Introduction
Rafiq engineering industries (Pvt.) Ltd. (ROYAL FAN) come into existence in 1957
under the dedicated and enterprising businessman.
A modern automatic Japanese plant was installed in 1985 to manufacture enameled
copper wires of top international quality. Marketed under the brand name royal copper
wire, this copper wire has won major segments in Karachi, Lahore, Gujrat and
Gujranwala.
10/10/2017
5
Mission statement:-
 They being the market leader in Pakistan fans industry, their
aim to maintaining their present position, by constantly
improving the quality of their products and introducing
innovative designs backed by cutting edge technologies.
10/10/2017
6
These opportunities are spread across the globe. They are therefore, now focusing on
exports to a number of countries. These countries are;
Gulf region
UAE
Saudi Arabia
Yemen
Bangladesh
Europe
USA
Vision statement :-
10/10/2017
7
They always strive to remain NO.1, in the industry and by
the grace of GOD they are NO.1. Their objective therefore,
is to retain this position by increasing their market share in
local & foreign markets by 10% annually.
Objectives
10/10/2017
8
ISO (International Organization for Standardization)is the world's largest
developer and publisher of International Standards.
ISO is a network of the national standards institutes
of 160 countries, one member per country, with a Central
Secretariat in Geneva, Switzerland, that coordinates the system.
Certificates:-
10/10/2017
9
Competitors:-
R.E.I pvt limited is performing the good for performance to face all its
competitor in fan industries like
Wahid Industries Pvt Ltd.
G.F.C Fan Pvt Ltd.
Parwaaz Fan Pvt Ltd .
Younas Fan ind. Pvt Ltd.
10/10/2017
10
Hierarchy of Company:-
10/10/2017
11
Hierarchy of Company:-
10/10/2017
12
Number of employees:-
Operations and production.
Sheikh Khawar Rafiq.
Finance and marketing.
Sheikh Anjum Rafiq.
Under every manager.
3-4 foremen that are answerable to the manager
Totally there are.
10-12 manager
35-40 foremen
850-900 employees which are working in three shifts.
10/10/2017
13
Main offices:-
There are number of offices in
the royal fan but the main
offices are in following cities;
 Gujrat
 Gujranwala
 Lahore
 Karachi
10/10/2017
14
DEPARTMENTS OF Royal Fans:-
1. HR Department
2. Purchase Department
3. Inspection Department
4. Production Department
5. Sales Department
6. Marketing Department
7. Accounts Department
8. Export Department
9. Assembly Line
10/10/2017
15
Products
Fans
Bracket
Ceiling
Louver
Exhaust
TCP & Table Fans
Pedestal
Mist Fans
E-Saver Fan
Washing
Plastic
Metal
Dryer
Metal
Plastic
10/10/2017
16
Product Portfolio:-
Products of royal fan Consists of
Deluxe Series Lifestyle Series Washing Machines" Room Coolers
10/10/2017
17
SWOT Analysis
Strengths
•No compromise on quality.
•Gives the life time /18
years warranty.
Weaknesses
•Employee’s attitude.
•Lack of innovation.
•In house rejection is more.
Opportunities Threats
•PAK Fan
•Shipping.
•Adopting the latest
technology.
•Innovating the company.
10/10/2017
18
BCG
Matrix
1. Dogs:-
High growth & high
market share.
2. Question marks:
High growth markets
with high market
share.
3. Stars:
High growth
markets with high
market share.
4. Cash cows:
Low growth
markets with high
market share
10/10/2017
19
PEST Analysis
 Political
 New state tax policies for accounting
 Political instability in a foreign partner country
 Economic
 International economic growth
 Changes in interest rates
 Social
 Population growth rate’
 Technical
 Automated processes in the industry
 Rate of innovation
 Changes in technology incentives
10/10/2017
20
Thank you
10/10/2017
21

More Related Content

What's hot

Nishat mills limited presenation 24 03-2011
Nishat mills limited presenation 24 03-2011Nishat mills limited presenation 24 03-2011
Nishat mills limited presenation 24 03-2011Alina Gilbert
 
Consumer Behavior Project
Consumer Behavior ProjectConsumer Behavior Project
Consumer Behavior Projectmirah javed
 
Transformation Process of Saphire Textile Mills
Transformation Process of Saphire Textile MillsTransformation Process of Saphire Textile Mills
Transformation Process of Saphire Textile MillsOmer Malik
 
askari cement report
askari cement reportaskari cement report
askari cement reportEhsan Elahi
 
