SlideShare a Scribd company logo
1 of 14
Download to read offline
Service Manual Star T3/T3R UPS
1kVA~3kVA 220VAC
www.allis.com.tw
ST3 1-3kVA Service Manual Rev.1
Content
1. PSDR Introduction............................................................................................................................ 1
1.1 1 kVA PSDR............................................................................................................................ 1
1.2 2/3 kVA PSDR......................................................................................................................... 1
2. Fault and Warning............................................................................................................................ 2
3. Troubleshooting................................................................................................................................ 3
3.1 Quick Start............................................................................................................................... 3
3.2 PFC Analysis:.......................................................................................................................... 4
3.3 Boost Analysis......................................................................................................................... 5
3.4 Inverter Analysis...................................................................................................................... 6
3.5 SPS Module Analysis.............................................................................................................. 7
3.6 1A Charger Module Analysis ................................................................................................... 8
3.7 IGBT Driver Module Analysis .................................................................................................. 9
4. Final testing.................................................................................................................................... 10
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 1 of total 12 September 2006
1. PSDR Introduction
1.1 1 kVA PSDR
1.2 2/3 kVA PSDR
,,
1. Charger Module
2. Fan driver
3. Inverter IGBT Driver Module
4. PFC IGBT Driver Module
5. PFC Control Module
6. Boost IGBT Driver Module
7. SPS Module
8. Boost Control Module
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 2 of total 12 September 2006
2. Fault and Warning
LCD & LED Status /
Audible Alarms
Possible Cause Action
Fault Warning Normal
UPS in Bypass Mode.
The alarm beeps continuously.
AC: OK BATT: OK
TEMP Fail
1. Fan fail.
2. Temperature is
higher than
allowed operation
temperature.
1. Replace the fan.
2. Reduce ambient
temperature or O/P load.
Fault Warning Normal
UPS in Bypass Mode.
Fault LED lights up and the
alarm beeps continuously.
AC: OK BATT: OK
Inverter Fail
1. Inverter circuit
failed.
2. Inverter driver
failed.
3. PFC circuit failed.
4. Output shorted
1. Replace the Inverter
components or driver.
2. Replace the PFC
components or driver.
3. Remove the output
shorted.
Fault Warning Normal
UPS in Normal Mode, but
battery capacity is low.
The alarm beeps once every
second for battery low.
AC: OK BATT: LOW
Normal Mode
1. Charger may
break down.
1. Please replace charger
board.
Fault Warning Normal
UPS stop working.
The alarm beeps continuously.
AC: OK BATT: OK
DC_BUS Fail
1. Boost circuit
failed.
2. Inverter circuit
failed
3. PFC circuit failed
4. BUS circuit failed.
1. Replace the Boost
components.
2. Replace the Inverter
components.
3. Replace the PFC
components.
4. Replace the BUS circuit
components.
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 3 of total 12 September 2006
3. Troubleshooting
3.1 Quick Start
Before any check of UPS, please check the components as listed in the following table. This action could help you find
problem quickly and make sure these components good or not first.
Possible Circuit Block Coded Components Description Failure Mode
BAT FUSE 1K/3K:F1/F2;2K:F1 Fuse Open
I/P FUSE (on PSDR) F3, Fuse Open
2K/3K:D16, D17, REC02
1K:D10, D11, REC1
Diode Short or openPFC Correction
2K/3K:Q09,1K:Q14 IGBT C-E short or open
2K/3K:Q04, Q05, Q06Q07
1K:Q4, Q6, Q10Q11
MOSFET D-S short or openPush-Pull Booster
2K/3K:D05, D06, D07, D08
1K:D12, D13, D14, D15
Power Diode Short or open
Inverter 2K/3K:Q13, Q14, Q15, Q16
1K:Q12, Q13
IGBT C-E short or open
Charger module Q2 MOSFET D-S short or open
D10,D11,D12,D13D15 Power Diode Short or open
SPS module Q201 MOSFET D-S short or open
D202,D203 Power Diode Short or open
If the fuse is open, replacing fuse only, DO NOT mean you have solved the problem. General
speaking, fuse open was caused by other failure of components; therefore, you must find the
real defective components and replace them, before restart the UPS.
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 4 of total 12 September 2006
3. Troubleshooting
3.2 PFC Analysis:
In this section, some components you could check to see if failure occurs on PFC Correction circuit as shown below. Be
aware of F3 fuse open indicates failure of this block. Please replace all faulty components before re-start the UPS.
1kVA-PFC
2/3kVA-PFC
Step Checked components Instrument
function
Reference
Value
Failure Mode
1 F3 Ω Short Open
