Chapter One
1
Basic Concept of Environmental Impact Assessment
(EIA)
1.1 THE CONCEPT OF ENVIRONMENT
2
 The environment is surroundings of an individual
organism or a community of organisms, ranging on
up to the entire biosphere, the zone of Earth that is
able to sustain life.
 Environment is the surrounding which encompasses
all the external conditions influencing development
or growth of people, animals, and /or plants.
 The natural factors such as land forms, soil, climate,
vegetation, minerals, water, air, etc together influence
the human factors like demography, economy, culture,
social attitudes and institutions.
 Therefore, the term environment includes physical,
social, cultural, economic and aesthetic dimensions.
A. PHYSICAL ENVIRONMENT
3
 This includes the physical, chemical and
biological factors, both natural as well as man
made which include:
 land and climate, vegetation, wildlife and
natural areas,
 surrounding land use and physical character
of the area,
 infrastructure
 air pollution
 noise pollution
 water pollution levels
B. SOCIAL ENVIRONMENT
4
 politics ,etc
 This include large number of factors such as
 population density,
 community composition,
 social cohesion,
 educational factors,
 religion,
 norms,
 values,
 sanctions,
 governing the people,
 family structure,
C. ECONOMIC ENVIRONMENT
 This includes all economic factors like
 employment and unemployment,
 levels and sources of income, etc
D. Aesthetic environment
This subcategory includes factors such as
o historical,
o archeological and
o architecultural objects or sites.
5
1.2 ENVIRONMENTAL INVENTORY
 Environmental inventory is a complete description of
the environment as it exists in an area where a
particular proposed action is being considered. The
inventory is compiled from a check of descriptors
for:
 the physical-chemical environment
 biological environment
 cultural environment, and
 socio-economic environment
 Environmental Inventory is a complex description of
the env’t as it exists in an area where a particular
6
proposed actions of is being considered.
1.3 Definition of EIA
What is EIA?
• There are many definitions of EIA.
• The following are the sample of some of these
definitions which indicate the nature of the process,
including;
• "an assessment of impacts of a planned activity on the
environment" (United Nations)
• "EIA is the systematic process of identifying the future
consequences of a current or proposed action" (IAIA)
• Environmental impact assessment is the
methodology or instrument of identifying, analyzing
and evaluating and forecasting in advance any
impact, be it positive or negative, which results from
the implementation of a proposed project or public
instruments. 7
Definition cont…
•"EIA is the systematic, reproducible and interdisciplinary
evaluation of the potential effects of a proposed action and its
practical alternatives on the physical, biological, cultural and
socio-economic attributes of a particular geographical area"
(USEPA, 1993)
•"a procedure for assessing the potential environmental
impacts of a project before it is built, so that these impacts
can be properly considered during the decision-making
process and so that mitigative measures for detrimental
impacts can be defined“"a tool to use in integrated planning
of development proposals, policies and programs: (Sadar et
al., 1994)
•"an activity which identifies, predicts, interprets and
communicates information, and proposes ameliorative
measures, about impacts of a proposed action or
development proposal on human health and the well-being of8
the ecosystem upon which human survival depends" (Sadar
et al., 1994)
DEFNITION C O N T …
 It is also defined as a formal process for identifying
the likely effects of particular activities or projects
on the biogeographical environment, and on human
health and well-being, along with interpreting and
communicating information about these likely
impacts.
 EIA is a management tool, like economic analysis
and engineering feasibility studies for official and
managers who must make important decisions
about major development projects.
 From this definition we can understand that EIA is
for projects.
 To include other things we need Strategi9c
Environmental Assessment (SEA) that expands EIA
•SEA is a systematic and comprehensive process of
evaluating the environmental impacts of a policy,
program, and plan prior to their implementation. In
short, EIA is for projects and SEA for policies, plans
and programs (public instruments).
•The definition of the EIA, though includes the impact
assessment of all types of programmes, policies, and
projects, but it is more certainly applied to the
developmental projects, such as the installation of a
new industry, large scale animal farming projects, or a
power plant, or a major airport, or a major township,
etc.
•Most of the countries of the world, nowadays, almost
mandatorily require preparations of environmental impact
assessment and to get clearance from the environmen1t0al
authorities before they are granted permissions to proceed with
Implications of an EIA Definition
EIA is defined as a systematic process of:
11
(identifying,
 Determining and managing
predicting, interpreting,
describing, measuring,
integrating, communicating, involving, and
controlling) the Potential (or real) impacts (direct
and indirect, individual and cumulative, likelihood of
occurrence) of Proposed (or existing) human
actions (projects, plans, programs, legislation,
activities) and their alternatives on the Environment
(physical, chemical, biological, ecological, human
health, cultural, social, economic, built, and
interrelations)
Implications of an EIA Definition cont…
This definition demonstrates that EIA is a process
that blends numerous activities. It shows that EIA
12
a broad definition of the
of alternatives, and of proposed
encompasses
environment,
actions.
The systematic exploration of interrelationships
(e.g., among environmental components, between
the proposal and the environment, among
alternatives, among impacts) is clearly crucial in
EIA.
ALL OF THESE DEFINITIONS SHARE THE BASIC CONCEPTS OF:
1.4 Historical Origins of EIA
•The main objective, however, was to ensure that public safety
and health were adequately protected.
•Separate documents, however, were used to be submitted to
each of the regulatory agencies involved, such as the water
authority, air pollution control authority, etc; and no attempt
was made in those earlier years to prepare a comprehensive
overview.
•The EIA of major developments have been undertaken in
developed countries, particularly in USA, Europe, and Japan, etc;
since 1950s or so.
In the 1960s and 1970s, the environmental movement resulted
in environmental groups becoming more active in many
countries.
Responding to the demands of these pressure groups, the
governments accepted the principle that citizens organizations
should get an opportunity to participate in the decisio14n
making process of those major developments that could
have significant environmental impacts.
HISTORICAL ORIGINS OF EIA CONT…
 Environmental impact assessment was first formally
established in the USA in 1969 and has since spread,
in various forms, to most other countries
 The U.S. National Environmental Policy Act (NEPA) of
1969 was the first legislation to provide a robust
framework for allowing all recognized environmental
concerns to be addressed simultaneously.
 As a consequence, the USA enacted the first
comprehensives environment legislation- the
National Environmental Policy Act (NEPA) on
January 1, 1970.
 This US action was followed by Canada, when the Canadian
Federal government established an environmental
assessment and review process in 1973. Many other countri1e5s
then followed suit, particularly after the creation of the UN
Historical Origins of EIA cont…
•The EIA process has, thus, evolved since the early
1970s.
•In the initial years, however, the emphasis was on
assessing the impacts on measurable factors,
particularly those for which some prescribed
standards are available (such as the air quality,
water quality, solid waste disposal, etc).
•After a few years, the EIAs began to include biological
and ecological factors.
•More recently, the EIAs have been broadened even
further to include socio-economic factors (such as
employment opportunities, cultural impacts,
recreational factors, etc.), so that the trade-offs amon1
g6
socio-economic and environmental factors could be
evaluated.
Historical Origins of EIA cont…
•It is pertinent to note that NEPA predated the
1972 UN conference in Stockholm where global
concerns about the state of the environment
emerged, an indicator in its own right of the
mould as having the greatest international impact
of any American legislation.
•Thus, the initiation of EIA indicates that it was
environmental crisis in the industrialized
countries.
•So for developing countries, like ours, it is the
right time to apply EIA proactively than after
crisis learning from others. 17
1.5 REASONS FOR USING EIA
 EIA has been developed as a result of the failure of
traditional project appraisal techniques to account for
environmental impacts.
 Many development projects in the past were designed
and constructed in isolation from any consideration
of their impacts on the environment, resulting in:
 higher costs,
 failure of projects,
 significant environmental change,and
 negative social effects
18
1.6 AIMS OF EIA
 Despite differences in individual EIA systems
throughout the world, the EIA process shares certain
aims:
 to provide decision-makers with analysis of the
total environment
so that decisions can be made based on as nearly
complete and balanced information as possible;
 to assess and present intangible/unquantifiable
effects
that are not adequately addressed by cost/benefit
analysis and other technical reports;
19
AIMS O F EIA CONT….
20
•To provide information to the public on a
proposal;
•To formalize the consideration of alternatives to
a proposal being considered, in order that the least
environmentally harmful means of achieving the
given objective can be chosen;
•To improve the design of new developments and
safeguard the environment through the application
of mitigation and avoidance measures
1.7 EIA objectives
EIA objectives can be categorized in to long term and
short term.
The long term objectives include the following:
•Conservation and sustainable use of natural
resources
•Protection and enhancement of the quality of all life
forms
•Integration of environmental considerations in
development planning processes
21
The short term objectives include the following:
•To assess the nature, intensity and duration of
impact of proposed development projects
•To promote local community and public
participation in the EIA processes of a project
•To promote social and cultural considerations in
project design
•To provide a methodology for prevention and
mitigation of expected impacts due to the presence of
a project 22
1.8 The purpose of EIA
1. An aid to decision-making
The primary purpose of EIA is to ensure that impacts of projects,
policy and programs, etc are adequately and appropriately
considered and mitigation measures for adverse significant impacts
incorporated when decisions are taken.
2. An aid to the formulation of development actions
Many developers no doubt see EIA as another set of hurdles to
jump before they can proceed with their various activities; the
process can be seen as yet another costly and time consuming
activity in the permission process. However, EIA can be of great
benefit to them, since it can provide a framework for considering
location and design issues and environmental issues in parallel.
3.An instrument for sustainable development
Underlying such immediate purpose is of course the central and
ultimate role of EIA as one of the instruments to achieve
sustainable development: Development that dose not cost the
Earth!
23
24
Generally, the primary and secondary purposes of EIA include:
•safeguarding valued ecological processes and heritage areas;
•avoiding irreversible and unacceptable loss and deterioration of
natural capital;
