BUS BAR PROTECTION
Sumeet Ratnawat
NCA Indore
OBJECTIVE OF STATION PROTECTION
 To protect all such elements or sections in
a substation which are not covered either
under line protection or equipment
protection
Station protection include
 Bus Bar protection
 LBB(Local Breaker back-Up) protection
CT CORES
 CORE 1  BUS BAR CHECK ZONE
 CORE 2  BUS BAR MAIN ZONE
 CORE 3  METERING
 CORE 4  MAIN I LINE PROTECTION
 CORE 5  LBB & MAIN II LINE
PROTECTION
 In Absence Of BUSBAR Protection,
Fault Clearance takes place
in Zone II of Distance Relay by
Remote End Tripping
 This Means Slow & Unselective Tripping
and wide spread blackout
NEED FOR BUS BAR PROTECTION
 Minimizing damage at fault location
 Maintaining system stability
 Localizing isolation to avoid wide
spread disruption
 Delayed clearance create shock to inter
connected equipment like Generator shaft
and windings of Transformer
NEED FOR BUS BAR PROTECTION
 High speed operation
 Selectivity – shall isolate the faulty bus bar only
 Stability – stable for through faults upto 40 KA
fault level
 Reliability – Check feature
 Applicable for any type of bus bar protection
 Shall provide zone indication
REQUIREMENT OF BUS BAR PROTECTION
 Continuous supervision for CT Secondaries
against any possible Open Ckt.
 In case of detection of any Open Circuiting of CT
secondary, after a time delay, the affected zone
of protection shall be rendered(provide) in-
operative and an alarm initiated.
REQUIREMENT OF BUS BAR PROTECTION
 Bus bar protection must be provided in all new 400kV and
220kV Substations as well as Generation Switch Yards
 For existing substations, provision of bus bar protection is
considered a must at 400kV level and for 220kV level it is
essential at substations having multiple feed.
 In case of radially fed 220kv substations, having more
than one bus it is desirable to have bus bar protection but
is not a must
RECOMMENDATIONS FOR PROVIDING BUS BAR
PROTECTION
BASICS OF BUSBAR PROTECTION
NEED FOR BUSBAR PROTECTION
In Its Absence Fault Clearing Takes Place In Zone-2 Of Distance Relay By Remote End Tripping. this means
slow and unselective tripping and wide spread blackout.
EFFECT OF DELAYED CLEARENCE
 Greater damage at fault point.
 Indirect shock to connected equipment like shafts of generator and windings of transformer.
BASIC THEORY
Kirchoff’s current law states that the sum of the currents entering a given node must be equal to the currents
leaving at that node.
TYPES OF BUS BAR PROTECTION
 Low Impedance
 High Impedance
Both use Circulating Current Differential
Principle - To isolate the entire bus bar section
by disconnecting all the feeders connected to
the bus.
HIGH SPEED DIFFERENTIAL PROTECTION
Simple Current Differential Circuit:
Simple Current Differential Circuit with Bus Fault
Simple Current Differential Circuit with Close in Line Fault
Simple Current Differential Circuit with Restraint Coils and a Close
Line in Fault
Simple
High Impedance Differential Relays ( Only Phase A shown)
Supervisory Circuit for Checking Bus Differential Protection
Typical Instantaneous Over-current Relay
IDMT Characteristic of a Relay
Bus Bar Protection

More Related Content

What's hot

Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
ashwin fcc
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
michaeljmack
 
Fundamentals of Power System protection by Y.G.Paithankar and S.R.Bhide
Fundamentals of Power System protection by Y.G.Paithankar and S.R.BhideFundamentals of Power System protection by Y.G.Paithankar and S.R.Bhide
Fundamentals of Power System protection by Y.G.Paithankar and S.R.Bhide
Sourabh Ghosh
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATION
Md Sarowar Alam
 

What's hot (20)

Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.ppt
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protection
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 
Protective relay
Protective relay Protective relay
Protective relay
 
Ipsa mv relay co-ordiantion shaik adam
Ipsa  mv relay  co-ordiantion shaik adamIpsa  mv relay  co-ordiantion shaik adam
Ipsa mv relay co-ordiantion shaik adam
 