2 2K/3K:Q09(GS)
1K:Q14(GS)
Ω 46.8kΩ Short or open
3 2K/3K:D16,D17
1K:D10,D11
DIODE 0.418 Short or open
4 2K/3K:REC02 (+,∼),(∼,-)
1K:REC1 (+,∼),(∼,-)
DIODE 0.46 Short or open
Action ltem: If all above-stated components are replaced well and UPS still can’t work, change PFC Module
and PFC IGBT driver module.
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 5 of total 12 September 2006
3. Troubleshooting
3.3 Boost Analysis
General speaking, the most distinct phenomenon of failure on this section is F1 and F2. Open finding this will be very
helpful to repair them.
1kVA-Boost
2/3kVA-Boost
Step Checked components Instrument
function
Reference
Value
Failure Mode
1 F1,F2 Ω short open
2 2K/3K:Q04~Q07 (G.S)
1K:Q4,Q6,Q10,Q11(G.S)
Ω 23.49kΩ short or open
3 2K/3K:D05,D06,D07,D08
1K:D12,D13,D14,D15
DIODE 0.41 short or open
Action ltem:
(1) Make sure the DC fuses with same rating as original ones for replacement. Otherwise, unpredictable
danger might happen.
(2) If all above-stated components are replaced well and UPS still can’t be DC start, change Boost Control
Module.
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 6 of total 12 September 2006
3. Troubleshooting
3.4 Inverter Analysis
1kVA-Inverter
2/3kVA-Inverter
Step Checked components Instrument
function
Reference
Value
Failure Mode
1 2k/3k:Q14,Q13,Q16,Q15 (G,S)
1k:Q12,Q13 (G,S)
Ω 23.5kΩ Short or open
2 2k/3k: D30,D31,D32,D33
1k: D21,D22
Ω 70
46.6
Short or open
Action ltem: If fail condition stated in resistance R110, R106, R117 and R119 of 2/3kVA and R53 and R37 of
1kVA, there is high possibility that the corresponding photo couplers are damaged, change the Inverter IGBT
driver module
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 7 of total 12 September 2006
3. Troubleshooting
3.5 SPS Module Analysis
1 kVA-SPS Module
2/3 kVA-SPS Module
Step Checked components Instrument
function
Reference
Value
Failure Mode
1 Q201(S,D) DIODE 0.42 Short or open
2 U01 (3845) PIN 5-6
PIN 5-7
PIN 5-8
PIN 6-8
Ω 46.7K
38K
4.31K
50.9K
Too low
Action ltem: Even If the input source connected with UPS, the UPS still does not work. The high possible
cause is on SPS Module.
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 8 of total 12 September 2006
3. Troubleshooting
3.6 1A Charger Module Analysis
1 kVA-Charger Module
2/3 kVA-Charger Module
Step Checked components Instrument
function
Reference
Value
Failure Mode
1 Q2(S,D) DIODE 0.45 Short or open
2 U07 (3845) PIN 5-6
PIN 5-7
PIN 4-8
Ω
47K
20K
7.48K
Too low
3 D10.D11,D12,D13,D15 DIODE 0.45 Short or open
Action ltem: UPS can work on bypass Mode normally when the input source connected, but it can not
start-up completely. The high possible cause is on Charger Module.
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 9 of total 12 September 2006
3. Troubleshooting
3.7 PFC / Boost / Inverter IGBT Driver Module Analysis
1 kVA- IGBT Driver Module
2/3 kVA- IGBT Driver Module
Step Checked components Instrument
function
Reference
Value
Failure Mode
1 U701.PIN2/PIN3 DIODE 0.54 Short or open
2 Q702(E.B,E.C)
Q703(B.E,C.E)
DIODE 0.64,1.00 Short or open
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 10 of total 12 September 2006
4. Final testing
After you have replaced all defective components on power stage (PSDR), please follow the steps as below.
Step 1. Connect with control board.
Step 2. Re-plug fan wires into connector FAN1 and FAN2.
1 kVA
Step 1
Step 2
2/3 kVA
Step 1
Step 2
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 11 of total 12 September 2006
4. Final testing
Step 3. Supply DC voltage (96-110Vdc/3 Amp (limited current) for 2/3kVA, 36~41Vdc/3Amp for 1k) with DC power supply
via BAT(+) and BAT(-). Press the switch on front panel for more than 3 seconds, you will see "current limit" for a short time
on the DC power supply for about only 2 seconds, then UPS should be DC start (If UPS does not start successfully, and
LCD display off, replace the above procedure). If UPS fails to start up for several times or DC power supply is on
current-limit state continuously, there must be some defective components exist. Please follow the section 3 trouble
shooting to check again.
Step 4. If the UPS re-start normally, check the DC_BUS and output voltage.
- For 1kVA, DC_BUS: +340~365 and -340~365VDC, deviation between negative and positive voltage should be within
20VDC. Output Voltage: 220/230/240 +/-2%
- For 2kVA, DC_BUS: +340~365 and -340~365VDC, deviation between negative and positive voltage should be within
20VDC. Output Voltage: 220/230/240 +/-2%
- For 3kVA, DC_BUS: +340~365 and -340~365VDC, deviation between negative and positive voltage should be within
10VDC. Output Voltage: 220/230/240 +/-2%
1 kVA
Output Voltage: 220/230/240 +/-2%
-
DC_BUS: + 340~365VDC
DC_BUS: - 340~365VDC
-
Do not connect with AC power source yet.
ST3 1-3kVA Service Manual Rev.1
Allis Electric Page 12 of total 12 September 2006
4. Final testing
2/3 kVA
DC_BUS: + 340~365VDC
-
Output Voltage: 220/230/240 +/-2%
DC_BUS: - 340~365VDC
-
Step 5. Connect with AC power source, then follow the step3 and step4 to check the DC_BUS and output voltage again. If
UPS fails to start up for several times, there must be some defective components exist. Please follow section 3 trouble
shooting to check again.