•ensuring development is adjusted to the potentials and capacities of the
resource base;
•optimizing natural resource use, conservation and management opportunities;
•protecting human health and community well being;
•addressing distributional concerns related to the disruption of
people and traditional lifestyles;
•improving coordination among participating agencies and actions;
•fostering better designed and planned development projects, i.e.,
greener and more cost effective;
•empowering community development and building local capacity
through public participation;
•instilling environmental values and accountabilities across a
range of institutions; and
•internalizing environmental costs and damages in industry
consistent with the polluter pays principle.
1.9 MISCONCEPTIONS ABOUT EIA
The introduction of EIA has encountered resistance
on the part of many planners and engineers, who have
seen it as an unneeded change to traditional practices,
in spite of its intended role in improving the project
planning process.
•EIA has been severely criticized in some parts of the
developing world as being inappropriate for
application there.
•Some of these criticisms include:
25
MISC ONCEPTIONS CONT…
MISC ONCEPTIONS CONT…
27
MISCONCEPTIONS ABOUT EIA AND COUNTER ARGUMENTS
1. "EIA is too expensive"
 This is not true. Costs of EIA are commonly around
1%, sometimes up to 5% in complex cases of project
costs, often within normal variability of project
costs.
 In contrast, EIA often results in cost saving through
reduced changes to the project at later stages, or
through identification of easier and more efficient
ways to meet project goals.
 EIA should be carried out efficiently, just like any
other part of the planning process. 28
MISCONCEPTIONS AND COUNTER ARGUMENTS CONT…
2. "EIA is just an add-on and occurs too late to do
any good"
•EIA certainly has less value if done too late in the
project cycle; it must be done early enough so that
results can be incorporated into the detailed design.
•If EIA is done too late, costs for redesign of the
project can be high, or the EIA is ignored.
29
MISCONCEPTIONS AND COUNTER ARGUMENTS CONT…
3. "EIA delays projects"
•If properly phased, EIA should no more delay projects
than any part of the planning process.
•It should be done in parallel with other activities.
4. "EIA is too complex"
•This is not true.
•EIA is a simple process. Sometimes, however, the
potential impacts can be complex and therefore
difficult30to quantify.
•The degree to which you must investigate these
questions as part of the planning process must be
relative to the overall significance of the impacts.
ISCONCEPTIONS AND C O U N T E R ARGUMENTS
CONT…
5. "EIA doesn't produce useful results"
Often this has been true. This can be due to lack of a practical focus,
and/or poor training of practitioners. When carried out properly, EIA is
a valuable part of project planning.
6. "EIA will be misused to stop development"
There have been cases where EIA has been misused to stop
development. However, this does not invalidate the use of EIA; it
indicates a problem with how it is being coordinated. A properly
carried out EIA process is much more likely to generate support for
development.
31
MISCONCEPTIONS AND COUNTER ARGUMENTS CONT…
7. "We're too poor to afford EIA"
This is never true. No country is "too poor" to do its
planning properly. Bad planning means failing projects,
and these are often projects paid for by the country
through development loans. Bad planning means lack
of sustainability. Bad planning means extra costs to
society. Poor countries can't afford such costs. May be
wealthy, developed countries can arguably afford to
waste and destroy resources, but poor ones definitely
can't. EIA is therefore even more important for
develop3
i2
ng countries than for developed ones.
33
1.10 What are the characteristics of a good EIA?
The characteristics of environmental impacts vary.
Typical parameters to be taken into account in impact
prediction and decision-making include:
•nature (positive, negative, direct, indirect);
•magnitude (severe, moderate, low);
•extent/location (area/volume covered, distribution);
•timing (during construction, operation,
decommissioning, immediate, delayed, rate of
change);
•duration (short term, long term, intermittent,
continuous);
•reversibility/irreversibility;
•likelihood (probability, uncertainty or confidence in
the prediction); and
•significance (local, regional, global).
34
1.11 The Legal and Regulatory framework of EIA
policies-are plan of actions adopted by an individual or social
group
-A line of argument rationalizing the course of action of a
government
Strategies-An elaborate and systematic plan of action
Laws-The collection of rules imposed by authority
guidelines-A detailed plan or explanation to guide you in setting
standards or determining a course of action
-A rule or principle that provides guidance to appropriate
behavior
standards-A basis for comparison; a reference point against
which other things can be evaluated
-The ideal in terms of which something can be judged
Legal framework- Established by or founded upon law or
official or accepted rules
Convention- (diplomacy) an international agreement
Proclamation-A formal public statement
Environmental impact assessment needs:
•policy/policy making body
•legislation/legislation body
•directives
•enforcement
•coordination of the different authorities/ ministries/
bodies involved
35
It is also imperative to know/define:
•Who conducts EIA?
•Who reviews EIA?
•Which projects need EIA?
•What /which are the guidelines, norms etc to prepare
EIA?
All the above mentioned points require a well-
established legal system pertaining to environmental
impacts of development activities in a country or
region.
36
37
INTERNATIONAL BANKS’ REQUIREMENTS
 The Regional Development Banks, such as the
European Bank for Reconstruction and Development
(EBRD), the African Development Bank (AfDB) and
the Asian Development Bank (ADB), all have
environmental policies and guidelines which in most
respects resemble those of the World Bank Policies.
 The Regional Development Banks use environmental
screening to place projects as category A, B or C
(ADB & EBRD) or as category I, II or III (AfDB). These
categories are similar in principle to those of the
World Bank with only minor differences between
each Bank. ADB and EBRD procedures are developed
from the World Bank procedures (Hydro power
development, Environmental effects, 1995)
38
ENVIRONMENTAL POLICY
• The broad aim of UNECE’s environment activities is
to safeguard the environment and human health, and
to promote sustainable development in its member
countries in line with Agenda 21.
• Agenda 21 calls on all countries to assess the
environmental suitability of infrastructure for human
settlements, to ensure that relevant decisions are
preceded by EIAs and to take into account the costs of
any ecological consequences. It also calls on countries
 to integrate environmental considerations in
decision-making at all levels and in all ministries and
to ensure that transparency and accountability
prevail when economic or other policies have
environmental repercussions.
DECLARATION
39
• The principles of the 1972 Stockholm Declaration
did not expressly identify EIA as an instrument of
national or international policy.
• However, the rationale underlying EIA can be
identified in the Principle 14, which states: rational
planning constitutes an essential tool for reconciling
development and environment needs.
• In the same spirit, Principle 15 reads: planning
must be applied to human settlements and
urbanization with a view to avoiding adverse effects on
the environment and opting maximum social, economic
and environmental benefits for all.
• Agenda 21 in Paragraphs 8.5(b) and 10.8(b) also
endorses comprehensive analytical procedures for
prior and simultaneous assessment of the impacts of
decisions, including their environmental impacts and
the assessment of costs, benefits and risks, and the
systematic application of techniques and procedures
for assessing environmental impacts.
• EIA is also encouraged in specific Agenda 21
programs, including deforestation, conservation of
biodiversity and management of biotechnology.
• Agenda 21 supports the need for individuals, groups
and organizations to participate in the EIA process.
40
WORLD BANK
 The safeguard policies of the Bank are operationalizing
the 'do good' approach to the Bank investment lending
operations and are fundamental in meeting the three pillars
of the World Bank Environment Strategy:
 Improving the quality of life
 Improving the quality of growth
 Protecting the quality of the regional and global commons.
 Environmental Assessment, one of ten Safeguard
Policies, is used in the Bank to examine the potential
environmental risks and benefits associated with Bank
investment lending operations. It is an essential tool for
integrating environmental and social concerns into
development policies, programs and projects by providin41g
the minimum requirements that all Bank-supported
42
THE WORLD BANK’S REQUIREMENTS
 Common to all Regional Development Banks,
including the World Bank, is that the responsibility
for meeting the environmental requirements rests on
the hand of the borrower.
 The World Bank has ten “Safeguard Policies” whose
primary objective is to ensure that Bank operations
do not cause adverse impacts. The ten safeguard
policies are grouped into Environment & Social
Policies.
 Of these ten safeguard policies, three are not
applicable as they relate to international law on
waters and disputed areas, and the safety of
dams.
EXAMPLES OF THE WORLD BANK SAFEGUARD POLICIES
 OP 4.01 Environmental Assessment
• The core requirement of this policy is that screening
should be done as early as possible for potential impacts
and select appropriate instrument to assess, minimize and
mitigate potentially adverse impacts.
• EnvironmentalAssessment (EA) ensures that appropriate
levels of environmental and social assessment are carried
out as part of project design. It also deals with the public
consultation process and ensures that the views of PAPs
and local NGOs are incorporated as early as possible for
CategoryAand B projects.
• It is worth noting that OP 4.01 applies to all components
of a project with financing from the World Bank,
including co-financed components by the Borrower or b4
3
y
other funding agencies.
OP/BP 4.11 PHYSICAL CULTURAL RESOURCES
 Protection of cultural, historical archeological sites
 The policy requires the project avoid or mitigate adverse
impacts of development projects on physical cultural
resources.
 The policy bases itself on investigating and inventorying any
chance finds and cultural resources potentially affected. It
includes mitigation measures when there are adverse impacts
on physical cultural resources.
 The Borrower assesses the project’s potential impacts on
physical cultural resources as an integral component of the
EnvironmentalAssessment (EA).
 The Bank avoids projects that will significantly damage non-
replicable cultural property, and will assist only those
projects that are sited or designed so as to prevent such
OP/BP 4.12 INVOLUNTARY RESETTLEMENT
• Avoid or minimize involuntary resettlement where
feasible, exploring all viable alternative project designs.
• The policy covers not only physical relocation, but any
loss of land or other assets resulting in:
(i) relocation or loss of shelter;
(ii) loss of assets or access to assets; and
(iii)loss of income sources or means of livelihood, whether
or not the affected people must move to another location.
• Concerning public consultation, resettlers as well as the
host communities should be consulted for the successful
implementation of the resettlement process. The views
of the consulted re-settlers and the host commun4i5ties
should be incorporated into the resettlement action plan
(RAP) including the list of their choices.
46
BANK’S POLICY ON ACCESS TO INFORMATION
• It is a requirement of the Bank that the peoples
residing in the project areas have the Right to be