Tutorial on Distance and Over Current Protection
Tutorial on Distance and Over  Current ProtectionTutorial on Distance and Over  Current Protection
Tutorial on Distance and Over Current Protection
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
Alternator protection
Alternator protectionAlternator protection
Alternator protection
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)
 
Power system protection
Power system protectionPower system protection
Power system protection
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Fundamentals of Power System protection by Y.G.Paithankar and S.R.Bhide
Fundamentals of Power System protection by Y.G.Paithankar and S.R.BhideFundamentals of Power System protection by Y.G.Paithankar and S.R.Bhide
Fundamentals of Power System protection by Y.G.Paithankar and S.R.Bhide
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Busbar protection LEC 1
Busbar protection  LEC 1Busbar protection  LEC 1
Busbar protection LEC 1
 
Circuit breakers
Circuit breakers Circuit breakers
Circuit breakers
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATION
 

Viewers also liked

Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
Priten Vasa
 
Generator protection by a. kato
Generator protection by a. katoGenerator protection by a. kato
Generator protection by a. kato
Agrey Kato
 
Electrical Substations and Switchyard Design
Electrical Substations and Switchyard DesignElectrical Substations and Switchyard Design
Electrical Substations and Switchyard Design
Living Online
 

Viewers also liked (14)

Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma
 
Er rahul sharma feeder protection
Er rahul sharma feeder protectionEr rahul sharma feeder protection
Er rahul sharma feeder protection
 
protection and relay scheme
protection and relay schemeprotection and relay scheme
protection and relay scheme
 
Generator protection
Generator protectionGenerator protection
Generator protection
 
Electricity act 22 4-13
Electricity act 22 4-13Electricity act 22 4-13
Electricity act 22 4-13
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Transducers by bhushan kumbhalkar
Transducers by bhushan kumbhalkarTransducers by bhushan kumbhalkar
Transducers by bhushan kumbhalkar
 
E ball technology by Gayatri Kumbhalkar
E ball technology by Gayatri KumbhalkarE ball technology by Gayatri Kumbhalkar
E ball technology by Gayatri Kumbhalkar
 
Generator protection by a. kato
Generator protection by a. katoGenerator protection by a. kato
Generator protection by a. kato
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
 
Cloude computing By Gayatri Kumbhalkar
Cloude computing By Gayatri KumbhalkarCloude computing By Gayatri Kumbhalkar
Cloude computing By Gayatri Kumbhalkar
 
Electrical Substation and Switchyard Design
Electrical Substation and Switchyard DesignElectrical Substation and Switchyard Design
Electrical Substation and Switchyard Design
 
Electrical Substations and Switchyard Design
Electrical Substations and Switchyard DesignElectrical Substations and Switchyard Design
Electrical Substations and Switchyard Design
 
Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breaker
 

Similar to Bus Bar Protection

switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamlesh
Kamlesh Vala
 
1 residual current circuit breaker (rccb) ( elcb)
1 residual current circuit breaker (rccb) ( elcb)1 residual current circuit breaker (rccb) ( elcb)
1 residual current circuit breaker (rccb) ( elcb)
nikeshdubey
 
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).pptos-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
Thien Phan Bản
 
Substationoverview
Substationoverview Substationoverview
Substationoverview
sailusree
 

Similar to Bus Bar Protection (20)

17648763-CBIP-Recommondations.pdf
17648763-CBIP-Recommondations.pdf17648763-CBIP-Recommondations.pdf
17648763-CBIP-Recommondations.pdf
 
Busbar Blocking System
Busbar Blocking SystemBusbar Blocking System
Busbar Blocking System
 
220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur 220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamlesh
 
1 residual current circuit breaker (rccb) ( elcb)
1 residual current circuit breaker (rccb) ( elcb)1 residual current circuit breaker (rccb) ( elcb)
1 residual current circuit breaker (rccb) ( elcb)
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
newswitchgearandprotection-130925105559-phpapp02.pptx
newswitchgearandprotection-130925105559-phpapp02.pptxnewswitchgearandprotection-130925105559-phpapp02.pptx
newswitchgearandprotection-130925105559-phpapp02.pptx
 
POWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATIONPOWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATION
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
VOCATIONAL TRAINING FROM SECL , SOHAGPUR , KHAIRHA MINE , PPT (POWER POINT PR...
 