More Related Content

What's hot

Single Stage Differential Folded Cascode Amplifier
Single Stage Differential Folded Cascode AmplifierSingle Stage Differential Folded Cascode Amplifier
Single Stage Differential Folded Cascode AmplifierAalay Kapadia
 
automatic power factor correction report
automatic power factor correction reportautomatic power factor correction report
automatic power factor correction reportamaljo joju e
 
Teoría y operación ups
Teoría y operación upsTeoría y operación ups
Teoría y operación upsEdgar Escobar
 
Separation of losses in a dc shunt motor
Separation of losses in a dc shunt motorSeparation of losses in a dc shunt motor
Separation of losses in a dc shunt motorsuresh shindhe
 
Rectificacion monofasica uader-2012
Rectificacion monofasica uader-2012Rectificacion monofasica uader-2012
Rectificacion monofasica uader-2012jona silvestri
 
Memory types and logic families
Memory types and logic familiesMemory types and logic families
Memory types and logic familiesJaipal Dhobale
 
Industrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing companyIndustrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing companyShridhar kulkarni
 
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)AHMED MOHAMED HEGAB
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxSveris COE Pandharpur
 
harmonic distortion ppt
harmonic distortion pptharmonic distortion ppt
harmonic distortion pptAditi Tiwari
 
Unit 4 feedback amplifiers
Unit 4 feedback amplifiersUnit 4 feedback amplifiers
Unit 4 feedback amplifiersDr Piyush Charan
 
differential amplifier for electronic
differential amplifier for electronicdifferential amplifier for electronic
differential amplifier for electronicFaiz Yun
 