informed of the proposed development project(s) in
their respective areas. Therefore, prior to project
appraisal, the summary of the study of projects along
with other relevant information should be disclosed at
the Bank’s as well as project area (local) level.
• The Disclosure Policy requires that Category B
Environmental Assessment reports should be self-
standing documents, and thus disclosure is a pre-
requisite for appraisal of the project.
CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT
IN A TRANSBOUNDARY CONTEXT (ESPOO, 1991)
 Environmental threats do not respect national
borders. Governments have realized that to avert this
danger they must notify and consult each other on all
major projects under consideration that might have
adverse environmental impact across borders.
 The Espoo Convention is a key step to bringing
together all stakeholders to prevent environmental
damage before it occurs. The Convention entered into
force in 1997
CONT…
 The Espoo (EIA) Convention sets out the
obligations of Parties to assess the
environmental impact of certain activities at
an early stage of planning.
 It also lays down the general obligation of
States to notify and consult each other on all
major projects under consideration that are
likely to have a significant adverse
environmental impact across boundaries
1.12 Policy Framework for EIA in Ethiopia
• Until 1997, Ethiopia did not have a comprehensive
environment policy as such.
• The Environmental Policy of Ethiopia was issued in
1997 to provide overall guidance in the conservation
and sustainable utilization of the country’s
environmental resources in general.
• The overall objective of the environmental policy is to promote
the sustainable social and economic development of the country
through, inter alia, sustainable management and utilization of the
natural resources of the country.
• The specific objectives of the environmental policy seeks to
achieve are ensuring the conservation, development and
sustainable use of essential ecological processes and life support
systems, biological diversity and the empowerment and
participation of the people in environmental management. 49
• The environmental policy lays the foundation for EIA in the
country.
EIA ETHIOPIA CONT
•EIA is a recent phenomenon in Ethiopia.
•It became a legally required procedure toward the end of
year 2002, though emerged de facto before 2002 when a few
land developers, including state-owned agencies,
approached the Environmental ProtectionAuthority (EPA)
to have their environmental impact studies reviewed.
•Since the Environmental ImpactAssessment Proclamation
№ 299 of 2002 was adopted by the House of Peoples’
Representatives, some efforts have been made to implement
the law by the EPAand the relevant regional environmental
organs, which were themselves established by Proclamation
№ 295 of 2002.
•In spite of these efforts, EIAin Ethiopia has until now
remained weak.
LE G A L FRAMEWORK F OR EIA IN ETHIOPIA
1. The FDRE Constitution
The concept of sustainable development and environmental rights are
enshrined in Article 43, 44 and 92 of the Federal Constitution
states the following people’s environmental concerns.
Article, 43: The Right to Development
The peoples of Ethiopia as a whole and each Nation,
Nationality and people in Ethiopia in particular have the right to
improve living standards and to sustainable development.
Nations have the right to participate in national development
and, in particular, to be consulted with respect to policies and
projects affecting their community.
All internationalAgreements and relations concluded,
established or conducted by the state shall protect and ensure
Ethiopia’s right to sustainable development.
The basic aim of development activities shall be to enhance the
capacity of citizens for development and to meet basic needs.
ARTICLE, 44: ENVIRONMENT RIGHTS
All persons have the right to live in a clean and healthy
environment.
All persons who have been displaced or whose livelihoods have
been adversely affected because of state programs have the right
to commensurate monetary or alternative means of
compensation, including relocation with adequate state
assistance.
Article, 92: Environmental Objective
Government shall endeavor to ensure that all Ethiopians live in
a clean and healthy environment.
The design and implementation of programs and projects of
development shall not damage or destroy the Environment.
People have the right to full consultation and the expression of
views in the planning and implementation of environmental
policies and projects that affect them directly.
Government and citizens shall have the due to protect the
environment.
2. ENVIRONMENTAL IMPACT ASSESSMENT LAW
 Following the provisions of the environment policy, the
Ethiopian government introduced the Environmental
Impact Assessment Proclamation (Proclamation № 299 of
2002).
 The Environmental Impact Assessment Proclamation
(federal proc. No. 299/2002): has made it mandatory that
development projects are required to be subjected to EIA
scrutiny.
 It means that EIA is a legal requirement.
3. THE ENVIRONMENTAL POLICY AND STRATEGY
•National environmental policies, conservation strategy
as well as the Regional Conservation Strategy (RCS)
provide a number of guiding principles that indicate
and require a strong adherence to sustainable
development. Concerning the needs of EIA, the
following basic issues are contained indicated in these
documents.
•An early consideration of environmental impacts in
project and program design
•Reorganization of public consultation, including
mitigation plans and contingency plans
•Provision of auditing and monitoring is a legally
binding requirement and needs to be institutionalized.
4. INTERNATIONAL CONVENTIONS
•In addition to national environmental legislations, the federal
democratic republic of Ethiopia is also a party to a number of
regional and international conventions and protocols on
environment.
•The government has established an Environmental Protection
Authority, and this Authority is designated as focal point for
the implementation of these conventions and protocols.
•Accordingly;Article 9(4) of the constitution of the Federal
Democratic Republic of Ethiopia provides that once an
international agreement is ratified through the accepted or
established procedure, it automatically becomes an integral
part of the law of the land.
•Consequently, the convention and the protocol are the laws of
this land.
CONVENTIONS CONT…
Therefore; the following international conventions and
protocols are relevant to any proposed EIAproject
I.International Finance Corporation’s (IFC) Guidance on
Performance Standards on Social & Environmental Sustainability
II. Convention on Biological Diversity
III. Framework Convention on Climate Change
IV.The United Nations Conventions to Combat Desertification
V.The Basel Convention - to control and regulate the
Trans boundary movement of hazardous wastes.
VI. The Stockholm Convention
VII.Convention on International Trade in Endangered
Species of Fauna and Flora
IV NVIRONMENTAL MPACT SSESSMENT UIDELINE OCUMENT
The guide to EIA document that was prepared by EPA
provides a background to EIA and environmental
management in Ethiopia .
The basic objectives of the guide are:
•Providing all interested parties with a consistent
approach in EIA
•Providing background information for the context of EIA
in Ethiopia
•Assisting proponents in identifying their EIA
responsibility
•Assisting communities and NGO groups in realizing their
environmental rights with regard to EIA
•Assisting the authority in determining their roles and
responsibility as decision makers in the EIA process:
5 SEC TO R A L PO L I C I E S AND STRATEGIES
A. Water Resources Management Policy and Strategies
B. National Rural Land Administration and Use
(Proclamation No. 456/2005)
C. Measures Related to Occupational Health Control
D. Proclamations No. 42/1993 Labor Proclamation
E.Special Decree No, 20/1990 Council of State Special
Decree to Provide for the Registration and Control of
Pesticide
F.National Biodiversity Policy and Strategies
6 LEGISLATIVE INSTRUMENTS
1. Environmental Impact Assessment (Proclamation No.
299/2002)
 This Proclamation (No 299/2002) aims primarily at
making the EIAmandatory for categories of projects
specified under a directive issued by the EPA.
2.Environmental Pollution Control (Proclamation No.
300/2002)
3. Solid Waste Management (Proclamation No. 513/2007)
4.Labour Proclamation (Proc. No. 377/2003)
5. Public Health Proclamation (Proc. No. 200/2000).
6. Compensation
 Proclamation No. 455/2005), the basis and amount of
compensation is clearly explained.
ETHIOPIAN ENVIRONMENTAL PROTECTION
 EPAwas established under the Ministry of Natural
Resources Development and Environmental Protection
(MNRD&EP), in May 1994.
 Later, EPAas environmental regulatory and monitoring
body has become independent institution and re-
established by proclamation no. 295/2002.
 Vision
 Ensure that a participatory environmental management
for sustainable development governs the use of
environmental resources by the present and future
generations in each sector at each administrative level.
MISSION
•Put in place an environmental management system that
could support the national development efforts by
avoiding duplication of efforts among stakeholders,
promoting sustainable utilization of environmental
resources and strengthening coordinated but
differentiated responsibilities through:
· Preparing the State of Environment Report;
· Development of environmental strategic plan;
· Formulation of environmental laws and standards;
· Provision of support for environmental regulatory
bodies and implementers; and
· Undertaking monitoring and effectiveness evaluation
of the environmental system in place
OBJECTIVE
 The objective of the Authority is to formulate
policies, strategies, laws and standards, which foster
social and economic development in a manner that
enhance the welfare of humans and the safety of the
environment sustainably, and to spearhead in
ensuring the effectiveness of the process of their
implantation.
63
1.13 Guiding principles of EIA
The basic principles of EIA are
Early application: - protective consideration and integration
of environmental concerns at the earliest stages of the
conceptualization of the projects, programs or policies.
Participation:- appropriate and timely access and
opportunity to the process for all interested and affected
parts.
Issues based:- the focus of an EA is on the resolution of
major issues of significant impacts.
Alternatives:- all feasible options to a projects, policies,
programs or its component like site, processes, products,
raw materials, designs, etc including the “no go” option
should be considered.
Accountability:- refers to answerability of proponent
consultant and environmental agencies for their respective
roles and responsibilities.
principles of EIA cont….
Flexibility: - the assessment process should be able to adapt to deal
efficiently with changing circumstances and decision making
situation.
Credibility: - assessments reviews are under taken with
professionalism and objectivity.
Time and cost effectiveness: - the assessment process, its out comes
and decision taking will ensure environmental protection at the least
cost and within reasonable time to society and developer alike.
Transparency: - all assessment decisions, and their basis, should be
open and accessible to the public.
Supportive: - the review and decision making process should
enhance and support sustainable development and environmentally
friendly investment efforts.
Conservation based:- the EIA process should strive to promote
conservation based development
Practicality: - the information and out puts provided by the 64
assessment process are readily usable in the decision making and
planning.
65
1.14 Benefits of EIA
The potential benefits of EIA are
•saving in capital and operating costs
•environmentally sound and sustainable design
•increase project acceptance
•facilitate better decisions
•better compliance with standards
•better protection of the environment and human
health