Industrial relations act 2012 full
Industrial relations act 2012 fullIndustrial relations act 2012 full
Industrial relations act 2012 fullMis bah
 
Academia vs industry
Academia vs industryAcademia vs industry
Academia vs industrySetia Pramana
 
Khaadi Report with Brief Combined final
Khaadi Report with Brief Combined finalKhaadi Report with Brief Combined final
Khaadi Report with Brief Combined finalAhmed Amin
 
Servis - Shoes for everyone..
Servis - Shoes for everyone..Servis - Shoes for everyone..
Servis - Shoes for everyone..Zuhaib Ali
 
Application of downsized technology in khadi sector
Application of downsized technology in khadi sectorApplication of downsized technology in khadi sector
Application of downsized technology in khadi sectorAdane Nega
 
Nishat mills LTd Final Project
Nishat mills LTd Final ProjectNishat mills LTd Final Project
Nishat mills LTd Final ProjectMehmood Ul Hassan
 
Khaadi business case (semester project)
Khaadi business case (semester project)Khaadi business case (semester project)
Khaadi business case (semester project)Ali Raza Anjum
 
Maria b - consumer behavior
Maria b - consumer behavior Maria b - consumer behavior
Maria b - consumer behavior Ahmed Faizan
 

What's hot (20)

Nishat mills limited presenation 24 03-2011
Nishat mills limited presenation 24 03-2011Nishat mills limited presenation 24 03-2011
Nishat mills limited presenation 24 03-2011
 
Consumer Behavior Project
Consumer Behavior ProjectConsumer Behavior Project
Consumer Behavior Project
 
Transformation Process of Saphire Textile Mills
Transformation Process of Saphire Textile MillsTransformation Process of Saphire Textile Mills
Transformation Process of Saphire Textile Mills
 
askari cement report
askari cement reportaskari cement report
askari cement report
 
Industrial relations act 2012 full
Industrial relations act 2012 fullIndustrial relations act 2012 full
Industrial relations act 2012 full
 
Mitchels annual report
Mitchels annual reportMitchels annual report
Mitchels annual report
 
Nishat Mills
Nishat MillsNishat Mills
Nishat Mills
 
Servsafe Certificate
Servsafe Certificate Servsafe Certificate
Servsafe Certificate
 
Chenab textile
Chenab textileChenab textile
Chenab textile
 
Academia vs industry
Academia vs industryAcademia vs industry
Academia vs industry
 
Khaadi Report with Brief Combined final
Khaadi Report with Brief Combined finalKhaadi Report with Brief Combined final
Khaadi Report with Brief Combined final
 
Servis - Shoes for everyone..
Servis - Shoes for everyone..Servis - Shoes for everyone..
Servis - Shoes for everyone..
 
Dawlance
DawlanceDawlance
Dawlance
 
NISHAT
NISHAT NISHAT
NISHAT
 
Application of downsized technology in khadi sector
Application of downsized technology in khadi sectorApplication of downsized technology in khadi sector
Application of downsized technology in khadi sector
 
Nishat mills LTd Final Project
Nishat mills LTd Final ProjectNishat mills LTd Final Project
Nishat mills LTd Final Project
 
Khaadi business case (semester project)
Khaadi business case (semester project)Khaadi business case (semester project)
Khaadi business case (semester project)
 
Maria b - consumer behavior
Maria b - consumer behavior Maria b - consumer behavior
Maria b - consumer behavior
 
Presentation
PresentationPresentation
Presentation
 
Khaadi SWOT Analysis.pdf
Khaadi SWOT Analysis.pdfKhaadi SWOT Analysis.pdf
Khaadi SWOT Analysis.pdf
 

Similar to Royal Fan Industry Gujrat Punjab Pakistan

RATIO ANALYSIS ON R.S FASTENERS
RATIO ANALYSIS ON R.S FASTENERS RATIO ANALYSIS ON R.S FASTENERS
RATIO ANALYSIS ON R.S FASTENERS 8437812912
 
RATIO ANALYSIS OF R.S FASTENERS
RATIO ANALYSIS OF R.S FASTENERS RATIO ANALYSIS OF R.S FASTENERS
RATIO ANALYSIS OF R.S FASTENERS mithpreet
 
mitchell fruit farm ltd
mitchell fruit farm ltdmitchell fruit farm ltd
mitchell fruit farm ltdsaeed anjum
 