Transformer vector group_test_conditions
Transformer vector group_test_conditionsTransformer vector group_test_conditions
Transformer vector group_test_conditionsSARAVANAN A
 
Operational Amplifier Design
Operational Amplifier DesignOperational Amplifier Design
Operational Amplifier DesignBharat Biyani
 
Toshiba satellite c660 la 6841p r01
Toshiba satellite c660 la 6841p r01Toshiba satellite c660 la 6841p r01
Toshiba satellite c660 la 6841p r01Fatage Net
 
RF Circuit Design - [Ch2-2] Smith Chart
RF Circuit Design - [Ch2-2] Smith ChartRF Circuit Design - [Ch2-2] Smith Chart
RF Circuit Design - [Ch2-2] Smith ChartSimen Li
 
Transistor unijuntura
Transistor unijunturaTransistor unijuntura
Transistor unijunturaAndrea Storti
 

What's hot (20)

Single Stage Differential Folded Cascode Amplifier
Single Stage Differential Folded Cascode AmplifierSingle Stage Differential Folded Cascode Amplifier
Single Stage Differential Folded Cascode Amplifier
 
automatic power factor correction report
automatic power factor correction reportautomatic power factor correction report
automatic power factor correction report
 
Teoría y operación ups
Teoría y operación upsTeoría y operación ups
Teoría y operación ups
 
Separation of losses in a dc shunt motor
Separation of losses in a dc shunt motorSeparation of losses in a dc shunt motor
Separation of losses in a dc shunt motor
 
Rectificacion monofasica uader-2012
Rectificacion monofasica uader-2012Rectificacion monofasica uader-2012
Rectificacion monofasica uader-2012
 
Memory types and logic families
Memory types and logic familiesMemory types and logic families
Memory types and logic families
 
Industrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing companyIndustrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing company
 
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.Pptx
 
harmonic distortion ppt
harmonic distortion pptharmonic distortion ppt
harmonic distortion ppt
 
Unit 4 feedback amplifiers
Unit 4 feedback amplifiersUnit 4 feedback amplifiers
Unit 4 feedback amplifiers
 
differential amplifier for electronic
differential amplifier for electronicdifferential amplifier for electronic
differential amplifier for electronic
 
Transformer vector group_test_conditions
Transformer vector group_test_conditionsTransformer vector group_test_conditions
Transformer vector group_test_conditions
 
Operational Amplifier Design
Operational Amplifier DesignOperational Amplifier Design
Operational Amplifier Design
 
FINALREPORTOPAMP.docx(1)
FINALREPORTOPAMP.docx(1)FINALREPORTOPAMP.docx(1)
FINALREPORTOPAMP.docx(1)
 
Toshiba satellite c660 la 6841p r01
Toshiba satellite c660 la 6841p r01Toshiba satellite c660 la 6841p r01
Toshiba satellite c660 la 6841p r01
 
Recta de carga para señal
Recta de carga para señalRecta de carga para señal
Recta de carga para señal
 
RF Circuit Design - [Ch2-2] Smith Chart
RF Circuit Design - [Ch2-2] Smith ChartRF Circuit Design - [Ch2-2] Smith Chart
RF Circuit Design - [Ch2-2] Smith Chart
 
Transistor unijuntura
Transistor unijunturaTransistor unijuntura
Transistor unijuntura
 
Folded cascode1
Folded cascode1Folded cascode1
Folded cascode1
 

Similar to St3 1k va-3kva-ups-service-manual

Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewAUTHELECTRONIC
 
Simulation Analysis of Ac/Dc Adapter Under Zero No-Load Power Consumption usi...
Simulation Analysis of Ac/Dc Adapter Under Zero No-Load Power Consumption usi...Simulation Analysis of Ac/Dc Adapter Under Zero No-Load Power Consumption usi...
Simulation Analysis of Ac/Dc Adapter Under Zero No-Load Power Consumption usi...IJPEDS-IAES
 
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 NewOriginal Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 NewAUTHELECTRONIC
 