More Related Content

What's hot

Disaster Management In INDIA.
Disaster Management In INDIA.Disaster Management In INDIA.
Disaster Management In INDIA.Urvesh Prajapati
 
MULTI HAZARD AND DISASTER VULNERABILITY OF IN DIA
MULTI HAZARD AND DISASTER VULNERABILITY OF IN DIAMULTI HAZARD AND DISASTER VULNERABILITY OF IN DIA
MULTI HAZARD AND DISASTER VULNERABILITY OF IN DIAKartik Mondal
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 
Lecture 9: Urban Disaster Risk Reduction
Lecture 9: Urban Disaster Risk ReductionLecture 9: Urban Disaster Risk Reduction
Lecture 9: Urban Disaster Risk ReductionESD UNU-IAS
 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIASakthivel R
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)SANDEEP PATRE
 
Sendai framework 2015 2030
Sendai framework 2015 2030Sendai framework 2015 2030
Sendai framework 2015 2030Mahendra Poudel
 
Environmental Laws PD 1586
Environmental Laws PD 1586Environmental Laws PD 1586
Environmental Laws PD 1586Ramses Bato
 
Environmental impact assessment in nepal
Environmental impact assessment in nepalEnvironmental impact assessment in nepal
Environmental impact assessment in nepalBhim Upadhyaya
 
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Himanshu Goyal
 
'The role of insurance and reinsurance in disaster risk management'
'The role of insurance and reinsurance in disaster risk management''The role of insurance and reinsurance in disaster risk management'
'The role of insurance and reinsurance in disaster risk management'UNDP Climate
 
Environmental laws & policies
Environmental  laws & policiesEnvironmental  laws & policies
Environmental laws & policiesSrinivas Gajjela
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)KASHYAP V
 
1 2 3_environmental principles
1 2 3_environmental principles1 2 3_environmental principles
1 2 3_environmental principlesindaykarya
 

What's hot (20)

Disaster Management In INDIA.
Disaster Management In INDIA.Disaster Management In INDIA.
Disaster Management In INDIA.
 
MULTI HAZARD AND DISASTER VULNERABILITY OF IN DIA
MULTI HAZARD AND DISASTER VULNERABILITY OF IN DIAMULTI HAZARD AND DISASTER VULNERABILITY OF IN DIA
MULTI HAZARD AND DISASTER VULNERABILITY OF IN DIA
 
Environmental Governance
Environmental GovernanceEnvironmental Governance
Environmental Governance
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Lecture 9: Urban Disaster Risk Reduction
Lecture 9: Urban Disaster Risk ReductionLecture 9: Urban Disaster Risk Reduction
Lecture 9: Urban Disaster Risk Reduction
 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
 
Eia pakistan perspective
Eia   pakistan perspectiveEia   pakistan perspective
Eia pakistan perspective
 
Environmental policy
Environmental policyEnvironmental policy
Environmental policy
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
 
Sendai framework 2015 2030
Sendai framework 2015 2030Sendai framework 2015 2030
Sendai framework 2015 2030
 
Environmental Laws PD 1586
Environmental Laws PD 1586Environmental Laws PD 1586
Environmental Laws PD 1586
 
Environmental impact assessment in nepal
Environmental impact assessment in nepalEnvironmental impact assessment in nepal
Environmental impact assessment in nepal
 
Historical context of disaster management
Historical context of disaster managementHistorical context of disaster management
Historical context of disaster management
 
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
 
'The role of insurance and reinsurance in disaster risk management'
'The role of insurance and reinsurance in disaster risk management''The role of insurance and reinsurance in disaster risk management'
'The role of insurance and reinsurance in disaster risk management'
 
Environmental laws & policies
Environmental  laws & policiesEnvironmental  laws & policies
Environmental laws & policies
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
1 2 3_environmental principles
1 2 3_environmental principles1 2 3_environmental principles
1 2 3_environmental principles
 

Similar to EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment (1).pptx

BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfTausifAhmad53
 
Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...MdHaque78
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact AssessmentTesfahunTesema
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)Lucasrukona
 
Facts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsFacts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsIgiegie Oghenegueke
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
 
Environment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And ProblemsEnvironment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And Problemsinventionjournals
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Jagriti Agarwal
 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
 
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptxEnvironemental Impact Assessment.pptx
Environemental Impact Assessment.pptxKalaimani
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
 
January 8th esp 179 lecture- class intro and eia basics
January 8th  esp 179 lecture- class intro and eia basicsJanuary 8th  esp 179 lecture- class intro and eia basics
January 8th esp 179 lecture- class intro and eia basicsCEQAplanner
 
Tourism planning environmental impact assessment eia - rahul garg
Tourism planning  environmental impact assessment eia - rahul gargTourism planning  environmental impact assessment eia - rahul garg
Tourism planning environmental impact assessment eia - rahul gargrahul garg
 
Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)S.Shafiqur Rehman
 
EIA: The state of art.
EIA: The state of art.EIA: The state of art.
EIA: The state of art.Tulsi Makwana
 

Similar to EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment (1).pptx (20)

EIA presentation.pptx
EIA presentation.pptxEIA presentation.pptx
EIA presentation.pptx
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
 
Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact Assessment
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
Facts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsFacts about-environmental-impact-assessments
Facts about-environmental-impact-assessments
 
What is EIA????
What is EIA????What is EIA????
What is EIA????
 
EIA
EIAEIA
EIA
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And ProblemsEnvironment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And Problems
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptxEnvironemental Impact Assessment.pptx
Environemental Impact Assessment.pptx
 
Eia e top1_body
Eia e top1_bodyEia e top1_body
Eia e top1_body
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
January 8th esp 179 lecture- class intro and eia basics
January 8th  esp 179 lecture- class intro and eia basicsJanuary 8th  esp 179 lecture- class intro and eia basics
January 8th esp 179 lecture- class intro and eia basics
 
Tourism planning environmental impact assessment eia - rahul garg
Tourism planning  environmental impact assessment eia - rahul gargTourism planning  environmental impact assessment eia - rahul garg
Tourism planning environmental impact assessment eia - rahul garg
 
Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)
 
EIA: The state of art.
EIA: The state of art.EIA: The state of art.
EIA: The state of art.
 

