. Indah Kiat Pulp & Paper Serang Mill Serang
PRODUCTION STAFFJuly 2015 –
January 2016
WORK EXPERIENCE
PRODUCTION HEAD ASSISTANT (DRY END PART)
PT. Indah Kiat Pulp & Paper Serang Mill Serang
January -
November
2016
Make sure coating & drying process conform with SOP
Together with leader shift control process in dry end part
Control preventif maintenance (weekly & monthly)
Trouble shooting for any defect from dry end process
Support customer complaint (make CCAR, provide PIC for
claim & make coaching)
TPM coordinator ( Make abnormal machine list, AM1, AM2 ,
AM3, RCA for breakdown, OPL & follow up abnormal
machine to supporting section)
Project admin (I-Suggest, JDI, SDA, SGA & SPC)
Check incoming roll (sparepart for paper machine)
Setting target for next year by brainstroming programme
with the other section
Support R&D for trial new chemical used in production
process
PRODUCTION SECTION HEAD
PT. Mayora Indah Jatake 1 Tangerang
November 16
– Present
Manage subordinate to finish production planning on time
Make sure molding machine & oven always on good
condition
Control oven temperature corresponding to SOP
Make sure sunpack machine & multi pack machine on good
condition
Make report for daily operation molding machine, oven &
packing machine
Reduce reject form daily operation machine
Control 5R/5S activity
Give motivation for subordinate to improve skill
Implementation working instruction
Control daily & weekly cleaning
Make Rencana Lembur Harian (RLH)
3. PROJECT LIST
SKILL DEVELOPMENT ACTIVITY (SDA)
PT. Indah Kiat Pulp & Paper Serang Mill Serang
2014 - 2016
Title : Reduce Energy Cost Paper Machine 6
Description : How to reduce consumption for steam, electric & water
Target : Steam (1.45T/TP), Electric (475 T/TP) & Water (11.20 T/TP)
2014
Title : Increase Production Capacity Paper Machine 6
Description : How to increase production capacity for a month
Target : Net Winder (23,750 ton/month)
2015
Title : Paper Machine 6 Quality Improvement
Description : How to reduce reject PM 6 up to finishing & defect paper (streak)
Target : Reject up to finshing (11%) & Streak (0 ton/month)
JUST DO IT (JDI)
PT. Indah Kiat Pulp & Paper Serang Mill Serang
2014 -
2016
Install air regulator for install metering bar to holder varibar ( 01/12/2014 - 01/01/2015)
Marking setting gap pick up roll (08/12/2014 - 08/01/2015)
Install shower deckle filler layer (08/12/2014 – 08/01/2015)
Making cover coater varibar area (02/06/2014 – 02/07/2016)
Reinstall name plate of control panel (01/04/2014 – 30/04/2016)
Making dial gauge cover for adjuster gap applicator roll (12/05/2015 – 30/06/2015)
Making line flushing for OBA Chemical (10/05/2015 – 10/06/2015)
Modify sewer coater (01/05/2015 – 01/06/2015)
Making air line for starch spray shower (01/06/2015 – 30/06/2015)
Modify piping of starch spray filler layer (01/05/2015 – 10/06/2015)
Practical Education Center Branch Dian Plaza Tangerang
ENGLISH TEACHERMay – July
2013
SerangPT Indah Kiat Pulp & Paper Serang Mill
MANAGEMENT TRAINEE PRODUCTION ENGINEERINGJuly 2013 -
July 2015
Work in different section to gain perspective (production,
stock preparation, colour kitchen, calcium carbonate &
deinking process)
Receive classroom instruction in subjects related to their
rotational experience
Join in improvement project to make better production
process
Organize the work group especially in dry end process
Support production manager in daily job
Title : Reduce Unit Consumption Paper Machine 6 up to Finishing B
Description : How to reduce unit consumption PM 6 & unit consumption finishing
Target : Unit consumption PM (0.76 T/TP) & Unit consumption Finishing (1.060 T/TP)
Action Plan :
- Balancing reject Paper Machine & Finishing
- Replace fiber consumption
- Improve quality
o
2016