FOR AUTONICS IC.pdf
FOR AUTONICS IC.pdfFOR AUTONICS IC.pdf
FOR AUTONICS IC.pdfeShikhon
 
Automatic main gate controller
Automatic main gate controllerAutomatic main gate controller
Automatic main gate controllerPROJECTRONICS
 
デザインキット・DCモータ制御回路のインデックス
デザインキット・DCモータ制御回路のインデックスデザインキット・DCモータ制御回路のインデックス
デザインキット・DCモータ制御回路のインデックスTsuyoshi Horigome
 
Original Power Supply IC TNY290PG TNY290P TNY290 DIP-7 New Power Integration
Original Power Supply IC TNY290PG TNY290P TNY290 DIP-7 New Power IntegrationOriginal Power Supply IC TNY290PG TNY290P TNY290 DIP-7 New Power Integration
Original Power Supply IC TNY290PG TNY290P TNY290 DIP-7 New Power IntegrationAUTHELECTRONIC
 
Report on minor project
Report on minor projectReport on minor project
Report on minor projectAnil Maurya
 
06 scr & ujt
06  scr & ujt06  scr & ujt
06 scr & ujtGowtham P
 
Auto Control for Three Phase Induction Motor
Auto Control for Three Phase Induction MotorAuto Control for Three Phase Induction Motor
Auto Control for Three Phase Induction Motorijiert bestjournal
 
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...authelectroniccom
 
Advanced motion controls be12a6
Advanced motion controls be12a6Advanced motion controls be12a6
Advanced motion controls be12a6Electromate
 
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...AUTHELECTRONIC
 
testing purpose for ic testing and othettastinng
testing purpose for ic testing and othettastinngtesting purpose for ic testing and othettastinng
testing purpose for ic testing and othettastinngPvaveen
 
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...Dien Ha The
 

Similar to St3 1k va-3kva-ups-service-manual (20)

Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
 
Simulation Analysis of Ac/Dc Adapter Under Zero No-Load Power Consumption usi...
Simulation Analysis of Ac/Dc Adapter Under Zero No-Load Power Consumption usi...Simulation Analysis of Ac/Dc Adapter Under Zero No-Load Power Consumption usi...
Simulation Analysis of Ac/Dc Adapter Under Zero No-Load Power Consumption usi...
 
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 NewOriginal Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
 
FOR AUTONICS IC.pdf
FOR AUTONICS IC.pdfFOR AUTONICS IC.pdf
FOR AUTONICS IC.pdf
 
Automatic main gate controller
Automatic main gate controllerAutomatic main gate controller
Automatic main gate controller
 
C2000 m en_20120201
C2000 m en_20120201C2000 m en_20120201
C2000 m en_20120201
 
デザインキット・DCモータ制御回路のインデックス
デザインキット・DCモータ制御回路のインデックスデザインキット・DCモータ制御回路のインデックス
デザインキット・DCモータ制御回路のインデックス
 
Original Power Supply IC TNY290PG TNY290P TNY290 DIP-7 New Power Integration
Original Power Supply IC TNY290PG TNY290P TNY290 DIP-7 New Power IntegrationOriginal Power Supply IC TNY290PG TNY290P TNY290 DIP-7 New Power Integration
Original Power Supply IC TNY290PG TNY290P TNY290 DIP-7 New Power Integration
 
AN-9754
AN-9754AN-9754
AN-9754
 
Report on minor project
Report on minor projectReport on minor project
Report on minor project
 
06 scr & ujt
06  scr & ujt06  scr & ujt
06 scr & ujt
 
Auto Control for Three Phase Induction Motor
Auto Control for Three Phase Induction MotorAuto Control for Three Phase Induction Motor
Auto Control for Three Phase Induction Motor
 
Cd00003612
Cd00003612Cd00003612
Cd00003612
 
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
 
Advanced motion controls be12a6
Advanced motion controls be12a6Advanced motion controls be12a6
Advanced motion controls be12a6
 