More from AbdirahmanYusufAli1

9. Ethiopian Health Systems and Policy.pptx
9. Ethiopian Health Systems and Policy.pptx9. Ethiopian Health Systems and Policy.pptx
9. Ethiopian Health Systems and Policy.pptxAbdirahmanYusufAli1
 
Lecture note health-planning-pptx.pptx
Lecture note   health-planning-pptx.pptxLecture note   health-planning-pptx.pptx
Lecture note health-planning-pptx.pptxAbdirahmanYusufAli1
 
193414920-Primary-Health-Care-Ppt.ppt ggg
193414920-Primary-Health-Care-Ppt.ppt ggg193414920-Primary-Health-Care-Ppt.ppt ggg
193414920-Primary-Health-Care-Ppt.ppt gggAbdirahmanYusufAli1
 
primary health care lecture note about h
primary health care lecture note about hprimary health care lecture note about h
primary health care lecture note about hAbdirahmanYusufAli1
 
breastfeedingreal-150526070457-lva1-app6891.pptx
breastfeedingreal-150526070457-lva1-app6891.pptxbreastfeedingreal-150526070457-lva1-app6891.pptx
breastfeedingreal-150526070457-lva1-app6891.pptxAbdirahmanYusufAli1
 
548941977-Chapter-Four.pptx ASSESSMENT OF CNS
548941977-Chapter-Four.pptx  ASSESSMENT OF CNS548941977-Chapter-Four.pptx  ASSESSMENT OF CNS
548941977-Chapter-Four.pptx ASSESSMENT OF CNSAbdirahmanYusufAli1
 
eatingdisorders-130711052741-phpapp02.pptx
eatingdisorders-130711052741-phpapp02.pptxeatingdisorders-130711052741-phpapp02.pptx
eatingdisorders-130711052741-phpapp02.pptxAbdirahmanYusufAli1
 
benefits of breast feeding and important of exclusive of breast feeding
benefits of breast feeding and important of exclusive of breast feedingbenefits of breast feeding and important of exclusive of breast feeding
benefits of breast feeding and important of exclusive of breast feedingAbdirahmanYusufAli1
 
OG-IFE-Update_Food-Security-Livelihoods.pptx
OG-IFE-Update_Food-Security-Livelihoods.pptxOG-IFE-Update_Food-Security-Livelihoods.pptx
OG-IFE-Update_Food-Security-Livelihoods.pptxAbdirahmanYusufAli1
 
protein-energymalnutritionnew-111229122250-phpapp01.pptx
protein-energymalnutritionnew-111229122250-phpapp01.pptxprotein-energymalnutritionnew-111229122250-phpapp01.pptx
protein-energymalnutritionnew-111229122250-phpapp01.pptxAbdirahmanYusufAli1
 
integratedmanagementofacutemalnutritionimam-200725060624.pptx
integratedmanagementofacutemalnutritionimam-200725060624.pptxintegratedmanagementofacutemalnutritionimam-200725060624.pptx
integratedmanagementofacutemalnutritionimam-200725060624.pptxAbdirahmanYusufAli1
 
Essential_Concepts_on_HealthSystems_Management._-_Copy.pptx
Essential_Concepts_on_HealthSystems_Management._-_Copy.pptxEssential_Concepts_on_HealthSystems_Management._-_Copy.pptx
Essential_Concepts_on_HealthSystems_Management._-_Copy.pptxAbdirahmanYusufAli1
 
protein-energymalnutritionnew-111229122250-phpapp01.pptx
protein-energymalnutritionnew-111229122250-phpapp01.pptxprotein-energymalnutritionnew-111229122250-phpapp01.pptx
protein-energymalnutritionnew-111229122250-phpapp01.pptxAbdirahmanYusufAli1
 

More from AbdirahmanYusufAli1 (20)

9. Ethiopian Health Systems and Policy.pptx
9. Ethiopian Health Systems and Policy.pptx9. Ethiopian Health Systems and Policy.pptx
9. Ethiopian Health Systems and Policy.pptx
 
Lecture note health-planning-pptx.pptx
Lecture note   health-planning-pptx.pptxLecture note   health-planning-pptx.pptx
Lecture note health-planning-pptx.pptx
 
193414920-Primary-Health-Care-Ppt.ppt ggg
193414920-Primary-Health-Care-Ppt.ppt ggg193414920-Primary-Health-Care-Ppt.ppt ggg
193414920-Primary-Health-Care-Ppt.ppt ggg
 
primary health care lecture note about h
primary health care lecture note about hprimary health care lecture note about h
primary health care lecture note about h
 
breastfeedingreal-150526070457-lva1-app6891.pptx
breastfeedingreal-150526070457-lva1-app6891.pptxbreastfeedingreal-150526070457-lva1-app6891.pptx
breastfeedingreal-150526070457-lva1-app6891.pptx
 
548941977-Chapter-Four.pptx ASSESSMENT OF CNS
548941977-Chapter-Four.pptx  ASSESSMENT OF CNS548941977-Chapter-Four.pptx  ASSESSMENT OF CNS
548941977-Chapter-Four.pptx ASSESSMENT OF CNS
 
eatingdisorders-130711052741-phpapp02.pptx
eatingdisorders-130711052741-phpapp02.pptxeatingdisorders-130711052741-phpapp02.pptx
eatingdisorders-130711052741-phpapp02.pptx
 
benefits of breast feeding and important of exclusive of breast feeding
benefits of breast feeding and important of exclusive of breast feedingbenefits of breast feeding and important of exclusive of breast feeding
benefits of breast feeding and important of exclusive of breast feeding
 
OG-IFE-Update_Food-Security-Livelihoods.pptx
OG-IFE-Update_Food-Security-Livelihoods.pptxOG-IFE-Update_Food-Security-Livelihoods.pptx
OG-IFE-Update_Food-Security-Livelihoods.pptx
 
Session4Presentation.ppt
Session4Presentation.pptSession4Presentation.ppt
Session4Presentation.ppt
 
17711.ppt
17711.ppt17711.ppt
17711.ppt
 
14 DOH.ppt
14 DOH.ppt14 DOH.ppt
14 DOH.ppt
 
protein-energymalnutritionnew-111229122250-phpapp01.pptx
protein-energymalnutritionnew-111229122250-phpapp01.pptxprotein-energymalnutritionnew-111229122250-phpapp01.pptx
protein-energymalnutritionnew-111229122250-phpapp01.pptx
 
CHAPTER TWO.pptx
CHAPTER TWO.pptxCHAPTER TWO.pptx
CHAPTER TWO.pptx
 
INTRODUCTION TO PEM.pptx
INTRODUCTION TO PEM.pptxINTRODUCTION TO PEM.pptx
INTRODUCTION TO PEM.pptx
 
Lecture no 1.pptx
Lecture no 1.pptxLecture no 1.pptx
Lecture no 1.pptx
 
integratedmanagementofacutemalnutritionimam-200725060624.pptx
integratedmanagementofacutemalnutritionimam-200725060624.pptxintegratedmanagementofacutemalnutritionimam-200725060624.pptx
integratedmanagementofacutemalnutritionimam-200725060624.pptx
 
43561.ppt
43561.ppt43561.ppt
43561.ppt
 
Essential_Concepts_on_HealthSystems_Management._-_Copy.pptx
Essential_Concepts_on_HealthSystems_Management._-_Copy.pptxEssential_Concepts_on_HealthSystems_Management._-_Copy.pptx
Essential_Concepts_on_HealthSystems_Management._-_Copy.pptx
 
protein-energymalnutritionnew-111229122250-phpapp01.pptx
protein-energymalnutritionnew-111229122250-phpapp01.pptxprotein-energymalnutritionnew-111229122250-phpapp01.pptx
protein-energymalnutritionnew-111229122250-phpapp01.pptx
 

Recently uploaded

Unit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfUnit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfRajjnish1
 
Call {Girls Delhi} Very Low rateVaishali 9711199012 DownLoad PDF
Call {Girls Delhi} Very Low rateVaishali 9711199012 DownLoad PDFCall {Girls Delhi} Very Low rateVaishali 9711199012 DownLoad PDF
Call {Girls Delhi} Very Low rateVaishali 9711199012 DownLoad PDFMs Riya
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyKristineRoseCorrales
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionrgxv72jrgc
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527nagunakhan
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Open Access Research Paper
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样umasea
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxTesfahunTesema
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhidelih Escorts
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证jdkhjh
 
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...Amil baba
 

Recently uploaded (20)

young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
Unit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfUnit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdf
 
Call {Girls Delhi} Very Low rateVaishali 9711199012 DownLoad PDF
Call {Girls Delhi} Very Low rateVaishali 9711199012 DownLoad PDFCall {Girls Delhi} Very Low rateVaishali 9711199012 DownLoad PDF
Call {Girls Delhi} Very Low rateVaishali 9711199012 DownLoad PDF
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copy
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollution
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptx
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
 