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).pptos-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgear
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
 
L.v tech presentation 2
L.v tech presentation 2L.v tech presentation 2
L.v tech presentation 2
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Substationoverview
Substationoverview Substationoverview
Substationoverview
 
Dc mini-breaker
Dc mini-breakerDc mini-breaker
Dc mini-breaker
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 

More from Sumeet Ratnawat

More from Sumeet Ratnawat (6)

Contunity process in Indian Railway
Contunity process in Indian RailwayContunity process in Indian Railway
Contunity process in Indian Railway
 
Auto transformer
Auto transformerAuto transformer
Auto transformer
 
Infrared rays
Infrared rays  Infrared rays
Infrared rays
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 
Protection of transformer
Protection of transformerProtection of transformer
Protection of transformer
 

Recently uploaded

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Bus Bar Protection

  • 1. BUS BAR PROTECTION Sumeet Ratnawat NCA Indore
  • 2.
  • 3. OBJECTIVE OF STATION PROTECTION  To protect all such elements or sections in a substation which are not covered either under line protection or equipment protection Station protection include  Bus Bar protection  LBB(Local Breaker back-Up) protection
  • 4. CT CORES  CORE 1  BUS BAR CHECK ZONE  CORE 2  BUS BAR MAIN ZONE  CORE 3  METERING  CORE 4  MAIN I LINE PROTECTION  CORE 5  LBB & MAIN II LINE PROTECTION
  • 5.  In Absence Of BUSBAR Protection, Fault Clearance takes place in Zone II of Distance Relay by Remote End Tripping  This Means Slow & Unselective Tripping and wide spread blackout NEED FOR BUS BAR PROTECTION
  • 6.  Minimizing damage at fault location  Maintaining system stability  Localizing isolation to avoid wide spread disruption  Delayed clearance create shock to inter connected equipment like Generator shaft and windings of Transformer NEED FOR BUS BAR PROTECTION
  • 7.  High speed operation  Selectivity – shall isolate the faulty bus bar only  Stability – stable for through faults upto 40 KA fault level  Reliability – Check feature  Applicable for any type of bus bar protection  Shall provide zone indication REQUIREMENT OF BUS BAR PROTECTION
  • 8.  Continuous supervision for CT Secondaries against any possible Open Ckt.  In case of detection of any Open Circuiting of CT secondary, after a time delay, the affected zone of protection shall be rendered(provide) in- operative and an alarm initiated. REQUIREMENT OF BUS BAR PROTECTION
  • 9.  Bus bar protection must be provided in all new 400kV and 220kV Substations as well as Generation Switch Yards  For existing substations, provision of bus bar protection is considered a must at 400kV level and for 220kV level it is essential at substations having multiple feed.  In case of radially fed 220kv substations, having more than one bus it is desirable to have bus bar protection but is not a must RECOMMENDATIONS FOR PROVIDING BUS BAR PROTECTION
  • 10. BASICS OF BUSBAR PROTECTION NEED FOR BUSBAR PROTECTION In Its Absence Fault Clearing Takes Place In Zone-2 Of Distance Relay By Remote End Tripping. this means slow and unselective tripping and wide spread blackout. EFFECT OF DELAYED CLEARENCE  Greater damage at fault point.  Indirect shock to connected equipment like shafts of generator and windings of transformer. BASIC THEORY Kirchoff’s current law states that the sum of the currents entering a given node must be equal to the currents leaving at that node.
  • 11. TYPES OF BUS BAR PROTECTION  Low Impedance  High Impedance Both use Circulating Current Differential Principle - To isolate the entire bus bar section by disconnecting all the feeders connected to the bus.
  • 12. HIGH SPEED DIFFERENTIAL PROTECTION Simple Current Differential Circuit:
  • 13. Simple Current Differential Circuit with Bus Fault
  • 14. Simple Current Differential Circuit with Close in Line Fault
  • 15. Simple Current Differential Circuit with Restraint Coils and a Close Line in Fault Simple
  • 16. High Impedance Differential Relays ( Only Phase A shown)
  • 17. Supervisory Circuit for Checking Bus Differential Protection