4. Team 1 - Hangzhou
4 12/13/2014
1. Project overview
Collocation Data Center
5. Team 1 - Hangzhou
5 12/13/2014
Rack
Storage
Rack
Unit
Storage
Internet
Additional
Racks
Customer
Racks
Additional
Rack Units
Customer
Rack Units
Not recommended in China
Price sensitive,
low security
clients:
Office buildings
Head offices
Small offices
Start-ups
Branch offices
Shops
7. Team 1 - Hangzhou
7 12/13/2014
2.1 Disaster protection
Box in box construction:
The outer box is equipped with dewatering
pumps.
The inner box is completely hermetically sealed,
ball bearing mounted and equipped with an
carbon dioxide fire fighting system.
Best possible protection against:
โข Earthquakes
โข Typhoons
โข Flood
โข Fire
Aerial perspective:
Lateral perspective:
~~
8. Team 1 - Hangzhou
8 12/13/2014
2.2 Physical security
โข Electronic Access Control System (ACS)
โข Alarms
โข Cameras
โข Data center security staff
โข Low-key appearance
โข Limited entry points
โข Anti-passback and man-traps
โข Layers of security
Alternative power supply:
โข Battery back-up
โข Turbine Power Generators
Layers of security:
Perimeter
Security
Facility
Controls
Computer
Room
Controls
Cabinet
Controls
9. Team 1 - Hangzhou
9 12/13/2014
2.3 Digital security
โข Data back-up
โข Data double allocation to avoid failure
โข Encryption
โข Monitoring
After installation of clientโs systems in the racks,
special monitoring software will be introduced in
order to control the activities of customers
> legal check
10. Team 1 - Hangzhou
10 12/13/2014
2.4 Security procedures
โข Security Scorecard
โข Monthly basis
โข Physical Risk Security
โข Information Risk Security
โข External Auditing
โข Information Security
โข Overall risk assessment
โข Social engineering
โข Staff training
โข Incident response
โข Response plan and stand-by team
(CERT)
Security Scorecard example:
Training:
%
Disaster recovery:
%
Incident handling:
%
Policy:
%
Patch:
%
Vulnerability:
%
12. Team 1 - Hangzhou
12 12/13/2014
3.1 Reasoning
โข Issues:
โข Nearly 2/3 of the energy produced by
burning coal or fossil fuel is wasted
โข Power consumption constitutes the
biggest cost for data centres
โข Enormous amount of water needed to
cool data centres
โข Challenges:
โข Balance growth and consolidation
โข Find ways to make data centre more
efficient
Issues facing data center
manager (in %)
0 5 10 15 20 25
Energy cost
Power density
Space constraints
Heat density
13. Team 1 - Hangzhou
13 12/13/2014
3.2 TRI Concept
โข It means using the energy that is wasted from
other operational processes.
โข Purpose:
โข POWER
โข HEAT
โข COOLING
โข Benefit:
โข It improves efficiency and reduce
operating costs
Fuel
100%
Trigeneration
Line Loss 2%
Heat Loss 13%
Electricity 30%
Cooling Heat 55%
14. Team 1 - Hangzhou
14 12/13/2014
3.3 Modular concept
โข Data Centre On Demand
โข Purpose:
โข We need to be ready for on demand
expansion possibilities.
โข Partnering with Huawei who offers modular
solutions to increase space and capacity.
โEnterprises are dealing with a continual data
deluge and have to find ways to expand their
capacity quickly and efficientlyโ
- Kevin St Cyr
15. Team 1 - Hangzhou
15 12/13/2014
3.4 Measuring efficiency
โข Metrics are needed in order to keep track the
progress in reaching the targets of efficiency
โข Power Usage Efficiency (PUE)
โข Carbon Usage Effectiveness (CUE)
โข Water Usage Effectiveness (WUE)
ํํํธ =
ํํํกํํ ํนํํํํํํกํฆ ํธํํํํํฆ
ํผํ ํธํํขํํํํํํก ํธํํํํํฆ
ํถํํธ =
ํดํํํขํํ ํถํ2 ํธํํํ ํ ํํํํ ํํฆ ํํํกํํ ํทํํกํ ํถํํํกํํ ํธํํํํํํํํํฆ
ํผํ ํธํํขํํํํํํก ํธํํํํํฆ
ํํํธ =
ํดํํํขํํ ํถํ2 ํํํกํํ ํถํํํ ํขํํํกํํํ ํํ ํนํํํํํํกํฆ
ํผํ ํธํํขํํํํํํก ํธํํํํํฆ
16. Team 1 - Hangzhou
16 12/13/2014
4. Projections
17. Team 1 - Hangzhou
17 12/13/2014
4.1 Timeline
Digital Security
Box construction Physical Security
1 2 3 4 5 6 7 8 9
TRI Implementation
18. 4.2 Budget
Team 1 - Hangzhou
18 12/13/2014
2% 5%
8%
10%
15%
30%
30%
Installation
Power Supply
(UPS)
Equipment
(racks/wiring)
Digital Security
Box Construction
Tri-Generation
Installation
Physical Security
Co-location data center
Provide space, power, cooling, and physical security for the server, storage, wiring equipment, and bandwidth rental to firms
Connect customers to a variety of telecommunications and network service providers
Building construction complete
WOFE License in progress