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
 

EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment (1).pptx

  • 1. Chapter One 1 Basic Concept of Environmental Impact Assessment (EIA)
  • 2. 1.1 THE CONCEPT OF ENVIRONMENT 2  The environment is surroundings of an individual organism or a community of organisms, ranging on up to the entire biosphere, the zone of Earth that is able to sustain life.  Environment is the surrounding which encompasses all the external conditions influencing development or growth of people, animals, and /or plants.  The natural factors such as land forms, soil, climate, vegetation, minerals, water, air, etc together influence the human factors like demography, economy, culture, social attitudes and institutions.  Therefore, the term environment includes physical, social, cultural, economic and aesthetic dimensions.
  • 3. A. PHYSICAL ENVIRONMENT 3  This includes the physical, chemical and biological factors, both natural as well as man made which include:  land and climate, vegetation, wildlife and natural areas,  surrounding land use and physical character of the area,  infrastructure  air pollution  noise pollution  water pollution levels
  • 4. B. SOCIAL ENVIRONMENT 4  politics ,etc  This include large number of factors such as  population density,  community composition,  social cohesion,  educational factors,  religion,  norms,  values,  sanctions,  governing the people,  family structure,
  • 5. C. ECONOMIC ENVIRONMENT  This includes all economic factors like  employment and unemployment,  levels and sources of income, etc D. Aesthetic environment This subcategory includes factors such as o historical, o archeological and o architecultural objects or sites. 5
  • 6. 1.2 ENVIRONMENTAL INVENTORY  Environmental inventory is a complete description of the environment as it exists in an area where a particular proposed action is being considered. The inventory is compiled from a check of descriptors for:  the physical-chemical environment  biological environment  cultural environment, and  socio-economic environment  Environmental Inventory is a complex description of the env’t as it exists in an area where a particular 6 proposed actions of is being considered.
  • 7. 1.3 Definition of EIA What is EIA? • There are many definitions of EIA. • The following are the sample of some of these definitions which indicate the nature of the process, including; • "an assessment of impacts of a planned activity on the environment" (United Nations) • "EIA is the systematic process of identifying the future consequences of a current or proposed action" (IAIA) • Environmental impact assessment is the methodology or instrument of identifying, analyzing and evaluating and forecasting in advance any impact, be it positive or negative, which results from the implementation of a proposed project or public instruments. 7
  • 8. Definition cont… •"EIA is the systematic, reproducible and interdisciplinary evaluation of the potential effects of a proposed action and its practical alternatives on the physical, biological, cultural and socio-economic attributes of a particular geographical area" (USEPA, 1993) •"a procedure for assessing the potential environmental impacts of a project before it is built, so that these impacts can be properly considered during the decision-making process and so that mitigative measures for detrimental impacts can be defined“"a tool to use in integrated planning of development proposals, policies and programs: (Sadar et al., 1994) •"an activity which identifies, predicts, interprets and communicates information, and proposes ameliorative measures, about impacts of a proposed action or development proposal on human health and the well-being of8 the ecosystem upon which human survival depends" (Sadar et al., 1994)
  • 9. DEFNITION C O N T …  It is also defined as a formal process for identifying the likely effects of particular activities or projects on the biogeographical environment, and on human health and well-being, along with interpreting and communicating information about these likely impacts.  EIA is a management tool, like economic analysis and engineering feasibility studies for official and managers who must make important decisions about major development projects.  From this definition we can understand that EIA is for projects.  To include other things we need Strategi9c Environmental Assessment (SEA) that expands EIA
  • 10. •SEA is a systematic and comprehensive process of evaluating the environmental impacts of a policy, program, and plan prior to their implementation. In short, EIA is for projects and SEA for policies, plans and programs (public instruments). •The definition of the EIA, though includes the impact assessment of all types of programmes, policies, and projects, but it is more certainly applied to the developmental projects, such as the installation of a new industry, large scale animal farming projects, or a power plant, or a major airport, or a major township, etc. •Most of the countries of the world, nowadays, almost mandatorily require preparations of environmental impact assessment and to get clearance from the environmen1t0al authorities before they are granted permissions to proceed with
  • 11. Implications of an EIA Definition EIA is defined as a systematic process of: 11 (identifying,  Determining and managing predicting, interpreting, describing, measuring, integrating, communicating, involving, and controlling) the Potential (or real) impacts (direct and indirect, individual and cumulative, likelihood of occurrence) of Proposed (or existing) human actions (projects, plans, programs, legislation, activities) and their alternatives on the Environment (physical, chemical, biological, ecological, human health, cultural, social, economic, built, and interrelations)
  • 12. Implications of an EIA Definition cont… This definition demonstrates that EIA is a process that blends numerous activities. It shows that EIA 12 a broad definition of the of alternatives, and of proposed encompasses environment, actions. The systematic exploration of interrelationships (e.g., among environmental components, between the proposal and the environment, among alternatives, among impacts) is clearly crucial in EIA.
  • 13. ALL OF THESE DEFINITIONS SHARE THE BASIC CONCEPTS OF:
  • 14. 1.4 Historical Origins of EIA •The main objective, however, was to ensure that public safety and health were adequately protected. •Separate documents, however, were used to be submitted to each of the regulatory agencies involved, such as the water authority, air pollution control authority, etc; and no attempt was made in those earlier years to prepare a comprehensive overview. •The EIA of major developments have been undertaken in developed countries, particularly in USA, Europe, and Japan, etc; since 1950s or so. In the 1960s and 1970s, the environmental movement resulted in environmental groups becoming more active in many countries. Responding to the demands of these pressure groups, the governments accepted the principle that citizens organizations should get an opportunity to participate in the decisio14n making process of those major developments that could have significant environmental impacts.
  • 15. HISTORICAL ORIGINS OF EIA CONT…  Environmental impact assessment was first formally established in the USA in 1969 and has since spread, in various forms, to most other countries  The U.S. National Environmental Policy Act (NEPA) of 1969 was the first legislation to provide a robust framework for allowing all recognized environmental concerns to be addressed simultaneously.  As a consequence, the USA enacted the first comprehensives environment legislation- the National Environmental Policy Act (NEPA) on January 1, 1970.  This US action was followed by Canada, when the Canadian Federal government established an environmental assessment and review process in 1973. Many other countri1e5s then followed suit, particularly after the creation of the UN
  • 16. Historical Origins of EIA cont… •The EIA process has, thus, evolved since the early 1970s. •In the initial years, however, the emphasis was on assessing the impacts on measurable factors, particularly those for which some prescribed standards are available (such as the air quality, water quality, solid waste disposal, etc). •After a few years, the EIAs began to include biological and ecological factors. •More recently, the EIAs have been broadened even further to include socio-economic factors (such as employment opportunities, cultural impacts, recreational factors, etc.), so that the trade-offs amon1 g6 socio-economic and environmental factors could be evaluated.
  • 17. Historical Origins of EIA cont… •It is pertinent to note that NEPA predated the 1972 UN conference in Stockholm where global concerns about the state of the environment emerged, an indicator in its own right of the mould as having the greatest international impact of any American legislation. •Thus, the initiation of EIA indicates that it was environmental crisis in the industrialized countries. •So for developing countries, like ours, it is the right time to apply EIA proactively than after crisis learning from others. 17
  • 18. 1.5 REASONS FOR USING EIA  EIA has been developed as a result of the failure of traditional project appraisal techniques to account for environmental impacts.  Many development projects in the past were designed and constructed in isolation from any consideration of their impacts on the environment, resulting in:  higher costs,  failure of projects,  significant environmental change,and  negative social effects 18
  • 19. 1.6 AIMS OF EIA  Despite differences in individual EIA systems throughout the world, the EIA process shares certain aims:  to provide decision-makers with analysis of the total environment so that decisions can be made based on as nearly complete and balanced information as possible;  to assess and present intangible/unquantifiable effects that are not adequately addressed by cost/benefit analysis and other technical reports; 19
  • 20. AIMS O F EIA CONT…. 20 •To provide information to the public on a proposal; •To formalize the consideration of alternatives to a proposal being considered, in order that the least environmentally harmful means of achieving the given objective can be chosen; •To improve the design of new developments and safeguard the environment through the application of mitigation and avoidance measures
  • 21. 1.7 EIA objectives EIA objectives can be categorized in to long term and short term. The long term objectives include the following: •Conservation and sustainable use of natural resources •Protection and enhancement of the quality of all life forms •Integration of environmental considerations in development planning processes 21
  • 22. The short term objectives include the following: •To assess the nature, intensity and duration of impact of proposed development projects •To promote local community and public participation in the EIA processes of a project •To promote social and cultural considerations in project design •To provide a methodology for prevention and mitigation of expected impacts due to the presence of a project 22
  • 23. 1.8 The purpose of EIA 1. An aid to decision-making The primary purpose of EIA is to ensure that impacts of projects, policy and programs, etc are adequately and appropriately considered and mitigation measures for adverse significant impacts incorporated when decisions are taken. 2. An aid to the formulation of development actions Many developers no doubt see EIA as another set of hurdles to jump before they can proceed with their various activities; the process can be seen as yet another costly and time consuming activity in the permission process. However, EIA can be of great benefit to them, since it can provide a framework for considering location and design issues and environmental issues in parallel. 3.An instrument for sustainable development Underlying such immediate purpose is of course the central and ultimate role of EIA as one of the instruments to achieve sustainable development: Development that dose not cost the Earth! 23