Saeed speacial on mitchells fruit farm ltd
Saeed speacial on mitchells fruit farm ltdSaeed speacial on mitchells fruit farm ltd
Saeed speacial on mitchells fruit farm ltdsaeed anjum
 
Dharmesh varmora ceramic report
Dharmesh varmora ceramic reportDharmesh varmora ceramic report
Dharmesh varmora ceramic reportjitharadharmesh
 
forging-presentation for mass production.pdf
forging-presentation for mass production.pdfforging-presentation for mass production.pdf
forging-presentation for mass production.pdfashoksanghvi1
 
forging-presentation for mass production.pdf
forging-presentation for mass production.pdfforging-presentation for mass production.pdf
forging-presentation for mass production.pdfashoksanghvi1
 
Case Study-Investment casting sourcing
Case Study-Investment casting sourcingCase Study-Investment casting sourcing
Case Study-Investment casting sourcingJohn William
 
Ponencia Laura Rodriguez Barbero. Ingeniero en el mundo de la Energía. Cepsa ...
Ponencia Laura Rodriguez Barbero. Ingeniero en el mundo de la Energía. Cepsa ...Ponencia Laura Rodriguez Barbero. Ingeniero en el mundo de la Energía. Cepsa ...
Ponencia Laura Rodriguez Barbero. Ingeniero en el mundo de la Energía. Cepsa ...IngenieriaQuimicaUCLM
 
Business process re engineering at royal enfield
Business process re engineering at royal enfieldBusiness process re engineering at royal enfield
Business process re engineering at royal enfieldLohith Lohi
 
TRAINING REPORT ON ROAD ROLLERS
TRAINING REPORT ON ROAD ROLLERSTRAINING REPORT ON ROAD ROLLERS
TRAINING REPORT ON ROAD ROLLERSParag Priyank
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyJohn William
 

Similar to Royal Fan Industry Gujrat Punjab Pakistan (20)

RATIO ANALYSIS ON R.S FASTENERS
RATIO ANALYSIS ON R.S FASTENERS RATIO ANALYSIS ON R.S FASTENERS
RATIO ANALYSIS ON R.S FASTENERS
 
RATIO ANALYSIS OF R.S FASTENERS
RATIO ANALYSIS OF R.S FASTENERS RATIO ANALYSIS OF R.S FASTENERS
RATIO ANALYSIS OF R.S FASTENERS
 
mitchell fruit farm ltd
mitchell fruit farm ltdmitchell fruit farm ltd
mitchell fruit farm ltd
 
Saeed speacial on mitchells fruit farm ltd
Saeed speacial on mitchells fruit farm ltdSaeed speacial on mitchells fruit farm ltd
Saeed speacial on mitchells fruit farm ltd
 
CA Sanket Kalyani_CV
CA Sanket Kalyani_CVCA Sanket Kalyani_CV
CA Sanket Kalyani_CV
 
Kay - Company Profile
Kay - Company ProfileKay - Company Profile
Kay - Company Profile
 
Dharmesh varmora ceramic report
Dharmesh varmora ceramic reportDharmesh varmora ceramic report
Dharmesh varmora ceramic report
 
forging-presentation for mass production.pdf
forging-presentation for mass production.pdfforging-presentation for mass production.pdf
forging-presentation for mass production.pdf
 
forging-presentation for mass production.pdf
forging-presentation for mass production.pdfforging-presentation for mass production.pdf
forging-presentation for mass production.pdf
 
Report_docx
Report_docxReport_docx
Report_docx
 
Case Study-Investment casting sourcing
Case Study-Investment casting sourcingCase Study-Investment casting sourcing
Case Study-Investment casting sourcing
 
Pdf polycab-profile-(silver)
Pdf polycab-profile-(silver)Pdf polycab-profile-(silver)
Pdf polycab-profile-(silver)
 
Ponencia Laura Rodriguez Barbero. Ingeniero en el mundo de la Energía. Cepsa ...
Ponencia Laura Rodriguez Barbero. Ingeniero en el mundo de la Energía. Cepsa ...Ponencia Laura Rodriguez Barbero. Ingeniero en el mundo de la Energía. Cepsa ...
Ponencia Laura Rodriguez Barbero. Ingeniero en el mundo de la Energía. Cepsa ...
 