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
 
Ultisolar LS1024BP LS2024BP Solar Controller user manual
Ultisolar  LS1024BP LS2024BP Solar Controller user manualUltisolar  LS1024BP LS2024BP Solar Controller user manual
Ultisolar LS1024BP LS2024BP Solar Controller user manual
 
Probador de-flybacks
Probador de-flybacksProbador de-flybacks
Probador de-flybacks
 
testing purpose for ic testing and othettastinng
testing purpose for ic testing and othettastinngtesting purpose for ic testing and othettastinng
testing purpose for ic testing and othettastinng
 
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
 

More from sudeep kumar

Electronic devices circuits
Electronic devices circuitsElectronic devices circuits
Electronic devices circuitssudeep kumar
 
Lecture8.0 silicon crystal growth
Lecture8.0 silicon crystal growthLecture8.0 silicon crystal growth
Lecture8.0 silicon crystal growthsudeep kumar
 
Digital satellite television
Digital satellite televisionDigital satellite television
Digital satellite televisionsudeep kumar
 
Lecture dc machines
Lecture dc machinesLecture dc machines
Lecture dc machinessudeep kumar
 

More from sudeep kumar (6)

Electronic devices circuits
Electronic devices circuitsElectronic devices circuits
Electronic devices circuits
 
Lecture8.0 silicon crystal growth
Lecture8.0 silicon crystal growthLecture8.0 silicon crystal growth
Lecture8.0 silicon crystal growth
 
Vikram kaushik
Vikram kaushikVikram kaushik
Vikram kaushik
 
Digital satellite television
Digital satellite televisionDigital satellite television
Digital satellite television
 
2 tv transmitter
2 tv transmitter2 tv transmitter
2 tv transmitter
 
Lecture dc machines
Lecture dc machinesLecture dc machines
Lecture dc machines
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 