  • 24. 24 Generally, the primary and secondary purposes of EIA include: •safeguarding valued ecological processes and heritage areas; •avoiding irreversible and unacceptable loss and deterioration of natural capital; •ensuring development is adjusted to the potentials and capacities of the resource base; •optimizing natural resource use, conservation and management opportunities; •protecting human health and community well being; •addressing distributional concerns related to the disruption of people and traditional lifestyles; •improving coordination among participating agencies and actions; •fostering better designed and planned development projects, i.e., greener and more cost effective; •empowering community development and building local capacity through public participation; •instilling environmental values and accountabilities across a range of institutions; and •internalizing environmental costs and damages in industry consistent with the polluter pays principle.
  • 25. 1.9 MISCONCEPTIONS ABOUT EIA The introduction of EIA has encountered resistance on the part of many planners and engineers, who have seen it as an unneeded change to traditional practices, in spite of its intended role in improving the project planning process. •EIA has been severely criticized in some parts of the developing world as being inappropriate for application there. •Some of these criticisms include: 25
  • 28. MISCONCEPTIONS ABOUT EIA AND COUNTER ARGUMENTS 1. "EIA is too expensive"  This is not true. Costs of EIA are commonly around 1%, sometimes up to 5% in complex cases of project costs, often within normal variability of project costs.  In contrast, EIA often results in cost saving through reduced changes to the project at later stages, or through identification of easier and more efficient ways to meet project goals.  EIA should be carried out efficiently, just like any other part of the planning process. 28
  • 29. MISCONCEPTIONS AND COUNTER ARGUMENTS CONT… 2. "EIA is just an add-on and occurs too late to do any good" •EIA certainly has less value if done too late in the project cycle; it must be done early enough so that results can be incorporated into the detailed design. •If EIA is done too late, costs for redesign of the project can be high, or the EIA is ignored. 29
  • 30. MISCONCEPTIONS AND COUNTER ARGUMENTS CONT… 3. "EIA delays projects" •If properly phased, EIA should no more delay projects than any part of the planning process. •It should be done in parallel with other activities. 4. "EIA is too complex" •This is not true. •EIA is a simple process. Sometimes, however, the potential impacts can be complex and therefore difficult30to quantify. •The degree to which you must investigate these questions as part of the planning process must be relative to the overall significance of the impacts.
  • 31. ISCONCEPTIONS AND C O U N T E R ARGUMENTS CONT… 5. "EIA doesn't produce useful results" Often this has been true. This can be due to lack of a practical focus, and/or poor training of practitioners. When carried out properly, EIA is a valuable part of project planning. 6. "EIA will be misused to stop development" There have been cases where EIA has been misused to stop development. However, this does not invalidate the use of EIA; it indicates a problem with how it is being coordinated. A properly carried out EIA process is much more likely to generate support for development. 31
  • 32. MISCONCEPTIONS AND COUNTER ARGUMENTS CONT… 7. "We're too poor to afford EIA" This is never true. No country is "too poor" to do its planning properly. Bad planning means failing projects, and these are often projects paid for by the country through development loans. Bad planning means lack of sustainability. Bad planning means extra costs to society. Poor countries can't afford such costs. May be wealthy, developed countries can arguably afford to waste and destroy resources, but poor ones definitely can't. EIA is therefore even more important for develop3 i2 ng countries than for developed ones.
  • 33. 33 1.10 What are the characteristics of a good EIA? The characteristics of environmental impacts vary. Typical parameters to be taken into account in impact prediction and decision-making include: •nature (positive, negative, direct, indirect); •magnitude (severe, moderate, low); •extent/location (area/volume covered, distribution); •timing (during construction, operation, decommissioning, immediate, delayed, rate of change); •duration (short term, long term, intermittent, continuous); •reversibility/irreversibility; •likelihood (probability, uncertainty or confidence in the prediction); and •significance (local, regional, global).
  • 34. 34 1.11 The Legal and Regulatory framework of EIA policies-are plan of actions adopted by an individual or social group -A line of argument rationalizing the course of action of a government Strategies-An elaborate and systematic plan of action Laws-The collection of rules imposed by authority guidelines-A detailed plan or explanation to guide you in setting standards or determining a course of action -A rule or principle that provides guidance to appropriate behavior standards-A basis for comparison; a reference point against which other things can be evaluated -The ideal in terms of which something can be judged Legal framework- Established by or founded upon law or official or accepted rules Convention- (diplomacy) an international agreement Proclamation-A formal public statement
  • 35. Environmental impact assessment needs: •policy/policy making body •legislation/legislation body •directives •enforcement •coordination of the different authorities/ ministries/ bodies involved 35
  • 36. It is also imperative to know/define: •Who conducts EIA? •Who reviews EIA? •Which projects need EIA? •What /which are the guidelines, norms etc to prepare EIA? All the above mentioned points require a well- established legal system pertaining to environmental impacts of development activities in a country or region. 36
  • 37. 37 INTERNATIONAL BANKS’ REQUIREMENTS  The Regional Development Banks, such as the European Bank for Reconstruction and Development (EBRD), the African Development Bank (AfDB) and the Asian Development Bank (ADB), all have environmental policies and guidelines which in most respects resemble those of the World Bank Policies.  The Regional Development Banks use environmental screening to place projects as category A, B or C (ADB & EBRD) or as category I, II or III (AfDB). These categories are similar in principle to those of the World Bank with only minor differences between each Bank. ADB and EBRD procedures are developed from the World Bank procedures (Hydro power development, Environmental effects, 1995)
  • 38. 38 ENVIRONMENTAL POLICY • The broad aim of UNECE’s environment activities is to safeguard the environment and human health, and to promote sustainable development in its member countries in line with Agenda 21. • Agenda 21 calls on all countries to assess the environmental suitability of infrastructure for human settlements, to ensure that relevant decisions are preceded by EIAs and to take into account the costs of any ecological consequences. It also calls on countries  to integrate environmental considerations in decision-making at all levels and in all ministries and to ensure that transparency and accountability prevail when economic or other policies have environmental repercussions.
  • 39. DECLARATION 39 • The principles of the 1972 Stockholm Declaration did not expressly identify EIA as an instrument of national or international policy. • However, the rationale underlying EIA can be identified in the Principle 14, which states: rational planning constitutes an essential tool for reconciling development and environment needs. • In the same spirit, Principle 15 reads: planning must be applied to human settlements and urbanization with a view to avoiding adverse effects on the environment and opting maximum social, economic and environmental benefits for all.
  • 40. • Agenda 21 in Paragraphs 8.5(b) and 10.8(b) also endorses comprehensive analytical procedures for prior and simultaneous assessment of the impacts of decisions, including their environmental impacts and the assessment of costs, benefits and risks, and the systematic application of techniques and procedures for assessing environmental impacts. • EIA is also encouraged in specific Agenda 21 programs, including deforestation, conservation of biodiversity and management of biotechnology. • Agenda 21 supports the need for individuals, groups and organizations to participate in the EIA process. 40
  • 41. WORLD BANK  The safeguard policies of the Bank are operationalizing the 'do good' approach to the Bank investment lending operations and are fundamental in meeting the three pillars of the World Bank Environment Strategy:  Improving the quality of life  Improving the quality of growth  Protecting the quality of the regional and global commons.  Environmental Assessment, one of ten Safeguard Policies, is used in the Bank to examine the potential environmental risks and benefits associated with Bank investment lending operations. It is an essential tool for integrating environmental and social concerns into development policies, programs and projects by providin41g the minimum requirements that all Bank-supported
  • 42. 42 THE WORLD BANK’S REQUIREMENTS  Common to all Regional Development Banks, including the World Bank, is that the responsibility for meeting the environmental requirements rests on the hand of the borrower.  The World Bank has ten “Safeguard Policies” whose primary objective is to ensure that Bank operations do not cause adverse impacts. The ten safeguard policies are grouped into Environment & Social Policies.  Of these ten safeguard policies, three are not applicable as they relate to international law on waters and disputed areas, and the safety of dams.
  • 43. EXAMPLES OF THE WORLD BANK SAFEGUARD POLICIES  OP 4.01 Environmental Assessment • The core requirement of this policy is that screening should be done as early as possible for potential impacts and select appropriate instrument to assess, minimize and mitigate potentially adverse impacts. • EnvironmentalAssessment (EA) ensures that appropriate levels of environmental and social assessment are carried out as part of project design. It also deals with the public consultation process and ensures that the views of PAPs and local NGOs are incorporated as early as possible for CategoryAand B projects. • It is worth noting that OP 4.01 applies to all components of a project with financing from the World Bank, including co-financed components by the Borrower or b4 3 y other funding agencies.
  • 44. OP/BP 4.11 PHYSICAL CULTURAL RESOURCES  Protection of cultural, historical archeological sites  The policy requires the project avoid or mitigate adverse impacts of development projects on physical cultural resources.  The policy bases itself on investigating and inventorying any chance finds and cultural resources potentially affected. It includes mitigation measures when there are adverse impacts on physical cultural resources.  The Borrower assesses the project’s potential impacts on physical cultural resources as an integral component of the EnvironmentalAssessment (EA).  The Bank avoids projects that will significantly damage non- replicable cultural property, and will assist only those projects that are sited or designed so as to prevent such
  • 45. OP/BP 4.12 INVOLUNTARY RESETTLEMENT • Avoid or minimize involuntary resettlement where feasible, exploring all viable alternative project designs. • The policy covers not only physical relocation, but any loss of land or other assets resulting in: (i) relocation or loss of shelter; (ii) loss of assets or access to assets; and (iii)loss of income sources or means of livelihood, whether or not the affected people must move to another location. • Concerning public consultation, resettlers as well as the host communities should be consulted for the successful implementation of the resettlement process. The views of the consulted re-settlers and the host commun4i5ties should be incorporated into the resettlement action plan (RAP) including the list of their choices.
