1.1. PRESENTED BY- MR.YOGESH A. DENGALE
INTRODUCTION
PERT was developed in the late 1950 in the US the Polaris submarine missile
programme. It has the potential to reduce both the time &cost require to
complete a project.
PERT shows the time taken by each component of project &the total time
required for its completion. PERT breaks down the project into events, activity
&lays down their proper sequence relationship &duration in the form of
network.
PERT is a technique of representing project plan in network. This is represented
in a graphic from known as network diagram.
DEFINITION
The program (or project) evaluation and review technique, commonly
abbreviated PERT, is a statistical tool, used in project management, which was
designed to analyze and represent the tasks involved in completing a given
project &to illustrate the flow of events in a project.
TYPES
There are two types of network diagrams,
Activity on arrow(AOA) –
In the first variant the duration is denoted on arrow connecting diagram nodes.
Suchdiagram type called AOA.
Activity on node(AON)-
In such diagram the information about the task duration is denoted in the
diagram node &each task is represented in the form of rectangle with definite
set of fields.
NEED OFPERT
Prediction of deliverables
Planning resource requirement
Controlling resource allocation
Internal programme review
Performance evaluation
Uniform wide acceptance
Reduction in cost
Saving time
Determination of activities
Elimination of risk in complex activities
Flexibility
Evaluation of alternatives
Useful effective control
Useful decision making
Useful research work
PERT planning involve the following steps:
Determine the proper sequence of the activities
Construct a networkdiagram
Estimate the time require for each activity
Determine the critical path
Identity the specific activity &events
1.Identity Activities &events:
The activities are tasks require to complete the project. The events marking
the beginning &end of one or more activities. It is helpful to list the tasks in a
table that in later steps can be expanded to include on sequence is duration.
2.Determine the proper sequence of the activities :
This steps may be combine with the activity identification steps since the
activity sequence is event for some task. Other tasks may require more
analysis to determine exact order in which they must be perform.
3.Construct a network diagram :
Using the activity sequence information , a network diagram can be drawn
showing the sequence of the serial is &parallel activities .For the original
activity –on-are model, the activities are depicted by arrowed lines &
milestones are depicted bycircles.
4.Estimate the time required for activity :
A distinguishing feature of PERT is its ability to deal with uncertainty in
activity completion times
For each activity , the model usually includes three time estimates;-
Optimistic time:
Generally the shortest time in which the activity can be completed .
Most likely time:
The completion time having the highest probability note that this time is
different for the expectedtime.
Pessimistic time :
The longest time that an activity might require.
Determine the critical path :
The critical path is determine by adding the times for the activities in each
sequence &determining the longest path in project. The critical path
determines the total timerequire.
Update the PERT chart as the project progresses :
Make adjustment in the PERT chart as the project progresses. As the project
unfolds ,the estimated times can be replaced with actual times. The PERT chart
may be modified &improved to reflect the new situation.
ADVANTAGES
Simple to understand anduse.
Show whether the project is on schedule; or behind /ahead of the schedule.
Identify the activities that need closer attention
Determine the flexibility available withactivities
Show potential risk withactivities
Provide good documentation of the project activities
Help to set priorities among activities &resource allocation as per priority
APPLICATION
Used in research and development projects
For developing, tooling and introducing a new project
To plan and execute the acquisition and installation of an electronic system
Development and administration of various training programmes
For management development and organizational planning
LIMITATION
A major disadvantages of PERT has been its emphasis only on time, not on
costs.
The cost of setting up such system are extensive
It is difficult to estimate accurate time &cost of various activities involved in a
project Errors in estimation makes the PERT charts, unreliable as a control aid.
These systems will not help managers to solve all their problem.

More Related Content

Similar to Pert and gantt chart planning techniques under 40 characters

Similar to Pert and gantt chart planning techniques under 40 characters (20)

porject management
porject managementporject management
porject management
 
6- Scheduling & Networking Ch 6 project m.pptx
6- Scheduling & Networking Ch 6 project m.pptx6- Scheduling & Networking Ch 6 project m.pptx
6- Scheduling & Networking Ch 6 project m.pptx
 
Schedule_Module_V.10.ppt
Schedule_Module_V.10.pptSchedule_Module_V.10.ppt
Schedule_Module_V.10.ppt
 
Pert
PertPert
Pert
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Programme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt ChartProgramme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt Chart
 
Advanced project management mod 4
Advanced project management mod 4Advanced project management mod 4
Advanced project management mod 4
 
or-pert
or-pertor-pert
or-pert
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
PERT CPM Intro
PERT CPM IntroPERT CPM Intro
PERT CPM Intro
 