Business process re engineering at royal enfield
Business process re engineering at royal enfieldBusiness process re engineering at royal enfield
Business process re engineering at royal enfield
 
TRAINING REPORT ON ROAD ROLLERS
TRAINING REPORT ON ROAD ROLLERSTRAINING REPORT ON ROAD ROLLERS
TRAINING REPORT ON ROAD ROLLERS
 
november Profile
november Profilenovember Profile
november Profile
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case Study
 
Project on sdl 01
Project  on sdl 01Project  on sdl 01
Project on sdl 01
 
F.y. rado
F.y. radoF.y. rado
F.y. rado
 
Abdul ghaffar and sons overseas employment
Abdul ghaffar and sons overseas employmentAbdul ghaffar and sons overseas employment
Abdul ghaffar and sons overseas employment
 

Recently uploaded

THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 

Recently uploaded (20)

THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 

Royal Fan Industry Gujrat Punjab Pakistan

  • 5. Introduction Rafiq engineering industries (Pvt.) Ltd. (ROYAL FAN) come into existence in 1957 under the dedicated and enterprising businessman. A modern automatic Japanese plant was installed in 1985 to manufacture enameled copper wires of top international quality. Marketed under the brand name royal copper wire, this copper wire has won major segments in Karachi, Lahore, Gujrat and Gujranwala. 10/10/2017 5
  • 6. Mission statement:-  They being the market leader in Pakistan fans industry, their aim to maintaining their present position, by constantly improving the quality of their products and introducing innovative designs backed by cutting edge technologies. 10/10/2017 6
  • 7. These opportunities are spread across the globe. They are therefore, now focusing on exports to a number of countries. These countries are; Gulf region UAE Saudi Arabia Yemen Bangladesh Europe USA Vision statement :- 10/10/2017 7
  • 8. They always strive to remain NO.1, in the industry and by the grace of GOD they are NO.1. Their objective therefore, is to retain this position by increasing their market share in local & foreign markets by 10% annually. Objectives 10/10/2017 8
  • 9. ISO (International Organization for Standardization)is the world's largest developer and publisher of International Standards. ISO is a network of the national standards institutes of 160 countries, one member per country, with a Central Secretariat in Geneva, Switzerland, that coordinates the system. Certificates:- 10/10/2017 9
  • 10. Competitors:- R.E.I pvt limited is performing the good for performance to face all its competitor in fan industries like Wahid Industries Pvt Ltd. G.F.C Fan Pvt Ltd. Parwaaz Fan Pvt Ltd . Younas Fan ind. Pvt Ltd. 10/10/2017 10
  • 13. Number of employees:- Operations and production. Sheikh Khawar Rafiq. Finance and marketing. Sheikh Anjum Rafiq. Under every manager. 3-4 foremen that are answerable to the manager Totally there are. 10-12 manager 35-40 foremen 850-900 employees which are working in three shifts. 10/10/2017 13
  • 14. Main offices:- There are number of offices in the royal fan but the main offices are in following cities;  Gujrat  Gujranwala  Lahore  Karachi 10/10/2017 14
  • 15. DEPARTMENTS OF Royal Fans:- 1. HR Department 2. Purchase Department 3. Inspection Department 4. Production Department 5. Sales Department 6. Marketing Department 7. Accounts Department 8. Export Department 9. Assembly Line 10/10/2017 15
  • 16. Products Fans Bracket Ceiling Louver Exhaust TCP & Table Fans Pedestal Mist Fans E-Saver Fan Washing Plastic Metal Dryer Metal Plastic 10/10/2017 16
  • 17. Product Portfolio:- Products of royal fan Consists of Deluxe Series Lifestyle Series Washing Machines" Room Coolers 10/10/2017 17
  • 18. SWOT Analysis Strengths •No compromise on quality. •Gives the life time /18 years warranty. Weaknesses •Employee’s attitude. •Lack of innovation. •In house rejection is more. Opportunities Threats •PAK Fan •Shipping. •Adopting the latest technology. •Innovating the company. 10/10/2017 18
  • 19. BCG Matrix 1. Dogs:- High growth & high market share. 2. Question marks: High growth markets with high market share. 3. Stars: High growth markets with high market share. 4. Cash cows: Low growth markets with high market share 10/10/2017 19
  • 20. PEST Analysis  Political  New state tax policies for accounting  Political instability in a foreign partner country  Economic  International economic growth  Changes in interest rates  Social  Population growth rate’  Technical  Automated processes in the industry  Rate of innovation  Changes in technology incentives 10/10/2017 20