  • 46. 46 BANK’S POLICY ON ACCESS TO INFORMATION • It is a requirement of the Bank that the peoples residing in the project areas have the Right to be informed of the proposed development project(s) in their respective areas. Therefore, prior to project appraisal, the summary of the study of projects along with other relevant information should be disclosed at the Bank’s as well as project area (local) level. • The Disclosure Policy requires that Category B Environmental Assessment reports should be self- standing documents, and thus disclosure is a pre- requisite for appraisal of the project.
  • 47. CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT (ESPOO, 1991)  Environmental threats do not respect national borders. Governments have realized that to avert this danger they must notify and consult each other on all major projects under consideration that might have adverse environmental impact across borders.  The Espoo Convention is a key step to bringing together all stakeholders to prevent environmental damage before it occurs. The Convention entered into force in 1997
  • 48. CONT…  The Espoo (EIA) Convention sets out the obligations of Parties to assess the environmental impact of certain activities at an early stage of planning.  It also lays down the general obligation of States to notify and consult each other on all major projects under consideration that are likely to have a significant adverse environmental impact across boundaries
  • 49. 1.12 Policy Framework for EIA in Ethiopia • Until 1997, Ethiopia did not have a comprehensive environment policy as such. • The Environmental Policy of Ethiopia was issued in 1997 to provide overall guidance in the conservation and sustainable utilization of the country’s environmental resources in general. • The overall objective of the environmental policy is to promote the sustainable social and economic development of the country through, inter alia, sustainable management and utilization of the natural resources of the country. • The specific objectives of the environmental policy seeks to achieve are ensuring the conservation, development and sustainable use of essential ecological processes and life support systems, biological diversity and the empowerment and participation of the people in environmental management. 49 • The environmental policy lays the foundation for EIA in the country.
  • 50. EIA ETHIOPIA CONT •EIA is a recent phenomenon in Ethiopia. •It became a legally required procedure toward the end of year 2002, though emerged de facto before 2002 when a few land developers, including state-owned agencies, approached the Environmental ProtectionAuthority (EPA) to have their environmental impact studies reviewed. •Since the Environmental ImpactAssessment Proclamation № 299 of 2002 was adopted by the House of Peoples’ Representatives, some efforts have been made to implement the law by the EPAand the relevant regional environmental organs, which were themselves established by Proclamation № 295 of 2002. •In spite of these efforts, EIAin Ethiopia has until now remained weak.
  • 51. LE G A L FRAMEWORK F OR EIA IN ETHIOPIA 1. The FDRE Constitution The concept of sustainable development and environmental rights are enshrined in Article 43, 44 and 92 of the Federal Constitution states the following people’s environmental concerns. Article, 43: The Right to Development The peoples of Ethiopia as a whole and each Nation, Nationality and people in Ethiopia in particular have the right to improve living standards and to sustainable development. Nations have the right to participate in national development and, in particular, to be consulted with respect to policies and projects affecting their community. All internationalAgreements and relations concluded, established or conducted by the state shall protect and ensure Ethiopia’s right to sustainable development. The basic aim of development activities shall be to enhance the capacity of citizens for development and to meet basic needs.
  • 52. ARTICLE, 44: ENVIRONMENT RIGHTS All persons have the right to live in a clean and healthy environment. All persons who have been displaced or whose livelihoods have been adversely affected because of state programs have the right to commensurate monetary or alternative means of compensation, including relocation with adequate state assistance. Article, 92: Environmental Objective Government shall endeavor to ensure that all Ethiopians live in a clean and healthy environment. The design and implementation of programs and projects of development shall not damage or destroy the Environment. People have the right to full consultation and the expression of views in the planning and implementation of environmental policies and projects that affect them directly. Government and citizens shall have the due to protect the environment.
  • 53. 2. ENVIRONMENTAL IMPACT ASSESSMENT LAW  Following the provisions of the environment policy, the Ethiopian government introduced the Environmental Impact Assessment Proclamation (Proclamation № 299 of 2002).  The Environmental Impact Assessment Proclamation (federal proc. No. 299/2002): has made it mandatory that development projects are required to be subjected to EIA scrutiny.  It means that EIA is a legal requirement.
  • 54. 3. THE ENVIRONMENTAL POLICY AND STRATEGY •National environmental policies, conservation strategy as well as the Regional Conservation Strategy (RCS) provide a number of guiding principles that indicate and require a strong adherence to sustainable development. Concerning the needs of EIA, the following basic issues are contained indicated in these documents. •An early consideration of environmental impacts in project and program design •Reorganization of public consultation, including mitigation plans and contingency plans •Provision of auditing and monitoring is a legally binding requirement and needs to be institutionalized.
  • 55. 4. INTERNATIONAL CONVENTIONS •In addition to national environmental legislations, the federal democratic republic of Ethiopia is also a party to a number of regional and international conventions and protocols on environment. •The government has established an Environmental Protection Authority, and this Authority is designated as focal point for the implementation of these conventions and protocols. •Accordingly;Article 9(4) of the constitution of the Federal Democratic Republic of Ethiopia provides that once an international agreement is ratified through the accepted or established procedure, it automatically becomes an integral part of the law of the land. •Consequently, the convention and the protocol are the laws of this land.
  • 56. CONVENTIONS CONT… Therefore; the following international conventions and protocols are relevant to any proposed EIAproject I.International Finance Corporation’s (IFC) Guidance on Performance Standards on Social & Environmental Sustainability II. Convention on Biological Diversity III. Framework Convention on Climate Change IV.The United Nations Conventions to Combat Desertification V.The Basel Convention - to control and regulate the Trans boundary movement of hazardous wastes. VI. The Stockholm Convention VII.Convention on International Trade in Endangered Species of Fauna and Flora
  • 57. IV NVIRONMENTAL MPACT SSESSMENT UIDELINE OCUMENT The guide to EIA document that was prepared by EPA provides a background to EIA and environmental management in Ethiopia . The basic objectives of the guide are: •Providing all interested parties with a consistent approach in EIA •Providing background information for the context of EIA in Ethiopia •Assisting proponents in identifying their EIA responsibility •Assisting communities and NGO groups in realizing their environmental rights with regard to EIA •Assisting the authority in determining their roles and responsibility as decision makers in the EIA process:
  • 58. 5 SEC TO R A L PO L I C I E S AND STRATEGIES A. Water Resources Management Policy and Strategies B. National Rural Land Administration and Use (Proclamation No. 456/2005) C. Measures Related to Occupational Health Control D. Proclamations No. 42/1993 Labor Proclamation E.Special Decree No, 20/1990 Council of State Special Decree to Provide for the Registration and Control of Pesticide F.National Biodiversity Policy and Strategies
  • 59. 6 LEGISLATIVE INSTRUMENTS 1. Environmental Impact Assessment (Proclamation No. 299/2002)  This Proclamation (No 299/2002) aims primarily at making the EIAmandatory for categories of projects specified under a directive issued by the EPA. 2.Environmental Pollution Control (Proclamation No. 300/2002) 3. Solid Waste Management (Proclamation No. 513/2007) 4.Labour Proclamation (Proc. No. 377/2003) 5. Public Health Proclamation (Proc. No. 200/2000). 6. Compensation  Proclamation No. 455/2005), the basis and amount of compensation is clearly explained.
  • 60. ETHIOPIAN ENVIRONMENTAL PROTECTION  EPAwas established under the Ministry of Natural Resources Development and Environmental Protection (MNRD&EP), in May 1994.  Later, EPAas environmental regulatory and monitoring body has become independent institution and re- established by proclamation no. 295/2002.  Vision  Ensure that a participatory environmental management for sustainable development governs the use of environmental resources by the present and future generations in each sector at each administrative level.
  • 61. MISSION •Put in place an environmental management system that could support the national development efforts by avoiding duplication of efforts among stakeholders, promoting sustainable utilization of environmental resources and strengthening coordinated but differentiated responsibilities through: · Preparing the State of Environment Report; · Development of environmental strategic plan; · Formulation of environmental laws and standards; · Provision of support for environmental regulatory bodies and implementers; and · Undertaking monitoring and effectiveness evaluation of the environmental system in place
  • 62. OBJECTIVE  The objective of the Authority is to formulate policies, strategies, laws and standards, which foster social and economic development in a manner that enhance the welfare of humans and the safety of the environment sustainably, and to spearhead in ensuring the effectiveness of the process of their implantation.
  • 63. 63 1.13 Guiding principles of EIA The basic principles of EIA are Early application: - protective consideration and integration of environmental concerns at the earliest stages of the conceptualization of the projects, programs or policies. Participation:- appropriate and timely access and opportunity to the process for all interested and affected parts. Issues based:- the focus of an EA is on the resolution of major issues of significant impacts. Alternatives:- all feasible options to a projects, policies, programs or its component like site, processes, products, raw materials, designs, etc including the “no go” option should be considered. Accountability:- refers to answerability of proponent consultant and environmental agencies for their respective roles and responsibilities.
  • 64. principles of EIA cont…. Flexibility: - the assessment process should be able to adapt to deal efficiently with changing circumstances and decision making situation. Credibility: - assessments reviews are under taken with professionalism and objectivity. Time and cost effectiveness: - the assessment process, its out comes and decision taking will ensure environmental protection at the least cost and within reasonable time to society and developer alike. Transparency: - all assessment decisions, and their basis, should be open and accessible to the public. Supportive: - the review and decision making process should enhance and support sustainable development and environmentally friendly investment efforts. Conservation based:- the EIA process should strive to promote conservation based development Practicality: - the information and out puts provided by the 64 assessment process are readily usable in the decision making and planning.
  • 65. 65 1.14 Benefits of EIA The potential benefits of EIA are •saving in capital and operating costs •environmentally sound and sustainable design •increase project acceptance •facilitate better decisions •better compliance with standards •better protection of the environment and human health