Pert 182
Pert 182Pert 182
Pert 182
 
06 pert cpm
06 pert cpm06 pert cpm
06 pert cpm
 
06 pert cpm (1)
06 pert cpm (1)06 pert cpm (1)
06 pert cpm (1)
 
time mamangement.ppt
time mamangement.ppttime mamangement.ppt
time mamangement.ppt
 
Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)
 
Pert -cpm
Pert  -cpmPert  -cpm
Pert -cpm
 
06 pert cpm
06 pert cpm06 pert cpm
06 pert cpm
 

Recently uploaded

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 

Recently uploaded (20)

ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 

Pert and gantt chart planning techniques under 40 characters

  • 1. Pert and ganttchart 1.1. PRESENTED BY- MR.YOGESH A. DENGALE
  • 2. INTRODUCTION PERT was developed in the late 1950 in the US the Polaris submarine missile programme. It has the potential to reduce both the time &cost require to complete a project. PERT shows the time taken by each component of project &the total time required for its completion. PERT breaks down the project into events, activity &lays down their proper sequence relationship &duration in the form of network. PERT is a technique of representing project plan in network. This is represented in a graphic from known as network diagram.
  • 3. DEFINITION The program (or project) evaluation and review technique, commonly abbreviated PERT, is a statistical tool, used in project management, which was designed to analyze and represent the tasks involved in completing a given project &to illustrate the flow of events in a project.
  • 4. TYPES There are two types of network diagrams, Activity on arrow(AOA) – In the first variant the duration is denoted on arrow connecting diagram nodes. Suchdiagram type called AOA. Activity on node(AON)- In such diagram the information about the task duration is denoted in the diagram node &each task is represented in the form of rectangle with definite set of fields.
  • 5. NEED OFPERT Prediction of deliverables Planning resource requirement Controlling resource allocation Internal programme review Performance evaluation Uniform wide acceptance Reduction in cost Saving time
  • 6. Determination of activities Elimination of risk in complex activities Flexibility Evaluation of alternatives Useful effective control Useful decision making Useful research work
  • 7. PERT planning involve the following steps: Determine the proper sequence of the activities Construct a networkdiagram Estimate the time require for each activity Determine the critical path Identity the specific activity &events
  • 8. 1.Identity Activities &events: The activities are tasks require to complete the project. The events marking the beginning &end of one or more activities. It is helpful to list the tasks in a table that in later steps can be expanded to include on sequence is duration.
  • 9. 2.Determine the proper sequence of the activities : This steps may be combine with the activity identification steps since the activity sequence is event for some task. Other tasks may require more analysis to determine exact order in which they must be perform.
  • 10. 3.Construct a network diagram : Using the activity sequence information , a network diagram can be drawn showing the sequence of the serial is &parallel activities .For the original activity –on-are model, the activities are depicted by arrowed lines & milestones are depicted bycircles.
  • 11. 4.Estimate the time required for activity : A distinguishing feature of PERT is its ability to deal with uncertainty in activity completion times
  • 12. For each activity , the model usually includes three time estimates;- Optimistic time: Generally the shortest time in which the activity can be completed . Most likely time: The completion time having the highest probability note that this time is different for the expectedtime. Pessimistic time : The longest time that an activity might require.
  • 13. Determine the critical path : The critical path is determine by adding the times for the activities in each sequence &determining the longest path in project. The critical path determines the total timerequire.
  • 14. Update the PERT chart as the project progresses : Make adjustment in the PERT chart as the project progresses. As the project unfolds ,the estimated times can be replaced with actual times. The PERT chart may be modified &improved to reflect the new situation.
  • 15. ADVANTAGES Simple to understand anduse. Show whether the project is on schedule; or behind /ahead of the schedule. Identify the activities that need closer attention Determine the flexibility available withactivities Show potential risk withactivities Provide good documentation of the project activities Help to set priorities among activities &resource allocation as per priority
  • 16. APPLICATION Used in research and development projects For developing, tooling and introducing a new project To plan and execute the acquisition and installation of an electronic system Development and administration of various training programmes For management development and organizational planning
  • 17. LIMITATION A major disadvantages of PERT has been its emphasis only on time, not on costs. The cost of setting up such system are extensive It is difficult to estimate accurate time &cost of various activities involved in a project Errors in estimation makes the PERT charts, unreliable as a control aid. These systems will not help managers to solve all their problem.