St3 1k va-3kva-ups-service-manual

  • 1. Service Manual Star T3/T3R UPS 1kVA~3kVA 220VAC www.allis.com.tw
  • 2. ST3 1-3kVA Service Manual Rev.1 Content 1. PSDR Introduction............................................................................................................................ 1 1.1 1 kVA PSDR............................................................................................................................ 1 1.2 2/3 kVA PSDR......................................................................................................................... 1 2. Fault and Warning............................................................................................................................ 2 3. Troubleshooting................................................................................................................................ 3 3.1 Quick Start............................................................................................................................... 3 3.2 PFC Analysis:.......................................................................................................................... 4 3.3 Boost Analysis......................................................................................................................... 5 3.4 Inverter Analysis...................................................................................................................... 6 3.5 SPS Module Analysis.............................................................................................................. 7 3.6 1A Charger Module Analysis ................................................................................................... 8 3.7 IGBT Driver Module Analysis .................................................................................................. 9 4. Final testing.................................................................................................................................... 10
  • 3. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 1 of total 12 September 2006 1. PSDR Introduction 1.1 1 kVA PSDR 1.2 2/3 kVA PSDR ,, 1. Charger Module 2. Fan driver 3. Inverter IGBT Driver Module 4. PFC IGBT Driver Module 5. PFC Control Module 6. Boost IGBT Driver Module 7. SPS Module 8. Boost Control Module
  • 4. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 2 of total 12 September 2006 2. Fault and Warning LCD & LED Status / Audible Alarms Possible Cause Action Fault Warning Normal UPS in Bypass Mode. The alarm beeps continuously. AC: OK BATT: OK TEMP Fail 1. Fan fail. 2. Temperature is higher than allowed operation temperature. 1. Replace the fan. 2. Reduce ambient temperature or O/P load. Fault Warning Normal UPS in Bypass Mode. Fault LED lights up and the alarm beeps continuously. AC: OK BATT: OK Inverter Fail 1. Inverter circuit failed. 2. Inverter driver failed. 3. PFC circuit failed. 4. Output shorted 1. Replace the Inverter components or driver. 2. Replace the PFC components or driver. 3. Remove the output shorted. Fault Warning Normal UPS in Normal Mode, but battery capacity is low. The alarm beeps once every second for battery low. AC: OK BATT: LOW Normal Mode 1. Charger may break down. 1. Please replace charger board. Fault Warning Normal UPS stop working. The alarm beeps continuously. AC: OK BATT: OK DC_BUS Fail 1. Boost circuit failed. 2. Inverter circuit failed 3. PFC circuit failed 4. BUS circuit failed. 1. Replace the Boost components. 2. Replace the Inverter components. 3. Replace the PFC components. 4. Replace the BUS circuit components.
  • 5. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 3 of total 12 September 2006 3. Troubleshooting 3.1 Quick Start Before any check of UPS, please check the components as listed in the following table. This action could help you find problem quickly and make sure these components good or not first. Possible Circuit Block Coded Components Description Failure Mode BAT FUSE 1K/3K:F1/F2;2K:F1 Fuse Open I/P FUSE (on PSDR) F3, Fuse Open 2K/3K:D16, D17, REC02 1K:D10, D11, REC1 Diode Short or openPFC Correction 2K/3K:Q09,1K:Q14 IGBT C-E short or open 2K/3K:Q04, Q05, Q06Q07 1K:Q4, Q6, Q10Q11 MOSFET D-S short or openPush-Pull Booster 2K/3K:D05, D06, D07, D08 1K:D12, D13, D14, D15 Power Diode Short or open Inverter 2K/3K:Q13, Q14, Q15, Q16 1K:Q12, Q13 IGBT C-E short or open Charger module Q2 MOSFET D-S short or open D10,D11,D12,D13D15 Power Diode Short or open SPS module Q201 MOSFET D-S short or open D202,D203 Power Diode Short or open If the fuse is open, replacing fuse only, DO NOT mean you have solved the problem. General speaking, fuse open was caused by other failure of components; therefore, you must find the real defective components and replace them, before restart the UPS.
  • 6. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 4 of total 12 September 2006 3. Troubleshooting 3.2 PFC Analysis: In this section, some components you could check to see if failure occurs on PFC Correction circuit as shown below. Be aware of F3 fuse open indicates failure of this block. Please replace all faulty components before re-start the UPS. 1kVA-PFC 2/3kVA-PFC Step Checked components Instrument function Reference Value Failure Mode 1 F3 Ω Short Open 2 2K/3K:Q09(GS) 1K:Q14(GS) Ω 46.8kΩ Short or open 3 2K/3K:D16,D17 1K:D10,D11 DIODE 0.418 Short or open 4 2K/3K:REC02 (+,∼),(∼,-) 1K:REC1 (+,∼),(∼,-) DIODE 0.46 Short or open Action ltem: If all above-stated components are replaced well and UPS still can’t work, change PFC Module and PFC IGBT driver module.
  • 7. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 5 of total 12 September 2006 3. Troubleshooting 3.3 Boost Analysis General speaking, the most distinct phenomenon of failure on this section is F1 and F2. Open finding this will be very helpful to repair them. 1kVA-Boost 2/3kVA-Boost Step Checked components Instrument function Reference Value Failure Mode 1 F1,F2 Ω short open 2 2K/3K:Q04~Q07 (G.S) 1K:Q4,Q6,Q10,Q11(G.S) Ω 23.49kΩ short or open 3 2K/3K:D05,D06,D07,D08 1K:D12,D13,D14,D15 DIODE 0.41 short or open Action ltem: (1) Make sure the DC fuses with same rating as original ones for replacement. Otherwise, unpredictable danger might happen. (2) If all above-stated components are replaced well and UPS still can’t be DC start, change Boost Control Module.
  • 8. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 6 of total 12 September 2006 3. Troubleshooting 3.4 Inverter Analysis 1kVA-Inverter 2/3kVA-Inverter Step Checked components Instrument function Reference Value Failure Mode 1 2k/3k:Q14,Q13,Q16,Q15 (G,S) 1k:Q12,Q13 (G,S) Ω 23.5kΩ Short or open 2 2k/3k: D30,D31,D32,D33 1k: D21,D22 Ω 70 46.6 Short or open Action ltem: If fail condition stated in resistance R110, R106, R117 and R119 of 2/3kVA and R53 and R37 of 1kVA, there is high possibility that the corresponding photo couplers are damaged, change the Inverter IGBT driver module
  • 9. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 7 of total 12 September 2006 3. Troubleshooting 3.5 SPS Module Analysis 1 kVA-SPS Module 2/3 kVA-SPS Module Step Checked components Instrument function Reference Value Failure Mode 1 Q201(S,D) DIODE 0.42 Short or open 2 U01 (3845) PIN 5-6 PIN 5-7 PIN 5-8 PIN 6-8 Ω 46.7K 38K 4.31K 50.9K Too low Action ltem: Even If the input source connected with UPS, the UPS still does not work. The high possible cause is on SPS Module.
  • 10. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 8 of total 12 September 2006 3. Troubleshooting 3.6 1A Charger Module Analysis 1 kVA-Charger Module 2/3 kVA-Charger Module Step Checked components Instrument function Reference Value Failure Mode 1 Q2(S,D) DIODE 0.45 Short or open 2 U07 (3845) PIN 5-6 PIN 5-7 PIN 4-8 Ω 47K 20K 7.48K Too low 3 D10.D11,D12,D13,D15 DIODE 0.45 Short or open Action ltem: UPS can work on bypass Mode normally when the input source connected, but it can not start-up completely. The high possible cause is on Charger Module.
  • 11. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 9 of total 12 September 2006 3. Troubleshooting 3.7 PFC / Boost / Inverter IGBT Driver Module Analysis 1 kVA- IGBT Driver Module 2/3 kVA- IGBT Driver Module Step Checked components Instrument function Reference Value Failure Mode 1 U701.PIN2/PIN3 DIODE 0.54 Short or open 2 Q702(E.B,E.C) Q703(B.E,C.E) DIODE 0.64,1.00 Short or open
  • 12. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 10 of total 12 September 2006 4. Final testing After you have replaced all defective components on power stage (PSDR), please follow the steps as below. Step 1. Connect with control board. Step 2. Re-plug fan wires into connector FAN1 and FAN2. 1 kVA Step 1 Step 2 2/3 kVA Step 1 Step 2
  • 13. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 11 of total 12 September 2006 4. Final testing Step 3. Supply DC voltage (96-110Vdc/3 Amp (limited current) for 2/3kVA, 36~41Vdc/3Amp for 1k) with DC power supply via BAT(+) and BAT(-). Press the switch on front panel for more than 3 seconds, you will see "current limit" for a short time on the DC power supply for about only 2 seconds, then UPS should be DC start (If UPS does not start successfully, and LCD display off, replace the above procedure). If UPS fails to start up for several times or DC power supply is on current-limit state continuously, there must be some defective components exist. Please follow the section 3 trouble shooting to check again. Step 4. If the UPS re-start normally, check the DC_BUS and output voltage. - For 1kVA, DC_BUS: +340~365 and -340~365VDC, deviation between negative and positive voltage should be within 20VDC. Output Voltage: 220/230/240 +/-2% - For 2kVA, DC_BUS: +340~365 and -340~365VDC, deviation between negative and positive voltage should be within 20VDC. Output Voltage: 220/230/240 +/-2% - For 3kVA, DC_BUS: +340~365 and -340~365VDC, deviation between negative and positive voltage should be within 10VDC. Output Voltage: 220/230/240 +/-2% 1 kVA Output Voltage: 220/230/240 +/-2% - DC_BUS: + 340~365VDC DC_BUS: - 340~365VDC - Do not connect with AC power source yet.
  • 14. ST3 1-3kVA Service Manual Rev.1 Allis Electric Page 12 of total 12 September 2006 4. Final testing 2/3 kVA DC_BUS: + 340~365VDC - Output Voltage: 220/230/240 +/-2% DC_BUS: - 340~365VDC - Step 5. Connect with AC power source, then follow the step3 and step4 to check the DC_BUS and output voltage again. If UPS fails to start up for several times, there must be some defective components exist. Please follow section 3 trouble shooting to check again.